Loading...
HomeMy WebLinkAboutResolution - 2009-R0184 - Change Order To Contract - Eagle Contracting LP - SE Water Reclamation Plant - 05/14/2009Resolution No. 2009-RO184 May 14, 2009 Item No. 5.22 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock is hereby authorized and directed to execute a Change Order #5 and any associated documents with Eagle Contracting, LP, of' Keller, Texas, for changes to the contract Southeast Water Reclamation Plant improvements per contract ITB 07-730-BM, including various changes, including repair of a leaking 12-inch water line, excavation of the Plant #3 filter complex and UV Disinfection Basin, demolition of existing utilities and pressure testing of the grit suction line at the Headworks Building, which Change Order #5 and any associated documents are attached hereto as Exhibit A and made a part hereof for all intents and purposes. Passed by the City Council this 14th day of may r- Aa-- TOM MARTIN, MAYOR ATTEST: cbeaca Garza, City Secretary { APPh')VED AS O CONTENT: ood ankh Chief at tilities Engineer APPROVED AS TO FORM: , on Vandiv r, ►ty Attorney DDresi EagleCon-00#5SEwaler009 Res March 13, 2009 CITY OF LUBBOCK CHANGE ORDER Change Order #: 5 Contractor: Eagle Contracting, L.P. Date: I April 3, 2009 BID/ITB #: 07-730-BM Contract #: I 8119 { Project Name: I Southeast Water Reclamation Plant Improvement Change Order within the scope of the contract means a Change Order that DOES NOT ALTER THE NATURE OF THE THING TO BE CONSTRUCTED AND THAT IS AN INTEGRAL PART OF THE PROJECT OBJECTIVE. After performance of a construction contract begins, Change Orders may be approved if necessary to 1) make changes in plans or specifications; or 2) decrease or increase the quantity of work to be performed or materials, equipment, or supplies to be furnished. Description of change (alteration, deviation, addition, or deletion) caused by conditions encountered during construction not covered by the specifications and drawings or theproject (attach additional pages if necessary): This change Order includes the repair of a leaking 12-inch potable water line, rerouting of the chlorine line in the excavation area of the Plant 3 Filter Complex and UV Disinfection Basin and demolition of the existing utilities, and pressure testing of the grit suction line at the Headworks building. The total cost of this change order is $23,353.02. The new contract substantial completion date will be September 6, 2011. Change Orders must either be negotiated in the best interest of the City of Lubbock or put out for public bid by the Purchasing Department. Where the Change Order is negotiated, the Change Order must be fully documented and itemized as to costs, including material quantities, material costs, taxes, insurance, employee benefits, other related costs, profit and overhead. ITEMIZED COSTS MUST BE FULLY DOCUMENTED AND ATTACHED TO THIS FORM. ITEM DESCRIPTION AMOUNT A. ORIGINAL CONTRACT VALUE: $ 43,520,000.00 B. AMOUNT OF THIS CHANGE ORDER: Council approval required if over $25,000 $ 23,353.02 C. PERCENT OF CONTRACT VALUE THIS CHANGE ORDER (B/A): 0,053% D. AMOUNT OF PREVIOUS CHANGE ORDERS: $ 377,7 t0.73 E. TOTAL AMOUNT OF ALL CHANGE ORDERS (B+D): $ 401,063.75 F. PERCENT OF CONTRACT OF ALL CHANGE ORDERS (EIA): 25%Maximum 0.922% G. NEW CONTRACT AMOUNT (A+E): $ 43,921,063.75 It is mutually agreed that the above dollar amount and the time extension, as applicable, as set forth in this Change Order constitutes full compensation to the Contractor for all costs, expenses and damages to the Contractor, whether direct, consequential or otherwise, in anyway incident to, or arising out of or resulting directly or indirectly; from the work performed or modified by the Contractor under this Change Order. This Change Order is not valid without the following signatures tnlease sign in order and return 3 originals with Contract Cover Sheet to Purchasir and CoukactManamentent De arlrnent : (1) CO OR Date (2) PROJECT ARCHrrBCTlENGINEER Date Approved as to Cont Approved as to Form: ) OWNE 'S PRESENTATIVE D to (4)"C ATTOR . Date oI (5) CA -PIT PROJECTS MANAGER Date (6) URCHASIN D CONTRACT MANAGER Date Change Orders over $25,000 require a Contract Cover Sheet and the following signatures: CITY Ccx 5/14/09 A 5/14/09 (7) MAVbk Date (8) CITY SECRETARY Date Council Date:. May 14, 2009 Agenda Item #: 5.22 Resolution �#-_ , 909-110184 PUR-045 (Rev 02/06) Resolution No. 2009 R0184 March 9, 2009 Black & Veatch Corp. 9441 LB7 Freeway — Suite 114 Dallas, Texas 75243 Attn: Ms. Laura Stratton RE: Southeast Water Reclamation Plant Improvements Contract ITB # 07-730-BM — Project # 92126 The City of Lubbock, Texas Black & Veatch Corporation Subj.: Proposed Contract Modification (CMR-11) — Locate and Repair Ieak in the existing 12" PW Line to the West of the Existing Wash Water Tank. Dear Laura, As instructed by the Engineer, Eagle Contracting has located a leak in the existing 12" PW Line to the West of the existing Wash Water Tank. The Total Lump Sure Amount of this Time & Material work is Two Thousand Three Hundred and Ninety Three Dollars and Fifteen Cents ($2,393.15). Please refer to the attached Time & Material worksheet. With Kin e t Re ds, G rant . Project Manager cc: File (Proposals) & Field P.Q. Sox 1600 Keller, Texas 76244 Metro (817) 379-1897 Metro (817) 379-0610 Fax Eagle Contracting, LP. SEWRP - Lubbock Date: March 9, 2009 Job No. 171 Proposal: CMR-11 Work Description: Fixed leak in existing 12" PW line West of the Wash Water Tank Ref: Time & Material Work Requested by the Owner's Representative-B&V MATERIAL TOTAL LABOR TOTAL UNIT PRICE MATERIAL UNIT PRICE LABOR ACTIVITY 01IANTITY IINITS ciiarnrrtanrr .T1 % I Repair leaking 12" PW line - West of a Existing Wash Water Tank Labor to locate leak and Fix Line 26 mhs 0.00 16.70 434.20 with a SS Repair Clamp 0.00 0.00 Purchase SS Repair Clamp 1 ea 1,063.15 1,063.15 0.00 Purchase Gravel Encasement 4 Ins 15.50 62.00 0.00 15 feet of Polywrap Pipe Encasement 1 Is 5.00 5.00 0.00 Rubber Tired BackhoelLoader Fuel, Oil & Grease - 30% Equip.Rent 0.14 1 m0 Is 1,200.00 168.00 168.00 50.40 0.00 0.00 Small Tools - 5% of Labor 1 Is 434.20 21.71 0.00 I I 0.00 0.00 0.00 1,370.26I TOTAL LABOR 434.20 0.00 TOTAL LABOR W10 BURDEN 434.20 LABOR BURDEN/BNFTS - 52°10 225.78 TOTAL LABOR 659.98 TOTAL MATERIALS 1,370.26 TOTAL SUBCONTRACTS 0.00 0.00 SUBTOTAL 2,030.24 INSURANCE @ 2-112% 50.76 SUBTOTAL 2.081.00 OH&P@ 15% 312.15 SUBTOTAL 2,393.15 0.00 TOTAL I j 2,393.15 SEWRP - Lubbock 4306 0 t 7/ DATE: 3/3/09 TIME AND MATERIAL SHEET T & M SHEET No 1 DESCRIPTION DATE LABOR NAME TIME EQUIPMENT TIME MATERIAL Excavate and investigate leak 2/25/2009 Pipe Fitter Eddie Caiique 3hrs 15 ft poty wrap Operator Tony Perez 3 hrs 2 yds gravel lea 1r' x 30" long stainless Clean area and repair leak 2126/2009 Pipe Fitter Eddie Cadque 6hrs steel repair clamp Operator Tony Perez 6hrs Backhoe 6 hrs Backfiil and compact 2J27/2009 Operator Tony Perez 6hrs Backhoe 6hrs 25th & 26th Supervision Mike Godwin 2 hrs Excavate 12" PW found to leaking through the ground west of the Wash Water Tank. After excavation it was found the Ductile iron Pipe to be corroded and split. The resident engineer Rich Houghton instructed Eagle to make the repair. The repair consisted of excavation / install SS repair clamp wrap exposed area with Poly wrap,install gravel around pipe and back fill. 2/26109. Repair confirmed by Soon A Submitted by: 3 �rP L4 I %.s ac 'f7'6 CO - Resident Engineer Eagle lont7raing 07001 Plastic Pipe, Inc. P.O. Box 1917 Lubbock Texas 79408 Bill To: Eagle Contracting, Lp 607 SrPearson Keller TX 76248 Ship To: Invoice 83120 REQUEST FOR INFORMATION PROJECT: SOUTHEAST WATER RECLAMATION PLANT IMPROVEMENTS PROJECT NUMBER: OWNER: THE CITY OF LUBBOCK, TEKAS 92126 CONTRACTOR: EAGLE CONTRACTING, LP 171 ENGINEER: BLACK & VEATCH CORPORATION REFERENCE DATA: Contractor RFI No. 067 Spec Section Page Para. Drawing No. Contract Drawing CY4 CONTRACTOR REQUESTS: ® Information ❑ Interpretation ❑ Clarification We have located two existing Pipe Lines and one Electrical Duct Bank that are directly inside of the new Plant 3 Filter Structure and UV Basin that are not located as drawn in the contract drawings. These two lines and this duct bank will have to be re -located before we can build these two structures. The existing obstructions are a 2'A" Chlorine Line, 6" Sludge Line and an'electrical duct bank (please refer to the attached photograph and drawing that locate these three obstructions. Where do you want these lines and duct bank relocated? CONTRACTOR'S PROPOSED SOLUTION: REQUESTED BY: DATE: 03/06/09 ENGINEER'S RESPONSE: ® Information ❑ Interpretation ❑ Clarification For the items described above or in the attached material referenced: See attachments for response. RESPONSE BY: Laura A Stratton DATE: 03/13/2009 S;1SandllEagla Contracting FIIesUob Filesl171- Lubbock WWTPAFI'sRF1-067- Pipe and Electrical Dud Bank Obstructions at Plant 3.doc RFI-067 Response: 03/13/2009 In regards to the 2 '/2" chlorine line, this line should be rerouted to the north of the excavation area as indicated in the attached drawing. Contractor may modify layout so that the pipe is located outside of the excavation slopes for the filter complex and UV disinfection facility. The tie-in point may be modified in the field based on the location of the existing lines. In regards to the 6" sludge line, this line may be removed from service and demolished if Eagle can make two connections on existing sludge lines by the administration building and in the solids handling building. Once the 6" line is out of service, it may be demolished to the extent is in the active construction area and the ends plugged with concrete. The details for the two connections are provided on the attached figures and shall be made concurrently in an 8-hour shutdown. Connection 1 — Tie in an 8" sludge line to a 6" sludge line to the west of the administration building. This tie-in is estimated to be located in the parking area west of the building, possibly beneath the handicapped parking space. We recommend that the pipe sizes, material, and separation be determined prior to ordering any piping. This will require that the area be prospected and then the excavation remain open while material is ordered. Once the connection is made, the asphalt paving shall be restored. Eagle shall proceed with caution in excavating in the area due to numerous utilities, Including a gas line. Connection 2 — Tie in an 8" ductile line to a 6" Schedule 80 PVC line. In regards to the duct bank, it is believed that the duct bank is not active and can be removed. Eagle shall notify the plant 24 hours prior to removal. Additionally, there is a 24-inch line near the alignment of the 42-inch line in the vicinity of the generator that will be abandoned in place. The Contractor shall submit a cost proposal for review for the additional work. w-':�.:� ,rC='=-"-• .'il ��1 '--T ,r,'1'�P - - _ _ I - t, > �. I, ' 11 ;\ �... r� gull I n iilPfiiN7 .�. y` •ay.``�C` __::._ , N � SFC�^LLa1faR lit i ' `''yam - tl _ ..J'`r��^tle _, �-_-,• -r- -� ���I�� 1 I Ik I Y :- .. r — '9 _•f=�,,_.. ~ '�.-••_ I, I � �(.,_ I ti F \� � f u ` 1 n IL I I' �- ,'?' ��- .,-\ v,._.`_Y�'�:,� `Y i. ._rt` � � I I it Y ......a...__i.:.•n�..._._ r.,l sl � � `\.• •\ \�' �,� `�''�`�:w� �''t�,��.._ II Y u+ ,,, h ;d•` i\\•,� I Ift�Ifii� "�� �I `1•L .'. � ' ,Y, `,, ,,. Y. I"'�V � I _'{'. 1_A1fad• i ��t/..��.f.�� �I r I��� �� i ` �, �� ' �~, •~ >.ti `���.a •• \. � I 1 n _ _ _i_V (�—... __._•: .I lei', -'I l � � IL 4 r '' � 1 � �•.' .� � I .i: ��• r--..} a, lb , I II1I IIII �' _ _ _ " -- -- - - - -. ��,,.r? , l� AI q'`;��~��itiil '''~ N4D.�,H�� xut\4eC�iy p ' al r/ YI �• Tt#tu t'�3+ .f ,J�(1, a% , ' �, .\\1�\ 1 !, q I .✓ 1,Yr)-, f.rl lr\ �,\ I u� 'I ,�4 { n Y D 15. f �� 1 \..'r wl U •�`a.+�- Q' i" I _ =�p \, I +I \ � � R � ��_+•+. _— ,_33 F,..+:: =, `= 1 X -,. .. +f1 P7 �� /��/J •qr'� g!��1 f'1 ,4. L')1 i`; � �jl �. fe __-___. =__-�--_`" '�y _� f„ 1 I A i J• :: �x 1 E_ _11Si f el* �""al r, Irk 46tikJ ouj ¢ �la ��,1r 2 � -+�j � iw � .�-, �' ~- !.,•1 ;i1 � y �e,','rr �. \ ,, ' ; -�' S •� t � _ - .. - � �: �i� as � �I�I is -�I % �t.�„- ',.�,:> w''- - - ;K �. �... - - - ... _ .. _ _ _i _ ,{ ` .. �• a _ •\ :\r'. •\ ram, `. � `r �;/• Jt `'.a h�� i1 •.. 1I r' La ul \ �I~♦ � �'}�. � \ ,� 1 vLL'i ado 1 '!r f{ 1 'r:! ��' •��' \ y 4 �• Y\ ti. r, : .� x w MATCH LFW G-12 saw! m.. st—L.. lk. 'A" I -W Lv --- - - . .. fe I- M AL bw a xim- wi ul 1. Ago Id. WIB# 11. Il" w - 20 ,,NI... .. 441 W, AM17 ". 1-111 1,19" "As. 5`1 Area for I Mum I.AV.-.. --It tow w —w+,r AO-w im Iia �1�.m connectionl m M mom 4, Numn 11"t it- -76T.—v —a-31 —tr Ig.".061.014.06 W.MsLn Iwlr .9 IMF 11 ja. M.m ow.mm rNN is- un. I, L.- Imm Boo, mul" l9t." W JIM!. m smi I M3.R6 21 6*-. +dP W W, 'IN to " I -jow Box awl m I jQw 0 1mv.. W UM.P -7 IF' &-= m a --M.M.0 2- Vl- 2- 310 an AM 0 "mm" �-71424 4-1 311.. 11.16 1:141, so 90,1W 11 am Dom LOS 1.1-4 1• I.L1, it- �.v .1 u. a M MAP a 1--1 .� ;11 S, %.W 00 TAWL�.- --AW 8 V. "a I. - - 11 miremireIN l.mirm"l. Ilt.ei6 W. TASK --I.- . "36ft -Lw "aft AM go 14"v- I�raiMT 1- 7 0, sn a r ---A 9 -961-1,011 % mmo -Go- I I m D- -.!L --T-- Vs SID sow wmmll- KA - m it at •ALI 6.91, & ML If-- Ki,ln.Nu -W —W -1 (D ALUM LOR IT it m mom nlR com 8. C.6 7 T T.- Ll ,4NF I'Lum PLAW LUBWX. TEXM IMMOMF 11AYM PEDLOWSOM PLW WWW�" rv-14 Pave pmrVt WMAMttGN PtWl in. 4 9ENERAL v TWO PIP1111; LAYOUT 14 M 31I K-11, T-1 11, 4U,� - - W, - ME .... ...... Ul Connec w Owner Computed By - Plant Unit Date 20 BLACK & VEATCH Project No. Fife No, Verified By plYECC-I JI Title 20 �f 1, l d V , Page of W 0 a i5i W c� 0 z 0 0 m 1- T z CL FI tF mA75RvKL sou �vE ►� TD BF- WC7 kE IRON, rf it n If _ i o -r- _ .- m 151 yiAf--f��Q C-C, 1 U 7 �( C*N W A xgo 11 sz-u c6F _uDUE- PLA �J REVISED, SUPERSEDED, AND VOID CALCULATIONS MUST BE CLEARLY IDENTIFIED, INTALED, AND DATED BY THE RESPONSIBLE INDIVIDUAL. Nor4h r if , 61 1I -lDof 'i F>1 qe)' fw!D pipe csFac, P— I t LLPtTe VAL11e 1 rr� i _� No Text April 2, 2009 Black & Veatch Corp. 9441 LBJ Freeway — Suite 114 Dallas, Texas 75243 Attn: Ms. Laura Stratton RE: Southeast Water Reclamation Plant Improvements Contract ITB # 07-730-BM -- Project # 92126 The City of Lubbock, Texas Black & Veatch Corporation Subj.: Proposed Contract Modification (PCM-12R3) — Re-route CL2 Line and then Demolish the Chlorine and Sludge Lines and Electrical Duct Bank in Plant 3 Structures per RFI-067 and directions given at the April 1, 2009 Monthly Meeting. Dear Laura, Eagle Contracting proposes to demolish the existing electrical duct bank out of the limits of the Plant 3 Structures, demolish the existing 24" Buie out of the limits of the Plant 3 work (price assumes that we can give owner 24 hours notice of demolition and then be able to demolish this piping without any holdups) and the reroute 2 Y2" CL2 Line north of Plant 3 structures and tie back into original points and then demolish the existing Chlorine Line out of the limits of the Plant 3 work. Cross -connect 6" Sludge to 8" Sludge in Handicap Spots in Parking West of Administration Building and then Cross - connect the 8" and 6" piping inside of the Solids Building per RFI-067 will be performed and completed by the City of Lubbock in the next couple of weeks per the request of the City of Lubbock in the April 1, 2009 Monthly Meeting. Eagle will demolish the 6" Sludge Line out of the limits of the Plant 3 work when the City of Lubbock completes the cross connection of this sludge line at the Solids Building and in the west Parking Lot of the Administration Building. Eagle Contracting, L.P. request the total Lump Sum Amount of Seventeen Thousand Six Hundred and Eighty One Dollars and Seventy Cents ($17,681, 70). We also request a contract time extension of 7 calendar days. With Kin t gards, G Grant Pmj ect Manager cc: File (Proposals) & Field P.O. Box 1600 0 Keller, Texas 76244 0 Metro (817) 379-1897 Metro (817) 379-0610 Fax Eagle Contracting, L.P. Date: April 2, 2009 SEWRP - Lubbock ,Job W 171 Proposal: PCM-12 R3 Work Description: Remove existing piping and electrical dud bank from Plant 3 Structures Ref. RFI-067 Revised Scope per Monthly Meeting of 4-1-09 MATERIAL TQTAi. LABOR TOTAL UNIT PRICE MATERIAL UNrr PRICE LABOR AUIMIT FI*W W Duct Bank at Plant 3 Ml Ures Saw Cut Electrical Duct Bank 8 mhs 0.00 16.70 133.60 (2men x 8hrs/day x 1 /2 day) 0.00 0.00 16.70 0.00 668.00 Demolish Duct Bank 40 mhs 0.00 0.00 (5men x 8hrs/day x 1 day) 14 tys 7.50 105.00 0.00 Haul off Concrete Rubble 0.00 0.00 Llna: 0.00 0.00 tea -Rolf+ 2112" Chlorine Repair Una broken when we found It 1 Is 99.90 99.90 16.70 0.00 267.20 Remove existing CL2 Une 16 mhs 0.00 0.00 0.00 (2men x 8hrs/day x 1 day) 0.00 0.00 (13 sys Q $75/6y) 120 mho 0.00 16.70 2,004.00 New CL2 Una 0.00 0.00 (5men x 8hrs/day x 3 days) 8 35.00 280.00 0.00 Samil Thrust Blocks at Fittings ea 0.00 Purchase Aggregate Encasement 36 tons 16.50 558.00 0.00 Haul off Excess 28 lye 5.00 130.90 130.00 261.80 0.00 Valve Boxes Purchase Pipe, Fittings & Valves: 2 1 as Is 1,903.64 1,903.64 0.00 (40011' pipe, tea tees, Ise valve w/vb, 0.00 0.00 0.00 7ea fittings) 0.00 0.00 0.00 New Tle-In's - 2each (3men x 8hre/day x 1/2 day) 12 mhs 0.00 18.70 200.40 0.00 0.00 Crossover Connections for the 6" 0.00 0.00 0.00 Sludge Una to be able to reMve Plant 3_ 0.00 0.00 0.00 6" siuda Una tgm 0.00 0.00 Scope Change: City of Lubbock to 0.00 0.00 Perform this Work 0.00 0.00 0.00 0.00 Cross -over Connections Inside of 0.00 0.00 0.00 0.00 the Solids Build= 0.00 0.00 Scope Change: City of Lubbock to 0.00 0.00 0.00 Perform this Work 0.00 0.00 0.00 Remove existing °Abandoned" 24" 0.00 0.00 PS#1 to PS#2 Transfer Line where It 0.00 0.00 Construction: 0.00 0.00 obstucts Now Cut out 24" Piping & Dispose 0.00 0.00 16.70 0.00 1.068.80 (omen x 8hrs/day x 2 day) 64 mhs 0.00 0.00 480 Track Hoe 0.17 mo 9,500.00 1,615.00 0.00 Rubber Tired Loader 0.33 Mo 4,200.00 1,388.00 0.00 SEWRP - Lubbock Rubber Tired LoadadHoe 0.33 mo 1,200.00 386.00 0.00 Walk Behind Compactor 0.33 mo 1,000.00 330.00 0.00 Fuel, dli, Grease & Maintenance - 30% 1 Is 3,727.00 1,118.10 0.00 of Equipment Rend 0.00 0.00 Small Toole - 6% of labor 1 Is 4,342.00 217.10 0.00 TOTALLABOR TOTAL LABOR W10 BURDEN LABOR BURDEN/BNFTS - 52% TOTAL LABOR TOTAL MATERIALS TOTAL SUBCONTRACTS SUBTOTAL INSURANCE Q 2-112% SUBTOTAL OH&P@15% SUBTOTAL CONTRACT TIME EXTENSION REQt1EST a 7 SEWRP - Lubbock 4,342.00 8,400.64 0.00 Bandl B 8128907 - 'Yehoa l leii Pagel ad 2 i PJIHn B6dl� Bf2B407 'Murs& , Meech 10, MN 2ao apa � Pt VWM cm - � Hnuesrt3riwtir Corr„ Tm .00m • Azx�s� es � a a Press QUVW6n B12840 Ferguson Waisrmrke #788 Flukm. TX ?NO Pharr: 817-m-noo Pu a IK7-W.3M Bid My—..Y.: `H125W B1d De e...: o8plmv MW Phone; 817-879-1887 QVcftd Ar. DD TOW06«.... 6 NLrr i H PROX c usst mwj a1i3L E OONTRAGT1NO L P 8htp TbA....: PACOLS CON RACTtNG L P LUBBOCK BE WdR RECLAMA77ON LUBBOOK 8E WM RSCLAMATiON PO BOX Iwo PO BOX 1600 K aIML TX 7M4 4 KELLERI 7X 78244 Crust POiLa—GLEN dnb•Nsms.: LUBBOCK SE W1R ROGLAMATiON mm I mmimy Ipint In me Um TOW , !1 r.:r co: r•: i1 mmmm l /•::�Y:i ce.. I IRISH MR444%4 m49LE a3qTy*zrxm PAGE 9WI52 SRI*& QUCA4 avrvarmapo% him WTV MWAO WY Spam= Kdwrg 7" 11 MRWO MF1 wowx 44 111L li;�E �cl THANK YOU FMWqWMW / RBQUORrFUR MFFOM47TON RgPSUNM DAM' Cordmalbr RM No. QZ, Spec 8eotlon gaga Pere. Draft No. conbisot Drevft OY•4 OONM40MR te~QllIgBT ®IMbtma3on ❑ kde"ftffan ❑ C�millGoon We hays 1p* Wo e8lelrg a Uncle and orbs Bleotrla�td Duct Bea k that are dheotty fields of the new ?lent 8 Fft Btru*n and LM &Wn Ht am tat k oaW ee dmn In ft ooi sba rt dnwwbVk -These bw fines +laud thia duct bank will hem to be r&400tdad.bsf irs we osn bold two Wo atruolxtt t "fhe Ong c�i Im -dana are a 2 V ClV Rr Lki% e' 8kzlp Line and a;rrdsoMW duct bank 09asas rWW too the holograph and dtatna tat to de #me three obuh mfiom Where do you ward these lfnee wo dpot Macahed'P GON1Z:iAGTOIM PfROPOSM OOLE t'ION: RE4uPM BY." vATts�, dares . f Sty R03PONM m htf xmamn Ll rMtaQan ❑ Cluf3fa4on � Forfhe flees dso*W Wrow or In Me aMaiw materiel rafierwxnd: see et:tacbmenta f= re4wc=2. l� Rf ON8B W xm= A 8trat t am MATE" 03/13/2009 a.wr�rrre.umr�ran.i�rkwwtzabr-P��.aar.�r�aaraeetolKrrAraa"m 0 i i i RFl W Rosponsa 03/1312M9 In tegm-de to the 2 W ohlodne line, this fine should be rerouted to the north of the exoave.#lon one as Indlostnd In the aftechad dMWhg. Cal it! may modify fayout so that the pipe Is located outside of the eomavatlon slopee for the ffer oormpim and W disirrlbotlon faoW. The tiean point may be mo011ed In the field based on the looter of the existing lines, In nVarde to the 86 sludge One, this line may be mmoved from service and dsrnoilshad ff Eagle can make two oonnedons on exksting sludge llnes by the admk*ftefbn building and In the solids handlft bulldfng Onos the Er Ins, Is out of service, I may be demoffshed to the mdent Is In the active construction area and the ends plugged with oonorsis. The derails far the two connsiodons we provided an the attached f gures and shag be made conoummfly In an "our shuidowa, Connecdon i -- Tie In an 8' sludge One to a r sludge Mm to the weat of the admfifsff'atlon barlk t0. This 094n le estimated to be located In the psrrld V area went of the bvWing, pxombly beneath the handlaepped parking space. We rmxw mend that the pipe abets, material, and seperetlon be determined prior to ordering any p[ptng. This will mqube that the area be prnapeafad and then the excavation ramaln open whffo rnaterkl le miared. Onoe the connection to made, the eVhaR paving shallbe rtetored. Eagle chaff pm eyed with caution In excavating In the area clue to numerous ufirlOw, including ages Me. Connection 2 - Th In -an 8" ducf3fe he to a r Schedule 80 PVC One. In reperda -b the dust bank, ft Is believed that file duct bank Is not active and can be rwnaved, Eagle shall noM the plant 24 h" prior to removal. Addlbndy, there Is a 244roh line near this erlllpnmeM of fire 42-mail fine In the viol* of the gnerftr that W be abandoned In place. The Co Weator shall subs t a cost proposal for review fbr the addMonal wodL I r7W l.- 'r9w'2&— l • LY�� - 4 1m# '.March 31, 2009 Black & Veatch Corp. 9441 LBJ Freeway -- Suite 114 Dallas, Texas 75243 Attn: Ms. Laura Stratton RE: Southeast Water Reclamation Plant Improvements Contract ITB # 07-730-BM — Project # 92126 The City of Lubbock, Texas Black & Veatch Corporation Subj.: Proposed Contract Modification (PCM-15) — Hydrostatic Pressure Testing of the 6" Grit Discharge Line from inside of the Grit Basin to the Grit Pump Basin Dear Laura: As requested by the Owner and You, Eagle proposes to run a Hydrostatic Pressure Test on the Grit Discharge Line from inside of the Grit Basin to the Grit Pump Basin to see if this line still holds the specified pressure. Eagle Contracting requests the Total Lump Sum Amount of Three Thousand Two Hundred and Seventy Eight Dollars and Seventeen Cents ($3,278.17) to provide this extra work and a two day (2) Contract Time Extension. Sincerely, Glenn —Grant Project manager Cc: File (Proposals) & Field P.D. Box 1600 0 Keller, Texas 76244 a Metro (817) 379-1897 - Metro (817) 379-0610 Fax Eagle Contracting, L.P. SEWRP - Lubbock Date: March 31, 2009 Job No. 171 Proposal: PCM-15 Work Description: Test 6" Grit Piping from Grit Basin to Grit Pump Basin Ref. Black & Veatch E-Mail Request dated 3-30-09 MATERIAL TOTAL LABOR TOTAL UNIT PRICE MATERIAL UNIT PRICE LABOR ACTIVITY QUANTITY UNITS SUBCONTRACT $ $ Test 6" Grit Pipiingfrgm Grit Basin to Grit Pump Basin Set Up Fan and Confined Space 0.00 0.00 Equipment 9 mhs 0.00 1670 150.30 (3men x 3hrs) 0.00 0.00 0.00 0.00 Chip out Invert Grout inside of pipe & 15 mhs 0.00 16.70 250.50 around 6" discharge pipe inside 0.00 0.00 of Grit Basin 0.00 0.00 (3men x 5hrs) 0.00 0.00 0.00 0.00 Set up Testing Equipment & Plugs 15 mhs 0.00 16.70 250.50 (3men x 5hrs) 0.00 0.00 0.00 0.00 Run one day test of 6" line 24 mhs 0.00 16.70 400.80 (3men x 8hrs) 0.00 0.00 0.00 0.00 Test Pump, piping, gauge & plugs 1 Is 500.00 500.00 0.00 0.00 I 0.00 Remove test equipment, grout back 24 mhs I 0.00 16.70 400.80 invert inside of Grit Basin &remove + 0.00 I 0.00 Confined space equipment 0.00 0.00 (3men x 8hrs) 0.00 0.000.00 0.00 Small Tools - 5% of Labor 1 Is ! 1,452.90 72.65 .' 0.00 0.00 I 0.00 0.00 572.65 ' I TOTAL LABOR f 1,452.90 0.00 TOTAL LABOR W/O BURDEN 1,452.90 LABOR BURDENIBNFTS - 52% 755.51 TOTAL LABOR 2,208.41 TOTAL MATERIALS I 572.65 TOTAL SUBCONTRACTS 0.00 SUBTOTAL I 2,781.05 INSURANCE @ 2-1l2% 69.53 SUBTOTAL 2,850.58 ON & P @ 15% I 427.59 SUBTOTAL 3,278.17 mo l TOTAL 3,278.171 CONTRACT TIME EXTENSION REQUEST = 2 DAYS SEWRP - Lubbock