Loading...
HomeMy WebLinkAboutResolution - 2005-R0248 - Agreement Amendment No 2 - Parkhill Smith & Cooper - Airport Improvement Project - 06_23_2005Resolution No. 2005-RO248 June 23, 2005 Item 17 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock BE and is hereby authorized and directed to execute for and on behalf of the City of Lubbock an Amendment No. 2 to the Master Engineering Agreement for Airport Improvement Projects between the City of Lubbock and Parkhill, Smith & Cooper for preliminary and final design services, bidding phase services, and construction phase services for a new roof at the Silent Wings Museum and all related documents. Said Amendment is attached hereto and incorporated in this Resolution as if fully set forth herein and shall be included in the minutes of the Council. Passed by the City Council this 23rd day ATTEST: f) Qce,-, � Rebe ca Garza, City Secretary AS TO CONE T: Loomis, Director of Aviation APPROVED AS TO FORM: c- - � � � �- Linda L. Chamales, Senior Attorney Office Practice Section LC: LATTY/Linda/RES-PSC AMENDMENT -Silent Wings Roof June 10, 2005 Resolution No. 2005-RO248 CONTRACT NO. 5689 April 27, 2005 Mr. James W. Loomis, A.A.E. Director of Aviation Lubbock Preston Smith International Airport Route 3 Box 389 Lubbock, Texas 79403 Re: Amendment No. 2 to Agreement for A/E Services for Airport Improvement Projects: Silent Wings Museum Re -roof Dear Mr. Loomis: We have met with your staff, reviewed the project and prepared an Engineers Opinion of Probable Cost (EOPC) to design the improvements for the Silent Wings Museum Re -roof. Our understanding of the scope items and a fee proposal for Task 1 (design) and Task 2 (construction) is included in the attached EOPC. Silent Wings Museum Re -roof: Task 1 - Fee for Professional Services (Study and Report, Preliminary Design, Final Design and Bidding/Negotiation, lump sum) $24,250 Task 2 - Construction Phase Services (which includes RPR and construction related Engineering Services, lump sum) $17,850 TOTAL $42,100 We propose to modify the agreement between the City of Lubbock and Parkhill, Smith & Cooper, Inc. dated January 13, 2005 and to provide the Task 1 and Task 2 services on a lump sum basis under the provisions of the contract, EXHIBIT B - PAYMENTS TO THE ENGINEER, LUMP SUM METHOD, Paragraph B4.0LA. 1. Compensation for Design Phase - Task 1 and Construction Phase - Task 2 services shall not exceed $42,100 without Owner's approval. Parkhill, Smith & Cooper, Inc. Engineers ■ Architects ■ Planners 4222 85th Street, Lubbock, Texas 79423 (806) 473-2200 FAX (806) 473-3500 Lubbock El Paso Midland Amarillo Odessa & Mr. James W. Loomis, AAE Page 2 April 27, 2005 If the terms of this amendment are agreeable to you, please sign and return one copy of this letter to our office. We will take receipt of this signed letter as our notice to proceed with these services. We look forward to working with you in completing this project. If you have any questions please call either John Hamilton or myself. Sincerely, Accepted by: PARKHILL, SMITH & COOPER, INC. CT By By Mike W. Moss, AIA Vice President Enclosures Attest: IN TRIPLICATE By R becca Garza, City Secretary R:\pro. ¢xtA200512735.MCORRFSPLTR\jl 04Z705. DOC Approvedpto Content: Ifl W. Loomis, A.A.E. )r of Aviation Approved as to Form: John M. Knight Assistant City Attorney PARMML SMITH & COOPER, INC E Engineer's Opinion of Probable Cost Silent Wings Museum Re -roof Date : 27-Apr45 Job#: cumsw ITEM DESCRIPTION QUANTITY UNIT UNIT COSTS EXTENDED TOTAL MAT'L LABOR EQUIP SUB :NAIL LABOR EQUIP SUB Mobilization I is $IIS00.00 $11.500 $11.500 molition Tear Off 37000 sf $0.75 527.750 $27.750 TPO Recover membranehaperinsulation 370M sf $3.00 $111,000 $111.000 19Insulation 37000 sf $1.35 $49950 $49.950 Wall (lashings 715 If $7.00 $5.(X)5 $5.009 Fascia Metal Drip Edge 1505 if $7.00 $10.535 $IO335 Repair Roof Deck 1000 sf $6.00 $6.000 $6,000 eehlEhxt Re -piping I is $28,(W.00 S28.00O $28.(M eneralConditions I is $10.0W.00 $10.000 SIO.(X)O SUBTOTALS 1 $259.740 1 1 1 5259.740 Labor Burden 4'<* 5259.740 Material Sales Tax 5259.740 5259,74ir Area ,Multi lien 5259.740 5­59.740 General Contractor Overhead S_59.740 General Contractor Prnlit 1159.740 Bond 2 ;n's 56.494 Construction Contingency15�., ti'tv.9;5 Sub -TOTAL Construction $.M16,169 Basic A/E. Sersices rDesign through bidding and negotiation) Construction Phase Profecsionai Sem ices S 17.1,4; TOT %L $348,269