HomeMy WebLinkAboutResolution - 2005-R0229 - Amendment To Agreement, No 3 - Parkhill, Smith, And Cooper - Airport Improvement - 06_09_2005Resolution No. 2005-R0229
June 9, 2005
Item 22
RESOLUTION
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock BE and is hereby authorized and
directed to execute for and on behalf of the City of Lubbock an Amendment No. 3 to the
Agreement between the City of Lubbock and Parkhill, Smith & Cooper for
Architecture/Engineering Services for Airport Improvement Projects: Security Access
Control Improvements, and all related documents. Said Amendment is attached hereto
and incorporated in this Resolution as if fully set forth herein and shall be included in the
minutes of the Council.
Passed by the City Council this 9th day of Z Junes 52005.
MARC M¢DOUGAL, MAYOR
ATTEST:
I ')� 4--1
Re ecca Garza, City Secretary
AP VED AS TO CONTENT:
Ja s Loomis, Director of Aviation
APPROVED AS TO FORM:
Linda L. Chamales, Senior Attorney
Office Practice Section
LC: LATTY/Linda/RES-PSC AMENDMENT -Security Access
May 27, 2005
Resolution No. 2005-R0229
April 27, 2005
Mr. James W. Loomis, A.A.E.
Director of Aviation
Lubbock Preston Smith International Airport
Route 3 Box 389
Lubbock, Texas 79403
Re: Amendment No. 3 to Agreement for A/E Services for Airport Improvement Projects:
Security Access Control Improvements
Dear Mr. Loomis:
We have met with your staff, for the purpose of discussing the proposed improvements needed under the
upcoming Security Access Control Improvements Project. Our understanding of the scope items and a fee
proposal for Task I (design) and Task 2 (construction) is included in the project budget sheets which are
attached to this amendment. A detailed Engineers Opinion of Probable Cost (EOPC) has not been prepared for
this project however we understand that the budget for both professional design services and construction is
$650,000.
Security Access Control Improvements:
Task I -Fee for Professional Services
(Study and Report, Preliminary Design, Final Design and Bidding/Negotiation, lump sum) $51,900
Task 2 - Construction Phase Services
(which includes RPR and construction related Engineering Services, lump sum) $38,600
TOTAL $90,500
We propose to modify the agreement between the City of Lubbock and Parkhill, Smith & Cooper, Inc. dated
January 13, 2005 and to provide the Task I and Task 2 services on a lump sum basis under the provisions of the
contract, EXHIBIT B — PAYMENTS TO THE ENGINEER.. LUMP SUM METHOD, Paragraph B4.0I.A.1.
Compensation for Design Phase - Task I and Construction Phase - Task 2 services shall not exceed $90,500
without Owner's approval.
Parkhill, Smith & Cooper, Inc.
Engineers ■ Architects ■ Planners
4222 85th Street, Lubbock, Texas 79423
(806) 473-2200 FAX (806) 473-3500
Lubbock ElPaso Midland
Amarillo
Odessa
Mr. James W. Loomis, AAE Page 2 April 27, 2005
If the terms of this amendment are agreeable to you, please sign and return one copy of this letter to our office.
We will take receipt of this signed letter as our notice to proceed with these services. We look forward to
working with you in completing this project. If you have any questions please call either John Hamilton or
mvself.
Sincerely,
PARKHILL, SMITH & COOPER, INC.
By
Michael E. Cartwright, PE
Chief Financial Officer
Enclosures
IN TRIPLICATE
N:�xc�jca\199R10DI5.9Q�(:N11..VfINJA�Sccvrily � I'leve IIVtmyYlm:iu-z.IXX'
Accepted by:
C
B
Attest:
By— gi 0 ,p 4 -, , D—�\
-becca Garza.
City Secretary
Approved,,2 qo Content:
By 111/ . 6/G
Ja les W. Loomis, A.A.E.
(rector of Aviation
Approved as to Form:
John M. Knight
Assistant City Attorney
PARKHILL, SMITH & COOPER,
INC.
PROJECT BUDGET SHEET
■■r.rrrr.rr■rrrrw
u■■u■s■ruuu
LOCATION CODE:
OS
.............■...
PROJECT NAME:
LIA Security Upgrade
JOB NO.:
05-2736-05
■1 � I i_JI :1 1■
=
':
TASK:
1 DSN
Not :
; ;,,,;;,,,,■;
DATE:
04/27/05
FEE TYPE:
Lump Sum
PREPARED BY:
DGW
PRINCIPAL:
RKW
PROJ. MANAGER:
DGW
OVERHEAD RATE:
179.00%
PROFIT ON LABOR:
15.00%
PROFIT ON REIMB:
15.00%
PROFIT ON DIRECTS:
15.00%
C� S� 3 51,9fl0
TOTAL FEE:
$5 14 VII
LABOR:
$46,669
LABOR:
1000,
$14,545
DIRECTS:
$5,242
OVERHEAD:
$26,036
SUBTOTAL:
$51,911
REIMB. CONSULTANTS:
REIMB. EXPENSES:
REIMB. FEE:
DIRECT CONSULTANTS:
DIRECT EXPENSES:
$4,559
TOTAL FEE:
$51,911
LABOR BUDGETS:
CODE
DESCRIPTION
HOURS
COSTS
01
Firm Principal
7
$282
03
Engineer
95
$3,222
03
Engineer
79
$2,644
07
Engineer -in -Training
224
$4,480
03
Engineer
31
$972
14
CADD Operator
168
$2,424
18
Clerical
32
$521
Page 1 of 3
FEE ESTIMATING SHEET PROJECT:
LIA Security upgrade
JOB NO.:
05.2736.05
TASK:
1DSN
SALARY
CATEGORY OF PERSONNEL
RATE PER HOUR
RKW DGW
MT/Arch
WDL
JH
DLS
DYK
FP ENG
ENG
EIT
ENG
CARD OPT
CLERICAL
TASK
01 03
03
07
03
14
18
Trips
$40.26 $33.92
$33.47
$20.00
$31.35
$14.43
$16.28
TOTAL
Design Phase
System Inventory
1
10
2
12
4
28
Research existing infrastructure
2
16
18
Develop Conceptual CCTV Layout
2
2
12
1
8
25
Develop Conceptual Access Control Layout
2
2
12
1
8
25
Develop Conceptual Ops. Room Mods
8
8
8
4
24
52
Develop Preliminary Cost Estimate
4
2
16
2
24
Review Conceptual Plan w/Owner (25%)
1
2 6
12
2
2
24
Develop CCTV Plans
2
16
1
24
43
Develop Access Control Plans
4
24
1
16
45
Develop Operations Room Plans
8
24
4
2
40
78
Update Preliminary Cost Estimate
1
2
2
1
6
Reviw Plans w/Owner (75%)
1
1 6
12
2
2
23
Finalize Plans and Specifications
2
24
16
1
32
8
83
Review Final Plans & Specs w/Owner (90%)
1
1 6
12
2
21
Finalize Cost Estimates
2
1
4
1
8
Prepare Bid Documents
1 8
2
8
2
12
8
41
Bidding Phase
Answer Pre -Qualification Questions
2
2
8
2
14
Review Pre -Qualification Proposals
2
8
2
12
Attend Pre -Bid Meeting
1
6
12
2
20
Answer Bid Proposal Questions
2
8
8
2
20
Attend Bid Opening
1
6
1
7
Review Bids and make Recommendation
2
2
2
6
Prepare Contract Documents
2 2
1
4
4
13
BUDGET SUBTOTALS: HOURS/ Trips -
6
7 95
79
224
31
168
32
6368
SALARY
$282 $3,222
$2,644
$4,480
1972
$2,424
$521 1
$14,545
Page 2 of 3
EE ESTIMATING SHEET PROJECT:
IRECTS
LIA Security Upgrade JOB NO.: 05-2736-05 TASK:
1 DSN
DIRECT CONSULTANT COSTS
SUBTOTAL
611 STRUCTURAL CONSULTANTS
612 MECH/ELEC CONSULTANTS
613 ENV & CIVIL CONSULTANTS
614 LANDSCAPE CONSULTANTS
616 TESTING CONSULTANTS
616 SURVEYING CONSULTANTS
617 INTERIOR DESIGN CONSULTANTS
618 OTHER CONSULTANTS
TOTAL DIRECT CONSULTANTS
DIRECT EXPENSES
621 TRAVELILODGING
MOTEL DAYS O
AIR TRAVEL 5 AIR FARE O
PARKING DAYS O
CAR RENTAL DAYS O
MILEAGE 260 MILES O
1
$0.365
MEN O /MANDAY =
MEN O $230.00 /MAN $1,150.00
/DAY =
/DAY =
O 6 TRIPS = $569.40
SUBTOTAL
$1,719
622 REPRODUCTIONS
BLUELINE PRINTS 15
SEPIA PRINTS
PRINTING:
ORIGINAL SET-UP COST
COST PER SHEET
BINDING COST
XEROX 5000
SHTS O
SHTS O
ORIGINALS
SETS O
SETS O
SHTS O
$2.55 O 25 SETS = $956.25
$8.51 O SETS -
O $0.15 /ORI.
$0.08 /SHT O SHEETS -
$2.00 /SET =
$0.08 /SHT $400.00
SUBTOTAL
$1,356
623 MODEL/RENDERINGSIPHOTOS
Shots O /Shot
624 TELEPHONE 20 Calls*
$5.00 /Call
$100
625 MEALS 5 DAYS O
1
MEN O $25.00 /MANDAY
$125
626 FIELD SUPPLIES
628 POSTAGE Mailings O
/Mailin
$150
629 PUBLICATIONS 8 SUBSCRIPTIONS
630 MISC DIRECT EXP
631 FAX 100 Pa s O
$1.00
$100
632 TEMPORARY PERSONNEL
633 DRAFTING SUPPLIES
634 OFFICE SUPPLIES
635 CADD 168 HOURS O
$6.00 /HOUR
$1,008
636 FIELD EQUIP RENTAL
646 SOFTWARE
TOTAL DIRECT EXPENSE
$4,559
Page 3of3
PARKHILL, SMITH & COOPER,
INC.
PROJECT BUDGET SHEET
nrlrouwoorw
LOCATION CODE:
05
wwsuww■suuwu■.
rrrlrrrrrtrlrrrrsr
PROJECT NAME:
LIA Security Upgrade
;����������;%�r�N
JOB NO.:
05-2736-05
■1 • • ■_J�• 1■
ri ... SS ...■
" ' " of `-"
TASK:
2CST
r' Sure ` ' Ilu
nY. Sum
■rJ�•rA�
DATE:
04/27/05
FEE TYPE:
Lump Sum
PREPARED BY:
DGW
PRINCIPAL:
RKW
PROD. MANAGER:
DGW
OVERHEAD RATE:
179,00%
PROFIT ON LABOR:
15.00%
PROFIT ON REIMB:
15.00%
PROFIT ON DIRECTS:
15.00%
c.)sE 44 38, moo
TOTAL FEE:
$3&61e2
LABOR:
$33,907
LABOR:
$10,568
DIRECTS:
$4'1666
OVERHEAD:
$18,916
SUBTOTAL:
$38,572
REIMB. CONSULTANTS:
REIMB. EXPENSES:
REIMB. FEE:
DIRECT CONSULTANTS:
DIRECT EXPENSES:
$4,057
TOTAL FEE:
$38,572
LABOR BUDGETS:
CODE
DESCRIPTION
HOURS
COSTS
01
Firm Principal
2
$81
03
Engineer
80
$2,714
02
Architect
32
$1,071
07
Engineer -in -Training
232
$4,640
03
Engineer
53
$1,662
14
CADD Operator
12
$173
18
Clerical
14
$228
Page 1 of 3
FEE ESTIMATING SHEET PROJECT:
LIA security upgrade
JOB NO.:
05-2736.05
TASK:
2CST
SALARY
CATEGORY OF PERSONNEL
RATE PER HOUR
RKW
DGW
Arch
WDL JH
DLS
DYK
FP
ENG
ARCH
EIT ENG
CADD OPT
CLERICAL
TASK
01
03
02
07 03
14
18
Trips
$40.26
$33.92
$33.47
$20.00 $31.35
$14.43
$16.28
TOTAL
Construction Phase
Attend Pre -Construction Meeting 1
6
12 2
20
Review Submittals
8
8
2
18
Review Contractor's DBE and Wages
4
1
8
13
Prepare Record Drawings
2
2
2
8
12
2
28
Reviw O&M Documentation
2
2
Regular On -Site Inspections 12
48
16
144 48
256
2/month for 6 months
Answer routine questions
12
4
48
64
Final Walk-thru 1
6
2
12 2
2
24
BUDGET SUBTOTALS: HOURS/ Trips -
Page
EE ESTIMATING SHEET PROJECT:
IRECTS
LIA Security Upgrade JOB NO.: 05-2736-06 TASK:
2CST
DIRECT CONSULTANT COSTS
SUBTOTAL
611 STRUCTURAL CONSULTANTS
612 MECH/ELEC CONSULTANTS
613 ENV S CIVIL CONSULTANTS
614 LANDSCAPE CONSULTANTS
615 TESTING CONSULTANTS
616 SURVEYING CONSULTANTS
617 INTERIOR DESIGN CONSULTANTS
618 OTHER CONSULTANTS
TOTAL DIRECT CONSULTANTS
DIRECT EXPENSES
621 TRAVEULODGING
MOTEL DAYS 0
AIR TRAVEL 8 AIR FARE 9
PARKING DAYS O
CAR RENTAL DAYS Q
MILEAGE 260 MILES ®
MEN Q /MANDAY =
1 MEN Q $230.00 /MAN = $1.840.00
/DAY =
/DAY
$0.365 a 14 TRIPS = $1,328.60
SUBTOTAL
$3,169
622 REPRODUCTIONS
BLUELINE PRINTS 15
SEPIA PRINTS
PRINTING:
ORIGINAL SETUP COST
COST PER SHEET
BINDING COST
XEROX 500
SHTS O $2.55 ® 2 SETS - $76.50
SHTS 0 $8.51 a SETS =
ORIGINALS a $0.15 /ORI. _
SETS Q $0.08 /SHT 0 SHEETS.
SETS 0 $2.00 /SET =
SHTS Q $0.08 /SHT $40.00
SUBTOTAL
$117
623 MODEL/RENDERINGS/PHOTOS
Shots 0 /Shot
624 TELEPHONE 50 Calls*
$5.00 /Call
$250
625 MEALS 8 DAYS 0
1 MEN 0 $25,00 /MANDAY
$200
626 FIELD SUPPLIES
628 POSTAGE Mailings Q
/Mailin
$200
629 PUBLICATIONS & SUBSCRIPTIONS
630 MISC DIRECT EXP
631 FAX Pages @
$50
632 TEMPORARY PERSONNEL
633 DRAFTING SUPPLIES
634 OFFICE SUPPLIES
635 CADD 12 HOURS 0
$6.00 /HOUR
$72
636 FIELD EQUIP RENTAL
646 SOFTWARE
TOTAL DIRECT EXPENSES
$4,05711
Page 3of3