HomeMy WebLinkAboutResolution - 2005-R0171 - Amendment - Development Agreement For Design And Construction - Milwaukee Avenue - 04_25_2005Resolution No. 2005-RO171
April 25„ 2005
Item No. 4
RESOLUTION
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock BE and is hereby authorized and
directed to execute for and on behalf of the City of Lubbock, the First Amendment of
Development Agreement for Design and Construction of Milwaukee Avenue, between
the City of Lubbock and Hubwest Development, L.L.C. and Canyon Hub Holdings, L.P.,
for the design and construction of Milwaukee Avenue. Said First Amendment of
Development Agreement is attached hereto and incorporated in this Resolution as if fully
set forth herein and shall be included in the minutes of the Council.
Passed by the City Council this 25th day of April 2005.
UGAL, MAYOR
ATTEST:
Rebecca Garza, City Secretary
APPROVED AS TO CONTENT:
Hertel,
APPROVED AS TO FORM:
Richard K. Casner
First Assistant City Attorney
ml/ccdocs/Milwaukee Paving.Hubwest2.res
April 22, 2005
CONTRACT NO,
STATE OF TEXAS § 00006050
COUNTY OF LUBBOCK §
FIRST AMENDMENT
of
DEVELOPMENT AGREEMENT
for
DESIGN and CONSTRUCTION
of
MILWAUKEE AVENUE
This First Amendment of Development Agreement for Design and Construction
of Milwaukee Avenue (the "Amendment") is entered into by and between the City of
Lubbock, Texas, a Texas home rule municipal corporation (the "City"), Hubwest
Development, L.L.C., a Texas limited liability company (the "Developer") and Canyon
Hub Holdings, L.P., a Texas limited partnership ("Owner").
WITNESSETH:
WHEREAS, pursuant to that certain Development Agreement for Design and
Construction of Milwaukee Avenue, entered into on or about October 11, 2004,
Resolution No. 2004-RO507 (the "Original Agreement"), Developer and Owner agreed to
pay their proportionate share, as set forth therein, of the costs related to the street paving,
drainage, water and sewer construction of Milwaukee Avenue, as defined in the Original
Agreement;
WHEREAS, it has come to the attention of the Developer and Owner that they
desire traffic signal lights located at the intersection of Milwaukee Avenue and the
entrance of the Canyon West development (being approximately 1300 feet north of US
Highway 62/82), when constructed, for the control of traffic at such intersection;
WHEREAS, Owner and Developer stipulate that they will pay all costs for such
traffic signal light;
WHEREAS, the City is amenable to constructing and operating such traffic signal
light, upon the terms and provisions set forth below;
WHEREAS, City, Developer and Owner desire to amend the Original Agreement
to provide for the construction and payment of such signal traffic light, upon the terms
and conditions set forth below.
NOW THEREFORE, City, Owner and Developer hereby amend the Original
Agreement as follows:
1. Section 1.06 (d), as set forth below, shall be added to the Original
Agreement for all purposes, to -wit:
"1.06 (d) In addition to the funds to be paid to City or placed into the
Escrow Account by Developer, as described in Section 1.06 (a), above,
Developer or Owner shall also pay to City or place into the Escrow
Account, on or before the date set forth for payment by Developer to the
Escrow Agent of the Actual Bid Cost, as set forth in Section 1.04, above,
funds sufficient for the construction of traffic signal lighting to be located
at the intersection of Milwaukee Avenue and the entrance of the Canyon
West development (being approximately 1300 feet north of US Highway
62/82). A description of the traffic signal lighting to be constructed, along
with the cost of same to be paid to City by Developer or Owner (the
"Signal Funds") is set forth on Exhibit "A-1", attached hereto and made a
part here for all purposes. If deposited into the Escrow Account, the City
First Amendment of Milwaukee Paving Project Agreement Page 2 of 5
may withdraw the Signal Funds in the same manner as it withdraws all
other funds in the Escrow Account pursuant to this Agreement. The traffic
signal lighting shall be constructed and capable of operation (whether in
actual operation or not) on or before March 1, 2006. However, in the event
that the City shall fail to complete such construction on or before such
date, the Developer and/or Owner shall not have the right to self perform
such activities, as set forth in Section 1.08, below, but may solely resort to
the rights and remedies available to them as provided in Section 4, below.
Notwithstanding anything to the contrary herein, Developer and Owner
expressly stipulate and agree that the traffic signal lighting shall not be
activated by the City unless and until the traffic warrants for such lighting
are met, as determined by the City Traffic Engineer of the City."
2. Developer and Owner represent and warrant to City that they (i) possess
the requisite power and authority to execute, deliver and perform this
Amendment; (ii) have taken all actions and formalities necessary to authorize
Developer and Owner to execute, deliver and perform this Amendment; and (iii)
the party executing for and on behalf of Developer and Owner has been duly
authorized to act in such behalf for Developer and Owner.
3. Except as expressly modified herein, all terms and provisions of the
Original Agreement shall remain as originally provided, such Original Agreement
being expressly stipulated to be validly subsisting and effective, as amended
hereby, by City, Owner and Developer.
First Amendment of Milwaukee Paving Project Agreement Page 3 of 5
Effective this 28th day of April, 2005.
ATTEST:
P"*\,f O-AD C ,,zf 0- -
Rebecca Garza, City Secretary
APPROV AS )T�O;
CONTENT:
arry Hertel, City Engineer
APPROVED AS TO FORM:
Richard K. Casner
First Assistant City Attorney
CITY OF
MAYOR
DEVELOPER:
T DEVELOPVF,1T, L.L.C.
Naitt'e: Charles Hodges
Title: Manager
First Amendment of Milwaukee Paving Project Agreement Page 4 of 5
OWNER:
L.P.
Nam: Charles Hodges
Title: Manager of General
ml/Milwaukee Ave Paving Project.Hodges. I stAmended Agreement
April 7, 2005
First Amendment of Milwaukee Paving Project Agreement Page 5 of 5
EXHIBIT A-1
Milwaukee Avenue
Traffic Signal Installation
Opinion of Probable Construction Cost
Canyon West Entrance
Standard Most Arm Assemblies with
Decorative Skirt
44'
3 ea
$
4,700.00
S
14,100.00
32'
1 ea
S
3,600.00
$
3,600.00
Red Pole
3 ea
$
800.00
$
1.800.00
Pod push-button
3 ea
S
95,00
S
286.00
Foundation
88 tf
S
130.00
$
11,440.00
SOW Beads - 5 ind
2 ea
$
840.00
S
1,680.00
Signal Heeds - 3 ind
8 ea
S
400,00
S
3,200.00
Badcplate
4 ea
$
75.00
S
300.W
Pod Symbol Head
4 ea
$
350.00
S
1,400.00
Detector Loop
0 ea
$
2,000.00
S
-
Contro8er
Cabinet
1 ea
$
7,600.00
$
7,600 00
Controtler
1 ea
$
1 �000.00
$
1,000 00
Foundation
1 ea
$
2,100.00
$
2,100.00
City installation
40 hr
$
27.00
$
1,060.00
CablelConduit
11s
$
4,000.00
$
4,OOO.00
53 Rego
1 Is
$
1,750.00
5
1,750,00
Contractor install
1 is
S
1.000.00
$
1,000.00
VKW
1 to
$
12,000.00
$
12,000.00
Contractor install
362
S
750.00
S
2,250.00
City Setup
1 Is
S
1,700.00
$
1,700.00
opticorn
I Is
$
3,000.00
S
3,000.00
Contractor install
2 ea
$
500.00
$
1,000.00
City Installation
100 hr
$
27.00
5
2,700.00
Electrical Service
1 Is
$
5,000.00
$
5,000.00
SUBTOTAL
$
83.986,00
Mobilization, Traffic Contrsl, SV4PPP,
etc t20% Const !terns)
$
16,797.00
Total $100,782.00
Engineering Cost $ 6,788.00
Total Cost Construction & Engineering $107,570.00