Loading...
HomeMy WebLinkAboutResolution - 2008-R0413 - Change Order For Downtown Waterline Replacement Project - 10_23_2008Resolution No. 2008-RO413 October 23, 2008 Item No. 5.11 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock BE and is hereby authorized and directed to execute for and on behalf of the City of Lubbock, Change Order No. 1 to that certain Contract by and between the City of Lubbock and S.J. Louis Construction of Texas Ltd., LLP, for Downtown Waterline Replacement Project, and related documents. Said Change Order No. 1 is attached hereto and incorporated in this resolution as if fully set forth herein and shall be included in the minutes of the City Council. Passed by the City Council this 23rd ATTEST: day of October , 2008. TOM MARTIN, MAYOR Reber a Garza, City Secretary APPROVED AS TO CONTENT: ood a n, Chief Water Utilities Director APPROVED AS TO FORM: Chad Weaver, Assistant —City Attorney vw/Chad/Resolutions/RES.ChangeOrderl/1-SJLouis Construction 10/07/08 CITY OF LUBBOCK CHANGE ORDER Change Order #: 1 Contractor: S J Lewis Date: 10/06/08 BID/ITB/RFP #: 08-706-BM Contract #: 8354 Project Name: Downtown Waterline Replacement Project "Change Order" means a written order to a Contractor executed by the Owner in accordance with the contract authorizing an addition to, deletion from, or adjustment or revision of the requirements of the contract documents, or an adjustment to the compensation payable to Contractor, or to the time for performance of the contract and completion of the Project, or a combination thereof, which does not alter the nature of the thing to be constructed and is an integral part of the project objective. Adjustments to "Estimated Quantities" to a line item in a Unit Price contract do not require a Change Order. All work that alters the nature of the thing to be constructed or that is not an integral part of the project objective must be let out for public bid. Description of change (alteration, deviation, addition, or deletion) caused by conditions encountered during construction not covered by the specifications and drawings of the project (attach additional pages if necessary): This will allow the water department to remove and replace 2,250 linear feet of curb and gutter that was installed in the late 30's and is now bad condition. After removal of the existing street water engineering inspecting the existing curb conditions suggested the additional work. The work will be done by linear ft cost $25.00 for Curb and gutter, $30.00 for Gutter, $4.00 additional base under curb, and $15.00 removal of the existing curb. 30 days will also be added to the end of the contract making the final completion date June 12, 2009 Where the Change Order is negotiated, the Change Order must be fully documented and itemized as to costs, including material quantities, material costs, taxes, insurance, employee benefits, other related costs, profit and overhead. Where certain unit prices are contained in the initial contract, no deviations are allowed in computing negotiated change order costs. ITEMIZED COSTS MUST BE FULLY DOCUMENTED AND ATTACHED TO THIS FORM. ITEM DESCRIPTION AMOUNT A. ORIGINAL CONTRACT VALUE: $5,435,663.74 B. AMOUNT OF THIS CHANGE ORDER: Council approval required if over $25,000 $lc sob Q C. PERCENT OF CONTRACT VALUE THIS CHANGE ORDER (B/A): D. AMOUNT OF PREVIOUS CHANGE ORDERS: $0.00 E. TOTAL AMOUNT OF ALL CHANGE ORDERS (B+D): $145,500.00 F. PERCENT OF CONTRACT OF ALL CHANGE ORDERS (E/A): 25%Maximum', 1r 68b" G. NEW CONTRACT AMOUNT (A+E): $5581163.74 It is mutually agreed that the above dollar amount and the time extension, as applicable, as set forth in this Change Order constitutes full compensation to the Contractor for all costs, expenses and damages to the Contractor, whether direct, consequential or otherwise, in anyway incident to, or arising out of or resulting directly or indirectly; from the work performed or modified by the Contractor under this Change Order. This Change Order is not valid without the following signatures (please sign in order and return 3 originals with Contract Cover Sheet to (1) io-7 cy�l. /o 7 o� Date (2) P J T ARCHITECT/ENGINEER Date Apgto ed as to Conte k Appr—v �C�� (3) OWNE REYrRESEN A Date (4) CITY A / _),� 1 (5) CAPITAL PROJECTS MANAGER Date (6) PURCH Change Orders over $25,000 require a Contract Cover Sheet and the following signatures. ja .0/P001 Date MANAGER Date CITY Qg.IUBBOC K� ST: 10/23/08 10/23/08 (7) AYOR Date (8) CI Y S RETARY Date Council Date: October 23, 2008 Agenda Item #: 5.11 Resolution #: 2008— 413 PWC-045 (Rev 01/08) Change Proposal Request No. 1 (Not a Change Order) Project Name: Downtown Waterline Replacement Project Owner's Project No. (if applicable): Project Owner City of Lubbock Regulatory Agency Project No. (if applicable): HDR Project No. 51897 initiated by. Engineer ❑ Contractor Contractor: Si Louis Date: 9117/08 Attention: The following change In the contract on this project is proposed. Please provide your proposed price for the cost of this change. • A breakdown of cost SHALL be provided upon request by the Owner or Engineer. • Work shah not commence until authorized by the Owner. Descriotion of the Pr000sed Chance: This proposal addresses the additional cost for the labor, equipment, fuel, and material for the addNioml curb and gutter as requested in CPR f1. The following costs are based on the infdnna*m contained in the protect plans anti specifications as well as the additkmal information provided by HDR. The quantities shown below reflect the Information in CPR 91 as provided. Actual quantities will be field measured and paid at the agreed unit prices. Please be advised that a removal item Is added due to the additional quantity anticipated. The contact price under Bid Item 42 does not state that removal is part of the item, therefore the bid price was established to replace curb and gutter only at locations where the construction of the new water main would require the wdsiing curb and gutter to be replaced during construction operations. If appropriate please sign this proposal and fax back to our office. By Jamie Van Guilder AN work shah be in accordance with it% terms, stipulations, and conditions of the original Contract Documents. If the work herein provided for is Approved by Change Order. the time of completion Increased ❑ Decreased ❑ Unchanged by 30 calendar days. This change will: / Add ❑ Deduct ❑ No Change $ tractor S.J. Constriction (Jun 1990: ReNeed Oct 2001 ) Copyr%M 1991 HDR Ergineerf% Inc. H Recommendation: Recommend Acceptance ❑ Do Not ty nd�f�� By: HOR Engin Inc. III) Form 601 M2 Project Name: Lubb Downtown Waterline Replacement Change Order No. 1 Page 1 of 2 HDR Project No.: Project Owner City of Lubbock, Texas P.O. Box 2000 Room 107 Lubbock, TX 79457 Owners Project No.: N/A Date of Issuance: October 2, 2008 Project Contractor. S7 Louis Construction of Texas P.O. Box 834 Mansfield, TX Date of Contract: April 10, 2008 Contract Period: 365 Days It is a reed to modify the Contract referred to above as follows: Item No. Item and Description of Changes Contract Price Contract Time Decrease Increase Decrease Increase CPR 1 160i Street Curb and Gutter Replacement $145,500.00 30 days Subtotal $145 500,00 30 days Difference Net $145,500.00 130 days (Oct1900; Revised Oct2001) Form 0010-05 Copyright 1991 HDR Engineering, fnc Change Order No. 1 Page 2 of-2 Summary: It is agreed to modify the Contract referred to above as follows: Contract Price prior to this Change Order Contract Time prior to this Change Order Net Increase (decrease) of this Change Order Net Increase (decrease) of this Change Order �145.500.00 Increase of 30 days Revised Contract Price with all approved Change Orders Revised Contract Time with all approved Change Orders 55,$1.164.00 395 Days The changes included in this Change Order are to be accomplished In accordance with the terms, stipulations and conditions of the original Contract as though Included therein. Accepted for Contractor by: .. Date: Appcpval by (HDR Engineering, Inc.): Owner by: Attest: Distribution: X Owner X Contractor /0/8Ag Date: 10 3 0� Date: ❑ Office ❑ Field ❑ Other (Oct 1990; Revised Oct 2001) Form e010-05 Copyright 1991 HDR Engineering. Inc. Proposal Project Name Proposal No. Date Downtown Waterline Replacement 1 09/17/08 Response Required By Transmitted By Mr.John Marler, P.E. Jamie Van Guilder R Engineering Project Coordinator 01 West Gate Blvd. Suite 400 Signature Austin, Texas 78745-1469 escription of Work " This proposal addresses the additional cost for the labor, equipment, fuel, and material for the additional curb and gutter as requested in CPR #1. The following costs are based on the information contained in the project plans and specifications as well as the additional information provided by HDR. The quantities shown below reflect the information in CPR #1 as provided. Actual quantities will be field measured and paid at the agreed unit prices. Please be advised that a removal item is added due to the additional quantity anticipated. The contract price under Bid Item 42 does not state that removal is part of the item, therefore the bid price was established to replace curb and gutter only at locations where the construction of the new water main would require the existing curb and gutter to be replaced during construction operations. If appropriate please sign this proposal and fax back to our office. Downtown Waterline Replacement Pro eet Lubbock, Texas Item Description Units Quantity I UnitPrlce Cost CO-1 Additional Curb and Gutter LF 2,250 $ 25.00 $ 56,250.00 CO-1 2' Gutter LF 1,550 $ 30.00 $ 46,500.00 CO.1 Additional Base Under New Curb LF 2,250 $ 4.00 $ 9,000.00 CO-1 Removal Of Existing Curb and Gutter as Directed LF 2,250 $ 15.00 $ 33,750.00 Subtotal $ 145,500.00 f acceptable, please provide an authorization signature below and return one (1) copy to our office. Additional Contract Time 30 Days S.,f Louis Construction Action c Job No. 18009 Project File S.J. Louis Construction of Texas Ltd, LLP P.O. Box 834 Mansfield, Texas 76063 (817) 477-0320 OJ)?ce (817) 477-0552 Fax