HomeMy WebLinkAboutResolution - 2008-R0394 - Change Order For SE Water Reclamation Plant Improvement - Eagle Contracting, LP - 10_09_2008Resolution No. 2008-RO394
October 9, 2008
Item No. 5.9
RESOLUTION
IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock BE and is hereby authorized and
I to execute for and on behalf of the City of Lubbock, Change Order No. 2 to that
Contract by and between the City of Lubbock and Eagle Contracting, L.P., for the
ist Water Reclamation Plant Improvement (ITB# 07-730-BM), and related
ants. Said Change Order No. 2 is attached hereto and incorporated in this
on as if fully set forth herein and shall be included in the minutes of the City
by the City Council this 9th day of October , 2008.
TOM MARTIN, MAYOR
TTEST:
-)ca Garza, City Secretary
ROVED AS TO,jCONTENT:
for Water Utilities
City Manager
ROVED AS TO FORM:
Ord K. Casner
Assistant City Attorney
AT ARICHARDUResolutions\Res.EagleContracting. ChangeOrder2.092508. doc
Ca ./
CITY OF LUBBOCK
CHANGE ORDER
FChan7geOrder #:
2
Contractor:
Eagle Contracting, L.P.
ate:
September 9, 2008
BID/ITB #:
07-730-BM
Contract #: 8119 Project Name:
Southeast Water Reclamation Plant
Improvement
Change Order within the scope of the contract means a Change Order that DOES NOT ALTER THE NATURE OF THE THING
TO BE CONSTRUCTED AND THAT IS AN INTEGRAL PART OF THE PROJECT OBJECTIVE. After performance of a
construction contract begins, Change Orders may be approved if necessary to 1) make changes in plans or specifications; or 2)
decrease or increase the quantity of work to be performed or materials, equipment, or supplies to be furnished. Description of
change (alteration, deviation, addition, or deletion) caused by conditions encountered during construction not covered by
the specifications and drawings of the project (attach additional pages if necessary):
This change Order includes modifications to the beams in the roof of the Intermediate Lift Station, the addition of granular fill
and filter fabric beneath BNR No. 3, modifications of the Intermediate Lift Station influent line, the reconfiguration of the
temporary return activated sludge line, the addition of a vent and clean out at the Primary Sludge Pumping Station No. 2, the
addition of carbide coating to the TWAS pumps, and AFD enclosures for the WAS and TWAS pumps. The total cost of this
change order is $117,047.09. The new contract substantial completion date will be July 28, 2011.
Change Orders must either be negotiated in the best interest of the City of Lubbock or put out for public bid by the Purchasing
Department. Where the Change Order is negotiated, the Change Order must be fully documented and itemized as to costs,
including material quantities, material costs, taxes, insurance, employee benefits, other related costs, profit and overhead.
ITEMIZED COSTS MUST BE FULLY DOCUMENTED AND ATTACHED TO THIS FORM.
ITEM DESCRIPTION AMOUNT
A. ORIGINAL CONTRACT VALUE: $ 43,520,000.00
B. AMOUNT OF THIS CHANGE ORDER: Council approval required if over $25,000+ * 5}
C. PERCENT OF CONTRACT VALUE THIS CHANGE ORDER (B/A):
D. AMOUNT OF PREVIOUS CHANGE ORDERS: $ 29,583.00
E. TOTAL AMOUNT OF ALL CHANGE ORDERS (B+D): $ 146,630.09
F. PERCENT OF CONTRACT OF ALL CHANGE ORDERS (EIA): 25%Maximum
G. NEW CONTRACT AMOUNT (A+E): $43,666,630.09
It is mutually agreed that the above dollar amount and the time extension, as applicable, as set forth in this Change Order constitutes
full compensation to the Contractor for all costs, expenses and damages to the Contractor, whether direct, consequential or otherwise,
in anyway incident to, or arising out of or resulting directly or indirectly; from the work performed or modified by the Contractor
under this Change Order.
This Change Order is not valid without th_e foliowin-a denatures Tease sign in order and return 3�oriYinals with Contract Cover Sheet to
Purchasing and tract Maa&ement Department):
(1) Ct TRAC Date (2) PROJECT ARCHITECT/ENGINEER Date
as to
(3)
(5) CAPITAL
Approved as to
4TA� T�IVE ��--T Date (4) ATT(
MANAGER Date (6 PURCHAS'
Change Orders over $25,000 require a Contract Cover Sheet and the following signatures.
°! ly 0y
ate
� —Z'—pV
CONTRACT MANAGER Date
crrY o�F u$ocx A 10/9/08 1019/08
(7) MA OR Date (8) CITY 'ECRETARY Date
Council Date: October 9, 2008 Agenda Item #: 5.9 Resolution #: 2008—RO394
PUR-045 (Rev 02/06)
QBLACK & VEATCH
building a world of difference -
ENERGY . WATER . INFORMATION . GOVERNMENT
City of Lubbock, Texas
Southeast Water Reclamation Plant
Contract No. 6
Mr. Soo Koon Soon, P.E.
City of Lubbock
P.O. Box 2000
Lubbock, TX 79457
Mr. Soo Koon Soon:
Resolution No. 2008—RO394
B&V Project 140092.6100
B&V File G-1.9
September 9, 2008
Subject: Change Order 02
Attached with this letter is documentation for Change Order No. 02. This change order involves the
following items.
It has come to our attention that the access hatches for the Intermediate Lift Station pumps are too
large to fit within the space provided between the structural beams in the roof. The spacing between
the roof beams is 4'-0". The hatch frame outside dimension is 56'/2 -inches per the data included with
submittal 11150P1-020. This frame will reduce the size of the structural beam by 8'/2 -inches. This
change to the structural design is unacceptable. In order to minimize the delays associated with
delivery of new hatches, which could potentially be six to eight weeks, the beams were reviewed and
modified to accommodate the larger hatches. This resulting change to the beams would take
between one to two weeks. Eagle is requesting $12,234.00 and five (5) working days to complete the
work associated with this change.
The following documents are attached to support this change.
• Field Order No. 2 with the details for the recommended modifications to the roof beams.
• PCM-02 from Eagle Contracting with the cost breakdown.
2. Per Sheet MD3 (Sheet 181) Detail E, in the basins that have pressure relief valves, granular fill and
filter fabric are to be installed. There are not any installation details for the termination of the material
at the edge of the slab. Termination details were provided as Field Order No. 6, but were withdrawn
and the Contractor requested to provide termination similar to the two new clarifiers. Because of this
omission in the documents, Eagle did not provide costs in the Bid to cover the installation of granular
fill and filter fabric beneath BNR No. 3. Eagle is requesting $39,950.00 and seven (7) working days to
complete the work associated with this change.
The following documents are attached to support this change.
Letter dated September 9, 2008 from Glenn Grant with the cost breakdown (PCM-03).
3. Per RFI-036, revisions are required to the influent line for the Intermediate Lift Station due to conflicts
with an existing electrical duct bank. The new line was to be installed at the same elevation of the
duct bank. New elevations for the new line were provided to have the line pass beneath the existing
duct bank. Eagle is requesting $26,494.00 and three (3) working days to complete the work
associated with this change.
Black & Veatch Corporation 9441 LBJ Freeway, Suite 114 Dallas, TX 75243 USA - Telephone: 214.570.7000
Page 2
City of Lubbock, TX B&V Project 140092.6100
Mr. Soo Koon Soon, P.E. September 9, 2008
The following documents are attached to support this change.
• RFI-036 with response from Laura Stratton dated August 8, 2008.
• Letter dated August 28, 2008 from Glenn Grant including the cost breakdown for the changes
(PCM-04).
4. Per RFI-037, revisions to the temporary return activated sludge line at the Aeration Distribution
Structure were required to accommodate are more equal split to each existing aeration basin. Eagle
is requesting $3,143.70 to complete this work.
The following documents are attached to support this change.
• RFI-037 with response from Laura Stratton dated August 8, 2008.
• Letter dated August 22, 2008 from Glenn Grant including the cost breakdown for the changes
(CMR-06).
5. When the Primary Sludge Pumping Station No. 2 was inspected by the City's Building Inspector, they
indicated that vent piping and clean out be added to the drain line. Eagle is requesting $1,486.39 to
complete this work.
The following documents are attached to support this change.
• E-mail correspondence between Parkhill, Smith, & Cooper, Black & Veatch, and the City
concerning the addition of the vent and drain.
• Letter dated August 26, 2008 from Dave Mullenix including the cost breakdown for the changes
(CMR-07).
6. As discussed during Progress Meeting 05 on September 4, 2008, the waste activated sludge (WAS)
pump supplier is requesting additional compensation to add a carbide coating to the two thickened
WAS pumps and AFD enclosures to the two TWAS pumps and the three WAS pumps. Under a
separate contract with the City, the pump supplier had previously installed TWAS pump P-1202 in the
Solids Building. Under this separate contract, the supplier provided an AFD without the enclosure.
This AFD was installed in an existing enclosure by the City. Similarly, for the Contract 6 work, the
supplier prepared his bid to include the AFDs for the new WAS and TWAS pumps without enclosures.
These AFDS would be supplied by others. This was despite the specifications being written that the
new AFDs were to be supplied with new enclosures. Additionally, based on inspection of P-1202 by
the supplier, he is recommending a carbide coating be added to the new TWAS pumps that are to be
installed as part of this contract to provide additional protection to the pumps. The supplier has
discussed this with plant staff during his site visit and staff indicated that this coating should be
included. Eagle is requesting $33,739.00 to complete this work.
The following documents are attached to support this change.
Letter dated September 9, 2008 from Glenn Grant including the cost breakdown for the changes
(CMR-08).
City of Lubbock, TX
Mr. Soo Koon Soon, P.E.
Page 3
B&V Project 140092.6100
September 9, 2008
The change in contract price associated with these changes is detailed below.
Original Contract Price:
Contract Price with Change Order 01:
Net increase of this Change Order:
Contract Price with all approved Change Orders:
Original Contract Time:
Contract Time change with Change Order 01:
Net increase of time with this Change Order:
Contract Time with approved Change Order:
$43,520,000.00
$43,549,583.00
$117,047.09
$43,666,630.09
1,185 days to Substantial Completion
7 days
21 days
1,213 days to Substantial Completion
Please let me know if you have any questions regarding these changes.
Sincerely,
BLACK & VEATCH CORPORATION
Laura A. Stratton, P.E.
Engineering Manager
cc: Mr. John Kelley, P.E., Parkhill, Smith & Cooper, pdf copy
Mr. Richard Houghton, Black & Veatch, pdf copy
Mr. Gary Smith, P.E., Black & Veatch, pdf copy
Field Order No. 02
Date of Issuance: August 13, 2008
Project: Southeast Water Reclamation Plant, Water Resources improvement Project
Owner: City of Lubbock, TX
Contract. Contract No, 6
Contractor: Eagle Contracting, L.P.
Owner's Contract No.: 48119
Engineer's Project No.: 140092
Attention:
You are hereby directed to promptly execute this Field Order issued in accordance with General Conditions
Paragraph 22. if you consider that a change in Contract Price or Contract Times is required, please notify
the Resident Project Representative in accordance with General Conditions Paragraph 47. Any
modifications, including a change to the contract price or contract requirements shall be covered by a formal
Change Order executed by Owner and Contractor.
Reference:
(Specification Section(s))
IMLS1, IMLS2, IMLS4
(Drawing(s) / Detail(s))
Description: It has come to our attention by the Resident Project Representative that the access hatches
for the Intermediate Lift Station pumps are too large to fit within the space provided between the structural
beams in the roof. The spacing between the roof beams is 4'-0". The hatch frame outside dimension is
56% -inches per the data included with submittal 111501-020. This frame will reduce the size of the
structural beam by 8'/z -inches. This change to the structural design is unacceptable.
We have reviewed several options for correction of the hatch size. One option would be for the larger
hatches to be replaced with hatches with smaller frames that could fit within the 4'-0" beam spacing. Initial
discussions with the equipment representative indicate that delivery could take between four to six weeks.
A second option would be to modify the beams in the slab to accommodate the larger framed access
hatches. This change could take between one to two weeks. In an effort to minimize the delays, we
recommend that the beams be modified to accommodate the larger frames. Details are attached that
indicate the revisions required.
Refer to Drawing Sheets
Section or Detail
Refer to: Specification Paragraphs 01300, articles 1.01 and 1.02 and General Conditions of the Contract.
article 22.
Will additional drawings be necessary? (X ) ( )
Yes No
Attachments: IMLS Roof Beam and IMLS Roof Beam Support at Walls
by: ;
Accepted by Owner: I Date:
Receipt Acknowfedged by Contractor: I Date:
(2) #5 CONT
#4x2'-6" AT 10"
HATCH
SLAB BEYOND
REINF BEAM WITH
J2) #8 TOP AND BOTTOM
3 STIRRUP AT 10"
1'-2"
IMLS ROOF BEAM
3/4"=1'-0"
10m
PROJECT NAME: SEWRP SHEET: 1
ISSUE DATE: 12 AUG 2008
PROJECT ADDRESS:. REVISIONS:
LUBBOCK, TEXAS
PSC PROJECT #: 01-2680-06
0
1
REF 1 /IMLS4 FOR
f`/ 1n MrIKIC
IMLS
3/4'=1'-0"
ROOF BEAM SUPPORT AT
P..'OF r..
...............................
r IICHAEL ROLAND HOLDER
��� •. 93654 • ,��
(2) j6x 52 12
CONCRETE WALL
ALREADY PLACED
PROJECT NAME: SEWRP SHEET: 2
ISSUE DATE: 12 AUG 2008
PROJECT ADDRESS:. REVISIONS:
LUBBOCK, TEXAS
PSC PROJECT #: 01-2680-06
Eagle Contracting, L.P.
SEWRP - Lubbock Date: August 26, 2008
Job No. 171 Proposal: PCM-02
Work Description: Lower I MLS Wet Well Beams to make room for Access Hatches
Ref. Field Order No.2
MATERIAL TOTAL LABOR TOTAL
UNITPRICE MATERIAL UNIT PRICE LABOR
w�ITIT/ 1\IITQ re wnr T A
Lower Bearns of IMLS Deck
"Dismantle Deck Forms and
gwer Beams"
Five Man Crew for (5 days)
200
mhs
0.00
16.40
3,280.00
Crane Operator for (3 days)
24
hhs
0.00
20.00
480.00
0.00
0.00
Rent of Shoring System - PERI
0.25
mo
1,847.00
461.75
0.00
0.00
0.00
"Additional Beams Concrete"
0.00
0.00
0.00
0.00
Beam Sides Forms
144
sf
0.80
115.20
0.00
Install Beam Sides
44
mh
0.00
16.40
721.60
0.00
0.00
Additional Rebar
640
Ibs
0.54
345.60
0.00
Additional Rebar installation
640
Ibs
112.00
0.00
0.00
at 17.5 cents per pound rebar
1
0.00
0.00
0.00
0.00
Additional Concrete
1
cY
95.00
95.00
0.00
0.00
0.00
60 Ton Hydraulic Crane - Eagle
0.25
mo
7,500.00
1,875.00
0.00
Fuel, Oil, Grease & Maintnenance
1
Is
562.50
562.50
0.00
(30% of Rent)
0.00
0.00
0.00
0.00
112.00
3,455.05
TOTAL LABOR
F4,481.60
0.00
TOTAL LABOR W/0 BURDEN
4,481.60
LABOR BURDEN/BNFfS - 52%
2,330.43
6,812.03
TOTAL LABOR
TOTAL MATERIALS
3,455.05
TOTAL SUBCONTRACTS
112.00
SUBTOTAL
10,379.08
INSURANCE @ 2-1/2%
259.48
10,638.56
SUBTOTAL
OH & P @ 15%
1,595.44
12,234.00
SUBTOTAL
0.00
TOTAL
12,234.00
CONTRACT TIME EXTENSION REQUEST = S WORKING DAYS
SEWRP - Lubbock
Detailed Proposal
(Start of Detailed Proposall
7. Intermediate Lift Station Shoring
7.1. Intermediate Lift Station Multiflex
Pos City. Un Description Art.Nr.
1
24 PC
GT24 GIRDER X 14'
075420
2
38 PC
GT24 GIRDER X 15'
075450
3
6 PC
GT24 GIRDER X 16'
075480
4
16 PC
GT24 GIRDER X 18'
075540
5
50 PC
CROSS HEAD 20124S
028680
6
32 PC
MULTI PROP 625 (246')
027305
7
18 PC
MULTI PROP 250 (98'7
027289
8
85 PC
LEDGER FRAME MRK 150
026350
Total list
price
monthly rental (28 cal. days)
Summary Pos. 7. Intermediate Lift Station Shoring
Rental items
Pos. 7. Intermediate Lift Station Shoring
Pos. 7.1. Intermediate Lift Station Multiflex
monthly rental (28 cat. days)
Proposal summary
Rental items
Pos. 7. Intermediate Lift Station Shoring
Pos. 7.1. Intermediate Lift Station Multiflex
monthly rental (28 cal. days)
US$ US$Aotal
89.41
2,145.84
95.63
3,633.94
102.04
612.24
114.47
1,831.52
23.74
1,187.00
389.19
12,454.08
209.30
3,767.40
132.85
11,292.25
$1,846.21
Tax not included
Weight 11,417 lbs
$36,924.27
$1,846.21
$1,846.21
$1,846.21
$1,846.21
Field Order No. 02.
Date of Issuance: August 13, 2008
Project: Southeast Water Reclamation Plant, Water Resources Improvement Project
Owner: City of Lubbock, TX
Contract: Contract No. 6
Contractor: Eagle Contracting, L.P,
Owner's Contract No.: #8119
Engineer's Project No.: 140092
Attention:
You are hereby directed to promptly execute this Field Order issued in accordance with General Conditions
Paragraph 22. If you consider that a change in Contract Price or Contract Times is.required, please notify
the Resident Project Representative in accordance with General Conditions Paragraph 47. Any
modifications, including a change to the contract price or contract requirements shall be covered by a formal
Change Order executed by Owner and Contractor.
Reference: IMLS1 IMLS2 IMLS4
(Specification eytion(5)) (Drawing(s) / Detail(s))
Refer to Drawing Sheets Section or Detail
Refer to: Specification Paragraphs 01300, articles 1.01 and 1.02 and General Conditions. of the Contract
article 22.
Will additional drawings be necessary? (X ) ( )
Yes No
Attachments: IMLS Roof Beam and iMLS Roof Beam Support at Wails
Accepted. by Owner: I Date:
Receipt Acknowledged by Contractor: I Date:
0
I
OF Tf
MICHAEL ROLAND HOLDEF
93654
(2) #5 CONT
#4x2'-6" AT 10"
HATCH
SLAB BEYOND
�- REINF BEAM WITH
�2') #8 TOP AND BOTTOM
3 STIRRUP AT 10"
1'-2"
1MLS ROOF BEAM
3/4"=1'-0"
Op
PROJECT NAME: SEWRP SHEET: 1
ISSUE DATE: 12 AUG 2008
PROJECT ADDRESS:. REVISIONS:
LUBBOCK, TEXAS
PSC PROJECT J: 01-2680-06
a
CD
r � �• ii'
*........................:*.
MICHAEL ROLAND HOLDER
93654
REF 1/IMLS4 FOR
QI AM E2rt\Ir
(2) #6x 52 12
CONCRETE WALL
ALREADY PLACED
IMLS ROOF BEAM SUPPORT AT WALLS
3/4'=1'-O"
PROJECT NAME: SEWRP SHEET: 2
ISSUE DATE: 12 AUG 2008
PROJECT ADDRESS:. REVISIONS:
LUBBOCK, TEXAS
PSC PROJECT #:01-2680-06
Yahoo! Mail - g.grant@eaglecontractinglp.com
Page 1 of 1
MALL. SUI Print - Close Window
Date: Tue, 12 Aug 2008 13:31:20 -0700 (PDT)
From: "glenn grant'<g.grantLOeaglecontractingip.com>
Subject: SEWRP - Lubbock (IMLS Pump Hatches)
To: "Laura Stratton" <strattoniaObv.com>
Dear Laura,
I have attached a copy of Parkhill's Beam Drawing and two Hatches Drawings from J&L.
The dimension between hatches will be different than parkhiil drew. Is this a problem?
Thank You,
Glenn Grant
Eagle Contracting, L.P.
Attachments
Files:
if IMLS_Pump Hatche®_8_12_08.pdt (154k)
http://b5.mail.yahoo.com/ymleaglecontractinglp.com/ShowLetter?box=Sent&MsgId=3080_87b0577 1959 ... 8/12/2009
08/12/2008 13:15 9724752301 EAGLE CDNTRACTING PAGE 01/01
11
W
O
U
h
W
W
L3
I
---_HINGED-SIDE OF GRATES
\\ ♦\
°
\ ♦\\ \a\ \ a
°i°%i�°iii°i°i
Xv xv
\ \/\i\i\°\/\°\A.AA MM:1
°\\°\ r °
OF
i° i /° ° °°%r%°°i
�AN �
SAFETY GRATE
PADLOCK CLIP
LIFTHANDLE
81' HATCH OD
72' ACTUAL OPENING
LIFT ASSIST ON COVE
ACTUAL NUMBER OF GRATES DEPEND
ON FINAL LIFTING WEIGHT
Of GRATES. KEPT AT MAXIMUM
OF 30 LBS OF PULL REQUIRED
.r----TO OPEN GRATE----T
7fr HATCH FRAME OPENING
DRAWING NOT TO SCALE
Style 'FLED-AOSH-DD' access
hatch, as manufactured for ITT
Flygt Corp by Syracuse
Castings (Western Regional
Office In Tooele, UT.
Teti 901-544-572B
z
i
Faxi 801-544-9571,
9
N
a.�
�
1�.
""b �
Material shall be 6061-T6
for
aluminum bars, angles, and
a
- s v)
extrusions. 1/4' diamond plate
iy
4 £
shall be 5086 aluminum, Exterior
y
y
•�
of frame which comes In contact
w
with concrete shall have one
J Q
eo
er
r
6
::.. 66 ``
S V
coat black paint.
Z
Q N
=
Unit designed pedestrian rated,
in
for a minimum live load of 300
N
lbs./sq.ft,
Each door equipped with a hold
open arm, Doors shall lock
�.
open In the 90 degree position.
Grates will lock open at 90
12' THICK
ROOF SLAB—�-
—�
degrees.
All hardware shall be stanless steel. Each door shall be supplied with
a heavy duty, stainless steel
Hatch shall be supplied with a recessed slamlock. lift assist, for ease of
Each cover shall be equipped with an aluminum lift operation when opening,
handle, The lift handle shall be flush with the top of Angle frame shall be of
the 1/4' diamond plate. extruded aluminum, with a
continuous 1-1/4' anchor flange.
Unit shall be supplied with multiple hinged safety
grates to provide protection against fall through and Cover hinges shall be of heavy
to control access to the confined space, duty design, Material shall be
grade 316 stainless steel.
Unit supplied with safety chain
T n t L S�) on open side, (opposite of safe
i hatch).
12' THICK
is ROOF
SLTAB
I
E(M
E_ - A Padlock cAo
(Padaik Sk4plbd B,r oua�)
Unit supplied with exposed
padlock clip. (details this page),
O
U
LL.
f�
0_
U
O
a
a)
O
O
id
N
LL
0
IL
a)
.0
N
U)
U)
0
L-
n.
LL.
In
IL
if
SLAB THICKNESS
"FDRN" STYLE PEDESTRIAN RATED
SLAB THICKNESS
1 Q� STYLE
PEDESTRIAN RATED
ALL LIGHT DUTY AND HEAVY DUTY HATCHES ARE AVAILABLE WITH SKIRTS
TO MATCH THE SLAB THICKNESS. THIS OPTIONAL ITEM IS A LEFT IN PLACE
FORM WHICH HELPS ELIMINATE ERRORS DURING INSTALLATION
1) Caution: Cover may be spring loaded.
2) Remove tee handle (if equipped with
slamlock) attached to underside of hatch.
Remove threaded plug for access to
outside slam lock release.
3) Place hatch on formed opening so that
lift handle is in desired location. Be sure
unit is set on a slight pitch toward drain
comer and that drain is connected (on
"FDRN° styles only).
4) Before pouring concrete or anchoring in
place, open and close door(s). Check to
ensure that door(s) rest evenly on all
sides of frame. If not, shim under flame
at proper corner. Check for proper door
operation
5) With door(s) in closed position, pour
concrete flush with top of frame.
Exercise care to prevent concrete from
getting into the frame or around hinges.
6) Support frame to prevent sagging. Do
not permit the weight of the concrete to
push the frame inward which will reduce
clearances between door and flame.
7) Do not allow flame to twist or rack.
September 9, 2008
Black & Veatch Corp.
9441 LBJ Freeway - Suite 114
Dallas, Texas 75243
Attn: Ms. Laura Stratton
RE: Southeast Water Reclamation Plant Improvements
Contract ITB # 07-730-BM — Project # 92126
The City of Lubbock, Texas
Black & Veatch Corporation
Subj.: Proposed Contract Modification (PCM-03) per Field Order No.6
(Add 6" Excavation and 6" Crushed Rock Bedding with Filter Fabric and Poly
Cover under BNR#3's Slab)
Dear Laura,
Eagle Contracting, L.P. requests the Total Lump Sum Amount of Thirty Nine Thousand
Nine Hundred and Fifty Dollars ($39,950.00) to cover the cost of this work as defined in
Field Order No.6. Please note that we have removed the extra excavation and Bedding
outside of the Slab. We also request seven days of Contract Time Extension for this
work.
............. _........ _.
With Kindes egards,
^Grant
Project Manager
cc: File (Proposals), Lubbock — Soo Soon, B&V Field — Rich Houghton & Field
P.O. Box 1600 0 Keller, Texas 76244 0 Metro (817) 379-1897 Metro (817) 379-0610 Fax
Eagle Contracting, L.P.
SEWRP - Lubbock
Job No. 171
Work Description: Add 6" Crushed Rock Bedding under BNR Basin #3
Ref. Field Order No.6
ACTIVITY
Add 6" Crushed Rock Bedding
undqrr BNR Basin #3
Note: this work will require an 5 man
crew with 3 equipment operators =8
men at 8 hours per day for 7 days at a
manhour rate of $16.40/mh.
6" additional structural excavation
Haul Excess to Stockpile
Spread Excess at Stockpile
Filter Fabric
Crushed Rock Bedding
Poly ontop of Rock
Construction Equipment:
PC 480 Track Hoe - Eagle-1wk
Kawasaki Rubber Tire Load-Eagle-2wk
Dozer- Hertz - 1wk
Smooth Drum Roller-ASCO - 1wk
Bobcat to spread Rock - Hertz - 1wk
Fuel, Oil, Grease and maintenance -
30% of Rent
Small Tools (5% of Labor)
TOTALLABOR
TOTAL LABOR W10 BURDEN
LABOR BURDEN/BNFTS - 52%
TOTALLABOR
TOTAL MATERIALS
TOTAL SUBCONTRACTS
SUBTOTAL
INSURANCE @ 2-V2%
SUBTOTAL
OH&P@15%
SUBTOTAL
QUANTITY UNITS
448.001 mhs
429 cys
601 tys
429 cys
30063 sf
858 tons
27000 sf
0.10 mo
0.10 mo
0.10 mo
0.25 mo
0.25 mo
1 ! Is
Date: September 9, 2008
Proposal: PCM-03
MATERIAL TOTAL LABOR TOTAL
UNIT PRICE MATERIAL UNIT PRICE LABOR
0.00
3.00
1,803.00
0.00
0.00
0.08 .
2,405,04
15.50 i
13,299.00
0.03 ,
810.00
0.00
0.00
9,500.00
950.00
4,600.00
460.00
3,300.00
330.00
4,416.00
1,104.00
1178.50
294.63
3:138.63
941.59
i
0.00
0.00
7,347.20 I
326.95
0.00
{ 0.00
i
CONTRACT TIME EXTENSION REQUEST = 7 WORKING DAYS
SEWRP - Lubbock
16.401 7,347.20
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
7,347.20
11,167.74
22,724.20
0.00
33, 891.95
847.30
34,739.25
5,210.76
39,950.00
0.00
39,950.00
Field Order No. 06
Date of Issuance: August 26, 2008
Project: S%MeaetWater Reojamation Plant, Water Resources Improvement Project
Owner: City of Lubbock, TX lowner`s Contract No.: #811
Contract: Contract No. 6
Eagle Contracting, L.P.
Engineer's Project.No.: 140092
Attention:
You are hereby directed to promptly execute this Field Order Issued in accordance with General Conditions
Paragraph 23. If you consider that a change in Contract Price or Contract Times is required, please notify
the.Flesident Project Representative in accordance with General Conditions Paragraph 47. Any
modifications, including a change to the contract price or contract requirements shall be covered by a formal
Change Order executed by Owner and Contractor.
Reference: A84-12, MD3
(Specification Section(s)) (Drawing(s) J Detaii(s))
Will additional drawings be necessary! (X ) ( )
Yes No
A#achment$,. F;gure F06-1 showing the termination of the material at the BNR slab..
Accepted by Owner _ I Date:
Receipt- Ackno "I"ed b ntractor.: I Date:
. . . . . . . . . . . .
CKF L
. . . . . . . . . . . .
El 3144.0t
SANDS T9M,5
GRANULAR FILL
F06 1
oa:f N
%.lot
......
U ......
URA A. STIAl
92011
—,I&-A408
10J031�98 11:36 5173790610 EAGLE CONTRACTING LP PAGE 02/04
• RFM, AUG 0 5 2008
v ORIGINAL INVOICE
PROGRESS BILLING
mdai y12e10e jam
THANK YOU FOR RENTING FROM HERTZ[
CUSTOMER NUMBER; 0135262
RMIQUOTE NUMIBER: 17340499
INVOICE NUMBER: 23598396.001
EAGLE CONTRACTING LP
PO NUMBER: WED
JOB NUMBER: 1 - WATER PLANT
P 0 BOx 1800
ORDERED BY: RON BRAY
KELLER, TX 716244-1e00
SIGNED BY:
DKIVEREO SY, HERO
RENTAL START DATE: 81301M 11:06
CLOSED -By, i
SALES RIP: DICKIE DAVIS
SHIPPING ADDRESS:
HERTZ LOCATION: 490
RENTAL DAYS: 28
INYOXX FROM DATE: 6130108
WATER PLANT
3424 E. SLATON HUVY
INVOICE THRU DATE: 7124104
BOTH a JAVA
LUDDOCK.TX 7904
LUBNOCK, TX 75401
Ph: SO6.746.3500
Fes:806.745i048
ORIGINAL ADJ TOTAL
PAYMENT TERMS ARE NET 10 DAYS
RENTAL CHARGES 3300.00 3300,00
DELIVERY/PICK UP
150.00
Customer is rosporsrihia ter FUEL. FLATS. DAMAGE and
j TAXABLE CHARGES 3450.00 3450.
CLEANUP FM$.
TAX
353.45 1"93'919r
LATE CHARGES MAY APPLY
TOTAL CHARCIE6
3.65 3665"er
FOR CUSTOMER SERVICE AND BILLING
I1+tQUIRtES CAI.[. I-800456-[i442
J P
.
I6r.r..r........-.. Ant
ZCt` I'JlY»I1"Y'Oe
Red
HERTZ ECkUWMENT RENTAL CORPORATION
Vendor Y• r
P.O. BOX 8SC280
r�
DALLAS. TX 75233-0280
OtY zq%l�pment 4 Mrs/ xin Rour Day week 4 week AMO=t
1 DOZER/00-9S 9P/STA=ARD TAACK/DSL $/ 420.00 A�4,40 995.00 33CD.00 336D.40
2000BS025 Make: DEERE Modal: 550J $er #: 7055DJR1140.12
HR 07Ts 1929. nO 1M IN: >M CHO: t ,�
For GREAT DEALS on U4ED IQUIPMONT •visit us en -lima at y+r�,ttdug&i ppp1
Detach and sand bottom portion with payment.
DAOLIE CONTRACTING L/ 71ZD/db CWtomsr Number, 01352t2
P C BOX 1600 Invoice Number: 23596396-001
10ELLER,TX 762d4-1000
►LRASE PAY THIS AMOUNT: .$S
1nFndrznna ll:db tll/B/ybblb
621
14srroafatea�aa ls.pply Coonp�ny, �oeai.
83TABLISHED ISOO
EAGLE CONTRACTING LP PAGE 03104
INk
LUMQk, TEXAS
AMA10LL0, TEXAS OMBA, TWO MICHRA FAt1.% TSXA.a
PHONe: IM746,2000
PHONE SCt)19T94M PHONE: 4M37.28Z PHONE: 24aw-272a
FAX! 4D6/748.1;68
FAX; 90072.1000 FAX: 4==7-MIS FAX; 640OP-2724
PIRR1rTON, TOM
MIDLAND, TEX" CLOWS, NEW a1IWW DALHAAT, TWO AWLIENE, MAO
PHONE: 604Q6.7773 PHONE 431t$1409 PHONE: 97W42-Me PHONE: 3OW44-1a4O PHONE: 32640B-E72a
F1Ji: SOW443.7197
FAK 4U488.6W PAX, 51,032•Bt41 rAX: 8M44-1841 FAX: 32SBB&V4o
Customer I N V 0 I C E Invoi Ce Ps
26073
Document
R91405 5/24/08
Said To RECD ,SUN 0 2 2008 Snip To
EAGLE CONTRACTING CORP. RON BRAY
P.O. BOX 1600 EAGLE CONTRACTING CORP.
KELLER TX 76244 GUAVA STREET
LUBBOCK TX 77777
$171379-1897 $171379-i897
Ship Via ASCO TRUCK
--- --------------------------...--w----------.-----------.........---------...__
Sr Irk Make Model ser-ial Equi,pmomt Motor als Customer P.O.
---------------------------------- -..--. ----------- --------------- —-------- ---
001 44 QUAVA
----------..-----------------...--------...---------_----_.-------------_—_--------
Osp�dr Ship De4cp i p t i on Each Amount
-----------------------'�..rr. w�..�-- �--.--------- --�--- ---- ------.r--�w+�w,w-- -------- - --- --
Taken By JOE ROCHA
Rental Contract RIP1405
lPee-iodl 5/ZI /0B Thru 6f 1710$
1 1 90 600302 9WZ1 1 PD-3 C101580871104
DC14AG 'VIBRATORY 91tCLE DRUM
1 ENVIRONMENTAL FEE
I PICKUP/DELIVERY
9 4,416,010
I ION -TAXABLE
MUNI JOB
Ty
Pe Code Z.
1,3116tus �.....�....�,.. Amt
r1.,4
44.16
.00 N/C
FMT DUE ON DATE or INVOICE. ANNUAL IWTEREST OF 6X
WILL HE CHARw'ED STARTING 30TH DAY AFTER DUE DATE,
4,416.00
44.16
.00
------------ ------------------------------- --. --- -----_--_-.....---------------
i'otal 4.4ia4. 16
1MENwCUMw (8 v----_--�_-----,.."TMRT-T(EipImprair (FIVGICB'--•• �n�ft P.Oto: A900
:uetwere eaaeptanoe of a to gwde and serriou, ouateteer anreaa ta, ha rod and eaoapt4 all liens, . Sox 3t3b9 • Labboek. Tarot 79452
to and abrtdltlono ete emea here and on the mame aids homml. ..
ORIGINAL COPY
10/03/200EI 11:35 9173/ybblb
�-__-
wF7m
tI�UL.t WN I KAL I 1 Nb Lr'
FINAL BILL
ORIGINAL INVOICE
7110100
THANK YOU FOR RENTING FROM HERTZ!
CUSTOMER NUMBER; 0135252
REe/QUOTE NUMBER,
rAVt F74� n4
MOD JUL 16 202 �1
I
i�IIY�NNi�llfll�il{I���{{���I�I�
INVOICE NUMBER! 23348208-001
EAGLE CONTRACTING LP
NUMBER:
171PLANT
JO
JIOt NUMBER:
1 -WATER PLANT
` P O EIOX 1 Soo
ORDERED SY:
DAVIS, DICKIE
01-LE:i. TX 762"-1600
SIGNED BY:
DAVIS, DICKIE
DELIVERED BY:
HERO
RENTAL START DATE:
9l13108 13:59
CLOSED BY:
JAMES t, OWENS
SAL29 REP:
DICKIE DAVIS
SHIPPING ADDRESS:
WIRTZ LOCATION: 450
RENTAL DAYS;
27
INVOICE PROM DATE:
6113ios 14:00
WATER PLANT
242i E. SLATON HWY
INVOICE THRU DATt:
7X)S!OB 17:00
SDTH aV JAVA
LUBBOCK, TX 7M04
LUSSOCK. TX 79401
Ph: 806-745.3500
FaX406-748 404d
ORIGINAL
ADJ TOTAL
PAYMENT TERNS ARE NET 10 DAYS
NNTAL CHAR0111
1175.00
1175,00
OTHER CHARGES 3.50
3.50
Cuslarner le ►aaponslble for f1JEL. FLATS, DAMAGE and
DELTVERY,PICK UP 75.0D
0
CLEANUP FIRS,
TAXABLE CHARGES 1253.50
7258.50
LATE CHARGES MA'V APPLY
TAX 129."
TOTAL CHARGES 1301.94
44e%"
FOR CUSTOMER SERVICE AND BMLING
LNQLMUS CALL 1-800.48E-4442
In nm rT tATb=r ilk
HERTZ MUIPNIENT RENTAL CORPORATION
P.O. BOX 650290
DAL.LAS, TX 75205-0200
j NET DUE 1381.94 j
t r
Qty Equipment 14 r. r1 Hxs/ VAX flouryap Wank 4 week Amowak
1 CRAWLER, W DER/l/2 YD/G=RAL/DSL S/ 160.00
206055034 Maka: TA.X8V4H1 Model: TL1�C sex 4: 2i3 3401
Hours Free:
HR OCTTr 1419.200 FIR IN. 1449,600 ?OTALj 30.400
FM1% 16C.000 ECC8B8; 0 Hw CH3, 3.672
ENVIRONMENTAL, RECOVERY PSES GSB60000DIjob
DA 7 TYPE
7/10/08 HERTZ CHARGE TYha
�ati�B
Fw
Vendor
Date DLS ._-
160,00 393,00 1175,00 1175.00
B 40 160
1 3,50
Phaee.�._,�t � _ F1yCrrar
CQdg I 2s81.94
Amt
For GREAT DIALS an USED EQUIPMENT - visit us Sri -fins of www.hartze ptp,
Dataoh and send bottom portion wM paYmam.
EA3LE CONTRACTING LP 7110ME Cuatemst Number: 0136261
P O BOX 1600 Invales Numbor; 23548205-001
KILLER. TX 78244.1600
i PLRASE PAY THIS AMOUNT: 1381.94
PROJECT: SOUTHEAST WATER RECLAMATION PLANT IMPROVEMENTS
OWNER- THE CITY OF LUBBOCK TEXAS
CONTRACTOR: EAGLE CONTRACTING LP
ENGINEER: BLACK & VEATCH CORPORATION
PROJECT NUMBER-
92126
171
REFERENCE DATA:
Contractor RFI No. 036 Spec Section N/A Page No. N/A Para. N/A
Drawing No. CY9 & E2 and Sketches
CONTRACTOR REQUESTS: ® information ❑ Interpretation ❑ Clarification
We have found that the existing Duct Bank south, west and north of the West end of the Headworks
conflicts with the 36' Headworks Discharge Piping (48" IMLS Influent). The top of the new 36" Piping is
at 3148.00 and the top of the 30" thick Ductbank is at 3149.34. How do you want to re-route this piping?
CONTRACTOR'S PROPOSED SOLUTION:
REQUESTED BY: DATE:
08/05/08
ENGINEER'S RESPONSE: ❑ Information ❑ Interpretation
For the items described above or in the attached material referenced:
The pipe should be lowered 30-inches to accommodate
® Clarification
the duct bank.
See attached sketch.
RESPONSE BY: Laura Stratton
DATE:08/08/2008
S:1SandMagle Co*acgng FIIesUob FUes1171- Lubbock W WTPIRFI'8%RFI-D36-Cmflicts 43 IMLS Plpe and EtecMcel Ductbank.doc
IT
lam
R au,.w
a Jrer.w
'
3Sria
4}
V.Prr�c
i III
]u°
Join .el
ib
t +�.
mro ooac �xasserr.
•ems , ji�,�<'�
s
nox eqr par troy
"'h
ar o•»
0•M I.»
I.w a•» a•w
a•»
J.w +.W NM s.»
a•M a•» a.w r.» 0.
42• PNrIWiY DISTRINWTrON STRtaCTUPE
S�
►(� .
IwLIkM
i
rura: rw•
reel: r•ro•
{ f
1
ffF �(F•
B
i
�
i
8
3
��
a
f•
g
9
arm g
A.
arm
a
e
i
VIrc15
<
arm
s
arm
4
N
-.
- --
0
�i
G
4oPoA3,ki
210ti
2
YyrrJIM
Y
exgl
N
+2•
ae eet
NeOa
m rLL
G
rE�msr.w
J,p
Jtp ra
�
Jtp
]rp 1
e•w !,»
o•» o•M
]E 31�i1.50
,•» ,•»
z.»
a•M
a.»
o•w o•w
re
owo
ra,r», ,w
rOr!
'
ldal.11E, IrfleMF, 6 AlPIA[a r+• OGpv
YOUR, eooR, { xrPl.eE! r+• mM
LOInl10. a t rla' aw Ja xfa,/xm m
IQI]Ll IIIII PIM.
aa' P(i21lSRY DISTRIBUTION STRUCTLWE
CONx10L • r ,/]• 8{a
r,ac.rL .rer Pln.
Y IfWlxlO m
ae' INTERlIEDIATE LIFT STATION
28' fNTEAYE0IA7 LIF( STAiIQV
ae• INTEgtlEOlATE LIFT STATION
INFLUENT
Macs: 1'•w•
rwL Nr
hM/e: r•-»'
INFL /PMAL���rr Nl�
14ale: I-C -
INFL T�
gars: I••»'
1/MIaMCOM qI
.Mlq{ r• nx!{uxon
veer: r.,o•
rLn: r'•ro'
WRr: P-m'
rsAr: r ra
»a NrO.ra01 W,
T40092
CY9
j
EfB
Qy
OF2oi
08/05/2008 09:49
9724752301 EAGLE CONTRACTING
PAGE 02/03
0000
10001
9 0 O
0 0-
0 O O
' U00
1 00000b 0000
I 000000 0000
i o0000a o000
0000
F 11
ft
�ff
4
a&JYWMr NATO RiOM
s�
ca.
BLACK & VEATCH
swil 14 V�
08/05/2008 09:49 9724752301 EAGLE CONTRACTING PAGE 03/03
f4so two p+ea sfm 3+eo 4rm ++eo
4x' mZ'A y A SLng2 TSON 97R omps
am,,
Vdart 11-10,
MEN
0101.Q0
! � FQ � 1am1 Y6 ]f46.0l
IS 9 OO.OD—
,ti q y ]140 0.0� a.� ,f,� ,rso i; -: w �- �-, M'fT4r, „M,,,,-
oONiNpf. 6 f 112' CM A?
r�f,Atq� , e MR.4W 14' OM rAgrALL W PIPE-
' oAr AX Feautam ro 48' XNTM?tAre lJr-T $r67ZQN ae
S W-Dxv>ptu�Arf • r
O �
p r pot w
31+.o"Do
August 28, 2008
Black & Veatch Corp.
9441 LBJ Freeway — Suite 114
Dallas, Texas 75243
Attn: Ms. Laura Stratton
RE: Southeast Water Reclamation Plant Improvements
Contract ITB # 07-730-BM — Project # 92126
The City of Lubbock, Texas
Black & Veatch Corporation
Subj.: Proposed Contract Modification (PCM-04) per RFI-036
(Lower the new 48" IMLS Influent Piping at the Headworks to miss the Existing
Electrical Duct Banks)
Dear Laura,
Eagle Contracting, L.P. requests the Total Lump Sum Amount of Twenty Six Thousand
Four Hundred and Ninety -Four Dollars ($26,494.00) to cover the cost of this extra. work.
We also request three days of Contract Time Extension for this extra work.
This change will delete the conflict between the two electrical duct banks and the new
48" MILS Influent Piping at the Headworks.
With Kindest Regards,
G enn- rant
Project Manager
cc: File (Proposals), Lubbock — Soo Soon, B&V Field — Rich Houghton & Field
P.O. Box 1600 0 Keller, Texas 76244 & Metro (817) 379-1897 a Metro (817) 379-0610 Fax
Eagle Contracting, L.P.
SEWRP - Lubbock Date: August 28, 2008
Job No. 171 Proposal: PCM-04
Work Description: Lower 48" IMLS Influent Piping to go under Existing Electrical Duct Banks
Ref, RF1-036
MATERIAL TOTAL LABOR TOTAL
UNIT PRICE MATERIAL UNIT PRICE LABOR
�ITITV I IAIITC ITT
Lower 481' IMLS Influent Pine to go
under Existing Elec.Duct Banks
Note: This work will take a (7) man
crew (3) days -168 mhs x $16.40/mh
Additional Pipe Excavation
144
cy's
0.00
4.00
576.00
Hand Excavation @ two Duct Banks
6
cy's
0.00
30.00
180.00
Support Duct Banks @ Crossings
2
ea
0.00
200.00
400.00
Feed Pipe under Duct Bank -
19
if
0.00
35.00
665.00
Added difficulty In pipe installation
0.00
0.00
Additlonal Pipe Backfill
150
cy's
0.00
6.00
900.00
0.00
0.00
Purchase changes In Pipe from -Hanson
1
Is
15,000.00
15,000.00
0.00
0.00
0.00
Kobelco 480 Track Hoe - Eagle
0.15
mo
9,500.00
1,425.00
0.00
Kawasaki Rubber Tired Loader - Eagle
0.15
mo
4,600.00
690.00
0.00
Walk Behind Compactor - Hertz
0.25
mo
1,400.00
350.00
0.00
Fuel, Oil, Grease & Maintenance -
1
Is
2,465.00
739.50
I 0.00
30% of Rent
0.001
0.00
1 0.00
0.00
Small Tools (5% of Labor)
1
Is
136.05
136.05
0.00
0.00
0.00
0.00
18,340.55
TOTAL LABOR
2,721.00
0.00
TOTAL LABOR W/O BURDEN
2,721.00
LABOR BURDEN/BNFTS - 52%
1,414.92
4,135.92
TOTAL LABOR
TOTAL MATERIALS
18,340.55
TOTAL SUBCONTRACTS
0.00
SUBTOTAL
22,476.47
INSURANCE @ 2-1/2°k
j
561.91
SUBTOTAL
I
23,038.38
OH & P @ 15%
3,465.62
SUBTOTAL
I
f
26,494.00
0.00
TOTAL
! 26,494.00
CONTRACT TIME EXTENSION REQUEST = 3 WORKING DAYS
SEWRP - Lubbock
Yahoo! Mail - g.grant@eaglecontractinglp.com
Page 1 of 2
`+V&MR)OEsMALI. SUSINIMS
From: "T. Scott Baugh` <tsbaugh@baughinc.com>
To: "'glenn grant'"<g.grant@eaglecontractinglp.com>
Subject: RE: FW: SEWRP - Lubbock (RFI-036)
Date: Wed, 27 Aug 2008 11:32:44 -0500
Print - Close Window
Since the pipe for IMLS was all build some of the changes are additonal materials and some are modifications to materials that
have already been built. When I made the estimate I didn't know for sure what could be salvaged and what would have to be
remade. Based on the release drawings the cost will be $15,000.00 for the followin changes:
Sheet16A
B233 - 36" 15.000 Bend, w/ Bell Prepped for JH (additional materials)
6235 - 36" 15.00" Bend, w/ Bell Prepped for JH (additional materials)
8236 - 36" 15.000 Bend, w/ Bell Prepped for JH (additional materials)
8238 - 36" 15.000 Bend, w/ Bell Prepped for JH (additional materials)
BX88 - 36" 8-303 Short Pipe LL = 17.26' (modified from BX88 LL=28.25')
BX234 - 36" B-303 Short Pipe LL = 8.00' (modified from BX88 LL = 28.25')
BX92 - 36" B-303 Short Pipe LL = 21.01' (modified from 92 LL = 32.00')
BX237 - 36" B-303 Short Pipe LL = 8.00' (modified from 92 LL = 32.001)
6 Ea. 36" Snap -Rings (additional materials)
Sheet 16
BX83 - 48" B-303 Short Pipe LL = 8.21', w/ 0.480 Bevel (modified from BX83 LL = 8.25', w/ 1.40° Bevel)
Sheet 15
B77 - There is no change to this pc, however it will now be rolled down 0.92°.
Sheet 24 - this is not related to the change in the IMLS piping.
SX162 - revised lay length to match the contact drawings stationing.
Please let me know if you have any additional questions. In a nut shell the $15K pays for the 4- New 36" 15.000 Bends and
additional snap -rings to change the elevation of the line. Plus some additional expense to modify pipe that had already been
fabricated to the new lengths required to install the bends.
Thanks,
Scott
-----Original Message -----
From: glenn grant[mailto:g.grant@eagiecontractingip.com]
Sent: Wednesday, August 27, 2008 10:42 AM
To: tsbaugh@baughinc.com
Subject: Re: FW: SEWRP - Lubbock (RFI-036)
Dear Scott,
Which pieces of pipe have changed (that make up the 18K of change? Is it every piece that you show on your drawing?
Glenn Grant
Eagle Contracting, L.P.
"T. Scott Baugh" <tsbaugh@baughinc.com> wrote:
Resending ..... price for change is $18,000.00
-----Original Message-----
http://b5.mail.yahoo.com/ym/eaglecontractinglp.conVShowLetter?box=Inbox&Msgld=7323_31823498_3 5... 8/27/2009
REQUEST FOR INFORMATION
PROJECT: SOUTHEAST WATER RECLAMATION PLANT IMPROVEMENTS PROJECT NUMBER:
OWNER: THE CITY OF LUBBOCK TEXAS 92128
CONTRACTOR: EAGLE CONTRACTING LP 171
ENGINEER: BLACK & VEATCH CORPORATION
REFERENCE DATA:
Contractor RFl No. 036 Spec Section N/A Page No. N/A Para. N/A
Drawing No. CY9 & E2 and Sketches
CONTRACTOR REQUESTS: ® Information ❑ Interpretation ❑ Clarification
We have found that the existing Duct Bank south, west and north of the West and of the Headworks
conflicts with the 38" Headworks Discharge Piping (48" IMLS Influent). The top of the new 36" Piping is
at 3148.00 and the top of the 30" thick Ductbank Is at 3149.34. How do you want to re-route this piping?
CONTRACTOR'S PROPOSED SOLUTION:
REQUESTED DATE: 8Q /05/08
(-
BY -
ENGINEER'S RESPONSE: ❑ Information ❑ Interpretation ® Clarification
For the items described above or in the attached material referenced:
The pipe should be lowered 30-inches to accommodate the duct bank.
See attached sketch_
RESPONSE BY: Laura Stratton DATE:08/08/2008
SftSandllEagle Con"cthg FII"U* FRW171 - Lubbock 4W rP'AFPs%RF{-038-Cwffcta 48 IML9 Plpe and SwMcal Ductbank.dco I
'Wit
I
I
1
.
T
V
.... .�
e
..._......_._.,.,•..
y...._.
8
r(�l.F.ldJOl�
�
... ... •.�.�-- .._ _... ..--_
_ ..__
I4
ff-'�
I�aYY
__r_1..�
I
'
ilal I
� _
_ �.
... ..• •x
a
fY"!Gi !!H LLII'T
YC01O'an
_ uw rin aY irwl
i
aw
a•Ji wN I.M
I•w r•w hY
a•o ]W fMi NY w a»o FN
Pw NM /•Y .
>x•
s
a+u
llY
azfal �
alai i{
1
al.a
i
]li
tiY �.w
• r*rw4wOISraI9ur 1 T�;tNE
Wr: --
!!
a
Orsreraurll
wr2 I•m•
1 ,
' IE 3(ljL50 usge
i
a•0� a4� l+Y 1!M a.w Nw iW
!au
fOpAR, aught, a AAfAir u• mil
RlaaoL a 1 Ila• W garleYr, w
O/NtL m►im 40' INe®i1�I,HA?�
r
ra: I-W
a- le.w aw
36*
4 ugrxa
nY
ow «Y aal/«Y
mute. lmq. � rua u• aoa
AvaOl � rlre.
[MTOWWATE Lrrr STATION JV' L y�EDI r ffTMW
wl rw tlFLt7iwu: raw
•-w• ten. r•Ir
0g/05/2006 09:49 9724752301
i
i
tAGLE CONTRACTING PAGE 02/03
d0
90 :0:CUU
E)(D
00
t o00
000
00000� 0GG) 0
o�0000 oQoo
0000ao °°°O
o.0Ge
it
t q
A d
d••
••
a y
w
y>
zt
BLACK 6 VRATCH
nr A
08/05/2008 09:49 9724752381 EAGLE CONTRACTING PAGE 03/03
42• Mao Y nzsrRr MON gnoft
A zld,
vmrf v-,nl
ails
f
i
r
ram
d11tl
aTef.de
,f
y ff
fE 3120,90
t14W 3Yf also aoe o+aa ,�ao '" i�Sa 7ioe z.w �a'+ao NOW Prop
NOTE: favm ,i1 112 • AdK
pA rary�fq� , A mot" Y4• omn � A9V AI
Pa. RAf A7
fd4RILr. A ' WJ At A►WIM rO
is- z�rr>oznre _�.r�r r r ao • z
rrr
fhi �1 �i+'�3� ►�
31`A."Do
August 27, 2008
Eagle Contracting
P.O. Box 1600
Keller, Texas 76244
Attention: Mr, Glenn Grant
SUBJECT: LUBBOCK, TEXAS
Southeast Water Reclamation Improvements
Hanson Job No. 08-022B
Gentlemen:
■o■
MINN
"' Hanson
Hanson Pipe& Precast, Ina
South Central Revlon
1003 k MacArthur 131vd
Grand Prairie
TX 75050
Tel 972 262 3600
Fax 972 264 6236
www.hansonpipeandprecastcom
Enclosed are one copy of our drawings No. 08-022B, sheets 15, 16, 16A, 24, D18A, D19A,
D22A, D24, D44A, D45A, D55, which show the material we are furnishing for the subject
project. Please arrange for the distribution of the enclosures.
These drawings have been approved and issued for the manufacture of the material as
shown.
Please note the following items:
1. On sheet 15, we have revised the profile of pieces B77 thru BX81 to reflect the profile
changes requested by the consulting engineer.
2. On sheet 16, pieces BX88 thru A90, 92 thru TP97, and JH4 thru JH7 have been moved
to sheet 16A.
3. On sheet 16, we have revised the bevel angle and laying length of piece BX83 to reflect
the profile changes requested by the consulting engineer.
4. On sheet 16A, pipe #92 has been deleted, pieces B233 thru B238 & BX92 have been
added, and BX88 has been revised to reflect the profile changes requested by the
consulting engineer.
■a■
rr•
O"Hanson
Page 2
08-022B
If you have any questions In regard to delivery, please contact Jerry Vaughn at
9721262.3600.
Please feel free to call on us whenever we may be of further assistance.
Very truly yours,
Hanson Pressure Pipe
r
Jimmy Torres
Senior Engineering Coordinator
Enclosures
cc: Baugh & Associates, Attn: Mr. Scott Baugh, 1 copy
RELEASE COPY
AUG 2 7 2008
WAO FOR H+MUTION
N�g
MATERIALS LIST
PC. No.
DESCRIPTIONS
SHT.
NOTES UNLESS NOTED OTHERWISE, CONDNUED
U
ALL GASKET JOINTS ARE TO 8E ON SHEET 16
973
1
36' CKT. % 48' CKT. -
047
SNAP -RING AS PER SHEET 3A.
ECCENTRIC REDUCER
W/ SNAP -RING BELL k SPIGOT
EIV4
1
W SPC.
D23
..
y
C.
W/ SNAP -RING BELL k SPIGOT
L..= 17.25'
75
1
48' SPC.
D24
SPIGOT
w/ ws-RINGBBELL
*
N 10
BX76
,
49 sPC
023
7
o
W/ 9W-RING BELL k SPIGOT
LL- 15.00'
1e
B77
1
48' GKT. - 4a00' BEND
D43
00
m
W/ SNAP -RING BELL k SPIGOT
78 -
3
48' SPC.
2+21.01 nn
BO
W/ SNAP -RING BELL k SPIGOT
89 N 72633.61 ,a 0
BX61
1
48' sPC.
021
E 96283L96 q
HT- 48D0' RT H 4B' INTERYEOIATE LIFT
W/ SNAP -RING BF11 k SPIGOT
LL- 25.75'
Vi= 0.92' KIN n STATION INFLUENT
CT'- 48.00' $
x
IE+ 3140.19 m
a� p
2+70.01
N 72G8884.62 b
E 962531.96 r x
VT- 1.40' UP m
_
IE= 3139.00
$ O.B.
2+91.75
N 7266662.87 W7
E 962831/96
IE- 3139.00
CONTINUED
NOTE: SEE
GENERAL
INFORMATION SHEETS FOR
FROM SHEET 14
FIELD
INSTALLATION INSTRUCTIONS
� JST LAYOUT
� LUBBOCK, TEXAS
Hanson Pipe k NZsi Mc.
1
B _
ea o 08-0228 am 15
w.
a I IIwn
RELEASE COPY
AN 2 7 2008
MWW FOR FA&QrMM
y
ATER16LS LIST
m
PC. No.
TY
DESCRIPTIONS
SHr.
N i
..
82
,
w Sm
w $NAP-Rwc 9Eu. ! SPIGOT
36" INTERMEDIATE
n'
�,.�
B1163
,
46' SPC.
O22
LIFT STATION INFLUENT
w/ 0.48' BEVELED SPIGOT
p
�ARl1—���Fl j
w/ 5[UP-IrIG �YJ. !SPIGOT
L.L- 6.21'
N
DI
w
I
W GKL - 42.00' WYE
ONI
W SNAP-RM GDJ S ! SPIGOT
�T BM CONTMED
R�61 !
2
41rREDGKR X 3r GKT. - ECCENTRIC
DN
ydj SHEETON iBA
W1 S" -RWG KLL ! SPIGOT
one
91te!
I
3r SPC.
DIB
LL SNMar BELL ! SPGAT
♦ E7
m"
B87
1
36- GKT. - 47 OW SM
a"
*�T
°�
w SNAP-RMG BEU. ! SPIGOT
F.O.T. Q
�'iP►� �� *64` R91 BX92 CONTINUED
Ji�il...�R b ON SHMT A"
8.30' 190'
•.��'ry�j
��
m g 36INTERMEDIATE
LIFT STATION INFLUENT
/PARA I cI - va ITN1
O Na Qi
v
Cam,,
CONTINUED
FROM SNETT 15't
V�J
48- INTERMEDIATE
LIFT STATION fig, UNLESS NOTED OTH%:SE.
IN11 SENT
ALL GASKET JOINTS ARE TO SE
SNAP -RING AS PER SHEET 3A.
3 JST 26 RENSE MOVE mf66 - 92 - I7, AND .EI4 - .AI TO 16A:
T !
00. !' LAYOUT
ac�am
� lUBBflCK, TEXAS
Hanson Pipe k Precast Inc.
1
.IST 7 r MU !
",
WWEAt1NOM
low � 08-0228 Imax 16
ar
N � >2
D tm�y
ZM
A
Orli,M -31 m
Cs'L98L96 3 m
es'Lf+o g
Os'Lf l£ �31
do
OL'6B6Z96 3 '6'i �
Zb'OZ+O
WOW -31
Na .W'St -IA
Cs9bbZ96 3
es'91+o —
V
C
a =
ti
Os'Lf tC ��
� ts:•eaeL9s 3
sL•9c+o
m
m OS131
N p GI A
GZ" AO'V l
eL'LPoZYB 3
S9'9t+0
00'sftC -31
NO.00•91 -N
L9 SMSO 3
OC'1t0+0
jig
o°'
OOsfLC -31
11 .00,05 -134 t„
91'0=96 3 'M� nz
99'NOOSO44
3.50' t.93' � g
8NV
W* B-303 CLASS 113 (10')
_ N
o_a
CLASS
OVERALL LENGTH OF THIS PIECE IS 28' — 7 1/4'
B
BX88
1 BX234
i
I
I W
m
36' B-303
SHORT PIPE ARRANGEMENT (CLASS 113-10')
PC NO I LL I A I PC NO LL B REM. LENGTH
ax234 101 8.00 3' 11 5/If I 8X88 Qj I7.28 t 11, 5 1/8' 3.45
THE REVISED BX88 AND MU34 ARE TO BE CUT FROM THE EXISTING BX88,
RELEASE COPY
AUG 2 7 2003
W$ M FOR FABRICATION
QQ W/ SNAP —RING BELL k SPIGOT
SEE SHEET 3A FOR DETAIL
HARK IN WATERPROOF PLANT ON EACH PIPE
OR FITTING:
o. PIPE CLASS
b. DATE OF MANUFACTURE
c. TRADEMARK
EACH END OF ALL SPECIALS AND FITTINGS
SHALL BE MARKED ALONG TA.P. CENTERLINE
WITH A STRIPE OF WATERPROOF PAINT
APPROXIAMAIELY 1 I/7 WIDE AND 2' LONG.
a '� SPECIALS Hanson Pressure Pipe
lam a—LUBBOCK, TEXAS — 08-0228 1. DlaA
OVERALL LENGTH OF THIS PIECE IS 32' — 4 1/4'
B
A
8X82 BX237 �
36" 8-303
SHORT PIPE ARRANGEMENT (CLASS 113 (10'))
PC NO I LL I A PC NO I L.L 1 13 REM. LENGTH
BX237 1 8.00 3' 11 5/8 JBX92 M 21.01 111' 5 11ir 1 3.45
SX92 AND RX237 ARE TO BE CUT FROM EXISIING PIPE #92.
RELEASE COPY
AUG 2 7 2008_
IMED FOR FABRICATION
W/ SNAP —RING BELL SPIGOT
SEE SHEET 3A FOR DETAIL
MARK IN WATERPROOF PAINT ON EACH PIPE
OR FITTING:
o. PIPE CLASS
b. DATE OF MANUFACTURE
c. TRADEMARK
EACH END OF ALL SPECIALS AND FITTINGS
SHALL BE MARKED ALONG T.O.P. CENTERLINE
WITH A STRIPE OF WATERPROOF PAINT
APPROX~TELY 1 Ilt WIDE AND 2' LONG.
S.S. OF
BEVEL
T.O.P. I§
RELEASE COPY
AUG 2 7 2008
IM IMF
01 w/ 0.48• BEVELED SPIGOT
OVERALL LENGTH ALONG CENTERLINE IS 32' — 4 11lEr CYLwiz CUT DMENSION- I3/3Z
W/ SNAP —RING BELL & SPIGOT
SEE SHEET 3A FOR DETAIL
48' 8-303
SHORT PIPE ARRANGEMENT (CLASS 113 (12')}
PC NO I LL A REM. LENGTH_
1BXB3 1 8.2t 24' 3 5/16' 24.t2
MARK IN WATERPROOF PAINT ON EACH PIPE
OR FITTING:
0. PIPE CLASS TU b. DATE OF MANUFACRE
c. TRADEMARK
d. ON BEVELS, AMOUNT AND SHORT SIDE.
OF BEVEL
EACH END OF ALL SPECIALS AND FITTINGS
SHALL BE MARKED ALONG T.O.P. CENTERLINE
WITH A STRIPE OF WATERPROOF PAINT
APPROXIAMAlELY I I/7' WIDE AND 2' LONG.
T SPECIALS Hanson Pipe & Products Inc.
om I lumen LUBBOCK, TEXAS m. 08-0228 1. D2?A
4
o_
OEGWE
-- u
9F am
T.O.P_ � & S.S. OF BEYU
B-303 BEVEL SCHEDULE
PIPE
NO.
PIPE
I.D.
CLASS
DECREE
OF BEVEL
REMARKS
75
48'
113 (121
1.40
t
01 CYUNDER CUT DIMENSION - 1 3/16-
W/ SNAP —RING BELL & SPIGOT
SEE SHEET 3A FOR DETAIL
wARK IN WATERPROOF PARR ON EACH PIPE
OR FIITINO:
a PIPE CLASS
b. DATE OF mm"ACTIIRE
0. ONON �. AIID{FIT AND SHORT SIDE
OF
EACH ENO OF ALL SPECIALS AND FIMNGS
SHALL BE HARKED ALONG T.O.P. CENTERLINE
WWTH A STRIPE OF WATERPROOF PAINT
APPROMAiMTELY 1 t1r WIDE AND 2- LONG.
SPECIALS
RELEASE COPY
AU6 2 7 2008
ISSUED FOR FABRICATION
WEASE COPY
AUG 2720
Ilia FOR FAB ATION
/
MARK IN WATERPROOF PAINT ON EACH PIPE
I
/
OR FITTNNG:
I
/
o. PIPE CLASS
6. DATE OF MANUFACTURE
0. TRADEMARK
d. ON BENDS, THE ANGLE TURNED AND
THE LONG AND SHORT SIDES.
T.O.P. Q
EACH END OF ALL SPECIALS AND FITTINGS
SHALL BE MARKED ALONG T.O.P. CENTERLINE
WITH A STRIPE OF WATERPROOF PAINT
APPROXMMATELY t 1/Y WIDE AND 2' LONG.
2 — REQ'D
PC. NO. 8233 at 8236 10. 36
00 CYL• 37 7/g'
ANGLE- 15.W FULL CUTS- 1 TYPE 3
RADIUS. 39.3c TANGENT- 5,11W PLATE. 1/4
CUT ANGLE- 7.5017 OVERALL CAN LENGTH- 13 7/1G
im
1 EG2
DISTANCE DISTANCE FROM ENO TO EA CUT
LLo 0.66'
LL- 1.D0'
AROUN13 CIR. =
X. 1.5y
Y. 1.5Z
1) 0' 9 3/16-
BEVEL-
BEVEL-
2) 14 71T 8 1/2"
JOINT TYPE: SR B-303 SPIGOT
JOINT TYPE: SR 8-303 BELL
3) 29 3/4" 6 11/16
LENGTH° 5 1/Z
LENGTH- 5 1/47
4) 44 51T 4 15/19'
BACKUP RING:
BACKUP RING:
5) 59 1/2- 4 3/16'
RING 10-
RING ID -
RING OD-
RING 00-
CHECK LENGTH- 12 3/16-
CHECK LENGTH- 11 15/1G
dsT
FITTINGS
LUBBOCK. TEXAS
Hanson Pressure Pi e
1u -08-022e Mar 044A
-2 —aaI
RELEASE COPY
AUG 2 ? 2008
MW FOR i&RICATEN
T.O.P.
MARK W WATERPROOF PAINT ON EACH PIPE
OR FITTING:
a. PIPE CLASS
4
b. DATE OF MANUFACTURE
c. TRADEMARK
d. ON BENDS, THE ANGLE TURNED AND
i
THE LONG AND SHORT SIDES.
EACH END OF ALL SPECALS AND FITTINGS
SHALL BE MARKED ALONG T.O.P. CENTERLINE
SEE SHEET 3A
WITH A STRIPE OF WATERPROOF PAINT
APPROXNAMATELY 1 1/Y WIDE AND 2' LONG.
SEE SHEET 36.
2 - REQT
PC, NO. 8235 Nk 8238 10- 38'
OD CYL= 37 7/8'
ANGLE- 15.00' FULL CUTS- 1 TYPE 3
RADIUS- 39.38' TANGENT- 5.18' PLATE- 1 /4'
CUT ANGLE- 7.500' OVERALL CAN LENGTH- 14 3 16'
LEGt
i=
DISTANCE DISTANCE FROM END TO FA CUT
LL- 0.66'
LL- 1.09'
AROUND CIR• rrUTI
X- 1.53'
Y- 2.2Y
1) 0' 9 3/16'
BEVEL-
BEVEL—
2) 14 7/8' 8 1/27
JOINT TYPE: SR 8-303 SPIGOT
JOINT TYPE: HARN. 8-303 BELL
3) 29 3/4' 5 11/16'
LENGTH- 5 1/2'
LENGTH- 4 1/2'
4) 44 5/8' 4 15/16'
BACKUP RING:
BACKUP RING:
5) 59 1/2" 4 3/16'
RING ID-
RING IDn
RING DO—
RING OD -
CHECK LENGTH- 12 3/16-
CHECK LENGTH- it 15/16'
iST
FITTINGS
LUBBOCK, TEXAS
Ronson Pressure Pi
a,o MOD-022Blomw 045A
ADDITIONAL MATERIAL
u oI
MMI STL HAIF CPLG.
NYLON BUSHING
BRASS 9USHOJG
BRASS PLUG
PM EASE COPY
AUG 27 20
fiWFMrAQRC9=
OUANTITY
WE
DESCRIPTION
4 EA
24'
180/ FLANGE GASKET
80 EA
7 1/4 X
5"
ASTM A307 0MT N NUT 247
2 CAL..
- -_-
TNEMEC POTA-FOX 80 SERIES 141
1 GAL
TNEMEC WM 4 TNYRWR
4 GAL.
---_-
TNEMEC F.C. TWMY SERIES 27
1 GAL.
TNEMEC NO. 80 THINNER
JOINT WRAPPER SCHEDULE
OUANTITY
WIDTH
PIPE
TYPE OF PIPE
REMARKS
8-303 L-301 E-301
25 EA
9'
3r
X
SNAP --%NC
5 EA
18'
36"
X
4T, HARN.
3 EA
18'
38'
X
BUTT STRM
B EA
9"
42"
X
AIM —RING
1 £A
18
4Y
X
BUTT STRAP
15 EA,
V
Or
X
SNAP —RING
4 EA.
12"
27'
X
24" FLG
2 EA
1s"
39"
X
W FLX CPL
2 EA
18'
39"
X
38" M.LP.E.
ADDITIONAL MATERIAL Honson P4* k Products Inc.
VIRAP
aIECXEu:
1a�c IT WK .frillim OATE:08/04N8 LUBBOCK, TEXAS DM6 Na 08-0228 1 SHT. D55
REQUEST FOR INFORMATION
PROJECT: sOUTHEAST WATER RECLAMATION PLANT IMPROVEMENTS PROJECT NUMBER:
OWNER: THE CITY OF LUBBOCK, TEXAS 92126
CONTRACTOR: EAGLE CONTRACTING LP 171
ENGINEER: BLACK & VEATCH CORPORATION
REFERENCE DATA:
Contractor RFI No. 037 Spec Section 01015 Page No. 8 Para. 10.02.08 — 8a
Drawing No. CY3 and Black and Veatch Sketch
CONTRACTOR REQUESTS: ® Information ❑ Interpretation ❑ Clarification
Per the request of Rich Houghton, Eagle is submitting this RFI as follows.
We have routed the 16"RAS Temporary to the Existing Aeration Distribution Structure and were planning
to 90 down into this structure to discharge this RAS. The Flow could be split to either BNR#1 or BNR#2
by means of the Slide Gate that splits flow to either basin. Yesterday Laura Straton and Rich Houghton
requested a different means of discharging the RAS into the Aeration Distribution Structure (see the
attached sketch that shows what Black & Veatch wants).
Eagle will request extra money to cover the costs of this extra work.
CONTRACTOR'S PROPOSED SOLUTION:
REQUESTED BY: DATE: 08/07/08
ENGINEER'S RESPONSE: ❑ Information D Interpretation 91 Clarification
For the items described above or in the attached material referenced:
See attached for response.
RESPONSE BY: Laura Stratton DATE: 08/08/2008
SASandPEagle Conftding FOesUob Filee1171- Lubbock W WfP%RF1's1RF4-037 -16 Temp.RA510 Aer.Dist.3trudure.doc
RFI-037 Response
08/08/2008
An equal hydraulic split cannot occur by adding RAS to one
side of the Aeration Distribution Structure and opening gate
SG-403. As detailed on Sheet 12, RAS would mix with the
effluent from Primary Clarifier No. 2. With SG-403 open,
there will be some mixing between the sides of the box, but
an equal split of the RAS will not occur. An equal RAS
split to Basins 1 and 2 is important to the biological
process.
Upon review of the contract documents, it appears that not
enough detail was provided for the bypass line. Per Sheet
12, the RAS line was to be fed to the west side of the
Aeration Distribution Structure only. A second feed point
into the east side of the structure was not indicated but is
required. The attached detail indicates the changes to this
line to accommodate a hydraulic flow split between the two
basins.
Based on the contract documents and the required changes, it
appears that Eagle may ask for additional compensation to
purchase a 16"x10" Tee. Per Sheet 12, 16" pipe was to be
installed over the structure. A 16"x10" Tee is now
required.
In order to protect the grating, it should be removed from
the structure and replaced with plywood cut to accommodate
the ductile piping.
A revised sketch of the piping arrangement is attached to
this response.
.1 1
,TajONAL PLAN c�I1
�K64ieE"'
,ram rd, - ..
' 'winf{r �xia fv
.. ?4il
4p'I ID PLAN
y! o D o+ * N vk. I-- TON 1
1
bow s+Ags of b*L
Jrr�i�c�
{enT I20rnn 1 }} t
Of
berncriYi b,l L� 7
%� �5j E
8,05
F
. �Mf1��tFM��i��Ai1N�'NWMiMlP�M'
A
----- -----
1 rl5}fl11
{�011 A7rI.1 JCC WTr
.A„ a 1
y N
l;�rya 10`I �educ�t'
LUBBOCK, TEXAS
T WATER RECUAWATION PLANT INFRMEMM
AO-1
NO
NEW WATER RECLAMATION PLANT NO. 4
-----
®D.M. LO'1
,wr
n#d� 17m
oeu�ro
dip-�9
rRncr
2
AERATION DISTRI13UTION STRUCTURE
PLANS AND SECTIONS
■e,
N[Ei
73 a 31I
tb„.„.VCTON ,ticORof
�vo r,omv �
,
uv. wo. r.,m►ao-sra„
M. =i-!/
lr!*i
4 W 3
'iil
��'i'I.c.,
'!7
G)
m
N
m
m
.ca
m
OD
sD
v
N
1�
�I
U1
N
w
G)
►
,Z
D
se rr'n
August 22, 2008
Black & Veatch Corp.
9441 LBJ Freeway —Suite 114
Dallas, Texas 75243
Attn: Ms. Laura Stratton
RE: Southeast Water Reclamation Plant Improvements
Contract ITB # 07-730-BM — Project # 92126
The City of Lubbock, Texas
Black & Veatch Corporation
Subj.: Contractors Modification Request (CMR-06) per RFI-37 (Additions to 16" Temp.
Pipe at the Aeration Distribution Structure)
Dear Laura,
Eagle Contracting, L.P. proposes to add the necessary piping at the Aeration
Distribution Structure per RFI-037 for the total lump sum amount of Three Thousand
One Hundred Forty Three Dollars and Seventy Cents ($3,143.70).
With Kindest Regards,
Glenn Grant
Project Manager
cc: File (Proposals) & Field
P.O. Box 1600 0 Keller, Texas 76244 Metro (817) 379-1897 0 Metro (817) 379-0610 Fax
Eagle Contracting, L.P.
SEWRP - Lubbock Date: August 22, 2008
Job No. 171 Proposal: CMR-06
Work Description: Add 2nd drop of 16"RAS Temp. into Aeration Distribution Structure
Ref. RFI-037
MATERIAL TOTAL LABOR TOTAL
UNIT PRICE MATERIAL UNIT PRICE LABOR
At-TIVITV r)11ANT17V IINITS RIIRCANTRACT
Add 2nd drop_ mp RAS into
Aeration Distribution Structure aer_
I-03
16" X 10" MJ Tee
1
ea
524.00
524.00
0.00
labor to install tee
7.01
mh
0.00
16.40
114.96
16" Megalugs
2
ea
273.00
546.00
0.00
labor to install megalugs
7.07
mh
0.00
16.40
115.95
10" Megalug
1
ea
56.00
56.00
0.00
labor to install megalug
2.21
mh
0.00
16.40
36.24
Freight to Job for pipe
1
Is
315.00
315.00
0.00
0.00
0.00
Cut 16" Pipe for Tee
1
mh
0,00
16.40
16.40
Remove pipe listed above
8.14
mh
0.00
16.40
133.50
0.00
0.00
Remove & Replace Grating
6
mh
0.00
16.40
98.40
Temporary Plywood in place of grates
150
sf
0.80
120.00
0.00
Install /Remove plywood
9
mh
0.00
16.40
147.60
0.00
0.00
Rubber Tired Loader/Backhce-Eagle
0.05
mo
1,000.00
50.00
0.00
Fuel, Oil, Gas & Maintenance-30% rent
1
Is
15.00
15.00
0.00
Small Tools 5% of Labor
1
Is
33.15
33.15
0.00
0.00
0.00
0.00
1,659.15
TOTAL LABOR
663.05
0.00
TOTAL LABOR W/0 BURDEN
663.05
LABOR BURDENBNFTS - 52°%
344.79
Below is Eagle's Breakdown of Costs:
0.00
FICA - 7,65%
0.00
0.00
SUTA - 3%
0.00
FUTA - 0.8%
0.00
Workers Compensation - 12.8%
0.00
Overtime - 5%
0.00
Vacation - 3°%
0.00
Health Insurance - 7°%
0.00
401 K - 3.75°%
0.00
Housing, Furniture, Utilities, Meals & Gm,
0.00
- 9°%
0.00
Note: the only two items above that are
fixed are FICA and FUTA, all other
0.00
items are variable, subject to change,
0.00
averages and considered estimates.
0.00
1,007.84
TOTAL LABOR
TOTAL MATERIALS
1,659.15
TOTAL SUBCONTRACTS
0.00
0.00
SUBTOTAL
2,666.99
SEWRP - Lubbock
INSURANCE @ 2-1/2%
SUBTOTAL
OH&P@15%
SUBTOTAL
SEWRP - Lubbock
Aug 13 2a08 3;os m LONESTMR elet rMbKIL•M"'W"
21 15amom Blvd,
Saginaw, TX. 76179
8111 To
EAGLE CONTRAC"T'lN'Gi
607 S. PE.4RBON
IKELLER, TX 76249
-,. DWA invotc� #
8112l8008 940
Ship To
SAOLB CONC1zAC TING
3603 GUAVE AVE
LU813OCK 79404
ATTN: RON BRAY
P.O. Na. Terms Ship Date Ship Via
171-29432 Nnt 30 0/17,/P.A08 DMECT
Qty !Unit Description
FOB Lanestar Job #
FPA 738
Tag + Rats Arnount
1
IrACK
16" X 10" DI M7 TZE
524.00
124,00
2
EACH
16 SE'RIE$ 3000 P STAR CHIP W/ AC
273.00
546.00
1
EACII
30 SOUSS 3000 P STAR GRIP W/ AC
56.00
56.00
1
EACH
FMIGHT
313.00
315.00
%
t` /17%ut ,1/�G -c7— 030W roux— A.
F
3
3 froa�
Gc ?' g F'I 1P6 s�pP�,e
i?
t1 t lid
3 r iY6�
Ramitw=
Loncow Pipe Fabrication, I=
P.O, BOX 79230
Saginaw. TX 76179
Ph: 817.439-5575
Pax; 817-439-3738
ToW $1,441.00
t01I0 3Jdd
9NI10V1.N00 3-lW3
Z0Ez90U6 8S :5Z 800UST/86
_ Ja�17� �F�rsl
REQUES T FOR INFORMATION
PlROX-CT: S( iNsAr WATER' RECLAMATION PLANT IMPROVEMENTS PROJECT NUMBER:
owNER:. THE' C" OF LUBBOCK' TEXAS 92126
CONTRACTOR: EAGLE CCNTRACTING LP 171
ENGINEER: BLACK'& VEATCH CORPORATION
REFERENCE DATAk
Contractor RF1 No. 037 Spec Section 01016 Page No. 8 Para. 1C.02.08 — 8a
Drawing No. CY3 and Black and Veatch Sketch
CONTRACTOR REQUESTS: ® Information ❑ Interpretation O Clarification
Perthe request dfRlch Houghton, Eagle is submitting this RFI as follows.
We have routed the 16"RAS Temporary to the Existing Aeration Distribution Structure and were planning
to 90 down Into this structure to discharge this RAS. The Flow could be split to eitherBNR#1 or BNR#2
by means of the Slide Gate that splits flow to either basin. Yesterday Laura Straton and Rich Houghton
requested a different means of discharging the RAS into the Aeration Distribution Structure (see the
attached sketch that shows what Black & Veatch wants).
Ea lerwill•request-extra•mone to -cover the -costs -of this extra -work.
CONTRACTOR'S PROPOSED SOLUTION:
REQUESTED BY: DATE: 08/07/O8
ENGINEER'S RESPONSE: 0 Information ❑ Interpretation M Clarification
For the Items described above or in the attached material referenced:
See attached for response.
i
RESPONSE BY: Laura Stratton DATE: 08/08/2008
S:1SandllEaple Conhclinp FIIesUob Flleskl71- Lubbock WWrP1RFIVRFI-037-18 Tenmp.RAS to Aer.DIsLStructure.d=
RFt'Q37 Response•.
0s/08%260
An equal hydraulic split, cannot' occur by adding RAS to one
side of the. -,Aeration Distribution.Structure-and-opening gate
SG 4Q3 : As detailed 'on Sheet- 12: RAS wouid mix- with the'
effluent, frond ` ,rimarp .Clarifier. No: 2. With W-403' open.,
there."wil]; be' some mixing Ibetween, the- sides' of -,
-the bok, but
ari' equa'i split of the PAS. wilt nat •occur:':.:..An, equal RAS
split-, to. Basins'. 1 and "2 is important to' the .biological
process.: -
f ..
Upon -review of the contract documents, it appears that not
enough detail was -provided for the bypass line. Per Sheet
12, the -RAS, line` was 'to be fed to the west side of the
Aeration Distribution Structure only.... A second feed point
into the. east, -side: of. the structure was not. indicated but is
required, The attached detail,. in"dicates the. changes 'to this
line to accommodate a hydraulic flow split. between the two
... -bas=ins.,---_._..._..�-__._._.....,�__._.�....._......._._...Y�,.,,..�,.__.�.•..__._.._._T..._.. .._....,_ .
Based on the contract documents and the required changes, it
appears that Eagle may ask for additional compensation to
purchase a 16"x10" Tee. Per Sheet 12, 1611 pipe was to be
installed over the structure. A 1611x10" Tee is now
required.
In order to protect the grating, it should be removed from
the structure and replaced with plywood cut to accommodate
the ductile piping.
A revised sketch of the piping arrangement is attached to
this response.
13
fkbh*'S- eV+ 4IE
efrows"
ff in
9
1v
jr
F4144k
V7171
;Mx r-".W
WT
49�
..A fill
-Is
-V
q"
it
04
TO
a rw
. . . . . . . . . . . . . . . . . . . .
. ..... 14H
44
r:
tidi
I INKS
'M y.
- 72@7'F
I nsi-41
at, 7&e Ot
.. 4'.t
T rr ------------- ------ . . . . . .►T1 ' - ' w
G*
'e4
Imliadc
�!ffffpffY OF
a IF—
M—I
0g/0712008 13:08 9724752301
EAr,LE COT ACTING
i A _. _ I,
Y
9
Stratton, Laura A.
From: Soo Soon (SSoon@mail.ci.lubbock.tx.us)
Sent: Thursday, July 24, 2008 9:18 AM
To: Houghton, Richard H.
Cc: Stratton, Laura A.
Subject: Fwd: RE: FW: Lubbock SEWRP
Rich,
Please request a change order from Eagle contracting as soon as possible.
Soo Koon Soon
>>> Steven O'Neal 7/24/2008 8:56 AM >>>
Soon,
I spoke with Chad (one of my plumbing inspectors), and he does not recall the conversation or having seen the
drawing before. He does concur that the vent is needed and is OK as proposed. He did add that a cleanout fitting
needs to be added at the upstream end of the 4" horizontal drain line, however. Replacement of the last 45 degree
sweep with a wye fitting and adding of a 90 degree sweep, riser and floor clean -out plug will do it.
Thanks,
Steve
>>> Soo Soon 7/23/2008 2:30 PM >>>
Steve,
Any idea what this is about?
Soo Koon Soon
>>> "Houghton, Richard H." <HoughtonRH@bv.com> 7/23/2008 2:14 PM >>>
Ron meet with someone named Chad at the plumbing department and he said they want a second vent added in
that same area, at the other end of the floor drains. I need to go over routing with PSC and then get a cost proposal
from Eagle, it could take a week or 2.
From: Soo Soon [mailto_SSoon@ma l.ci.lubbock.tx.us]
Sent: Wednesday, July 23, 2008 1:58 PM
To: Houghton, Richard H.
Cc: Stratton, Laura A.; Steven O'Neal
Subject: Re: FW: Lubbock SEWRP
Rich,
The City building official will accept the proposed of the 2 inch air ventilation pipe. Please process the change order
asap.
009 .. _.
>>> "Houghton, Richard H." <HoughtonRH@bv.com> 7/15/2008 4:41 PM >>>
Soon, here is a small issue that might cost a few bucks. We have to add
a stink vent for plumbing code up to the roof. See plan sheet P5.
9/9/2008
-----Original Message -----
From: Roland Holder [mailto:RHolder@team-psc.com1
Sent: Monday, July 14, 2008 3:31 PM
To: Houghton, Richard H.; Stratton, Laura A.
Subject: Lubbock SEWRP
Keven Willis's response to the plumbing issue.
Roland
RH
-----Original Message -----
From: Arch_xerox@corp.team-psc.com [mailto:Arch_xerox@corp.team-psc.com]
Sent: Monday, July 14, 2008 2:47 PM
To: Roland Holder
Subject: Scan from a Xerox WorkCentre Pro
Please open the attached document. It was scanned and sent to you using
a Xerox WorkCentre Pro.
Sent by: Guest [Arch_xerox@corp.team-psc.com] Number of Images: 1
Attachment File Type: PDF
WorkCentre Pro Location: Lubbock Architecture Device Name: XRX ARCH
For more information on Xerox products and solutions, please visit
http,1Lwvwv.xerox.com (http. /www.xerox.comI )
9/9/2008
-Z' Mft 'Pft YAM
AUFA 70 CY spffTs
FM cwlAwrrav
,--Jk#A.L VALVES
'A
..... ......
7e
- ----- ----
....... . ...
............
>
f, . ..... 9 Mm ctwomTzav
wcrAw
�4- FOR WA MW
W-1 +.F.
PPIRMY
I&RIFIER W, 3
It i
T ... -77 T. ..... ....
I r
7"E—PM I At A
awrrAl ea CW
ov
PAJUMY CLARIFIER NO. 3 PUMP STATION PLUIMA'NO PLAN
?J4. - f 0,
KEYED NOTES
lAwoom oyf 0,---
I MM WW PrPIW AS MIGH U PQWfft$.
: POWIM &be fLiw An RMW a2w"Flrav TEWA4714T.
3 ACM 21 APM if* W TWEOd MW MIRW WW.
4 00M I' MV LIM DIM' It" M 0- 1. MOWr W f All
$d* A , F, 9,
August 26, 2008
Black & Veatch Corp.
9441 LBJ Freeway —Suite 114
Dallas, Texas 75243
Attn: Ms. Laura Stratton
RE: Southeast Water Reclamation Plant Improvements
Contract ITB # 07-730-BM — Project # 92126
The City of Lubbock, Texas
Black & Veatch Corporation
Subj.: Contractors Modification Request (CMR-07-Provide Plumbing Clean out and
Vent in the Primary Clarifier Pump Station)
Dear Laura,
Eagle Contracting, L.P. proposes to add the necessary Vent piping and Clean out
at the Primary Clarifier Pump Station for the total lump sum amount of One Thousand
Four Hundred Eighty Six Dollars and Thirty Nine Cents ($1,486.39).
Sincerely,
Dave Mullenix
cc: File (Proposals) & Field
P.O. Box 1600 0 Keller, Texas 76244 0
Metro (817) 379-1897
0 Metro (817) 379-0610 Fax
Eagle Contracting, L.P.
SEWRP - Lubbock
Job No. 171
Date: August 26, 2008
Proposal: CMR-07
Work Description: Provide additional Cieanout and Vent not detailed for the plumbing in the Primary Clarifier Pump Station
MATERIAL TOTAL LABOR TOTAL
UNIT PRICE MATERIAL UNIT PRICE LABOR
w laTrt lIT/ P11 Iw km ry 1 111111 @ -It 1
Install Vent and Clean Out Piping
for Drains in the Primary Clarifier
Pump Station
Subcontractor time to install material.
9
MH
702.00
0.00
0.00
Journeyman Plumber ($78 per hour)
0.00
0.00
0.00
0.00
4" Cl DBL Wye
1
EA
53.96
53.96
0.00
4"x2" Cl Wye
2
EA
49.10
98.20
0.00
2" Cl 1/8 Bend
2
EA
11.88
23.76
0.00
2" Cl 1/4 Bend
5
EA
14.27
71.35
0.00
2" CI Soil Pipe
50
EA
3.68
184.00
0.00
4" Clean Out cover
1
EA
27.72
27.72
0.00
Pipe/Fitting Gaskets
20.00
EA
5.00
100.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
702.00
558.99
TOTAL LABOR
0.00
0.00
TOTAL LABOR W/0 BURDEN
0.00
LABOR BURDENBNFTS - 52%
0.00
Below is Eagle's Breakdown of Costs:
0.00
FICA - 7.65%
0.00
SUTA - 3%
0.00
FUTA - 0.8%
0.00
Workers Compensation - 12.8%
0.00
Overtime - 5%
0.00
Vacation - 3%
0.00
Health Insurance - 7%
0.00
401 K - 3.75%
0.00
Housing, Furniture, Utilities, Meals & Ga
0.00
- 9%
0.00
Note: the only two items above that are
0.00
fixed are FICA and FUTA, all other
0.00
items are variable, subject to change,
0.00
averages and considered estimates.
0.00
0.00
TOTAL LABOR
TOTAL MATERIALS
558.99
TOTAL SUBCONTRACTS
702.00
0.00
SUBTOTAL
1,260.99
INSURANCE @ 2-1/2%
31.52
1,292.51
SUBTOTAL
OH & P @ 15%
193.88
1,486.39
SUBTOTAL
0.00
TOTAL
1,435.39
. 411- -
v
- 40OLV IAL1. SUMNIM Print - Close Window
CLAM
From: "Rebecca Freathy - 1107 HOUSTONWW" <rebecca.freathy@ferguson.com>
Subject, Email Bid# 8112230
To: d.mullenix@eaglecontractingip.com
Date: 1 Jul 2008 17.26:30 -0400
Price Quotation # B112230
Ferguson Waterworks #788
2650 S Pipeline Road
Euless, TX 76040
Phone: 817-267-3900
Fax: 817-267-3912
Bid No.......: B112230
Biii Date...: 06127/08 Cust Phone: 817-379-1897
Quoted By: RLF Terms.........: NET 10TH PROX
Customer.: EAGLE CONTRACTING L P Ship To.......: EAGLE CONTRACTING L P
LUBBOCK SE WT-R RECLAMATION LUBBOCK SE WTR RECLAMATION
PO BOX 1600 PO BOX 1600
KELLER, TX 76244 KELLER, TX 76244
Cust PO#..: CHANGE ORDER Job Name.: LUBBOCK SE WTR RECLAMATION
Item
Description
Quantity
Net Price
UM
Total
HEADWORKS DWG P1
W3003NH
*0505 3 NH ROOF DRN W/DOME
41
109.000
EA
436.00
NH9M
3 NH 114 BEND
10
7.543
EA
75.43
NH4M
3 NH 118 BEND
4
7.543
EA
30.17
NBPM10
3X10 NH SOIL PIPE
130
468.338
C
608.84
NHWBCM
3 HUSKY HD 2000 NH COUP
25
9.714
EA
242.85
W3943NH
3 NH NB DSPT NOZ
2
142.285
EA
284.57
ZP886E3
*0704 3 NH END CAP
2
7.055
EA
14.11
PLANT FOUR PRIMARY
CLARIFIER SLUDGE PS
DWO PS
W 1104STD6
4 C1 FLR DRN W/ A.DJ STRN
4
77.715
EA
310.86
SVDSPTP
4 SV DP SEAL TRAP
4
58.958
EA
235.83
SV4P
4 SV 118 BEND
7
7.371
EA
121.60
SVDYP
4 SV DBL WYE
3
53.95
161.87
SVSHPPl0
4X10 SV SH SOIL PIPE
80
771.250
C
617.00
SVTGP
4 SV TYSEAL GSKT
27
5.000
EA
135.00
http://b8.maiLyahoo. comlymleaglecontractinglp. comIShowLetter?box=Inbox&MsgId= l 3 99... 7/ 1 /200 8
�f ► plw,41J'0`8
NVUCE
6y1=.56' 11
M-3/2-/0
3 ► 3J r
3
llwl�c •
0Ai¢UPORDEK
ORDER TAKEN BY
CUSTOMER ORDER NUMBER
DAY WORK Q CONTRACT ❑ EXTRA
JOB NAME NUMBER
TERMS:;t
JOB PHONE
�i:,��c•-
STARTING DATE
�
�"OS
r,r ,9
ERA,
10
t
�lqft
'r
�Z
I
710 0 •n k
t
B. a
A
r
t
TOTAL OTHER
f4111
12
31
TOTAL LABOR
DATE COMPLETED
TOTALMATERIALS
art �y�
; ^�
TOTAL MATERIALS
2 T' 4
r..S.B.P.E. P.O. Box4200 AudBn, 7 7eS 12) 458-2145
Work ordered by
Signature y
I hereby admowiedge the satisfactory comPletion of the above described work.
TOTAL OTHER
�d i.�/
TAX
TOTAL
9
September 9, 2008
Black & Veatch Corp.
9441 LBJ Freeway — Suite 114
Dallas, Texas 75243
Attn: Ms. Laura Stratton
RE: Southeast Water Reclamation Plant Improvements
Contract ITB # 07-730-BM — Project # 92126
The City of Lubbock, Texas
Black & Veatch Corporation
Subj.: Contractors Modification Request (CMR-08 - Addition of Pump Linings for the
TWAS Pumps and Cabinets and Controls for the Free Standing RFD's for five
Pumps)
Dear Laura,
Eagle Contracting, L.P. proposes to add Pump Linings to the two TWAS Pumps
and add Cabinets and Controls for all five of the Double Disc Pumps AFD's for the total
lump sum amount of Thirty Three Thousand Seven Hundred and Thirty Nine Dollars
($33,739.00).
With Kindest Regards,
�� 0<
Glenn Grant
Project Manager
cc: File (Proposals) & Field
P.O. Box 1600 0 Keller, Texas 76244 0 Metro (817) 379-1897 0 Metro (817) 379-0610 Fax
Eagle Contracting, L.P.
SEWRP - Lubbock Date: September 9, 2008
Job No. 171 Proposal: CMR-08
Work Description: Provide cabinets & controls for the Double Disk Pumps and also a tungsten carbide lining
MATERIAL TOTAL LABOR TOTAL
UNIT PRICE MATERIAL UNIT PRICE LABOR
ACTIVITY QUANTITY UNITS sURMNTRACT $ $
Provide AFD Cabinets & Controls
for the Double Disc Pumps
Purchase Cabinets & Controls
5
ea
5,669.80
28,349.00
0.00
0.00
0.00
Provide Tungsen Carbide Lining
0.00
0.00
for Double Disc Pumps
0.00
0.00
0.00
0.00
Purchase Linings for TWAS Pumps
2
ea
1,500.00
3,000.00
0.00
0.00
0.00
0.00
31, 349.00
TOTAL LABOR
I
0.00
TOTAL MATERIALS
31,349.00
TOTAL SUBCONTRACTS
0.00
0.00
SUBTOTAL
31, 349.00
INSURANCE @ 2-1/2%
783.73
SUBTOTAL
!
32,132.73
OH & P @ 5%
I
I
1,606.28
SUBTOTAL
133,739.00
i
i
0.00
TOTAL
1
33,739.00
1E1
1
Resolution No. 2008—RO394
South Western Environmental Equipment Technicians
7904 La Cosa Drive
Dallas, TX 75249
(972) 233-1602 • Fax (972) 866-6852
Email: cjcortez@sbcglobal.net
QUOTATION # 967TX6-Revision # 1
To: Eagle Contracting L.P. Date: September 8, 2008
PO Box 1600 Terms: Per Contract
Keller, TX 76244 Submittals: 2-3 weeks from Change Order
Attn: Glenn Grant Delivery: See below
Phone: 817-379-1897
Email: g.grantna,eaglecontractinglp.com
TY
Description
Price
Amount
Changes to Contract and Pre -Negotiated Double Disc Pumps for
the Lubbock SE WRP Improvements Contract 6
Purchase Order # 171-1103
2-lot
Adder for Tungsten Carbide Coating on Housings for each Double
1,500.00
$3,000.00
Disc Pump Furnished
5-lot
Adder to Furnish Complete Enclosures and Controls for AFD Units
$6,000.00
$30,000.00
already being supplied, per Specification Section 16150P2 and all
related Drawings.
Unit Designations:
SCSC-P-4601, WAS-P-4602, WAS-P-4603, TWAS-P-2501 and
TWAS-P-2502
Exceptions:
Section 16150P2 1-4t Harmonic Testing Plan is not included.
Section 16150P2 1-6 Spare Drive will be provided in lieu of Spare
Parts Listed
Section 16150P2 3-5.02 Harmonic Testing is not included.
Note: Exceptions listed above are the same as approved on SWEET
Proposal # 106-A, dated 11/2/08
Less 5% Discount for Pre -Negotiated Package
($1,651.00)
Total Adder Price
$31,349.00
Revised Contract Price
$220,665.00
Note: Once approved and change order is issued. SWEET will
provide a new submittal to incorporate all the changes.
Delivery: Pumps-6 weeks from Approval
AFD Control Panels-8-10 weeks from Approval
Quotation By Chr gtoplher J. Cortez