Loading...
HomeMy WebLinkAboutResolution - 2008-R0296 - Supplemental Agreement For Traffic Signals - Texas Department Of Transportation - 08_12_2008Resolution No. 2008-RO296 August 12, 2008 Item No. 5.28 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the City Council of the City of Lubbock hereby authorizes and directs the Mayor of the City of Lubbock to execute a Supplemental Agreement No. 1 to the Agreement for Installation and Reimbursement for the Operation and Maintenance of Traffic Signals within a Municipality executed October 28, 2004, by and between the City of Lubbock and the Texas Department of Transportation for US 62/82 (Marsha Sharp Freeway) from Vicksburg Avenue to Avenue L, and any associated documents, which Supplemental Agreement No. 1 is attached hereto and made a part of this Resolution for all intents and purposes. Passed by the City Council this 12th day of August , 2008. TOM MARTIN, MAYOR ATTEST: —0� c _ Rebe ,a Garza, City Secretary APPRO JED 'A S TO CONTENT: eo el Marsha Reed, Director o Public Works APPROVED AS TO FORM: xk' A-, -'P\ Vandiver, Assistant City Attorney DDres/TXDOTsuppSignalAgree-V icks-L08Res July 11, 2008 Contract No. HP 55(1) / CSJ 0380-010-064 US 62/ 82 (Marsha Sharp Freeway) From: Vicksburg Ave. To: Ave L Resolution No. 2008—RO296 STATE OF TEXAS § COUNTY OF TRAVIS § SUPPLEMENTAL AGREEMENT NOA TO AGREEMENT FOR THE INSTALLATION AND REIMBURSEMENT FOR THE OPERATION AND MAINTENANCE OF TRAFFIC SIGNALS WITHIN A MUNICIPALITY WHEREAS, on 281h day of October, 2004, an Agreement for the Installation and Reimbursement for the Operation and Maintenance of Traffic Signals within a Municipality was entered into by and between the Texas Department of Transportation hereinafter called the "State," and the City Of Lubbock, hereinafter called the "City," and subsequently identified the agreement as a Type R Agreement by Resolution No. 2004-R0520; and WHEREAS, the parties to this agreement have mutually determined that it is necessary to amend the original agreement due to the following reasons: additional work is required by City forces due to changes in the traffic control on the freeway construction project as well as ongoing maintenance which was not covered in the original contract. NOW, THEREFORE, Contract No. HP 55(1) / CSJ 0380-010-064 is amended as follows: Article 2. Construction Responsibilities Scope of Work: The City has been assisting the contractor in the areas of repairs, construction and installation of traffic signal equipment. Included is the additional installation and repair of conduit, emergency response, additional miscellaneous work and power pole installation for temporary signal work. This work has been done in order to expedite work and for the safety of the Citizens of Lubbock. The State will reimburse the City for the cost of routine and emergency response which includes emergency bulb replacements, response to accident damage, service relocation/repair, installation and repair of damaged of signal equipment including conduits, realignment of signal heads, repair of backplate/hood damage, pedestrian pole relocation, removal of signal equipment, conduit and cable installation, furnishing temporary cabinet stands for temporary signals, signal work at Canton & MS Freeway and for the relocation of electrical power by LP& L of Flint & 41n A cost estimate of the additional work authorized under this supplemental agreement is marked "Exhibit A," attached hereto and made a part of this supplemental agreement. The above work has been done at the locations of along the MS Freeway project including: Salem, Quaker, Brownfield, TT Parkway, 4t", University, Avenue U, Avenue Q, Avenue L and Quaker & 19t". Types of work and locations is marked "Exhibit B", attached hereto and part of this supplemental agreement. Materials estimated for the above listed work is included in "Exhibit C". The City will be reimbursed for the cost of this work by the State Traffic -Traffic TEAT Page 1 of 12 Rev. 09/18/2006 Supplemental - Cost - Traffic Signal - Type R Contract No. HP 55(1) / CSJ 0380-010-064 US 62/ 82 (Marsha Sharp Freeway) From: Vicksburg Ave. To: Ave L Article 4. Compensation The maximum amount payable under this agreement is increased from $135,938.28 to $268,460.12 in accordance with the above changes. Calculations for the increase to the maximum amount payable are as follows: AMOUNT OF THIS SUPPLEMENTAL AGREEMENT $132,521.84 ORIGINAL MAXIMUM AMOUNT PAYABLE PER YEAR $135,938.28 TOTAL PREVIOUS SUPPLEMENTAL AGREEMENTS $0 REVISED MAXIMUM AMOUNT PAYABLE PER YEAR $268,460.12 ARTICLE 5. Payment The amount of this supplemental agreement shown above shall be a prorated amount based on the cost for the type of installation calculated on EXHIBIT A of the original agreement and any increases or decreases caused by any subsequent supplemental agreements All other terms or conditions are unchanged and remain in full force and effect. IN TESTIMONY WHEREOF, the parties hereto have caused these presents to be executed in duplicate on the dates shown hereinbelow. THE CITY OF LUBBOCK Executed on behalf of the City by: !~/— &Ia;!� Tom Martin, AYOR ATTEST: Re cca Garza, I Secret APPROVED AS TO CONTENT: Marsha Reed, P.E., Director of Public Works APPROVED AS TO FORM: LR91 'iI Ell IM116111 M-12reN• August 12, 2008 (Date) August 12, 2008 (Date) --7 zi I c (Date) ZZ I ) (Date) Traffic-Trafc_TEA7 Page 2 of 12 Supplemental - Cost - Traffic Signal - Type R Rev. 09/18/2006 Contract No. HP 55(1) / CSJ 0380-010-064 US 62/ 82 (Marsha Sharp Freeway) From: Vicksburg Ave. To: Ave L THE STATE OF TEXAS Executed for the Executive Director and approved for the Texas Transportation Commission for the purpose and effect of activating and/or carrying out the orders, established policies or work programs heretofore approved and authorized by the Texas Transportation Commission, By C.l Date IZtoo Randy Hop a n, P. i rict Engineer Exhibit A: Labor for Signal Work Provided Exhibit B: Additional Work Provided Exhibit C: Materials List Traffic -Traffic TEA7 Page 3 of 12 Rev. 09/18/2006 Supplemental - Cost - Traffic Signal - Type R Contract No. HP 55(1) / CSJ 0380-010-064 US 62/ 82 (Marsha Sharp Freeway) From: Vicksburg Ave. To: Ave L EXHIBIT A Labor for Signal Work Provided Labor Costs Date Item Cost "I'MRS SS Hosp Life Dental 6/1/2005 Labor $ 2,050.27 6/10/2005 Labor 74.88 $ 11.87 $ 5.35 $ 9.86 $ 0.02 $ 0.83 6/24/2005 Labor 97.63 15.47 7.39 12.60 0.02 1.06 7/22/2005 Labor 780.54 117.39 61.14 81.35 0.15 6.83 8/5/2005 Labor 1,391,23 206.08 104.68 195.87 0.38 16.42 8/19/2005 Labor 37.44 5.93 2.73 3.57 0.01 0.30 9/16/2005 Labor 1,339.87 212.37 100.06 166.27 0.31 13.93 9/30/2005 Labor 421.18 66.76 31.84 53.73 0.11 4.51 10/14/2005 Labor 1,502.24 238.10 113.10 219.52 0.41 18.40 10/28/2005 Labor 385.74 61.13 29.43 34.40 0.06 2.88 11/11/2005 Labor 260.05 41.21 19.86 31.93 0.06 2.67 11/25/2005 Labor 1,043,28 172.78 74.11 168.48 0.32 14.12 12/9/2005 Labor 4,419.92 706.78 322.49 584.45 1.12 49.02 12/23/2005 Labor 4,575.01 729.53 339.73 619.72 1.16 51.96 1/6/2006 Labor 704.63 111.61 53.58 136.39 0.21 9.72 1/20/2006 Labor 4,015.26 636.01 298.88 505.60 0.80 36.06 2/3/2006 Labor 647.90 102.64 48.14 91.28 0.13 6.50 2/17/2006 Labor 1,776.55 281.40 131.10 252.78 0.39 18.01 3/17/2006 Labor 841.05 133.22 63.06 118.60 0.19 8.45 3/31/2006 Labor 1,717.80 285.99 124.06 330.76 0.53 23.56 3/31/2006 Labor 110.45 17.50 8.45 17.45 0.03 1.24 4/14/2006 Labor 859.33 136.11 64.14 159.49 0.26 11.36 4/28/2006 Labor 1,545.70 246.82 114.70 284.52 0.46 20.27 5/ 12/2006 Labor 1,893.09 299.84 139.96 316.91 0.51 22.59 5/26/2006 Labor 1,984.63 314.38 147.23 337.60 0.54 24.04 6/9/2006 Labor 1,270.46 201.24 94.05 215.30 -0.34 15.35 6/23/2006 Labor 887.85 140.64 66.75 115.40 0.19 8.22 7/7/2006 Labor 518.67 82.16 39.57 81.44 0.13 5.80 7/21/2006 Labor 696.93 110.40 52.77 115.94 0.19 8.27 8/4/2006 Labor 1,886.94 298.65 141.96 283.88 0.45 20.22 8/18/2006 Labor 1,487.86 235.69 111.89 204.10 0.31 14.55 9/1/2006 Labor 852.66 135.07 61.82 174.51 0.28 12.44 Traffic-Traffic_TEA7 Page 4 of 12 Rev. 09/18/2006 Supplemental - Cost - Traffic Signal - Type R Contract No. HP 55(1) / CSJ 0380-010-064 US 62/ 82 (Marsha Sharp Freeway) From: Vicksburg Ave. To: Ave L 9/15/2006 Labor 1,833.63 290.45 136.02 355.95 0.57 25.37 9/29/2006 Labor 92.00 9/29/2006 Labor 624.31 98.89 47.17 90.16 0.14 6.43 10/13/2006 Labor 469.40 74.35 35.37 96.67 0.12 5.20 10/27/2006 Labor 252.97 40.08 18.91 50.11 0.06 2.69 11/10/2006 Labor 194.91 30.87 14.52 35.87 0.05 1.93 11/24/2006 Labor 114.61 18.15 8.75 23.17 0.03 1.24 12/8/2006 Labor 458.42 72.61 34.98 92.66 0.11 4.97 12/22/2006 Labor 716.16 113.44 54.08 129.51 0.16 6.95 1/19/2007 Labor 349.89 55.04 26.23 50.38 0.06 2.70 2/2/2007 Labor 267.41 42.06 20.40 60.06 0.07 3.22 2/16/2007 Labor 895.49 140.89 66.59 92.44 0.24 10.71 2/28/2007 Labor 51.00 3/2/2007 Labor 1,422.40 223.76 106.16 246.13 0.31 13.96 3/16/2007 Labor 38.20 6.01 2.91 7.31 0.01 0.41 3/30/2007 Labor 775.87 122.06 58.34 166.82 0.22 9.46 4/13/2007 Labor 139.02 21.87 10.02 20.50 0.03 1.16 4/27/2007 Labor 328.33 51.65 24.87 56.53 0.08 3.20 5/11/2007 Labor 178.13 28.02 13.47 24.23 0.03 1.38 5/25/2007 Labor 1,051.42 165.37 78.67 167.68 0.23 9.50 6/8/2007 Labor 37.17 5.84 2.60 3.93 0.00 0.17 7/6/2007 Labor 345.38 54.33 25.30 39.78 0.05 2.26 7/20/2007 Labor 142.63 22.43 10.42 14.24 0.01 0.81 8/3/2007 Labor 1,296.06 203.88 94.71 134.71 0.18 7.63 8/17/2007 Labor 1,372.29 215.86 99.47 136.13 0.17 7.72 8/31 /2007 Labor 1,662.79 261.56 121.72 179.99 0.23 10.19 9/14/2007 Labor 974.59 153.17 71.69 120.94 0.15 6.86 9/28/2007 Labor 237.30 37.33 17.61 30.72 0.04 1.74 9/28/2007 Labor 116.00 10/12/2007 Labor 498.86 78.47 35.87 51.15 0.06 3.63 10/26/2007 Labor 1,548.73 243.62 115.72 187.64 0.20 13.28 11/9/2007 Labor 209.37 32.94 15.26 27.76 0.03 1.97 11/23/2007 Labor 181.05 28.48 13.35 18.27 0.02 1.30 12/7/2007 Labor 185.75 29.22 13.62 21.17 0.03 1.51 1/4/2008 Labor 50.39 8.01 3.94 3.65 0.00 0.26 2/15/2008 Labor 264.66 42.05 19.97 33.04 0.04 2.34 Traffic-TrafficTEA7 Page 5 of 12 Rev. 09/18/2006 Supplementa_l - Cost - Traffic Signal - Type R Contract No. HP 55(1)1 CSJ 0380-010-064 US 62182 (Marsha Sharp Freeway) From: Vicksburg Ave. To: Ave L 3/14/2008 Labor 41.26 6.56 2.94 6.79 0.01 0.48 3/28/2008 Labor 2,338.32 371.55 171.20 278.44 0.45 19.73 3/31 /2008 Labor 273.65 4/ 11 /2008 Labor 136.43 21.68 10.13 7.31 0.02 0.52 4/25/2008 Labor 127.55 20.27 9.48 14.64 0.01 1.04 Total $ 64,370.84 $ 9,787.59 $ 4,586.48 $ 9,000.18 $ 14.29 $ 643.50 TOTAL LABOR COSTS $ 88,402.88 Less Timing Labor $ 9,327.28 Sum $ 79,075.60 Less 17% signal work completed (as part of original contract) $ 13,442.85 Sum $ 65,632.74 Remaining Labor for Project (Estimated time of completion 3/09) $ 21,658.81 Total additional Labor for Project $ 87,291.55 Traffic -Traffic _TEA7 Page 6 of 12 Rev. 09/18/2006 Supplemental - Cost - Traffic Signal - Type R Type of Work daily work daily work daily work daily work daily work daily work daily work daily work daily work daily work daily work daily work daily work daily work daily work daily work daily work daily work daily work daily work daily work daily work daily work daily work daily work daily work daily work daily work daily work daily work daily work daily work daily work daily work daily work daily work daily work daily work daily work daily work daily work daily work daily work daily work daily work daily work daily work daily work daily work daily work daily work daily work daily work Traffic-Traffic_TEA7 Supplemental - Cost - Contract No. HP 55(1) / CSJ 0380-010-064 US 62/ 82 (Marsha Sharp Freeway) From: Vicksburg Ave. To: Ave L EXHIBIT B Additional Work Provided Problem locate assist contractor back plate back plate back plate bulb out bulb out cable dug up change over service change over service change over service change over service change over service comm cable repair comm cable repair Comm cable work comm cable work comm cable work Comm cable work conduit repair deliver temp stand deliver temp stand deliver temp stand deliver temp stand deliver temp stand hang equipment install conduit install pole install pvc left turn not working louver installed new service opticom install ped pole work ped pole work pull cable pull cable remove equipment remove equipment remove poles remove service remove shafts remove shafts remove shafts repair service replace span wire service dug up supply bulbs supply bulbs supply bulbs supply bulbs switch heads switch heads Page 7 of 12 Traffic Signal - Type R Location Brownfield & 19th University & 4th Boston & 4th Boston & 4th Boston & 4th Quaker & Brownfield Indiana & Brownfield Brownfield & 19th U&4th L&4th Brownfield & 19th University & 4th Brownfield & 19th Quaker & Brownfield Quaker & Brownfield Quaker & Brownfield Quaker & Brownfield Quaker & Brownfield Quaker & Brownfield Brownfield & 19th Brownfield & 19th Q&4th Boston & 4th Brownfield & 4th Brownfield & 4th U & 4th Quaker & 19th U & 4th L & 4th Quaker & Brownfield Brownfield & 4th L & 4th Quaker & Brownfield Brownfield & 4th Brownfield & 4th University & 4th Quaker & Brownfield Quaker & Brownfield U & 4th University & 4th Q & 4th Quaker & 19th Memphis & 19th Q & 4th University & 4th Quaker & 19th Q & 4th Brownfield & 19th Indiana & Brownfield Brownfield & 4th Brownfield & 19th Brownfield & 19th Quaker & Brownfield Date 6/8/05 3/21 /06 4/ 1 /05 4/4/05 4/6/05 7/26/05 2/23/06 7/26/05 9/27/05 10/11/05 1 /9/06 4/ 10/06 6/ 1 /06 5/22/06 5/23/06 11 /30/05 12/1 /05 12/ 1 /05 12/2/05 8/3/05 1 /9/06 5/3/06 2/8/07 2/8/07 3/ 14/07 9/26/05 3/7/06 9/23/05 1015105 9/ 16/05 1 /3/05 10/6/05 815105 2/ 16/07 2/ 19/07 5/26/05 1 /6/06 1 1 / 16/05 1 1 /28/05 4/ 19/06 6/ 1 /06 12/15/05 2/7/06 5/30/06 5/26/05 5/ 15/06 8/ 11 /05 10/3/05 10/3/05 10/3/05 12/ 19/05 3/ 19/07 3/ 19/07 Rev. 09/ 18/2006 Contract No. HP 55(1) / CSJ 0380-010-064 US 62/ 82 (Marsha Sharp Freeway) From: Vicksburg Ave. To: Ave L daily work switch service U & 4th 6/8/05 daily work temp head Q & 4th 5/23/06 daily work trench Brownfield & 19th 2/16/07 daily work weld arm University & 4th 5111105 emergency call accident Brownfield & 19th 12/4/06 emergency call all green Brownfield & 19th 12/30/05 emergency call arm damaged Q & 4th 5/23/06 emergency call breaker replaced Brownfield & 19th 7/23/05 emergency call breaker replaced Brownfield & 19th 7/29/05 emergency call breaker replaced Brownfield & 19th 7/31/05 emergency call bulb out Q & 4th 2/5/05 emergency call bulb out Brownfield & 19th 2/9/05 emergency call bulb out Brownfield & 4th 2/16/05 emergency call bulb out Brownfield & 19th 4/5/05 emergency call bulb out Brownfield & 4th 4/5/05 emergency call bulb out Q & 4th 5/23/05 emergency call bulb out Boston & 4th 5/26/05 emergency call bulb out Quaker & Brownfield 6/3/05 emergency call bulb out L & 4th 7/4/05 emergency call bulb out Indiana & Brownfield 7/24/05 emergency call bulb out Indiana & Brownfield 7/26/05 emergency call bulb out Q & 4th 8/10/05 emergency call bulb out L & 4th 8/ 16/05 emergency call bulb out Brownfield & 4th 8/30/05 emergency call bulb out Indiana & Brownfield 9/7/05 emergency call bulb out Brownfield & 19th 9/25/05 emergency call bulb out Salem & Brownfield 11/8/05 emergency call bulb out Salem & Brownfield 12/2/05 emergency call bulb out Brownfield & 4th 12/19/05 emergency call bulb out Brownfield & 19th 12/27/05 emergency call bulb out L & 4th 1 /4/06 emergency call bulb out Q & 4th 4/22/06 emergency call bulb out U & 4th 5/22/06 emergency call bulb out U & 4th 6/2/06 emergency call bulb out Boston & 4th 8/8/06 emergency call bulb out Boston & 4th 10/2/06 emergency call bulb out Q & 4th 10/2/06 emergency call bulb out Brownfield & 4th 10/12/06 emergency call bulb out Indiana & Brownfield 10/20/06 emergency call bulb out Indiana & Brownfield 10/30/06 emergency call bulb out Indiana & Brownfield 11/30/06 emergency call bulb out Boston & 4th 12/28/06 emergency call bulb out Indiana & Brownfield 1 /2/07 emergency call bulb out Brownfield & 19th 1/18/07 emergency call bulb out Indiana & Brownfield 3/20/07 emergency call cabinet door open Indiana & Brownfield 11/21/06 emergency call cable short Brownfield & 4th 4/23/05 emergency call comm cable hit P & 4th 2/13/05 emergency call conflict Quaker & 19th 4/15/06 emergency call conflict Quaker & Brownfield 12/22/06 emergency call controller changes Brownfield & 19th 9/1/05 emergency call controller changes Indiana & Brownfield 10/10/05 emergency call flash Brownfield & 19th 1/9/05 emergency call flash Brownfield & 19th 7/30/05 emergency call flash Q & 4th 7/30/05 emergency call flash Brownfield & 4th 1/16/06 emergency call flash Brownfield & 19th 1 /27/06 emergency call flash Brownfield & 19th 2/12/06 emergency call flash Q & 4th 5/23/06 emergency call flash Q & 4th 5/24/06 Traffic-Traffic_TEA7 Page 8 of 12 Rev. 09/18/2006 Supplemental - Cost - Traffic Signal - Type R emergency call flash emergency call flash emergency call flash emergency call flash emergency call flash emergency call flash emergency call flash emergency call flash emergency call flash emergency call flash emergency call flash emergency call flash emergency call head turned emergency call head turned emergency call head turned emergency call head turned emergency call head turned emergency call hood missing emergency call hood missing emergency call hood missing emergency call hood missing emergency call hood missing emergency call hood missing emergency call hung emergency call hung emergency call hung emergency call hung emergency call intersection in flash emergency call left turn not working emergency call locate emergency call no left turn emergency call pole hit w/equipment emergency call power out emergency call power out emergency call power out emergency call repair cable emergency call service dug up emergency call service dug up emergency call shaft hit emergency call shaft hit emergency call shaft hit emergency call shaft hit emergency call signal hit Materials Purchased Company Item Contract No. HP 55(1) / CSJ 0380-010-064 US 62/ 82 (Marsha Sharp Freeway) From: Vicksburg Ave. To: Ave L Q & 4th 5/24/06 Brownfield & 19th 6/21/06 Brownfield & 19th 7/23/06 Brownfield & 19th 8/13/06 Brownfield & 19th 9/11/06 Brownfield & 19th 1/21/07 Brownfiled & 19th 2/18/07 Brownfield & 19th 3/4/07 Brownfield & 19th 3/31/07 Brownfield & 19th 4/5/07 Brownfield & 19th 5/ 13/07 TT Parkway & Brownfield 5/29/07 Q & 4th 9/19/05 Q & 4th 10/11/05 Quaker & Brownfield 10/18/05 University & 4th 1/17/06 L & 4th 7/25/06 University & 4th 4/1/05 University & 4th 5/18/05 Indiana & Brownfield 8/17/05 Q & 4th 8/18/05 Salem & Brownfield 10/4/05 Boston & 4th 9/6/06 Q & 4th 3/16/05 Brownfield & 19th 1/8/06 Salem & Brownfield 1/16/06 Brownfield & 4th 7/10/06 Q & 4th 7/30/05 Indiana & Brownfield 9/14/05 Quaker & Brownfield 5/19/06 University & 4th 12/13/05 Boston & 4th 3/26/05 University & 4th 9/18/05 Quaker & 19th 10/24/05 Quaker & 19th 10/27/05 U & 4th 11 /29/05 Q & 4th 5/23/05 University & 4th 5/25/05 Brownfield & 19th 3/4/05 Brownfield & 19th 5/6/05 University & 4th 8/11/05 Quaker & Brownfield 1/16/06 Boston & 4th 3/15/05 EXHIBIT C Materials List Traffic-Traffic_TEA7 Page 9 of 12 Supplemental - Cost - Traffic Signal - Type R Quantity Unit Cost Total Cost Rev. 09/18/2006 Contract No. HP 55(1) / CSJ 0380-010-064 US 62/ 82 (Marsha Sharp Freeway) From: VICKSbUrg Ave. I o: Ave L Digi-Key Linear Power Supply 4 $ 73.25 $ 293.00 Digi-Key Shipping 1 15.88 15.88 Carlton -Bates Co. Power Supplies 5 69.47 347.35 Carlton -Bates Co. Shipping 1 44.64 44.64 GDI Communications Modem Sets 2 711.95 1,423.89 O'Tool Plastic Pipe 2" Conduit parts 1 480.06 480.06 O'Tool Plastic Pipe 2" Conduit parts 1 461.92 461.92 O'Tool Plastic Pipe 2" Conduit parts 1 193.70 193.70 Nunn Electric Supply Electrical Parts 1 97.09 97.09 Rexel Miscellaneous Equip. 1 218.24 218.24 Rexel Miscellaneous Equip. 1 58.45 58.45 Rexel 3" Conduit parts 1 365.00 365.00 O'Tool Plastic Pipe 2" & 3" Conduit parts 1 495.77 495.77 Rexel 4" Conduit parts 1 208.66 208.66 O'Tool Plastic Pipe 2" & 3" Conduit parts 1 419.25 419.25 O'Tool Plastic Pipe 3" Conduit parts 1 456.30 456.30 O'Tool Plastic Pipe 2" & 3" Conduit parts 1 467.48 467.48 Calco Metal Cabinet Stand 1 325.00 325.00 O'Tool Plastic Pipe 2" Conduit parts 1 57.54 57.54 Nunn Electric Supply Pull Rope 1 361.54 361.54 Hi -Line Bolts & washers 1 30.00 30.00 HI -Line Nylon Locking Fork 1 403.61 403.61 Calco Metal Cabinet Stand 1 325.00 325.00 Texas Electronics Connectors 100 0.13 13.00 Calco Metal Cabinet Stand 1 325.00 325.00 Southwestern Elec Pull Rope 1 154.11 154.11 Southwestern Elec Pull Rope 1 154.11 154.11 Westex Radio Co. Radio Cables 13 25.00 325.00 Calco Metal Pedestal & Plates 1 415.00 415.00 Calco Metal Base Plate for Cabinet 1 250.00 250.00 Calco Metal Base Plate for Cabinet 1 250.00 250.00 Calco Metal Base Plate for Cabinet 1 250.00 250.00 Lubbock Bolt Bin Bolts, Nuts & Washers 1 52.88 52.88 Calco Metal Base Plate for Cabinet 1 250.00 250.00 Traffic-Traffic_TEA7 Page 10 of 12 Rev. 09/18/2006 Supplemental - Cost - Traffic Signal - Type R Contract No. HP 55(1) / CSJ 0380-010-064 US 62/ 82 (Marsha Sharp Freeway) From: Vicksburg Ave. To: Ave L Calco Metal Base Plate for Cabinet 1 250.00 250.00 ASCO Marking Paint 12 2.69 32.28 Rexel 2" conduit equipment 1 220.05 220.05 Hi -Line Miscellaneous equipment 1 480.50 480.50 X-Ergon Bolts, Nuts & Washers 1 469.65 469.65 Partsmaster Bolts, Nuts & Washers 1 257.93 257.93 ASCO Submersible Pump 1 44.07 44.07 Commercial Concrete Concrete (cu. yds.) LP&L 73 64.00 4,672.00 Commercial Concrete Concrete (cu. yds.) LP&L 10 64.00 640.00 Commercial Concrete Concrete (cu. yds.) LP&L 17 64.00 1,088.00 Deerwood Construction Install pipe & primary enclosure LP&L 1 9,725.00 9,725.00 City Warehouse I" rigid conduit 10' 7 9.82 68.77 City Warehouse 1" straps each 25 0.10 2.58 City Warehouse 1" Conduit Locknut each 20 0.73 14.60 City Warehouse 1" weatherhead each 7 2.23 15.61 City Warehouse 3" pvc conduit 10' 34 7.97 271.12 City Warehouse 5/8" x 14 bolt each 23 0.88 20.24 City Warehouse 5/8" x 14 eyebolt each 25 2.03 50.74 City Warehouse 5/8" locknut each 50 0.16 7.97 City Warehouse 5/8" square washer each 100 0.19 18.64 City Warehouse 1/2" bull rope foot 1175 0.20 235.00 City Warehouse 5/8" x 18 bolt each 25 1.57 39.30 City Warehouse 5/8" x 18 eyebolt each 25 1.70 42.50 City Warehouse I bail dead end each 6 6.90 41.40 City Warehouse 3/8" strand vise each 6 13.71 82.26 City Warehouse 3/8" strand splice each 4 8.40 33.60 City Warehouse 3/8" strand vise each 4 13.07 52.28 City Warehouse 40' wood pole each 1 221.02 221.02 City Warehouse bailing wire roll 2 3.19 6.38 City Warehouse 5" pvc 90 elbow each 15 23.63 354.49 City Warehouse pvc glue can 12 4.30 51.60 City Warehouse duct tape roll 2 3.24 6.49 City Warehouse warning tape roll 2 19.05 38.09 City Warehouse 5" pvc 20' length 195 $ 23.54 4,590.79 City Warehouse 5" pvc plug each 14 3.49 48.90 City Warehouse 5" pvc spacer each 56 2.98 166.94 City Warehouse primary enclosure each 2 781.11 1,562.23 City Warehouse purple primer can 8 5.89 47.10 Traffic-Traffic_TEA7 Page 11 of 12 Rev. 09/18/2006 Supplemental - Cost - Traffic Signal - Type R Contract No. HP 55(1) / CSJ 0380-010-064 US 62/ 82 (Marsha Sharp Freeway) From: Vicksburg Ave. To: Ave L City Warehouse 1/2"x 20' rebar foot 160 0.26 42.10 City Warehouse 3/8" strand vise each 35 14.41 504.34 City Warehouse Warehouse Charge June-05 8.12 City Warehouse Warehouse Charge October-05 21.69 City Warehouse Warehouse Charge November-05 7.81 City Warehouse Warehouse Charge December-05 35.24 City Warehouse Warehouse Charge May-06 24.55 City Warehouse Warehouse Charge May-07 553.21 City Warehouse Warehouse Charge March-08 40.35 Miscellaneous Charge Misc. Expense - Car Allowance 1 34.33 34.33 Total Additional Materials Est. Additional Materials Total Est. Materials $ 37,230.29 $ 8,000.00 $ 45,230.29 Traffic-Traffic_TEA7 Page 12 of 12 Supplemental - Cost - Traffic Signal - Type R Rev. 09/18/2006