HomeMy WebLinkAboutResolution - 2008-R0283 - Amendment To Engineering Agreement - Parkhill, Smith & Cooper - 08_12_2008Resolution No. 2008—RO283
August 12, 2008
Item No. 5.33
RESOLUTION
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock BE and is hereby authorized and
directed to execute for and on behalf of the City of Lubbock an Amendment No. 12A to
the engineering agreement between the City of Lubbock and Parkhill, Smith & Cooper
for the Runway 08/26 and Taxiway Improvements Project to add design services for the
demolition of the end of Runway 08 and reconstruction of Taxiway R at Lubbock Preston
Smith International Airport, and all related documents. Said Amendment is attached
hereto and incorporated in this Resolution as if fully set forth herein and shall be included
in the minutes of the Council
Passed by the City Council this 12th day of August , 2008.
- -
W. AA; � �
TOM MARTIN, MAYOR
ATTEST:
Rebetca. Garza, City Secretary
ED AS TO
,-1 ' `Z- v %G R /y (J x
Loomis, Assistant City Manager
ortation and Public Works
APPROVE AS TO FORM:
Chad Weaver, Assistant City Attorney
vw: CityAtt/Chad/RES-PSC Amendment No.12A Runway 08-26
July 30, 2008
Resolution No. 2008-R0283
!lGCCLO� :C=!!!CO!
:!•lz:I war.
:L.ilo'.:..:"
July 21, 2008
Mr. James W. Loomis, A.A.E.
Director of Aviation
Lubbock Preston Smith International Airport
Administration Office, 2nd Floor
5401 N. Martin Luther King Jr. Blvd., Unit 389
Lubbock, TX 79403
Re: Amendment No. 12A to Agreement for Professional Services,
Design Phase Services for: Runway 08/26 & Taxiway Improvements
(Demolition of Runway 08 End and Reconstruction of Taxiway R)
Dear Mr. Loomis:
We have met with your staff, reviewed the project, and prepared an Engineer's Opinion of Probable Cost
(EOPC) and site plan for the Runway 08/26 improvements noted in the LBB Master Plan. This contract
amendment modifies the scope of professional services included in Amendment No. 12 dated April 23, 2008, to
include the demolition of the Runway 8 end and reconstruction of Taxiway R. Our understanding of the scope
and a fee proposal for the professional services requested for Task l (design) is included below. Since the plan
for these projects is to have the designed improvements ready to bid, Task 2 (construction) and Task 3
(surveying/testing) services will be negotiated when FAA discretionary funding becomes available. This design
delivery method should allow the airport to very quickly move into the construction phase.
Task 1 - Fee for Professional Services (Study and Report, Preliminary Design,
Final Design, lump sum). $294,365.00
Task 2 - Construction Phase Services (Bidding/Negotiation, Engineers Services
Paragraph A1.05 of contract, which includes RPR and construction
related Engineering Services, lump sum).
Task 3 - Surveying and Testing Services, (reimbursable expense). *.
TOTAL
$294,365.00
* To be negotiated at a later date
We propose to modify the agreement between the City of Lubbock and Parkhill, Smith & Cooper, Inc. dated
January 13, 2005, and to provide the Task 1 services on a lump sum basis under the provisions of the contract,
EXHIBIT B -PAYMENTS TO THE ENGINEER, PARAGRAPH B4.01. Compensation for Design Phase -
Task 1 Services shall not exceed $294,365 (Amendment No. 12A) or $3,227,615 (Amendment No. 12 and 12A
combined) without Owner's approval.
Parkhill, Smith & Cooper, Inc.
Engineers ■ Architects ■ Planners
4222 85th Street, Lubbock, Texas 79423
(806) 473-2200 FAX (806) 473-3500
Lubbock ElPaso Midland Amarillo (liio cn
Mr. James Loomis, A.A.E. Page 2 July 21, 2008
If the teams of this amendment are agreeable to you, please sign and return one copy of this letter to our office.
We will take receipt of this signed letter as our notice to proceed with these services. We look forward to
working with you in completing this project. If you have any questions please call either Mark Haberer or
myself.
Sincerely,
PARKHIL.,L, SMITH & COOPER, INC.
B 1
Sohn T. Hamilton, PE
Firm Principal
JTH/jbh
Enclosures
IN TRIPLICATE
V20M 2706,WCWM\00 • FEE NEG0M-n0Ns ftw ng=neW\wnftaa ==&n=12A.&C
Accepted by:
CITY OF LUBBOCK
By .15
Tom Martin
Mayor
Attest:
Garza
City Secretary
as to Content:
James W. Loomis, A.A.E.
Director of Aviation
Approved as to Form:
By
Chad Weaver, Assistant City Attorney
Resolution No. 2008-R0283
Cost as of 4/08
City of Lubbock, Texas
LUBBOCK PRESTON SMITH INTERNATIONAL AIRPORT
MASTER PLAN PROJECT B.2, DEMOLISH RWY 08 END & RECONSTRUCT TXY R
ENGINEER'S OPINION OF PRO COSTS
Ph*" I groled
Taxiwa Rom*o Im rovrrmaMs
Mobdrzatbn
Item P-140, Contractor Mobilization (8%)
1
LS
M,341.70
S",340
Material Removal and Demolition (Phase I Protect)
Item P-150, Remove and Dispose of 2" P-401, 6" TxDOT ITEM 345 ASPHALT and 6' P-155
12,005
SY
$7.50
$90,040
Item P-150, Remove and Dispose of 28" P-501, 8' P,304, 6' P-155, and 18-T P-152 Concrete Pavement Section
2,649
SY
$30.00
$79,470
Item P-150, Remove and Dispose of 14" P-501, 16" P-201, and 6" P-155 Concrete Pavement Section
1,396
SY
$17.00
$23,730
Item P-150, Remove and Dispose of 14' P-01, 8' P-304, 6" P-156 end 18" P-152 Concrete Pavement Section
10,697
SY
$17.00
$181,850
P-150 Remove and Dis a of 14" P-601 8' P-301 6" P-155 and 18" P-152 Concrete Pavement Section
6,654
SY
17.00
113 120
Am
u iota
Concrete and Asphalt Paving, Base, Subarade. Excavation and Grading (Runway and Taxiway)
Item P-152, Excavation
10,000
CY
$6.00
$60,000
Item P-152, Embankrtnent
5,000
CY
$7.00
$35,000
Item P-152, Grading and Subgrade Preparation under 14'
18,588
SY
S3.50
$65,060
Item P-155, Lime Treated Subgrade, excluding lime
18,568
SY
$3-50
$65,060
Item P-155, Lime used in LTSG (Q 5%)
251
Ton
$170.00
$42,660
Item P-304, Cement Treated Base Course, 8" Thickness
18,588
SY
$16.00
$297,410
Item P-304, Cement Treated Base Course, 6" Thickness
12,238
SY
$12.00
$146,8W
Item P-304, Cement for Cement Treated Base Course (6%)
14,D90
CWT
$10.DO
$140,900
Item P-401, Bituminous Surface Course 2' Thickness
1,349
TON
$120.00
$161,880
Item P-401, Bituminous Surface Course 6% Bonus
1
LS
$9,712.90
$9,710
Item P-501, Portland Cement Concrete Pavement, 14" Thickness
19,588
SY
$62.50
$1,161,750
Item P-401, Bituminous Surface Course 6%Bonus
1
LS
$69,705.00
$69,710
Item P-602, Bituminous Prime Coat, including herbicidal treatment
18,588
Gallon
$4.50
$83,650
Item P-609, Bond Breaker
18,588
SY
$2.00
$37,180
Item P-620 Permanent Pavement Marking
26,158
SF
1.50
$39 240
Subtotal
r2,416,WT
Other Items
Item P-152 Grading and Topsoiling in Unpaved Areas
79,271
SY
$1.50
$118,910
Item P-156, Temporary Air and Water Pollution, Soil Erosion and Siltation Control
1
LS
$25,000.00
$25,000
Item D-705, Perforated underdrain system
2,926
LF
$30.00
$87,780
Item 0-752, Concrete Culverts, Headwalls, and Misc. Drainage
1
LS
$25,000.D0
$25,000
Item T-901, Soil Preparation, Seeding and Fertilizing
18
Acre
$600.00
$10,800
Item T-964, Soil Preparation, Sodding and Fertilizing
1,070
SY
$7.50
$8,030
item MC, Temporary Irrigation System
4
Mon
$12,500.00
$50,000
Tern rar Displace Threshold
1
EA
$36,000.00
$36 000
Subtotal
$361,520
I to I nCost
Item L-1116, Undergrouna Liectncal Canle, 11C, 98 AWU, b KV. cost snail InCIUOe all cable, z- conduit, grouna rags,
trenching, backfilling, all associated pull boxes regLired to facilitate puikng, and all labor, tools, equipment and
incidentals necessary to complete the installation:
4,888
LF
$6.50
$31,772
Item L-108, Counterpoise Wire #8 AWG, in Direct Bury, Including Grounding Rods
4,888
LF
$0.90
S4,399
Item L-109, Vault Improvements
1
LS
$100.000.00
$100.000
Item L-110, &way, 4-Inch Underground Electrical Dud, Installed by Bore. Cost shall Include conduit, steel casing,
spacers, grout, and all labor, tools, equipment and incidentals necessary to complete the installation
965
LF
$200.00
$193,000
Item L-110, 6-way, 4-inch Underground Electrical Duct, Installed by Open Trench. Cost shall include conduit,
trenching, backfill, concrete, and ail labor, toots, equipment and incdentals necessary to complete the installation
220
LF
$64.00
$14.090
Item L-125, Perform demolition of all electrical related hems (Including patching)
1
LS
$51,400.00
$51,4D0
Item L-125, Medium Intensity Taxhvay Edge Light, LED with Transformer and Base Can
56
EA
$580.00
$32,480
Item L-125, High Intensity Runway edge Lights,,Ath Transformer and Base Can
0
EA
$1,230-00
$0
Item L-125, Flush -Mounted High Intensity Runway Edge Lights, with Transformer and Base Can
1
EA
$2,140.00
$2,140
Item L-125, One Panel Internally lighted Sign, Including New Base Mounting and Concrete Slab
3
EA
$6,400.00
$19,200
Item L-125, Two Panel Internally Lighted Sign, Including New Base Mounting and Concrete Slab
0
EA
$7,000.00
$0
Item L-125, Three -Panel Internally Lighted Sign including New Base Mounting and Concrete Slab
5
EA
$8,000.D0
$40,000
Item MC, All items associated with ro ect in
1
LS
132,500.00
500
-----Tu-Ft-otal
$488,471
Construction Contingency on Base Bid 10ah
5 461
SUB-T TAL CONSTRUCTION :, : " r i, T,a tT > <:.
a "_: r •. ;. $4 460 072
Professional Services
6.2 Design for the demolition of Runway a to Taxiway R and the complete reconstruction of Taxiway R
Basic Engineering Services (Study and Report, Preliminary Design and Final Design)
$294,365
Construction Phase Services (Includes BiddinglNegotiatlon, RPR and Construction related Engr. Services) - Estimate
'
SurvetQg and Testing Services - Estimate
Subtotal Professional Services
$294,365
TOTAL COST - PRESENT VALU ..:':y.>._,�
754437
TOTAL COST - FUTURE VALUE
X120W,270e.06,CIVU07 - EOPOVD0. NEGOTIATION PHASE EOPOOPC (7-21-08) an-d 12.1,ds
Droving File: X:\2008\2706.O�CADD\2706 LAYOUT.dwg (Myer) ' 7/16/20M
■ r��ee�e�e
Uffamm T U6 9w
51
IIIII
s
P9
LD
z
0 Xrefs: XT9-2705, XR—Ctrcuits
m rr r
C.)
z
r—
w
cZ i
M,'E ntl
1
}
i
i
r
N
i
Z
Q
Z
Iles--ny—
y
T/