HomeMy WebLinkAboutResolution - 2008-R0222 - Change Order To Contract - Allen Butler Construction Co., Inc. - 06_26_2008Resolution No. 2008-RO222 June 26, 2008 Item No. 5.11 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the City Council of the City of Lubbock hereby authorizes and directs the Mayor of the City of Lubbock to execute a Change Order No. I to a Contract by and between the City of Lubbock and Allen Butler Construction Co., Inc., of Lubbock, Texas, for Lubbock Preston Smith International Airport G.A. Ramp Expansion Phase II, which Change Order No. I and any associated documents, are attached hereto and made a part of this Resolution for all intents and purposes. Passed by the City Council this 26th day of June , 2008. W TOM MARTIN, MAYOR ATTEST: "ebeccaG"arza.,ity Secretwry APPROVED AS T G CONTENT: Zames ooml ant City Manager/Transportation & Public Works APPROVED AS TO FORM: Vandiver, Attorney o DDres/AIlenButler-APrampChangeOrd 1 Res June 16, 2008 CITY OF LUBBOCK CHANGE ORDER Change Order #: I Contractor: Allen Butler Construction Inc.. Date: 05-14-08 BID/ITB #: 07-715-DD Contract #: 17643 I Project Name: I GA Ramp Expansion — Phase II Change Order within the scope of the contract means a Change Order that DOES NOT ALTER THE NATURE OF THE THING TO BE CONSTRUCTED AND THAT IS AN INTEGRAL PART OF THE PROJECT OBJECTIVE. After performance of a construction contract begins, Change Orders may be approved if necessary to 1) make changes in plans or specifications; or 2) decrease or increase the quantity of work to be performed or materials, equipment, or supplies to be furnished. This DOES NOT mean that a department can redefine the project. All work that alters the nature of the thing to be constructed or that is not an integral part of the 12roiect obiective must be let out for public bid by, the Purchasing Department. Description of change (alteration, deviation, addition, or deletion) caused by conditions encountered during construction not covered by the specifications and drawings of the project (attach additional pages if necessary): Change order # 1 includes final constructed quantity adjustments for all bid items, add weight limit sign, and obliteration requested by FAA inspector. Refer to the attachment for a detailed summary of each item. Change Orders must either be negotiated in the best interest of the City of Lubbock or put out for public bid by the Purchasing Department. Where the Change Order is negotiated, the Change Order must be fully documented and itemized as to costs, including material quantities, material costs, taxes, insurance, employee benefits, other related costs, profit and overhead. Where certain unit prices are contained in the initial contract, no deviations are allowed in computing negotiated change order costs. ITEMIZED COSTS MUST BE FULLY DOCUMENTED AND ATTACHED TO THIS FORM. ITEM DESCRIPTION AMOUNT A. ORIGINAL CONTRACT VALUE: $2,671,287.26 B. AMOUNT OF THIS CHANGE ORDER: Council approval required y'aver325,000 ($113,575.74) C. PERCENT OF CONTRACT VALUE THIS CHANGE ORDER (B/A): (4.25%) D. AMOUNT OF PREVIOUS CHANGE ORDERS: $0.00 E. TOTAL AMOUNT OF ALL CHANGE ORDERS (B+D): ($113,575.74) F. PERCENT OF CONTRACT OF ALL CHANGE ORDERS (E/A): zs%Maximum (4.25%) G. NEW CONTRACT AMOUNT (A+E): $2,557,711.52 It is mutually agreed that the above dollar amount and the time extension, as applicable, as set forth in this Change Order constitutes full compensation to the Contractor for all costs, expenses and damages to the Contractor, whether direct, consequential or otherwise, in anyway incident to, or arising out of or resulting directly or indirectly; from the work performed or modified by the Contractor under this Change Order. I Purcha@ke a d Coht&ct Aftihagement Department): (I) CONTRACTOR Date (2) PROJECT ARCHITECT/ENGINEER Date Approved as to Co nt: Approve o (3) OWNER'S REPRESENTATIVE Date (4) CITY ATTORNEY Date gl (5) CAPITAL PROJECTS MANAGER Date (6) PURCHASING ANDLCONTRACT MANAGER Date Change Orders over S25,000 require a Contract Cover Sheet and the following signatures: CITY BBOC 6/26/08 E 6/26/08 (7) MAYOR Date (8) CITY SECRETA Y ' n Date Council Date: June 26, 2008 Agenda Item #: 5.11 Resolution #: 2 08—RO222 PUR-046 (Rev 02106) City of Lubbock Bid No. 07-715-DD FAA A.I.P. Project No. 3-48-0138-030-2007 LUBBOCK PRESTON SMITH INTERNATIONAL AIRPORT GA Ramp Expansion Phase II SUMMARY OF ITEMS INCLUDED IN CHANGE ORDER #1 Item Description of Item ORIGINAL BID QUANTITIES ACTUAL CONSTRUCTED QUANTITIES NET DIFFERENCE Quantity Unit Unit Price Amount Quantity Amount Quantit Amount No. BID ITEM ADJUSTMENTS 3 Item MC, Miscellaneous removal, disposal and utility relocation 1 LS $5,000.00 $5,000.00 0.78 $3,900.00 (0.22) ($1.100.00) 4 Item P-150, Remove and Salvage Existing Bituminous Surface Course (2-inches) 8,730 SY $8.35 $72,895.50 6272.50 $52,375.38 (2,457.50) ($20,520.13) 5 Item P-150, Remove and salvage existing base course material (8- inches thick) and subgrade material 4,370 SY $8.18 $35,746.60 4949.00 $40,482.82 579.00 $4,736.22 6 Item P-150, Remove and dispose of concrete pavement (4-5 inches thick) 6.160 SY $27.63 $170,200.80 5986.00 $165,393.18 (174,00) ($4,807.62) 7 Item P-150, remove and dispose of existing gravel base material (2-3 inches thick) and subgrade material 5,870 SY $2,74 $16,083.80 5986.00 $16,401.64 116.00 $317.84 11 Item P-152, Grading and subgrade preparation under paved areas 11,530 SY $3,00 $34,590.00 11453.40 $34,360.20 (76.60) ($229.80) 13 Item P-208, Aggregate base course, 8-inches thickness 11,630 SY $9.55 $110,111.50 11453.40 $109.379.97 (76,60) ($731.53) 14 Item P501, Portland cement concrete pavement, 5-inches thickness 900 SY $57.96 $52,164.00 870.50 $50,454.18 (29.50) ($1,709.82) 15 Item P-501, Portland cement pavement, 9-inch thickness 10,580 SY $72.18 $763,664.40 9811.00 $708,157.96 (769.00) ($55,506.42) 16 Item P-501, Portland cement concrete pavement, 6% bonus 1 LS $48,949.70 $48,949,70 0.81 $39.611.29 (0.19) ($9,338.41) 19 Item P-620, Obliterate existing pavement marking 330 SF $16.50 $5,445.00 862.00 $14,223.00 532.00 $8,778.00 20 Item P-620, permanent pavement marking 13,300 SF $2.07 $27;531.00 10215.00 $21,145.05 (3,085.00) ($6,385.95) 38 TXDOT Item 340, Type D, hot mix asphaltic concrete pavement, furnished and installed 600 TONS $197,30 363.14 $71,64Z52 (236.86) ($46,732.48) 39 Item EB-35A, Thermoplastic coal tar emulsion slurry seal, level up application 2.540 SY $6.45 $16,383.00 2690.00 $17,3%50 150.00 $967.50 40 Item-35A, Thermoplastic coal tar emulsion slurry seal, two course application 86,580 SY $827 $716,016.60 88,235.00 $729,703.45 1.655.00 $13,686.85 TOTAL............................................................... $2,074,781.90 TOTAL ................. $2,074,586.16 $118,575.74 OTHERITEMS Weight Limit Sign 0 1 LS I $5,000.00 $0 1 1 $ 5,000.00 1 $ 5,000.00 TOTAL OTHER ITEMS ................. I ............ ........ $0.00 TOTAL OTHER ITI $5,000.000 $ 5,000.00 TOTAL CHANGE ORDER #1.......................................................................................... $113,575.74 05/09/2008 15:16 6873319 ALLEN BUTLER PAGE 01 FROM: Aftm I;u11 r CeaaBixut6ony Im hopomlNo. 1385 #24 S. LAeghere Drive Sbeet No. Ransom Canyon, Tex= 79366 Daw 05/08/08 CS" 745-74"; FAX MO -14s-7577 Propwd Submitted To 1waTOBeFftJXMdA1 orapany:FFax: John i;eu bo&%Urk Haberer are:. L A GA 1R�rmp Attention:patkhill. Smith da Cooper ddress: Address: 42,22 84t1� Sbred LHbbodr. Texas icy-StaraLubbock Texas 79423 of Plans: Phone: (806) 473.2200 rdL/Ew.: ax: 473-3500 C1 mmw M DER Ri QtMST ThstalMon of weight liwit sign as speeificad in e-mail Eras Richard Mutter wMSC da W January 10, ZM. The above work is to be performed in accordance with the drawarg�s and specifications submitted for abow wok and completed is a substantial wodwon�ship uaaruter for a sum of FM THOUSAM ,AND 05✓300- DoUnn 55,800-00 with payrrtemU to be made as follows: Estivarate submitted to contractors office at the end of the month Payment is due by the 10th of the follwing mon& alteration or deviation above sped iuoa+vtviz�g extra oosls, Will be executed octly upaa wiittxa elders, bye an extra charge air antd above the estimate. All agmeemetrts contingent upon strikes, accidects or randwill ys beyondour control. Owner to c aq fre, tornado and otba Accessary fima ce upon above worst. Worker's and Public liabilitybm m om oo abvft woork tobe taken out byAlknButlerCce st Inc.ae Sales Tmt will be added to the above priori u we receive a sales tax exe�ion cr�r4te at our offices_ Respectfogy Submitted by A1lee Butler Pres. Note —Thisproposalmay be withdrawn if n of wi0ft 30 days The above prim, specifications and conditions are satisfactory and are t�by accepted. You an authorized to do the work as fred. Paymentwill be made as outlined above. Accepted Signatae c Date Signature Agenda Item #.## ITB #07-715-DD — Consider a resolution authorizing the Mayor to approve Change Order # 1 to the Contract with Allen Butler Construction, Inc. for the GA Ramp Expansion — Phase II Project. (Lubbock Preston Smith International Airport) Item Summary The City Council approved a contract with Allen Butler Construction, Inc. for the GA Ramp Expansion — Phase II Project in the July 26, 2007 City Council Meeting for $2,671,287.26. The GA Ramp Expansion project is the second phase of the rehabilitation and replacement of general aviation ramp pavement to the east side of Runway 17L/35R. This item, Change Order#1 includes final construction quantity adjustments for all bid items, adding a weight limit sign, and obliteration requested by the Federal Aviation Administration inspector. The Bid Item Adjustments reduced the contract $118,575.74 and the cost of the Weight Limit Sign was $5,000.00 totaling a reduction of $113,575.74. The revised contract amount is $2,557,711.52. Fiscal Impact The Change Order reduces the contract amount by $113,575.74 making the contract amount $2,557,711.52. The Capital Improvement Project (251.90404) funding consists of entitlement funds from the Federal Aviation Administration (95%) and Passenger Facility Charge funds (5%). Staff Submitting/Recommendation James Loomis, Transportation and Public Works Assistant City Manager The Airport Board and Airport Staff recommend approval of Change Order #1 to the contract with Allen Butler Construction Inc. reducing the amount of the contract by $113,575.74. City Council Meeting