HomeMy WebLinkAboutResolution - 2006-R0018 - Contract For Total Demolition Of Municipal Building - Minnix Commercial Partners - 01_12_2006Resolution No. 2006-R0018
January 12, 2006
Item 5.22
RESOLUTION
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK
THAT the Mayor of the City of Lubbock BE and is hereby authorized and
directed to execute for and on behalf of the City of Lubbock, a Contract for total
demolition of the municipal building parking structure, Bid #05-147-MA, by and
between the City of Lubbock and Minnix Commercial Partners, LTD of Lubbock, Texas,
and related documents. Said Contract is attached hereto and incorporated in this
resolution as if fully set forth herein and shall be included in the minutes of the City
Council.
Passed by the City Council this 12th day of January, 2006.
4dCD(AJGAL, MAYOR
ATTEST:
Reb cca Garza, City Secretary
APPROVED AS TO CONTENT:
Harlan Stauffer�iliti
APPROVED AS TO FORM:
G. Vandiver, Attorney of
gs/ccdocs/res-Contract-Minnix Commercial Partner LTD
Dec.30, 2005
No Text
4
f
5
CITY OF LUBBOCK
INVITATION TO BID
rdFOR
TITLE: MUNICIPAL BUILDING PARKING STRUCTURE REPAIR
ADDRESS: LUBBOCK, TEXAS
ITB NUMBER: 05-147-MA
PROJECT NUMBER: 90394.8304.20000
L-i
CONTRACT PREPARED BY: PURCHASING & CONTRACT MANAGEMENT DEPARTMENT
INDEX
1. NOTICE TO BIDDERS
2. GENERAL INSTRUCTIONS TO BIDDERS
3. BID SUBMITTAL - BID FOR LUMP SUM CONTRACTS
4. PAYMENT BOND
5. PERFORMANCE BOND
6. CERTIFICATE OF INSURANCE
7. CONTRACT
8. GENERAL CONDITIONS OF THE AGREEMENT
9. CURRENT WAGE DETERMINATIONS
10. SPECIFICATIONS
No Text
r
NOTICE TO BIDDERS
ITB #05-147-MA
Sealed bids addressed to Victor Kilman, Director of Purchasing & Contract Management, City of Lubbock, Texas,
will be received in the office of Purchasing & Contract Management, Municipal Building, 1625 13th Street, Room 204,
Lubbock, Texas, 79401, until 2:00 o'clock p.m. on the 29tb day of December, 2005, or as changed by the issuance of formal
addenda to all planholders, to furnish all labor and materials and perform all work for the construction of the following
described project:
"MUNICIPAL BUILDING PARKING STRUCTURE REPAIR"
After the expiration of the time and date above first written, said sealed bids will be opened in the office of the
Director of Purchasing & Contract Management and publicly read aloud. It is the sole responsibility of the bidder to ensure
that his bid is actually in the office of the Director of Purchasing & Contract Management for the City of Lubbock, before the
expiration of the date above first written.
Bids are due at 2:00 o'clock p.m. on the 29 h day of December, 2005, and the City of Lubbock City Council will
consider the bids on the 26th day of January, 2005, at the Municipal Building, 1625 13th Street, Lubbock, Texas, or as soon
thereafter as may be reasonably convenient, subject to the right to reject any or all bids and waive any formalities. The
successful bidder will be required to furnish a performance bond in accordance with Chapter 2253, Government Code, in the
amount of 100% of the total contract price in the event that said contract price exceeds $100,000 and the successful bidder
will be required to furrmish a payment bond in accordance with Chapter 2253, Government Code, in the amount of 100% of
the total contract price in the event that said contract price exceeds $25,000. Said statutory bonds should be issued by a
company carrying a current Best R in of B or su erior.
z Bidders are required, whether or not a payment or performance bond is required, to submit a cashier's or certified
check issued by a bank satisfactory to the City of Lubbock, or a bid bond from a reliable surety company, payable without
recourse to the order of the City of Lubbock in an amount not less than 5% of the total amount of the bid submitted as a
guarantee that bidder will enter into a contract and execute all necessary bonds (if required) within ten (10) business days
after notice of award of the contract to him. FAILURE OF THE BIDDER TO INCLUDE BID SECURITY WITH THE
BID SUBMITTAL SHALL CONSTITUTE A NONRESPONSIVE BID AND RESULT IN DISQUALIFICATION OF
THE BID SUBMITTAL.
It shall be each bidders sole responsibility to inspect the site of the work and to inform himself regarding all local
conditions under which the work is to be done. It shall be understood and agreed that all such factors have been thoroughly
investigated and considered in the preparation of the bid submitted. There will be a non -mandatory pre -bid conference on the
20th day of December, 2005 at 10:00 o'clock a.m., in 1625 13th Street, Training Room L01, Lubbock, Texas., Lubbock,
Texas.
ONE SET OF PLANS AND SPECIFICATIONS MAY BE OBTAINED, AT THE CITY'S EXPENSE, FROM
THE CITY OF LUBBOCK, PURCHASING & CONTRACT MANAGEMENT DEPARTMENT, 162513TH STREET,
ROOM 204, LUBBOCK, TEXAS 79401, Phone: (806) 775-2171. Additional sets of plans and specifications may be
obtained at the bidder's expense.
Attention of each bidder is particularly called to the schedule of general prevailing rate of per diem wages included in
the contract documents on file in the office of the Director of Purchasing & Contract Management of the City of Lubbock,
which document is specifically referred to in this notice to bidders. Each bidder's attention is further directed to provision of
Article 5159a, Vernon's Ann. Civil St., and the requirements contained therein concerning the above wage scale and payment
by the contractor of the prevailing rates of wages as heretofore established by owner in said wage scale.
The City of Lubbock hereby notifies all bidders that in regard to any contract entered into pursuant to this
advertisement, minority and women business enterprises will be afforded equal opportunities to submit bids in response to
this invitation and will not be discriminated against on the grounds of race, color, sex, disability, or national origin in
consideration for an award.
The City of Lubbock does not discriminate against persons with disabilities. City of Lubbock pre -bid meetings and
bid openings are available to all persons regardless of disability. If you would like bid information made available in a more
accessible format or if you require assistance, please contact the City of Lubbock ADA Coordinator at (806) 775-2018 at
least 48 hours in advance of the meeting.
CITY OF LUBB CK
V
VICTOR KIL AN, DIRECTOR
PURCHASING & CONTRACT MANAGEMENT
GENERAL INSTRUCTIONS TO BIDDERS
.j
G.
F GENERAL INSTRUCTIONS TO BIDDERS
I BID DELIVERY TIME & DATE
1.1 The City of Lubbock is seeking written and sealed competitive bids to furnish MUNICIPAL
BUILDING PARKING STRUCTURE REPAIR per the attached specifications and contract
documents. Sealed bids will be received no later than 2:00 p.m. CST, the 29th day of December. 2005 at
the office listed below. Any bid received after the date and hour specified will be rejected and returned
unopened to the bidder. Each bid and supporting documentation must be in a sealed envelope or
container plainly labeled in the lower left-hand comer. "ITB #05-147-MA, MUNICIPAL BUILDING
PARKING STRUCTURE REPAIR" and the bid opening date and time. Bidders must also include
their company name and address on the outside of the envelope or container. Bids must be addressed to:
Victor Kilman, Director of Purchasing & Contrast Management
City of Lubbock
1625 13th Street, Room 204
Lubbock, Texas 79401
1.2 Bidders are responsible for making certain bids are delivered to the Purchasing & Contract Management
Department. Mailing of a bid does not ensure that the bid will be delivered on time or delivered at all. If
bidder does not hand deliver bid, we suggest that he/she use some sort of delivery service that provides a
receipt.
1.3 Bids will be accepted in person, by United States Mail, by United Parcel Service, or by private courier
service. No bids will be accepted by oral communication, telephone, electronic mail, telegraphic
transmission, or telefacsimile transmission. THE CITY WILL NOT ACCEPT FAX BIDS.
1.4 The City of Lubbock reserves the right to postpone the date and time for opening bids through an
addendum.
PRE -BID MEETING
2.1 For the purpose of familiarizing bidders with the requirements, answering questions, and issuing addenda
as needed for the clarification of the Invitation to Bid (ITB) documents, a non -mandatory pre -bid meeting
will be held at 10:00 a.m., December 2011, 2005 in 1625 13th Street, Training Room L01. Lubbock,
Texas., Lubbock, Texas. All persons attending the meeting will be asked to identify themselves and the
Fi prospective bidder they represent.
2.2 It is the bidder's responsibility to attend the pre -bid meeting though the meeting is not mandatory. The
City will not be responsible for providing information discussed at the pre -bid meeting to bidders who do
not attend the pre -bid meeting.
3 ADDENDA & MODIFICATIONS
3.1 Any changes, additions, or clarifications to the ITB are made by ADDENDA information available over
the Internet at http://www.RFPdgpot.com. We strongly suggest that you check for any addenda a
minimum of forty-eight hours in advance of the response deadline. BUSINESSES WITHOUT
r INTERNET ACCESS may use computers available at most public libraries.
a 3.2 Any bidder in doubt as to the true meaning of any part of the specifications or other documents may
request an interpretation thereof from the Purchasing & Contract Management Department. At the
_+ request of the bidder, or in the event the Purchasing & Contract Management Department deems the
interpretation to be substantive, the interpretation will be made by written addendum issued by the
Purchasing & Contract Management Department. Such addenda issued by the Purchasing & Contract
Management Department will be available over the Internet at http://www.RFPdepot.com and will
become part of the proposal package having the same binding effect as provisions of the original ITB. NO
VERBAL EXPLANATIONS OR INTERPRETATIONS WILL BE BINDING. In order to have a request
for interpretation considered, the request must be submitted in writing and must be received by the City of
Lubbock Purchasing & Contract Management Department no later than five (5) days before the bid
- closing date.
3.3 All addenda, amendments, and interpretations of this solicitation shall be in writing. The City of Lubbock
shall not be legally bound by any amendment or interpretation that is not in writing. Only information
supplied by the City of Lubbock Purchasing & Contract Management Department in writing or in this
ITB should be used in preparing bid responses. All contacts that a bidder may have had before or after
receipt of this ITB with any individuals, employees, or representatives of the City and any information
that may have been read in any news media or seen or heard in any communication facility regarding this
bid should be disregarded in preparing responses.
3.4 The City does not assume responsibility for the receipt of any addendum sent to bidders.
4 EXAMINATION OF DOCUMENTS AND REQUIREMENTS
4.1 Each bidder shall carefully examine all ITB documents and thoroughly familiarize itself with all
requirements before submitting a bid to ensure that their bid meets the intent of these specifications.
4.2 Before submitting a bid, each bidder shall be responsible for making all investigations and examinations
that are necessary to ascertain conditions and requirements affecting the requirements of this Invitation to
Bid. Failure to make such investigations and examinations shall not relieve the bidder from obligation to
comply, in every detail, with all provisions and requirements of the Invitation to Bid.
4.3 Notices of any discrepancies or omissions in these plans, specifications, or contract documents, shall
be given to the Director of Purchasing & Contract Management and a clarification obtained before
the bids are received, and if no such notice is received by the Director of Purchasing & Contract
Management prior to the opening of bids, then it shall be deemed that the bidder fully understands
the work to be included and has provided sufficient sums in its bid to complete the work in
accordance with these plans and specifications. If bidder does not notify Director of Purchasing &
Contract Management before bidding of any discrepancies or omissions, then it shall be deemed for
all purposes that the plans and specifications are sufficient and adequate for completion of the
project. It is further agreed that any request for clarification must be submitted no later than rive
(5) calendar days prior to the opening of bids.
BID PREPARATION COSTS
5.1 Issuance of this ITB does not commit the City of Lubbock, in any way, to pay any costs incurred in the
preparation and submission of a bid.
5.2 The issuance of this ITB does not obligate the City of Lubbock to enter into contract for any services or
equipment.
5.3 All costs related to the preparation and submission of a bid shall be paid by the bidder.
6 TRADE SECRETS CONFIDENTIAL INFORMATION AND THE TEXAS PUBLIC INFORMATION ACT
6.1 If you consider any portion of your bid to be privileged or confidential by statute or judicial decision,
including trade secrets and commercial or financial information, clearly identify those portions.
6.2 The City of Lubbock will honor your notations of trade secrets and confidential information and decline
to release such information initially, but please note that the final determination of whether a particular
portion of your bid is in fact a trade secret or commercial or financial information that may be withheld
from public inspection will be made by the Texas Attorney General or a court of competent jurisdiction.
In the event a public information request is received for a portion of your bid that you have marked as
being confidential information, you will be notified of such request and you will be required to justify
your legal position in writing to the Texas Attorney General pursuant to Section 552.305 of the
Government Code. In the event that it is determined by opinion or order of the Texas Attorney General or
a court of competent jurisdiction that such information is in fact not privileged and confidential under
Section 552.110 of the Government Code and Section 252.049 of the Local Government Code, then such
information will be made available to the requester.
6.3 Marking your entire bid CONFIDENTIAUPROPRIETARY is not in conformance with the Texas Open
Records Act.
Eli,
EJ
7 LICENSES, PERMITS, TAXES
The price or prices for the work shall include full compensation for all taxes, permits, etc. that the bidder is or
may be required to pay.
' 8 UTILIZATION OF LOCAL BUSINESS RESOURCES
Prospective bidders are strongly encouraged to explore and implement methods for the utilization of local
resources, and to outline in their bid submittal how they would utilize local resources.
9 CONFLICT OF INTEREST
9.1 The bidder shall not offer or accept gifts or anything of value nor enter into any business arrangement with
any employee, official or agent of the City of Lubbock.
9.2 B signing and executing this bid, the bidder certifies and represents to the City the bidder has not offered,
Y �g g �' tY
i conferred or agreed to confer any pecuniary benefit or other thing of value for the receipt of special treatment,
advantage, information, recipient's decision, opinion, recommendation, vote or any other exercise of
discretion concerning this bid.
10 CONTRACT DOCUMENTS
1�l 10.1 All work covered by the contract shall be done in accordance with contract documents described in the
General Conditions.
10.2 All bidders shall be thoroughly familiar with all of the requirements set forth on the contract documents
for the construction of this project and shall be responsible for the satisfactory completion of all work
contemplated by said contract documents.
11 PLANS FOR USE BY BIDDERS
It is the intent of the City of Lubbock that all parties with an interest in submitting a bid on the project covered by
the contract documents be given a reasonable opportunity to examine the documents and prepare a bid without
charge or forfeiture of deposit. The contract documents, may be examined without charge as noted in the Notice
to Bidders.
12 BIDDER INOUHUES AND CLARIFICATION OF REQUIREMENTS
12.1 It is the intent and purpose of the City of Lubbock that this request permit competitive bids. It shall be
the bidder's reWonsibility to advise the Director of Purchasing & Contract Management if any language,
requirements, etc., or any combinations thereof, inadvertently restricts or limits the requirements stated in
this ITB to a single source. Such notification must be submitted in writing and must be received by the
City of Lubbock Purchasing & Contract Management Office no later than five (5) calendar days before
the bid closing date. A review of such notifications will be made.
12.2 NO BIDDER SHALL REQUEST ANY INFORMATION VERBALLY. ALL REQUESTS FOR
ADDITIONAL. INFORMATION OR CLARIFICATION CONCERNING THIS INVITATION TO
BID (ITB) MUST BE SUBMITTED IN WRITING NO LATER THAN FIVE (5) CALENDAR
DAYS PRIOR TO THE BID CLOSING DATE AND` ADDRESSED TO:
MARTA ALVAREZ, SENIOR BUYER
' City of Lubbock
1625 13" Street
Lubbock, Texas 79401
Fax: (806)775-2164
Email: MAlvarez@mylubbock.us
RFPDepot: h=://www.RFPdogt.com
13 TIME AND ORDER FOR COMPLETION
13.1 The construction covered by the contract documents shall be substantially completed within THIRTY
(30) CONSECUTIVE CALENDAR DAYS from the date specified in the Notice to Proceed issued by
the City of Lubbock to the successful bidder.
13.2 The Contractor will be permitted to prosecute the work in the order of his own choosing, provided,
however, the City reserves the right to require the Contractor to submit a progress schedule of the work
contemplated by the contract documents. In the event the City requires a progress schedule to be
submitted, and it is determined by the City that the progress of the work is not in accordance with the
progress schedule so submitted, the City may direct the Contractor to take such action as the City deems
necessary to ensure completion of the project within the time specified.
14 PAYMENT
All payments due to Contractor shall be made in accordance with the provisions of the General Conditions of the
contract documents.
15 AFFIDAVITS OF BILLS PAID
The City of Lubbock reserves the right, prior to final acceptance of this project to require the Contractor to
execute an affidavit that all bills for labor, materials and incidentals incurred in the construction of the
improvements contemplated by the contract documents have been paid in full and that there are no claims
pending, of which the Contractor has been notified.
16 MATERIALS AND WORKMANSHIP
The intent of these contract documents is that only materials and workmanship of the best quality and grade will
be famished. The fact that the specifications may fail to be sufficiently complete in some detail will not relieve
the Contractor of full responsibility for providing materials of high quality and for protecting them adequately
until incorporated into the project. The presence or absence of a representative of the City on the site will not
relieve the Contractor of full responsibility of complying with this provision. The specifications for materials and
methods set forth in the contract documents provide minimum standards of quality, which the Owner believes
necessary to procure a satisfactory project.
17 GUARANTEES
17.1 All equipment and materials incorporated in the project and all construction shall be guaranteed against
defective materials and workmanship. Prior to final acceptance, the Contractor shall furnish to the Owner,
a written general guarantee which shall provide that the Contractor shall remedy any defects in the work,
and pay for any and all damages of any nature whatsoever resulting in such defects, when such defects
appear within ONE year from date of final acceptance of the work as a result of defective materials or
workmanship, at no cost to the Owner (City of Lubbock).
17.2 Notwithstanding any provisions contained in the contractual agreement, the Contractor represents and
warrants fault -free performance and fault -free result in the processing date and date -related data
(including, but not limited to calculating, comparing and sequencing) of all hardware, software and
firmware products delivered and services provided under this Contract, individually or in combination, as
the case may be from the effective date of this Contract. Also, the Contractor warrants calculations will
be recognized and accommodated and will not, in any way, result in hardware, software or firmware
failure. The City of Lubbock, at its sole option, may require the Contractor, at any time, to demonstrate
the procedures it intends to follow in order to comply with all the obligations contained herein.
17.3 The obligations contained herein apply to products and services provided by the Contractor, its sub-
contractor or any third party involved in the creation or development of the products and services to be
delivered to the City of Lubbock under this Contract. Failure to comply with any of the obligations
contained herein, may result in the City of Lubbock availing itself of any of its rights under the law and
under this Contract including, but not limited to, its right pertaining to termination or default.
17.4 The warranties contained herein are separate and discrete from any other warranties specified in this
Contract, and are not subject to any disclaimer of warranty, implied or expressed, or limitation to the
4
Contractor's liability which may be specified in this Contract, its appendices, its schedules, its annexes or
any document incorporated in this Contract by reference.
18 PLANS FOR THE CONTRACTOR
The contractor will be furnished one set of plans and specifications, and related contract documents for his use
during construction. Plans and specifications for use during construction will only be furnished directly to the
Contractor. The Contractor shall then distribute copies of plans and specifications to suppliers, subcontractors or
others, as required for proper prosecution of the work contemplated by the Contractor.
19 PROTECTION OF THE WORK
The Contractor shall be responsible for the care, preservation, conservation, and protection of all materials,
supplies, machinery, equipment, tools, apparatus, accessories, facilities, and all means of construction, and any
and all parts of the work whether the Contractor has been paid, partially paid, or not paid for such work, until the
date the City issues its certificate of completion to Contractor. The City reserves the right, after the bids have
f been opened and before the contract has been awarded, to require of a bidder the following information:
(a) The experience record of the bidder showing completed jobs of a similar nature to the one covered by
the intended contract and all work in progress with bond amounts and percentage completed.
(b) A sworn statement of the current financial condition of the bidder.
(c) Equipment schedule.
20 TEXAS STATE SALES TAX
20.1 This contract is issued by an organization which qualifies for exemption provisions pursuant to provisions
of Article 20.04 of the Texas Limited Sales, Excise and Use Tax Act.
20.2 The Contractor must obtain a limited sales, excise and use tax permit which shall enable him to buy the
materials to be incorporated into the work without paying the tax at the time of purchase.
21 PROTECTION OF SUBSURFACE LINES AND STRUCTURES
It shall be the Contractor's responsibility to prosecute the work contemplated by the contract documents in such a
way as to exercise due care to locate and prevent damage to all underground pipelines, utility lines, conduits or
other underground structures which might or could be damaged by Contractor during the construction of the
project contemplated by these contract documents. The City of Lubbock agrees that it will furnish Contractor the
location of all such underground lines and utilities of which it has knowledge. However, such fact shall not
relieve the Contractor of his responsibilities aforementioned. All such underground lines or structures cut or
damaged by Contractor during the prosecution of the work contemplated by this contract shall be repaired
immediately by Contractor to the satisfaction of the City of Lubbock, Texas, at Contractor's expense.
f 22 BARRICADES AND SAFETY MEASURES
The contractor shall, at his own expense, furnish and erect such barricades, fences, lights and danger signals, and
shall take such other precautionary measures for the protection of persons, property and the work as may be
necessary. The Contractor will be held responsible for all damage to the work due to failure of barricades, signs,
and lights to protect it, and when damage is incurred, the damaged portion shall be immediately removed and
replaced by Contractor at his own cost and expense. The Contractor's responsibility for maintenance of barricades,
signs, and lights shall not cease until the date of issuance to Contractor of City's certificate of acceptance of the
project.
23 EXPLOSIVES
23.1 The use of explosives will not be permitted unless written permission to do so is obtained by the
Contractor from the City. In all cases where written permission is obtained for the use of explosives, the
Contractor shall assume full responsibility for all damage, which may occur as a direct or indirect result
of the blasting. In addition, in all cases where explosives are authorized to be used, the Contractor shall
use utmost care so as not to endanger life or property and the Contractor shall further use only such
5
methods as are currently utilized by persons, firms, or corporations engaged in similar type of
construction activity.
23.2 Explosive materials shall not be stored or kept at the construction site by the Contractor.
23.3 In all cases where explosives are to be used during the construction of the project contemplated by this
contract, it shall be the duty of the Contractor to notify each utility company having structures (above or
below the ground) in proximity to the site of the work of Contractor's intention to use explosives, and
such notice shall be given sufficiently in advance to enable the companies to take such steps as they may
deem necessary to protect their property from injury. Such notice, however, shall not relieve the
Contractor of responsibility for any damage resulting from his blasting operations.
24 CONTRACTOR'S REPRESENTATIVE
The successful bidder shall be required to have a responsible local representative available at all times while the
work is in progress under this contract. The successful bidder shall be required to furnish the name, address and
telephone number where such local representative may be reached during the time that the work contemplated by
this contract is in progress.
25 INSURANCE
25.1 The Contractor shall not continence work under this contract until he has obtained all insurance as
required in the General Conditions of the contract documents, from an underwriter authorized to do
business in the State of Texas and satisfactory to the City. Proof of coverage shall be furnished to the
City and written notice of cancellation or any material change will be provided ten (10) days in advance
of cancellation or change. All policies shall contain an agreement on the part of the insurer waiving the
right to subrogation. The Contractor shall procure and carry at his sole cost and expense through the life
of this contract, insurance protection as hereinafter specified. Coverage in excess of that specified herein
also shall be acceptable. Such insurance shall be carried with an insurance company authorized to
transact business in the State of Texas and shall cover all operations in connection with this contract,
whether performed by the Contractor or a subcontractor, or separate policies shall be provided covering
the operation of each subcontractor. A certificate of insurance specifying each and all coverages shall be
submitted before contract execution.
25.2 PROOF OF COVERAGE SHALL BE FURNISHED TO THE CITY OF LUBBOCK IN THE
FORM OF A CERTIFICATE OF INSURANCE. THE INSURANCE CERTIFICATES
FURNISHED SHALL NAME THE CITY OF LUBBOCK AS A PRIMARY ADDITIONAL
INSURED AND PROVIDE A WAIVER OF SUBROGATION IN FAVOR OF THE CITY OF
LUBBOCK AS REQUIRED BELOW, OR IN THE ALTERNATIVE, SHALL BE
ACCOMPANIED BY A STATEMENT FROM THE CONTRACTOR TO THE EFFECT THAT
NO WORK ON THIS PARTICULAR PROJECT SHALL BE SUBCONTRACTED. IT SHALL
BE THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE TO THE OWNER ALL PROOF
OF COVERAGE INSURANCE DOCUMENTS INCLUDING WORKERS COMPENSATION
COVERAGE FOR EACH SUBCONTRACTOR
26 LABOR AND WORKING HOURS
26.1 Attention of each bidder is particularly called to the schedule of general prevailing rate of per diem wages
included in these contract documents. The wage rate that must be paid on this project shall not be less
than specified in the schedule of general prevailing rates of per diem wages as above mentioned. The
bidders' attention is further directed to the requirements of Article 5159a, Vernon's Annotated Civil
Statutes providing for the payment of the wage schedules above mentioned and the bidder's obligations
thereunder. The inclusion of the schedule of general prevailing rate of per diem wages in these contract
documents does not release the Contractor from compliance with any wage law that may be applicable.
Construction work under this contract requiring an inspector will not be performed on weekends or
holidays unless the following conditions exist:
26.1.1 The project being constructed is essential to the City of Lubbock's ability to provide the necessary
service to its citizens.
26.1.2 Delays in construction are due to factors outside the control of the Contractor. The Contractor is
x approaching the penalty provisions of the contract and Contractor can show he has made a
diligent effort to complete the contract within the allotted time.
R 26.2 Before construction work requiring an inspector is to be performed on weekends or holidays, the
Contractor must notify the Owner's Representative not less than three full working days prior to the
weekend or holiday he desires to do work and obtain written permission from the Owner's Representative
to do such work. The final decision on whether to allow construction work requiring an inspector on
weekends or holidays will be made by the Owner's Representative.
f
26.3 In any event, if a condition should occur or arise at the site of this project or from the work being done
1 under this contract which is hazardous or dangerous to property or life, the Contractor shall immediately
commence work, regardless of the day of the week or the time of day, to correct or alleviate such
condition so that it is no longer dangerous to property or life.
27 PAYMENT OF EMPLOYEES AND FILING OF PAYROLLS
The contractor and each of his subcontractors shall pay each of his employees engaged in work on the project
under this contract in full (less mandatory legal deductions) in cash, or by check readily cashable without
discount, not less often than once each week. The Contractor and each of his subcontractors engaged at the site of
the work shall not later than the seventh day following the payment of wages, file with the Owner's
Representative, or Engineer, a certified, sworn, legible copy of such payroll. This shall contain the name of each
employee, his classification, the number of hours worked on each day, rate of pay, and net pay. The affidavit
shall state that the copy is a true and correct copy of such payroll, that no rebates or deductions (except as shown)
have been made, or will in the future be made from the wages paid as shown thereon. The Contractor must
classify employees according to one of the classifications set forth in the schedule of general prevailing rate of per
diem wages, which schedule is included in the contract documents. The Contractor shall forfeit as a penalty to the
City of Lubbock on whose behalf this contract is made, ten dollars for each laborer, workman, or mechanic
employed for each calendar day, or portion thereof, such laborer, workman or mechanic is paid less than the
wages assigned to his particular classification as set forth in the schedule of general prevailing rate of per diem
wages included in these contract documents.
28 PROVISIONS CONCERNING ESCALATION CLAUSES
Bids submitted containing any conditions which provide for changes in the stated bid price due to increases or
decreases in the cost of materials, labor or other items required for the project will be rejected and returned to the
i bidder without being considered.
29 PREPARATION FOR BID
29.1 The bidder shall submit his bid on forms furnished by the City. All blank spaces in the form shall be
correctly filled in and the bidder shall state the price both in words and numerals, for which he intends to
do the work contemplated or furnish the materials required. Such prices shall be written in ink, distinctly
and legibly, or typewritten. In case of discrepancy between the price written in words and the price
written in figures, the price written in words shall govern.
29.2 If the bid is submitted by an individual, his name must be signed by him or his duly authorized agent. If a
bid is submitted by a finny association, or partnership, the name and address of each member must be
given and the bid signed by a member of the firm, association or partnership, or person duly authorized.
If the bid is submitted by a company or corporation, the company or corporate name and business address
must be given, and the bid signed by an official or duly authorized agent. Powers of attorney authorizing
agents or others to sign bids must be properly certified and must be in writing and submitted with the bid.
The bid shalt be executed in ink.
29.3 Each bid shall be enclosed in a sealed envelope, addressed as specified in the Notice to Bidders, and
endorsed on the outside of the envelope in the following manner:
28.3.1 Bidder's name
28.3.2 Bid for (description of the project).
30
31
29.4 Bid submittals may be withdrawn and resubmitted at any time before the time set for opening of the bids,
but no bid may be withdrawn or altered thereafter.
29.5 Pursuant to Texas Local Government Code 252.043(a), a competitive sealed bid that has been
opened may not be changed for the purpose of correcting an error in the bid price. THEREFORE,
ANY CORRECTIONS TO THE BID PRICE MUST BE MADE ON THE BID SUBMITTAL
FORM PRIOR TO BID OPENING.
BOUND COPY OF CONTRACT DOCUMENTS
Bidder understands and agrees that the contract to be executed by bidder shall be bound and include the
following:
(a) Notice to Bidders.
(b) General Instructions to Bidders.
(c) Bidder's Submittal.
(d) Statutory Bond (if required).
(e) Contract Agreement.
(f) General Conditions.
(g) Special Conditions (if any).
(h) Specifications.
(i) Insurance Certificates for Contractor and all Sub -Contractors.
6) All other documents made available to bidder for his inspection in accordance with the Notice to Bidders.
If Plans and Specifications are too bulky or cumbersome to be physically bound, they are to be considered
incorporated by reference into the aforementioned contract documents.
OUALIFICATIONS OF BIDDERS
The bidder may be required before the award of any contract to show to the complete satisfaction of the City of
Lubbock that it has the necessary facilities, ability, and financial resources to provide the service specified therein
in a satisfactory manner. The bidder may also be required to give a past history and references in order to satisfy
the City of Lubbock about the bidder's qualifications. The City of Lubbock may make reasonable investigations
deemed necessary and proper to detemune the ability of the bidder to perform the work, and the bidder shall
furnish to the City of Lubbock all information for this purpose that may be requested. The bidder's bid may be
deemed not to meet specifications or the bid may be rejected if the evidence submitted by, or investigation of, the
bidder fails to satisfy the City of Lubbock that the bidder is properly qualified to carry out the obligations of the
contract and to complete the work described therein. Evaluation of the bidder's qualifications shall include:
(a) The ability, capacity, skill, and financial resources to perform the work or provide the service required.
(b) The ability of the bidder to perform the work or provide the service promptly or within the time specified,
without delay or interference.
(c) The character, integrity, reputation, judgment, experience, and efficiency of the bidder.
(d) The quality of performance of previous contracts or services.
(e) The safety record of the Contractor and proposed Sub -Contractors
Before contract award, the recommended contractor for this project may be required to show that he has
experience with similar projects that require the Contractor to plan his work efforts and equipment needs with
City of Lubbock specifications in mind. Demonstration of experience shall include a complete list of ALL similar
municipal and similar non -municipal current and completed projects for the past three (3) years for review. This
list shall include the names of supervisors and type of equipment used to perform work on these projects. In
addition, the Contractor may be required to provide the name(s) of supervisor(s) that will be used to perform work
on this project in compliance with City of Lubbock specifications herein.
32 BID AWARD
j 32.1 The City of Lubbock reserves the right to reject any or all bids, reject any particular item on a bid, and to
waive immaterial formalities and to accept the offer most advantageous to the City of Lubbock in its sole
F discretion. Unless otherwise specified herein, the City shall award the bid based on the Total Bid Amount
or the sum of any Alternate Bids the Citymay select.
32.2 All bids are evaluated for compliance with specifications before the bid price is considered. Response to
specifications is primary in determining the best low bid. Failure to comply with the specifications may
result in disqualification of the bid.
32.3 In case of tie bids, preference will be given to local bidders. Consistent and continued tie bidding may be
cause for rejection of bids by the City of Lubbock and/or investigation by the Attorney General to
determine possible Anti -Trust violations.
32.4 Before the City may award a bid to a nonresident bidder, the nonresident bidder's bid must be lower than
lowest bid submitted by a responsible Texas bidder by the same margin or amount that a Texas bidder
would be required to underbid the nonresident bidder in the nonresident bidders' home state.
32.5 Any contract made, or purchase order issued, as a result of this Invitation to Bid, shall be entered into the
State of Texas and under the laws of the State of Texas. In connection with the performance of work, the
Bidder agrees to comply with the Fair Labor Standard Act, Equal Opportunity Employment Act, and all
other applicable Federal, State, and Local laws, regulations, and executive orders to the extent that the
®r same may be applicable.
32.6 NO INDIVIDUAL OF ANY USING DEPARTMENT HAS THE AUTHORITY TO LEGALLY
' AND/OR FINANCIALLY COMMIT THE CITY TO ANY CONTRACT, AGREEMENT OR
PURCHASE ORDER FOR GOODS OR SERVICES, UNLESS SPECIFICALLY SANCTIONED
BY THE REQUIREMENTS OF THIS INVITATION TO BID.
9
BID SUBMITTAL
z
BID SUBMITTAL
LUMP SUM BID CONTRACT
DATE: becember 29 2005
PROJECT NUMBER: #05-147-MA - MUNICIPAL BUILDING PARKING STRUCTURE REPAIR
Bid of Minnix Commercial Partners, Ltd. (hereinafter called Bidder)
To the Honorable Mayor and City Council City of Lubbock, Texas (hereinafter called Owner)
Gentlemen:
The Bidder, in compliance with your Invitation to Bid for the construction of a MUNICIPAL BUILDING PARKING
STRUCTURE REPAIR having carefully examined the plans, specifications, instructions to bidders, notice to bidders and
all other related contract documents and the site of the intended work, and being familiar with all of the conditions
surrounding the construction of the intended project including the availability of materials and labor, hereby intends to
furnish all labor, materials, and supplies; and to construct the project in accordance with the plans, specifications and
contract documents, within the time set forth therein and at the price stated below. The price to cover all expenses
incurred in performing the work required under the contract documents.
BASE BID: STRUCTURE REPAIR
MATERIALS: 6e(ve ADU.SatAd si buodred n(iiefy -h(ne 4 too ($ 12��a�,�o )
SERVICES:_TLjeA,-e[gi4,4 -(4Azu-,,aJ t\j tr-_ k(IM ed eQ44 !f `-%k - T =L 2`3 1J8L1.00 )
n LO
TOTAL BASE BID: q 1, (oI33.00 )
(Amount shall be shown in both words and numerals. In case Wilisc6pancy, the amount shown in words shall govern.)
ALTERNATE BID: STRUCTURE DEMOLITION
MATERIALS: —($ �t'<CO )
SERVICES:6.%,Cut\-i 4ref4Uu-14+J ovte �Uv%rc4 +ulwj., -StX (I
TOTAL ALTNERNATE Zq. -77100 )
(Amount shall be shown in both words and numerals. In case of discrepancy, the amount shown in words shall govern.)
Bidder hereby agrees to commence the work on the above project on or before a date to be specified in a written
"Notice to Proceed" of the Owner and to substantially complete the project within 30 (THIRTY) consecutive calendar
days thereafter as stipulated in the specifications and other contract documents. Bidder hereby further agrees to pay to
Owner as liquidated damages the sum of $250.00 (TWO -HUNDRED FIFTY) for each consecutive calendar day in
excess of the time set forth herein above for completion of this project, all as more fully set forth in the general conditions
of the contract documents.
Bidder understands and agrees that this bid submittal shall be completed and submitted in accordance with
instruction number 28 of the General Instructions to Bidders.
Bidder understands that the Owner reserves the right to reject any or all bids and to waive any formality in the
bidding.
l
I
The Bidder agrees that this bid shall be good and may not be withdrawn for a period of thirty (30) calendar days
after the scheduled closing time for receiving bids.
The undersigned Bidder hereby declares that he has visited the site of the work and has carefully examined the
plans, specifications and contract documents pertaining to the work covered by this bid, and he further agrees to
3 commence work on or before the date specified in the written notice to proceed, and to substantially complete the work on
which he has bid; as provided in the contract documents.
Bidders are required, whether or not a payment or performance bond is required, to submit a cashier's check or
certified check issued by a bank satisfactory to the City of Lubbock, or a bid bond from a reliable surety company,
payable without recourse to the order of the City of Lubbock in an amount not less than five percent (5%) of the total
amount of the bid submitted as a guarantee that bidder will enter into a contract, obtain all required insurance policies, and
execute all necessary bonds (if required) within ten (10) days after notice of award of the contract to him.
Enclosed with this bid is a Cashier's Check or Certified Check for
Dollars (S ) or a Bid Bond in the sum of 5% Dollars
($ ), which it is agreed shall be collected and retained by the Owner as liquidated damages in the event
the bid is accepted by the Owner and the undersigned fails to execute the necessary contract documents, insurance
certificates, and the required bond (if any) with the Owner within ten (10) business days after the date of receipt of
written notification of acceptance of said bid; otherwise, said check or bond shall be returned to the undersigned
upon demand.
Bidder understands and agrees that the contract to be executed by Bidder shall be bound and include all contract
documents made available to him for his inspection in accordance with the Notice to Bidders.
Pursuant to Texas Local Government Code 252.043(a), a
competitive sealed bid that has been opened may not be
changed for the purpose of correcting an error in the bid price.
THEREFORE, ANY CORRECTIONS TO THE BID PRICE
MUST BE MADE ON THE BID SUBMITTAL FORM PRIOR
TO BID OPENING.
(Seal if Bidder is a Corporation)
ATTEST:
Secretary
Bidder acknowledges receipt of the following addenda:
Addenda No.
Date
Addenda No.
Date
Addenda No.
Date
Addenda No.
Date
Date: December 29, 2005
gc
rized Signature
Jerry Smith, Managing Partner
(Printed or Typed Name)
Minnix Commercial Partners, Ltd.
Company
P.O. Box 64895, 12302 Slide Road
Address
Lubbock Lubbock
City, County
TX 79464-4895
State
Telephone: 806
Fax: 806 _
.M1 1WBE Firm: I I Woman �_ Black American I I Nativ
Hispanic American I Asian Pacific American I I Other
Zip Code
798- 7335
722-3087
ri
BID OR PROPOSAL BOND
KNOW ALL MEN BY THESE PRESENTS:
Partners
That we, 1Vhnnix Commercial, Ltd.
(hereinafter called e Principal), as Principal, and WASHINGTON
INTERNATIONAL INSURANCE COMPANY, a corporation organized and doing business
under and by virtue of the laws of the State of Arizona, and duly licensed
for the purpose of making, guaranteeing or becoming sole surety upon bonds or
undertakings required or authorized by the laws of the State of Texas
as Surety, are held and firmly bound unto City of Lubbock, Texas
(hereinafter called the Obligee) in the just and full sum of Five Percent of Greatest
Amount Bid----------------------------------------------------------------- Dollars ($------- (5%)-------------
) lawful
money of the United States of America, for the payment of which well and
truly to be made, we hereby bind ourselves and each of our successors and
assigns, jointly and severally, firmly be these presents.
THE CONDITION OF THIS OBLIGATION IS SUCH THAT, WHEREAS, the above bounden
Principal as aforesaid, is about to hand in and submit the Obligee a bid or
proposal for the Municipal Building Parking Structure Repair
in
accordance with the plans and specifications filed in the office of the
obligee and under the notice inviting proposals therefore.
NOW, THEREFORE, if the bid or proposal of said principal shall be accepted,
and the contract for such work be awarded to the principal thereupon by the
said obligee, and said principal shall enter into a contract and bond for the
completion of said work as required by law, then this obligation to be null
and void: otherwise to be and remain in full force and effect.
IN WITNESS WHEREOF, said Principal and said Surety have caused these
f
presents to be duly signed and sealed this 29th day of
December 20 05
Min . ommercial Partners, Ltd.
By
ASHINGT INT RNATIONAL
INSqR7/='
B
BDB 600201 ara D. Hancock, Attorney In Fact
NAS SURETY GROUP
NORTH AMERICAN SPECIALTY INSURANCE COMPANY
WASHINGTON INTERNATIONAL INSURANCE COMPANY
r GENERAL POWER OF ATTORNEY
KNOW ALL MEN BY THESE PRESENTS, THAT North American Specialty Insurance Company, a corporation duly organized and existing under
laws of the State of New Hampshire, and having its principal office in the City of Manchester, New Hampshire, and Washington International
Insurance Company, a corporation organized and existing under the laws of the State of Arizona and having its principal office in the City of Itasca,
Illinois, each does hereby make, constitute and appoint:
Kevin J. Dunn, Cara D. Hancock
and Harold D. Binggeli
jointly or severally
Its true and lawful Attomey(s)-in-Fact, to make, execute, seal and deliver, for and on its behalf and as its act and deed, bonds or other writings
obligatory in the nature of a bond on behalf of each of said Companies, as surety, on contracts of suretyship as are or may be required or permitted by
law, regulation, contract or otherwise, provided that no bond or undertaking or contract or suretyship executed under this authority shall exceed the
amount of TEN MILLION (10,000,000.00) DOLLARS
This Power of Attorney is granted and is signed by facsimile under and by the authority of the following Resolutions adopted by the Boards of
Directors of both North American Specialty Insurance Company and Washington International Insurance Company at meetings duly called and held
on the 20 of March, 2000:
"RESOLVED, that any two of the President, any Executive Vice President, any Vice President, any Assistant Vice President, the Secretary or any
Assistant Secretary be, and each or any of them hereby is authorized to execute a Power of Attorney qualifying the attorney named in the given Power
ti of Attorney to execute on behalf of the Company bonds, undertakings and all contracts of surety, and that each or any of them hereby is authorized to
attest to the execution of any such Power of Attorney and to attach therein the seal of the Company; and it is
FURTHER RESOLVED, that the signature of such officers and the seal of the Company may be affixed to any such Power of Attorney or to any
certificate relating thereto by facsimile, and any such Power of Attorney or certificate bearing such facsimile signatures or facsimile seal shall be
binding upon the Company when so affixed and in the future with regard to any bond, undertaking or contract of surety to which it is attached."
' 0111IUflIf r+++ar%
`���P��GVdJ7Vjj�yi{���.
; m = Steven P. Anderson, President & Chief Executive officer or Washington International Insurance Company &By 9—<:2-7 Z
CAP a
L. 3y�:,'t 1f♦79 �yr� s Vice President of North American Specialty insurance Company it EALp�
�'Si y`•hAMPa.��C *77 '�D••
David IN. Lyman, Via President of Wnhingten International Insurance Company &
Vice President of North American Specialty Insurance Company
1 IN WITNESS WHEREOF, North American Specialty Insurance Company and Washington International Insurance Company have caused their
official seals to be hereunto affixed, and these presents to be signed by their authorized officers this 9th day of August 12005 .
North American Specialty Insurance Company
Washington International Insurance Company
State of Illinois
County of Du Page ss:
On this 9th day of August 20 05 , before me, a Notary Public personally appeared Steven P. Anderson President and CEO of
Washington International Insurance Company and Vice President of North American Specialty Insurance Company and David M. Layman ,
Vice President of Washington International Insurance Company and Vice President of North American Specialty Insurance Company,
personally known to me, who being by me duly swom, acknowledged that they signed the above Power of Attorney as officers of and
acknowledged said instrument to be the voluntary act and deed of their respective companies.
t -OFFICIAL sEJ+►I."
SUSAN ANSEL
NWry Poo, State of llk%s Susan Ansel, Notary Public
My cwmbsm 6tpres 7Afi1Y00B
I, James A. Carpenter the duly elected Assistant Secretary of North American Specialty Insurance Company and Washington
International Insurance Company, do hereby certify that the above and foregoing is a true and correct copy of a Power of Attorney given by said North
American Specialty Insurance Company and Washington International Insurance Company, which is still in full force and effect.
IN WITNESS WHEREOF, I have set my hand and affixed the seals of the Companies this 29 t]day of December , 20 05.
James A. Carpenter, Vice President & Assistant Secretary of Washington International Insurance Company &
�' North American Specialty Insurance Company
Jan 12 06 12:42p
Minnix Commercial
806-722-3087
p.2
E]
SAFETY RECORD QUESTIONNAIRE
(Must Ile- SubinlaW With laid Suhmittal)
The City of Lubbock City Council dcsires to avail itself of the benefits cif Section 252.0435 of the Local Govemment
Coale, and consider the sal'ety record,,. of potential contractors prior to awarding bids on City contracts. Pursuant to Section
252.0435 of the Local Government Code, City of Lubbock has adopted the following written definition and criteria for
accurately determining the safety record of a bidder prior to awarding bids on City contracts.
The definition and criteria for determining the sa&-ty ruc:ord of a bidder for tivs consideration shall be:
The City or Lubbock shall consider the safety record of the bidders in determining the responsibility thereof. The City may
consider any incidence involving worker safety or safety of the citizens of the City of Lubbock, be it related or caused by
environmental, mechanical, operationaL supervision or any other cause or factor. Specifically. the City may consider. among
other think:
a. Complaints to, or final orders entered by. the Occupational Safety and Health [review Commission (OSiIRC),
against the; hicklc:r liar violations of OSl lA regulations within the; past three: (3) years.
h_ Citations (as defined below) from an Environmental Protection Agency (as defined below) liar violations within
the past live (5) years. Environmental Protection Agencies include, but are not necessarily limited to. the U.S.
Army Corps of Engineers (USACOE), the U.S. Fish and Wildlife Service (USFWS), the Environmental
Protection Agency (IiPA), the Texas Commission on Environmental Quality (TCEQ), the; Texas Natural Resource
Conservation Commission (TNRCC) (predecessor to the; TCE'Q). the 'Texas Department of State I lealth Services
(DSHS), the Texas Parks and Wildlife Department (TPWD), the: Structural Pest Control Board (SPCB), agencies
of local governments responsible fair enforcing environmental pmteclion or worker safety related laws or
regulations, and similar regulatory agencies of other states of the United States. Citations include notices of
violation, notices of enforcement, suspension/revocations of state or federal licenses or registrations, fines
;esse'sscd. pending criminal complaints. indictments, or etnviclions, administrative: orders, droll orders, linal
orders, and judicial final judgments.
C. Convictions of crimieutl oflcrne within the: past tun (10) years, which wsultexl in bodily lu►rm or dcath,
d. Any other safety related matter deemed by the City Council to be material in determining the responsibility of the
Ellbidder and his or her ability to perfi,)rm the services or goods required by the hid documents in a safe: environment,
both for the workers and other employees of bidder and the citizens of the City of Lubbock.
In onler to obtain proper information from bidden so tlutt City of Lubho ck may consider the safety records of potential
Nit'] contractors prior to awarding bids on City contracts, City of Lubbock requires that bidders answer the following three (3)
questions and submit them with their bids:
QUESTION ONE
Idas the: bidder. or the firm, corporation, partnership, or institution repn--iceucd by the bidder, or anyone actin; fir such
firm, corporation, partnership or institution, rc"ivcd citations for violations of OSHA within the past three (3) years?
YESNt )
If the bidder has indicated YES for question number one above, the bidder must provide to City of Lubbock, with its bid
submission. the Ibllowing ini'onnation with respect to each such citation:
Date of offense, location of establishment inspected. category of oflimnsc. final disposition of offense, if any, and penalty
assessed_
Jan 12 06 12:42p Minnix commercial 806-722-3087 p.3
L
[-,]i; OUIFSTION TWO,
Fins the bidder. or the fum, corporation, partnership, or institution represented by the bidder, or anyone acting for such
firm, corporation, .partnership or im-titution. rcceivod citations for violations of environmental protection laws or
regulations, of any kind or type, within the past five years? Citations include notice of violation, notice of enforcement,
suspc ssion/rcvocationc of state or federal licenses, or registrations, fines aeussed, pending criminal complaints,,
indictments, or convictions, administrative orders, draft orders, final orders, and judicial final judgments.
YL'•S` NV
If the bidder has indicated YES for question number two above, the bidder must provide to City of Lubbock, with its bid
submission, the following information with respect to each such conviction:
Date of offense or occurrence, location where offense occurred, type of offense, final disposition of omnsc, if any, and
penalty asscssed.
QUFST QN TIIRF1Fe
Has the bidder, or rite firm, corporation, partnership, or institution represented by bidder, or anyone acting for such firm,
corporation, partnership, or institution, ever been convicted, within the past ten (1 o) years. of a criminal offeme which
resulted in serious bodily injury or death?
YRS�_ NO
If the bidder has indicated YES for question number three above, the bidder must provide to City of Lubbock, with its bid
submission, the following information with respect to each such conviction:
Date of offense, location where offense occurred, type of offense, final disposition of offense,, in any, and penalty
asur.10d.
ACKNOWLEDGEMENT
THE STATE OF TEXAS
COUNIY OF LUBBOCK
I certify that I have made no willful misrcpresentations in this Questionnaire nor have I withheld information in my
statements and answers to questions. I am aware that the information given by me in this questionnaire will be
investigated, with my full permission, and that any misrepresentations or omissions may cause my bid to be rejected.
f
Si�pa�rc
Jerry Smith, Managing Partner
Title
Jan 12 06 12:42p
Minnix Commercial
806-722-3087
SUSPENSION AND DEBARMENT CERTIFICATION
RAcral Ixiw (A-102 Common Rulc and OMB Cimular A-110) prohibits non-1--Wcral entities from contracting with or
making sub -awards under covered transactions to parties that zwe suspended or debarred or whose principals are
suspended or debarred. Covered transactions include procurement contracts for goods or services equal to or in excess of
$25,000 and all non-rroc:urcmcnt Uhnsac:tions (e.g., sub -awards to sub-rceipicnis).
Contractor rcc:civing individual awards of $25.000 or more and all sub -recipients must eertiry that their organization and
its principals are not suspended or debarrexi by a federal agency.
Before an award of $25,000 or more; c;in be made to your firm, you must certify that your org aniz. ition and its principals
are not swspendcd or debarred by a Pederaal :agency.
1, the undensigned agent for the firm named below, certify that neither this firm nor its principals are suspended or
debarred by a Federal agency.
COMPANY NAME: Minnix Commercial Partners, Ltd.
Signature of Company Official: '
Date Signed: December 29, 2 05'
Printed name of company official si&aing above: Jerry Smith, Managi nn Partner
7
No Text
AC PRD
CERTIFICATE OF LIABILITY INSURANCE
DA1'M""°°`Y"YY'
Ol/04/2006
PRODUCER (806) 794-1177
DAVID TATB INSURANCE AGENCY, LLP
5233 79TH
LUBBOCK TX 79424—
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION
ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE
HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR
ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW.
INSURERS AFFORDING COVERAGE
NAIC 0
INSURED
MINNIX CObMRCIAL PARTNERS, LTD
BOX. 64895
LUBBOCK TX 79464—
INSURER A: DALLAS FIRE
INSURER B: TEXAS MUTUAL
INSURER C:
INSURER D
INSURER
rnvcosr_cc
THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY
REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN,
THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.
AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
INSRLTR
LTR
INSQJ
TYPE OF INSURANCE
POLICY NUMBER
OATS (MWDOIYY) Y EFFECTIVE
POLICY
(MMID YY)
LIMITS
A
GENERAL LIABILITY
DGL068118
07/07/2005
07/07/2006
EACH OCCURRENCE
$ 1,000,000
X COMMERCIAL GENERAL LIABILITY
CLAIMS MADE Fil OCCUR
/ /
/ /
PREMISESEeExc RENTED occurrence)
$ 100,000
MED EXP (Any oneperson)
$ 5,000
PERSONAL S ADV INJURY
$ 1,000,000
GENERALAGGREGATE
$ 2,000,000
GEN'LAGGREGATE LIMITAPPLIES PER :
PRODUCTS - COMP/OPAGG
S 2,000,000
POLICY M JECT LOC
AUTOMOBILE
LIABILITY
ANY AUTO
/ /
/ /
COMBINED SINGLE LIMIT
(Ea auadent)
$
BODILY INJURY
(Per person)
$
ALL OWNED AUTOS
SCHEDULED AUTOS
/ /
/ /
BODILY INJURY
(Per accident)
$
HIRED AUTOS
NON-OMEDAUTOS
/ /
/ /
PROPERTY DAMAGE
(Per accident)
$
GARAGE LUIBIUTY
AUTO ONLY - EA ACCIDENT
$
ANY AUTO
/ /
/ /
OTHER THAN EA ACC
$
$
AUTO ONLY: AGG
EXCESSAIMBRELLA LIABILITY
/ /
/ /
EACH OCCURRENCE
$
OCCUR CLAIMS MADE
AGGREGATE
$
$
S
DEDUCTIBLE
/ /
/ /
$
RETENTION $
B
WORKERS COMPENSATION AND
EMPLOYERS' LIABILITY
ANY PROPRIETORIPARTNERIEXECUTIVE
1095348
01/01/2005
01/01/2006
gg UU
TORYLIMI7S ER
E.L. EACH ACCIDENT
$ 500,000
E.L. DISEASE - EA EMPLOYEE
$ 500,000
OFFICER/MEMBER EXCLUDED?
/ /
/ /
It yes, describe under
SPECIAL PROVISIONS below
E.L. DISEASE -POLICY LIMIT Is
500,000
OTHER
DESCRIPTION OF OPERATIONSILOCATIONSNEHICLESIEXCLUSIONS ADDED BY ENDORSEMENT/SPECIAL PROVISIONS
THERE IS A BLANKET WAIVER OF SUBROGATION ON THE WORKERS COMPENSATION
MUNICIPAL BUILDING PARKING STRUCTURE RENOVATION #6573
BLNAKET WAIVER OF SUBROGATION AND ADDITIONAL INSURED ON THE COLMRCIAL GENERAL LIABILITY. CITY OF LUBBOCK IS PRn4hRY
ADDITIONAL INSURED PER POLICY CONDITIONS
UtK11rIUAIt MULUtK UAIY6tLLAIIUM
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE
EXPIRATION DATE THEREOF, THE ISSUING INSURER WILL ENDEAVOR TO MAIL
10 DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT, BUT
CITY OF LUBBOCK FAILURE TO DO SO SHALL IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE
INSURER, ITS AGENTS OR REPRESENTATIVES.
P O BOX 2000 AUTHORIZED REPRESENTATIVE
LUBBOCK, TX 79453—
ACORD 25 (2001108) C ACORD CORPORATION 1988
�� q_, - INS025 pots;).05 ELECTRONIC LASER FORMS, INC. - (800)327.0545 Page 1 of 2
r
E
Ell
IMPORTANT
If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. A statement on this
certificate does not confer rights to the certificate holder in lieu of such endorsement(s).
If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an
endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such
endorsement(s).
DISCLAIMER
The Certificate of Insurance on the reverse side of this form does not constitute a contract between the issuing
insurer(s), authorized representative or producer, and the certificate holder, nor does it affirmatively or negatively
amend, extend or alter the coverage afforded by the policies listed thereon.
ACORD 25 (2001108)
INS025 pioa) os
Page 2 of 2
{ DATE (MMIDD/YYM
ACOBA CERTIFICATE OF LIABILITY INSURANCE 10/20/2005
PRODUCER (806) 762- 0544 FAX (806) 741-1S27 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION
Grimes Insurance Agency, Inc. ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE
HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR
1651 Broadway ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW.
Lubbock, TI 79401
INSURERS AFFORDING COVERAGE NAIC #
INsuRED MINNII COMMBRCIAL PARTNERS LTD INSURER A: General :Ins. Co. of America 2473Z
AND MI1Y111II H010S, INC. INSURER B:
PO EOI 64895 INSURER C:
LUBBOCR, TX 79464 INSURER D:
INSURER E:
f�AVCOArCQ
THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDIN
ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR
MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH
POLICIES. AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
INSR
ADDL
TYPE OF INSURANCE
POLICY NUMBER
POLICE' EFFECTIVE
POLICY EXPIRATION
DATE (MMIDQ=
LIMITS
GENERAL LIABILITY
EACH OCCURRENCE
S
COMMERCIAL GENERAL LIABILITY
DAMAGE TO RENTED
S
CLAIMS MADE F_� OCCUR
MED EXP (Any one person)
$
PERSONAL & ADV INJURY
$
GENERAL AGGREGATE
$
GEN'L AGGREGATE LIMIT APPLIES PER:
PRODUCTS -COMPIOPAGG
$
POLICY M JE Q LOC
AUTOMOBILE
LIABILITY
ANY AUTO
24BA00046210
07/29/2005
07/29/2006
COMBINED SINGLE LIMIT
(Ea accident)
S
1,000,00
X
BODILY INJURY
(Per person)
S
A
ALL OWNED AUTOS
SCHEDULED AUTOS
BODILY INJURY
(Per accident)
$
HIREDAU70S
NON -OWNED AUTOS
PROPERTY DAMAGE
(Per accident)
$
GARAGE LIABILITY
AUTO ONLY - EA ACCIDENT
S
OTHER THAN EA ACC
$ -
ANY AUTO
S
AUTO ONLY: AGG
EXCESSAIMBRELLA LIABILITY
EACH OCCURRENCE
$
OCCUR ❑ CLAIMS MADE
AGGREGATE
$
S
$
DEDUCTIBLE
$
RETENTION $
WORKERS COMPENSATION AND
WC
QR STATUS FIR
EMPLOYERS LIABILITY
ANY PROPRIETOR/PARTNER/EXECUTIVE
E.L. EACH ACCIDENT
S
E.L. DISEASE - EA EMPLOYE
$
OFFICER/MEMBER EXCLUDED?
If yes, describe under
SPECIAL PROVISIONS below
E.L. DISEASE - POLICY LIMIT 1
$
OTHER
DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES / EXCLUSIONS ADDED BY ENDORSEMENT / SPECIAL PROVISIONS
Certificate holier is named as Additional Insured as regards Auto Liability and Waiver of
Subrogation applies to Auto Liability.
B#05-147-MA
City of Lubbock
c/o City of Lubbock purchasing and Contract
Management Dept.
16205 13th St., Room L04
Lubbock, TX 79401
_4P►I1L CLLA 1 1 V m
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE
EXPIRATION DATE THEREOF, THE ISSUING INSURER WILL ENDEAVOR TO MAIL
10 DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT,
BUT FAILURE TO MAL SUCH NOTICE SHALL IMPOSE NO OBLIGATION OR LIABILITY
OF ANY KIND UPON THE INSURER, ITS AGENTS OR REPRESENTATIVES.
AUTHORIZED REPRESENTATIVE
Richard Danean/DMB
ACORD 25 (2001108) FAX: 775 - 2093
OACORD CORPORATION 1988
f
IMPORTANT
If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. A statement
on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).
If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may
require an endorsement. A statement on this certificate does not confer rights to the certificate
holder in lieu of such endorsement(s).
DISCLAIMER
The Certificate of Insurance on the reverse side of this form does not constitute a contract between
the issuing insurer(s), authorized representative or producer, and the certificate holder, nor does it
affirmatively or negatively amend, extend or alter the coverage afforded by the policies listed thereon.
ACORD 25 (2001108)
I
H'rom: Heather H'IITHr AL UpsnaW Insurance Agency, Inc. raxiu. wp Aiaw ulauraltLw ^ww tu. mu it uA�aatamum
OP ID H
ACORD_ CERTIFICATE OF LIABILITY INSURANCE SOUTH40
DATE (MAYDDHYYYY)
01/26/06
PRODUCER
Upshaa Insurance Agency, Inc
P. 0. Box 1299
Amarillo TX 79105-1299
Phone: 806-468-0400 lax: 806-468-0450
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION
ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE
HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR
ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW.
INSURERS AFFORDING COVERAGE
NAIC NI
MURED
South Plains service, LLC
LOubbboocck9TX 79408
INSLRERA America rirst Insurance
INSURER B: Texas Mutual Insurance Co
INSURERC:
INSURER O:
INSURURER E:
rnvrRI[:RS
THE POLICIES CF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSLIREO NAWD ABOVE FOR THE POLICY PERIOD MICATED. NOTWITHSTANDING
ANY REOUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO NMHCHR THIS CERTIFICATE MAY BE ISSUED OR
MAY PERTAIN, THE INSLPANC.'E AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH
POLICIES. AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAN) CLAIMS.
LTR
N
TYPE OF NISURANCE
POLICY NUMBER
DATE (MVMWM
DATE MWDWM
WITS
GENERAL LIABILITY
EACH OCCURRENCE
s2,000,000
A
X coMMERctAL GENERAL LIABILITY
CLAIMS MsDE Fx] OCCUR
CCIS109143
01/01/06
01/01/07
PREMISES (Es ocaxence)
s 300 , 000
MEO E)P (Any one person)
$10 , 000
PERSONAL $ ADV INJURY
s2,000,000
GENERAL AGGREGATE
s4,000,000
GENT AGGREGATE LIMIT APPLIES PER:
PRODUCTS- COMP/OP AGG
$4 , 000 , 0 00
POLICY PPRCO- LOC
A
AUTOMOBILE LIABILITY
X AM AUTO
BAS109343
01/01/06
01/01/07
COMBINED SINGLE LIMIT
(Eaaeddwt)
s 300,000
BOOLYINJURY
(Per )
$
ALL OWNED AUTOS
SCHEDLAED AUTOS
BODILY INJURY
(Per ecadeA)
$
HIRED AUTOS
NON40Ww0 AUTOS
PROPERTY DAMAGE
(Per accideri)
$
GARAGE LIMLITY
AUTO ON Y - EA ACCIDENT
$_
OTHER THAN EA ACC
AUTO ONLY: MTG
$
ANY AUTO
$
EXCESSAIMBR A A A LIABILITY
EACH OCCURRENCE
s2,000,000
A
X OCCUR cLAwsMADE
CUS109543
01/01/06
01/01/07
AGGREGATE
s2,000,000
s
$
H�OUCT8LE
X RETENTION $10 , 000
$
8
WORKERS COMPI NIIATION AND
EMPLOYER!' LVtBILTrY
ANY PROPR�roRRARTHER0EXECUTIVE
OFFICERIAIEMBEREXCLIDED?
TSi0001164576
01/01/06
01/O1/07
TORY LltrgTS ER
E.L.EACNACCIOENr
i 1000000
E.L. DISEASE -EAEMPLOYEE
$ 1000000
It M. describe under
SPECIAL PROVISIONSbdorr
E.L. DISEASE -POLICY LIMIT
s 1000000
OTHER
DESORPTION OF OP TIONS I LOCATKW / LES I EXCLUSIONS ADDED BY ENDORSEMENT / SPECIAL PROVISIONS
Project: ITS #05-147-M& - Municipal Building Parking structure Repair -
contract M 6573 GL,AU: Certificate holder, its officers, agents i employees
are named as additional insureds (OL per attached 22-45TX (12/02)).
GL,AU,1NC: Provides a waiver of Subrogation in favor of the certificate
holder. General Liabiliy is primary per the policy.
�.Cn r tn�.n 1 c I7vL YCR bAN�.CLLA I IwN
CIT—LU7 SHOULD ANY OF THE ABOVE DESCRIBEO POLICIES BE CANCELLED BEFORE THE EXPRAT10N
DATE THEREOF, THE ISSUING INSURER WILL ENDEAVOR TO MAIL 10 DAYS WRITTEN
NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT, BUT FAILURE TO DO SO SHALL
City of Lubbock c/o Purchasing NF Contract Mgmt IMPOSE NO OBLIGATION OR LOSLMY OF ANY KIND UPON THE NSUREi , ITS AGENTS OR 1625 13th Street, Roam L04 REPRESENTA71VEs.
Lubbock TX 79401 alto REPRE7XJTIVF2 . A _
ACORD 25 (2001M) 0 ACORD CORPORATION 1988
From: Heather Fink At Upshaw Insurance Agency, Inc. raxlu: upsnaw insurance mge to: minnix tornmerodf rwuitnti, LLmug. urtxzuuv t-44r%- raw- owo u
F
rJ
L
0
-J
ACORD 25
IMPORTANT
If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. A statement
on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s)-
If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may
require an endorsement. A statement on this certificate does not confer rights to the certificate
holder in lieu of such endorsement(s).
DISCLAIMER
The Certificate of Insurance on the reverse side of this form does not constitute a contract between
the issuing insureqs), authorized representative or producer, and the certificate holder, nor does it
affirmatively or negatively amend, extend or alter the coverage afforded by the policies listed thereon.
r.
Frorn: Heather FmK At: Upshaw Insurance Agency, Inc. r•axi u: upsnaw insurance Age i u. mnvux wrnmei um rm uiuf a; CLJa 114 a u w.w rim r .yam. + —
THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY.
COMMERCIAL GENERAL LIABILITY EXTENSION ENDORSEMENT
This endorsement modifies insurance under the
COMMERICAL GENERAL LIABILITY COVERAGE PART
SCHEDULE
The following endorsement provision does not apply when "X" is shown in the space provided below:
Provision B. PROPERTY DAMAGE — BORROWED EQUIPMENT does not apply
Provision C. PROPERTY DAMAGE —CUSTOM ERS' GOODS does not apply
Provision F. MEDICAL PAYMENTS EXTENSION does do not apply
Provision H. ADDITIONAL INSUREDS — BY CONTRACT, AGREEMENT OR PERMIT does not apply
Provision I. ADDITIONAL INSUREDS — VENDORS does not apply
Provision J. BROAD FROM NAMED INSURED does not apply
Provision K. FAILURE TO DISCLOSE HAZARDS AND PRIOR OCCURRENCES does not apply
Provision L. KNOWLEDGE OF OCCURRENCE, OFFENSE, CLAIM OR SUIT does not apply
(If no entry appears above, information required to complete this endorsement will be shown in the Declarations as
applicable to this endorsement)
With respect to coverage afforded by this endorsement, the provisions of the policy apply unless modified by the
endorsement.
H. ADDITIONAL INSUREDS —BY CONTRACT, AGREEMENT OR PERMIT
1. Paragraph 2. Under SECTION II —WHO IS AN INSURED is amended to include as an insured any person
f or organization when you and such person or organization have agreed in writing in a contract, agreement
or permit that such person or organization be added as an additional insured on your policy to provide
insurance such as is afforded under this Coverage Part. Such person or organization is an additional
insured only with respect to liability arising out of:
a. Your ongoing operations performed for that person or organization; or
b. Premises or facilities owned or used by you.
With respect to provision 1.a. above, a person's or organization's status as an insured under this
endorsement ends when your operations for that person or organization are completed.
With respect to provision 1.b.above, a person's or organization's status as an insured under this
endorsement ends when their contract or agreement with you for such premises or facilities ends.
2. This endorsement provision H. does not apply:
a. Unless the written contract or agreement has been executed, or permit has been issued, prior to the
"bodily injury", "property damage' or "personal and advertising injury",-
b. To "bodily injury' or "property damage" occurring after:
(1) All work, including materials, parts or equipment furnished in connection with such work, in the
project (other than service, maintenance or repairs) to be performed by or on behalf of the
additional insured(s) at the site of the covered operations has been completed; or
(2) That portion of "your work" out of which the injury or damage arises has been put to its intended
use by any person or organization other that another contractor or subcontractor engaged in
performing operations for a principal a part of the same project;
c. To the rendering of or failure to render any professional services including, but no limited to, any
professional architectural, engineering or surveying services such as:
r;
From: Heather Fink At Upsnaw insurance Agency, inc. raxiu: upsiaw insurance nye i u. woe rmeu-a,
(1) The preparing, approving, or failing to prepare or approve, maps, shop drawings, opinions, reports,
surveys, field orders, change orders or drawings and specifications: and
(2) Supervisory, inspection, architectural or engineering activities;
d. To "bodily injury", "property damage" or "personal and advertising injury" arising out of any act, error or
omission that results from the additional insured's sole negligence or wrongdoing:
e. To any person or organization included as an insured under provision I. of this endorsement.
f. To any person or organization included as an insured by a separate additional insured endorsement
issued by us and made a part of this policy; or
g. When it is shown in the Schedule as not applicable.
22-45TX (12/02)
FROM : LALIR I E D I AZ
I
js
t
F-11,
cov NA
TMt: ppLlCiEs Of INSURANCE LIs1ED CF A CA
pspu,Raal. �M�T TBRIu� � . s1w I , pouclal
AGGRESA7e= UMIT3 SHOWN MAY NAVE BEEN RE
LTR TYPE INaUMNOE
PDX NO. 8066WS9§0 Jan. 27 2006 04:26PM P2
O'r►1iR oOCUMBNT EXt;LUSIONS
OR
OR MCREIN it SUeJECT 'TO ALL THE TERtA6, —
POUOY
OWNWAL UANGM
X ooMMI1RCIAL OENE IASM(TT
A CLAW MADE � OCCUR 41LX0995441-0
0EWM AGGKEGATIEUMITAPPLIE81'r
X M-qLOO
AUTOMO"X L-W JTV
r ANY AUTO
$ ALL OV"VAUTOS cT120047
X SC 46CULEC AUTOS
MIREDAUTOS
4 NON•ONMED AUTOS
OARAOa LJAMUTY
ANT AUTO
EIIC� LUIQIUIY
OCCUR p CLAMS MADE
DEDUCME
R NTION
WORKENiCOMPENSATIOMAND
PJIPLOYaw W11RU7Y
ANY PROPR IETO WPARTNEWIMCM49
OFFICEWMEMBER E7(CLUDED9
Nfm dmft wWw
SPOCIAL PROV ONS boft
` OTHER
10/25/2005 1 10/25/2006
COM MED SINftd LIMIT
(Ea swdrrt!
20/25/2005 10/25/2006 BOKYMURY
(Pat poem
BODILY INJURY
(�
PROMWDAMAGE
(Pars600m
AUTO ONLY, EAACCIOENT =
OTHER TMNN BA ACC =
AUTO ONLY.. AGG =
EAC"POCURRINC5 i
A =
i
_
100,
1,000,
2,000,
2,000,
1,000,0001
DESGRM M OP OPEItAYMNSiLWAIIDNiNBMICLEsRXCLUMONS ADDW BY 9NDOR.iMEN11W16CIAL PROVISIOMi
city of Lubbock, its Officers, aevnts and ewployees ass rlaa+d as privAry additional insurod on CWWCILL Liability aDd
N Autookobile tiability policies, as tespecta to T" 105-147-ML endorsesant f C92037 & CG2404. This certificate shall
also include a Wivor of Subrogation in favbr of the City of Lubbock On General Liability and Autoaobila Liability
LCERTIFICATE HOLDER
City of Lubbock
C/O City of Lubbock Purchasing & Conaact
r-; Management Dept
r 1625 13* Street
Room L04
Lubbock 71X 74401
ACORO 25 (20011"
INS025 (DTOBl. s AMS .
SHOULD ANY OP TM6 AMW VEMMaED ►OUCIa ON CA"Clt4i0 EW90M TIM
W"ATIOIN OAR "IEKEGF, MG ISSUIINO 013UMR ntLL GMWAVCA TO YAIL
10 DAYS WWTTFII WMX TO THE CEffTIFICATS 40LOM NAMW TO THE Le". MT
FAILURE TO 00 SD SHALL IMPOSE NO OeL#UTM OR UA21UTY OP ANY WIND UPON TN4
VIP Mwfta o SpuEwu. h- (SOD}1v4w
0
CONTRACTOR CHECKLIST
A CONTRACTOR SHALL:
(1) provide coverage for its employees providing services on a project, for the duration of the project based
on proper reporting of classification codes and payroll amounts and filling of any coverage agreements;
(2) provide a certificate of coverage showing workers' compensation coverage to the governmental entity
prior to beginning work on the project;
(3) provide the governmental entity, prior to the end of the coverage period, a new certificate of coverage
showing extension of coverage, if the coverage period shown on the contractor's current certificate of
coverage ends during the duration of the project;
(4) obtain from each person providing services on a project, and provide to the governmental entity:
(A) a certificate of coverage, prior to that person beginning work on the project, so the governmental
entity will have on file certificates of coverage showing coverage for all persons providing
services on the project; and
(B) no later than seven days after receipt by the contractor, a new certificate of coverage showing
extension of coverage, if the coverage period shown on the current certificate of coverage ends
during the duration of the project;
(5) retain all required certificates of coverage on file for the duration of the project and for one year
thereafter;
(6) notify the governmental entity in writing by certified mail or personal delivery, within ten (10) days after
the contractor knew or should have known, of any change that materially affects the provision of
coverage of any person providing services on the project;
(7) post a notice on each project site informing all persons providing services on the project that they are
required to be covered, and stating how a person may verify current coverage and report failure to provide
coverage. This notice does not satisfy other posting requirements imposed by the Act or other
commission rules. This notice must be printed in at least 19-point normal type, and shall be in both
English and Spanish and any other language common to the worker population. The text for the notices
shall be the following text provided by the commission on the sample notice, without any additional
words or changes:
PROOF OF COVERAGE SHALL BE FURNISHED TO .THE CITY OF LUBBOCK IN THE FORM OF A
CERTIFICATE OF INSURANCE. THE INSURANCE CERTIFICATES FURNISHED SHALL NAME THE
CITY OF LUBBOCK AS A PRIMARY ADDITIONAL INSURED AND PROVIDE A WAIVER OF
_W
SUBROGATION IN FAVOR OF THE CITY OF LUBBOCK, OR IN THE ALTERNATIVE, SHALL BE
ACCOMPANIED BY A STATEMENT FROM THE CONTRACTOR TO THE EFFECT THAT NO WORK ON
THIS PARTICULAR PROJECT SHALL BE SUBCONTRACTED. IT SHALL BE THE CONTRACTOR'S
RESPONSIBILITY TO PROVIDE TO THE OWNER ALL PROOF OF COVERAGE INSURANCE
DOCUMENTS INCLUDING WORKERS COMPENSATION COVERAGE FOR EACH SUBCONTRACTOR
2
111
REQUIRED WORKERS COMPENSATION COVERAGE
"The law requires that each person working on this site or providing services related to this construction project must (see
reverse) be covered by workers' compensation insurance. This includes persons providing, hauling, or delivering
equipment and materials, or providing labor or transportation or other service related to the project, regardless of the
identity of their employer or status as an employee."
0t
"Call the Texas Workers' Compensation Commission at (512)440- 3789 to receive information on the
legal requirement for coverage, to verify whether your employer has provided the required coverage, or to
report an employer's failure to provide coverage." and
(8) contractually require each person with whom it contracts to provide services on a project, to:
(A) provide coverage based on proper reporting of classification codes and payroll amounts and
filing of any coverage agreements for all of its employees providing services on the project, for
the duration of the project;
(B) provide a certificate of coverage to the contractor prior to that person beginning work on the
project;
(C) include in all contracts to provide services on the project the language in subsection (e) (3) of this
rule;
(D) provide the contractor, prior to the end of the coverage period, a new certificate of coverage
showing extension of coverage, if the coverage period shown on the current certificate of
coverage ends during the duration of the project;
(E) obtain from each other person with whom it contracts, and provide to the contractor:
T; (i) a certificate of coverage, prior to the other person beginning work on the project; and
(ii) prior to the end of the coverage period, a new certificate of coverage showing extension of the
coverage period, if the coverage period shown on the current certificate of coverage ends during
the duration of the project;
(F) retain all required certificates of coverage on file for the duration of the project and for one year
thereafter;
(G) notify the governmental entity in writing by certified mail or personal delivery, within (ten) 10
days after the person knew or should have known, of any change that materially affects the
provision of coverage of any person providing services on the project; and
(1i) contractually require each other person with whom it contracts, to perform as required by
't paragraphs (A) - (II}, with the certificate of coverage to be provided to the person for whom they
L:j
are providing services._
F-
U
EA m ml Ej EZA Um--
CONTRACT #6573
STATE OF TEXAS
COUNTY OF LUBBOCK
F, THIS AGREEMENT, made and entered into this 12TH DAY OF JANUARY, 2006 by and between the City of
Lubbock, County of Lubbock, State of Texas, acting by and through the Mayor, City of Lubbock, thereunto authorized to
do so, hereinafter referred to as OWNER, and MINNIX COMMERCIAL PARTNERS LTD. of the CITY OF
LUBBOCK, COUNTY OF LUBBOCK and the STATE OF TEXAS hereinafter termed CONTRACTOR.
WITNESSETH: That for and in consideration of the payments and agreements hereinafter mentioned, to be made and
performed by the OWNER and under the conditions expressed in the bond bearing even date herewith (if any) the
CONTRACTOR hereby agrees with OWNER to commence and complete the construction of certain improvements
described as follows:
BID 405-147-MA - MUNICIPAL BUILDING PARKING STRUCTURE REPAIR — $24,777.00
$ (Alternate Bid: Structure Demolition)
and all extra work in connection therewith, under the terms as stated in the contract documents and at his (or their) own
proper cost and expense to furnish all materials, supplies, machinery, equipment, tools, superintendence, labor, insurance
and other accessories and services necessary to complete the said construction in accordance with the contract documents
as defined in the General Condition of Agreement. MINNIX COMMERCIAL PARTNERS, LTD.'S bid dated
Old DECEMBER 29, 2005 is incorporated into and made apart of this agreement.
The CONTRACTOR hereby agrees to commence work within ten days after the date written notice to do so shall have
been given to him and to substantially complete same within the time specified in the contract documents.
The OWNER agrees to pay the CONTRACTOR in current funds for the performance of the contract in accordance
with the bid submitted therefore, subject to additions and deductions, as provided in the contract documents and to make
payment on account thereof as provided therein.
IN WITNESS WHEREOF, the parties to these presents have executed this agreement in Lubbock, Lubbock County,
Texas in the year and day first above written.
CONTRACTOR:
MINNIX COMMERCIf
By: C
PRINTED -� a
TITLE: n
COMPLETE ADDRESS:
CITY OF 44BBOC , TEXAS (OWNER):
PARTNERS, LTD. By:
ex`
Minnix Commercial Partners, Ltd.
PO Box 64895
Lubbock, TX 79464-4895
ATTEST:
Corporate Secretary
ATTEST:
City tecretary
Director
APPROVED AS TO FORM:
Attorney
GENERAL CONDITIONS OF THE AGREEMENT
I
I
GENERAL CONDITIONS OF THE AGREEMENT
1. OWNER
Whenever the word Owner, or First Party, are used in this contract, it shall be understood as referring to the City
of Lubbock, Texas.
CONTRACTOR
Whenever the word Contractor, or Second Party, is used, it shall be understood to mean the person, persons, co-
partnership or corporation, to wit MINNIX COMMERCIAL PARTNERS LTD. who has agreed to perform the
work embraced in this contract, or their legal representative.
3. OWNER'S REPRESENTATIVE
Whenever the word Owner's Representative or representative is used in this contract, it shall be understood as
referring to, City of Lubbock, or its representative HARLAN STAUFFER, FACILITIES MANAGER, so
designated who will inspect constructions; or to such other representatives, supervisors, architects, engineers, or
inspectors as may be authorized by said Owner to act in any particular under this agreement. Engineers,
supervisors or inspectors will act for the Owner under the direction of Owner's Representative, but shall not
directly supervise the Contractor or persons acting on behalf of the Contractor.
4. CONTRACT DOCUMENTS
The contract's documents shall consist of the Notice to Bidders, General Instructions to Bidders, Bid, Signed
Agreement, Statutory Bonds (if required), General Conditions of the Agreement, Special Conditions of the
Agreement (if any), Specifications, Plans, Insurance Certificates, and all other documents made available to
Bidder for inspection in accordance with the Notice to Bidders. The above described materials are sometimes
referred to herein as the "contract" or "contract documents".
S. INTERPRETATION OF PHRASES
Whenever the words "Directed," "Permitted," "Designated," "Required," "Considered Necessary," "Prescribed,"
or words of like import are used, it shall be understood that the direction, requirement, permission, order,
designation or prescription of the Owner's Representative is intended; and similarly, the words "Approved,"
"Acceptable," "Satisfactory," or words of like import shall mean approved by or acceptable or satisfactory to the
Owner's Representative.
6. SUBCONTRACTOR
The term Subcontractor, as employed herein, includes only those having a direct contract with the Contractor for
performance of work on the project contemplated by these contract documents. Owner shall have no
responsibility to any Subcontractor employed by Contractor for performance of work on the project contemplated
by these contract documents, but said Subcontractors will look exclusively to Contractor for any payments due
Subcontractor.
7. WRITTEN NOTICE
Written notice shall be deemed to have been duly served if delivered in person to the individual or to a member of
the firm or to an officer of the corporation for whom it is intended, or if delivered at or sent certified mail to the
y last business address known to the party who gives the notice.
CONTRACTOR'S RESPONSIBILITIES
Unless otherwise stipulated, the Contractor shall provide and pay for all materials, supplies, machinery,
equipment, tools, superintendence, labor, insurance, and all water, light, power, fuel, transportation and all other
facilities necessary for the execution and completion of the work covered by the contract documents. Unless
otherwise specified, all materials shall be new and both workmanship and materials shall be of a good quality.
The Contractor shall, if required, furnish satisfactory evidence as to the kind and quality of materials. Materials
or work described in words which so applied have well known, technical or trade meaning shall be held to refer
such recognized standards.
All work shall be done and all materials furnished in strict conformity with the contract documents.
9. SUBSTANTIALLY COMPLETED
The term "Substantially Completed" is meant that the structure or project contemplated by the contract documents
has been made suitable for use or occupancy or the facility is in a condition to serve its intended purpose, but still
may require minor miscellaneous work and adjustment.
10. LAYOUT
Except as specifically provided herein, the Contractor shall be responsible for laying out all work and shall
accomplish this work in a manner acceptable to the Owner's Representative. The Owner's Representative will
check the Contractor's layout of all major structures and any other layout work done by the Contractor at
Contractor's request, but this check does not relieve the Contractor of the responsibility of correctly locating all
work in accordance with the Plans and Specifications.
11. KEEPING OF PLANS AND SPECIFICATIONS ACCESSIBLE
The Contractor shall be furnished copies of all Plans and Specifications without expense to Contractor and
Contractor shall keep one copy of same consistently accessible on the job site.
12. RIGHT OF ENTRY
The Owner's Representative may make periodic visits to the site to observe the progress or quality of the executed
work and to determine, in general, if the work is proceeding in accordance with the contract documents. Owner's
Representative will not be required to make exhaustive or continuous onsite inspections to check the quality or
quantity of the work, nor will Owner's Representative be responsible for the construction means, methods,
techniques, sequences or procedures, or the safety precautions incident thereto. Notwithstanding the Owner's
Representative's rights of entry hereunder, the Owner's Representative will not be responsible for the Contractor's
failure to perform the work in accordance with the Contract Documents.
13. LINES AND GRADES
All lines and grades shall be furnished by the Owner's Representative whenever Owner's Representative deems
said lines and grades are necessary for the commencement of the work contemplated by these contract documents
or the completion of the work contemplated by these contract documents. Whenever necessary, Contractor shall
suspend its work in order to permit Owner's Representative to comply with this requirement, but such suspension
2
will be as brief as practical and Contractor shall be allowed no extra compensation therefore. The Contractor
shall give the Owner's Representative ample notice of the time and place where lines and grades will be needed.
All stakes, marks, etc., shall be carefully preserved by the Contractor, and in case of careless destruction or
removal by Contractor, its Subcontractors, or its employees, such stakes, marks, etc., shall be replaced by the
Owner's Representative at Contractor's expense.
14. OWNER'S REPRESENTATIVE'S AUTHORITY AND DUTY
Unless otherwise specified, it is mutually agreed between the parties to this Agreement that the Owner's
Representative has the authority to review all work included herein. The Owner's Representative has the
authority to stop the work whenever such stoppage may be necessary to ensure the proper execution of the
contract. The Owner's Representative shall, in all cases, determine the amounts and quantities of the several kinds
of work which are to be paid for under the contract documents, and shall determine all questions in relation to said
work and the construction thereof, and shall, in all cases, decide every question which may arise relative to the
execution of this contract on the part of said Contractor. The decision of the Owner's Representative shall be
conclusive in the absence of written objection to same delivered to Owner's Representative within fifteen (15)
calendar days of any decision or direction by Owner's Representative. In the absence of timely written objection
by Contractor, as provided herein, any and all objection or objections shall be deemed waived.
15. SUPERINTENDENCE AND INSPECTION
It is agreed by the Contractor that the Owner's Representative shall be and is hereby authorized to appoint from
time to time such subordinate engineers, supervisors, or inspectors as the said Owner's Representative may deem
proper to inspect the materials furnished and the work done under this Agreement, and to see that said material is
furnished and said work is done in accordance with the specifications therefore. The Contractor shall furnish all
reasonable aid and assistance required by the subordinate engineers, supervisors or inspectors for the proper
inspection and examination of the work.. The Contractor shall regard and obey the directions and instructions of
any subordinate engineers, supervisors or inspectors so appointed, when such directions and instructions are
consistent with the obligations of this Agreement and accompanying plans and specifications provided, however,
should the Contractor object to any orders by any subordinate engineer, supervisor or inspector, the Contractor
may within fifteen (15) calendar days make written appeal to the Owner's Representative for its decision. In the
absence of timely written objection by Contractor, as provided herein, any and all objection or objections shall be
deemed waived.
16. CONTRACTOR'S DUTY AND SUPERINTENDENCE
The Contractor shall give personal attention to the faithful prosecution and completion of this contract and shall
keep on the work, during its progress, a competent superintendent and any necessary assistants, all satisfactory to
Owner's Representative. The superintendent shall represent the Contractor in its absence and all directions given
to superintendent shall be binding as if given to the Contractor. It is expressly agreed that adequate supervision
by competent and reasonable representatives of the Contractor is essential to the proper performance of the work
and lack of such supervision shall be grounds for suspending operations of the Contractor.
The work, from its commencement to completion, shall be under the exclusive charge and control of the
Contractor and all risk in connection therewith shall be borne by the Contractor.
The Owner or Owner's Representatives shall not be responsible for the acts or omissions of the Contractor, or any
subcontractors, or any of Contractor's agents or employees, or any other persons performing any of the work.
17. CONTRACTOR'S UNDERSTANDING
It is understood and agreed that the Contractor has, by careful examination, satisfied itself as to the nature and
location of the work, the confirmation of the ground, the character, quality and quantity of materials to be
encountered, the character of equipment and facilities needed preliminary to and during the prosecution of the
work, and the general and local conditions, and all other matters which in any way affect the work under the
contract documents. No oral agreement or conversation with any officer, agent, or employee of the Owner, or
Owner's Representative either before or after the execution of this contract, shall affect or modify any of the
terms or obligations herein contained. Subject to the rights of Owner as set forth in Paragraph 23 hereof, all
modifications and/or amendments to the contract documents, shall be in writing, and executed by Owner's
Representative and Contractor.
Unless otherwise specified herein, all loss, expense or damage to Contractor arising out of the nature of the work
to be done, or from the action of the elements, or from any unforeseen circumstance and the prosecution of the
work, shall be sustained and bome by the Contractor at its own cost and expense.
18. CHARACTER OF WORKERS
The Contractor agrees to employ only orderly and competent workers, skillful in the performance in the type of
work required under this contract, to do the work, and agrees that whenever the Owner's Representative shall
inform Contractor in writing that any man or men on the work, are, in Owner's Representative's sole opinion,
incompetent, unfaithful, disorderly, or otherwise unacceptable to Owner or Owner's Representative, such man or
men shall be discharged from the work and shall not again be employed on the work without the Owner's
Representative's written consent.
19. CONSTRUCTION PLANT
The Contractor shall provide all labor, tools, equipment, machinery and materials necessary in the prosecution
and completion of this contract where it is not otherwise specifically provided that Owner shall furnish same, and
it is also understood that Owner shall not be held responsible for the care, preservation, conservation, or
protection of any materials, tools, equipment or machinery or any part of the work until it is finally completed and
accepted.
The building of structures for the housing of men or equipment will be permitted only at such places as the
Owner's Representative shall consent or direct, and the sanitary conditions of the grounds in or about such
structure shall at all times be maintained in a manner satisfactory to the Owner's Representative.
20. SANITATION
Necessary sanitary conveniences for the use of laborers on the work site, properly secluded from public
observation, shall be constructed and maintained by the Contractor in such manner and at such points as shall be
approved by the Owner's Representative and their use shall be strictly enforced.
21. OBSERVATION AND TESTING
The Owner or Owner's Representative shall have the right at all times to observe and test the work. Contractor
shall make necessary arrangements and provide proper facilities and access for such observation and testing at any
location wherever such work is in preparation or progress. Contractor shall ascertain the scope of any observation
that may be contemplated by Owner or Owner's Representative and shall give ample notice as to the time each
part of the work will be ready for such observation. Owner or Owner's Representative may reject any such work
found to be defective or not is accordance with the contract documents, regardless of the stage of its completion
or the time or place of discovery of such errors and regardless of whether Owner's Representative has previously
accepted the work through oversight or otherwise. If any such work should be covered without approval or
consent of the Owner, it must, Trequested by Owner or Owner's Representative, be uncovered for examination at
Contractor's expense. In the event that any part of the work is being fabricated or manufactured at a location
where it is not convenient for Owner or Owner's Representative to make observations of such work or require
testing of said work, then in such event Owner or Owner's Representative may require Contractor to furnish
4
Owner or Owner's Representative certificates of inspection, testing or approval made by persons competent to
perform such tasks at the location where that part of the work is being manufactured or fabricated. All such tests
will be in accordance with the methods prescribed by the American Society for Testing and Materials or such
other applicable organization as may be required by law or the contract documents.
If any such work which is required to be inspected, tested, or approved is covered up without written approval or
consent of the Owner or Owner's Representative, it must, if requested by the Owner or Owner's Representative, be
uncovered for observation and testing at the Contractor's expense. The cost of all such inspections, tests and
approvals shall be borne by the Contractor unless otherwise provided herein. Any work which fails to meet the
requirements of any such tests, inspections or approvals, and any work which meets the requirements of any such
tests or approvals but does not meet the requirements of the contract documents shall be considered defective,
and shall be corrected at the Contractor's expense.
Neither observations by the Owner or Owner's Representative, nor inspections, tests, or approvals made by
Owner, Owner's Representative, or other persons authorized under the contract documents to make such
inspections, tests, or approvals shall relieve the Contractor from its obligation to perform the work in accordance
with the requirements of the contract documents.
22. DEFECTS AND THEIR REMEDIES
It is expressly agreed that if the work or any part thereof, or any material brought on the site of the work for use in
the work or selected for the same, shall be deemed by the Owner or Owner's Representative as unsuitable or not in
conformity with plans, specifications and/or contract documents, the Contractor shall, after receipt of written
notice thereof from the Owner's Representative, forthwith remove such material and rebuild or otherwise remedy
such work so that it shall be in full accordance with the contract documents. It is further agreed that any remedial
action contemplated as hereinabove set forth shall be at Contractor's expense.
23. CHANGES AND ALTERATIONS
The Contractor further agrees that the Owner may make such changes and alterations as the Owner may see fit, in
the line, grade, form dimensions, plans or materials for the work herein contemplated, or any part thereof, either
before or after the beginning of the construction, without affecting the validity of this contract and the
V I accompanying bond.
If such changes or alterations diminish the quantity of the work to be done, they shall not constitute the basis for a
claim for damages, or anticipated profits on the work that may be dispensed with. If they increase the amount of
work, and the increased work can fairly be classified under the specifications, such increase shall be paid
according to the quantity actually done and at the unit price established for such work under this contract;
otherwise such additional work shall be paid for as provided under Extra Work. In case the Owner shall make
such changes or alterations as shall make useless any work already done or material already furnished or used in
said work, then the Owner shall recompense the Contractor for any material or labor so used, and for actual
expenses incurred in preparation for the work as originally planned.
24. EXTRA WORK
The term "extra work" as used in this contract shall be understood to mean and include all work that may be
required by the Owner or Owner's Representative to be done by the Contractor to accomplish any change,
alteration or addition to the work as shown on the plans and specifications or contract documents and not covered
by Contractor's bid, except as provided under Changes and Alterations herein.
It is agreed that the Contractor shall perform all extra work under the direction of the Owner's Representative
when presented with a written work order signed by the Owner's Representative; subject, however, to the right of
the Contractor to require written confirmation of such extra work order by the Owner. It is also agreed that the
compensation to be paid to the Contractor for performing said extra work shall be determined by the following
methods:
Method (A) - By agreed unit prices; or
Method (B) - By agreed lump sum; or
Method (C) - If neither Method (A) or Method (B) be agreed upon before the extra work is
commenced, then the Contractor shall be paid the lesser of the following: (1) actual field
cost of the extra work, plus fifteen (15%) percent; or (2) the amount that would have been
charged by a reasonable and prudent Contractor as a reasonable and necessary cost for
performance of the extra work.
In the event said extra work be performed and paid for under Method (C)(1), then the provisions of this paragraph
shall apply and the "actual field cost" is hereby defined to include the cost of all workmen, such as foremen,
timekeepers, mechanics and laborers, materials, supplies, teams, trucks, rentals on machinery and equipment, for
the time actually employed or used on such extra work, plus actual transportation charges necessarily incurred,
together with all expenses incurred directly on account of such extra work, including Social Security, Old Age
Benefits, Maintenance Bonds, Nblic Liability and Property Damage and Workers' Compensation and all other
insurances as may be required by law or ordinances or directed by the Owner or Owner's Representative, or by
them agreed to. Owner's Representative may direct the form in which accounts of the actual field cost shall be
kept and records of these accounts shall be made available to the Owner's Representative. The Owner's
Representative may also specify in writing, before the work commences, the method of doing the work and the
type and kind of machinery and equipment to be used; otherwise, these matters shall be determined by the
Contractor. Unless otherwise agreed upon, the prices for the use of machinery and equipment shall be determined
by using 100%, unless otherwise specified, of the latest Schedule of Equipment and Ownership Expenses adopted
by the Associated General Contractors of America. Where practical, the terms and prices for the use of
machinery and equipment shall be incorporated in the written extra work order. The fifteen percent (15%) of the
actual field cost to be paid to Contractor shall cover and compensate Contractor for its profit, overhead, general
superintendence and field office expense, and all other elements of cost and expense not embraced within the
actual field cost as herein defined, save that where the Contractor's Camp or Field Office must be maintained
primarily on account of such Extra Work, then the cost to maintain and operate the same shall be included in the
"actual field cost."
No claim for extra work of any kind will be allowed unless ordered in writing by Owner's Representative. In case
any orders or instructions appear to the Contractor to involve extra work for which Contractor should receive
compensation or an adjustment in the construction time, Contractor shall prior to commencement of such extra
work, make written request to the Owner's Representative for a written order authorizing such extra work. Should
a difference of opinion arise as to what does or does not constitute extra work or as to the payment therefore, and
the Owner's Representative insists upon its performance, the Contractor shall proceed with the work after making
written request for written order and shall keep adequate and accurate account of the actual field cost thereof, as
provided under Method (C)(1). If Contractor does not notify Owner's Representative before the commencement
of any extra work, any claim for payment due to alleged extra work shall be deemed waived.
25. DISCREPANCIES AND OMISSIONS
It is further agreed that it is the intent of the contract documents that all work described in the bid, the
specifications, plans and other contract documents, is to be done for the prices quoted by the Contractor and that
such price shall include all appurtenances necessary to complete the work in accordance with the intent of these
contract documents as interpreted by Owner's Representative. Notices of any discrepancies or omissions in
these plans, specifications, or contract documents, shall be given to the Owners' Representative and a
clarification obtained before the bids are received, and if no such notice is received by the Owner's
Representative prior to the opening of bids, then it shall be deemed that the Contractor fully understands
the work to be included and has provided sufficient sums in its bid to complete the work in accordance with
these plans and specifications. If Contractor does not notify Owner's Representative before bidding of any
it
discrepancies or omissions, then it shall be deemed for all purposes that the plans and specifications are
sufficient and adequate for completion of the project. It is further agreed that any request for clarification
must be submitted no later than five (5) calendar days prior to the opening of bids.
26. RIGHT OF OWNER TO MODIFY METHODS AND EQUIPMENT
If at any time the methods or equipment used by the Contractor are found to be inadequate to secure the quality of
work with the rate of progress required under this contract, the Owner or Owner's Representative may order the
Contractor in writing to increase their safety or improve their character and efficiency and the Contractor shall
comply with such order.
If, at any time, the working force of the Contractor is inadequate for securing the progress herein specified, the
Contractor shall, if so ordered in writing, increase its force or equipment, or both, to such an extent as to give
reasonable assurance of compliance with the schedule of progress.
27. PROTECTION AGAINST ACCIDENT TO EMPLOYEES AND THE PUBLIC AND GENERAL INDEMNITY
The Contractor shall take out and procure a policy or policies of Workers' Compensation Insurance with an
insurance company licensed to transact business in the State of Texas, which policy shall comply with the
Workers' Compensation laws of the State of Texas. The Contractor shall at all times exercise reasonable
precaution for the safety of employees and others on or near the work and shall comply with all applicable
provisions of federal, state and municipal laws and building and construction codes. All machinery and
equipment and other physical hazards shall be guarded in accordance with the "Manual of Accident Prevention in
Construction" of Associated General Contractors of America, except where incompatible with federal, state or
municipal laws or regulations. The Contractor, its sureties and insurance carriers shall defend, indemnify and
hold harmless the Owner and all of its officers, agents and employees against any all losses, costs, damages,
expenses, liabilities, claims and/or causes of action, whether known or unknown, fixed, actual, accrued or
contingent, liquidated or unliquidated, including, but not limited to, attorneys' fees and expenses, in connection
with, incident to, related to, or arising out of, the Contractor's or any subcontractor's, agent's or employee's, in
any manner whatsoever, omission, execution and/or supervision of this contract, and the project which is the
subject matter of this contract.
The safety precautions taken shall be the sole responsibility of the Contractor, in its sole discretion as an
Independent Contractor, inclusion of this paragraph in the Agreement, as well as any notice which may be given
by the Owners or the Owner's Representative concerning omissions under this paragraph as the work progresses,
are intended as reminders to the Contractor of its duty and shall not be construed as any assumption of duty to
supervise safety precautions by either the Contractor or any of its subcontractors.
28. CONTRACTOR'S INSURANCE
The Contractor shall not commence work under this contract until he has obtained all insurance as required in the
General Conditions of the contract documents, from an underwriter authorized to do business in the State of
Texas and satisfactory to the City. Proof of coverage shall be furnished to the City and written notice of
cancellation or any material change will be provided ten (10) calendar days in advance of cancellation or change.
All policies of insurance, required herein, including policies of insurance required to be provided by Contractor
and its subcontractors, shall contain a waiver of any and all of the insurer's or payor's, in the event of self-
insurance, rights to subrogation that any such insurer or payor, in the event of self-insurance, may acquire by
virtue of payment of any loss under such insurance or self-insurance. All certificates of insurance submitted to
the City in conformity with the provisions hereof shall establish such waiver.
The Contractor shall procure and carry at its sole cost and expense through the life of this contract, insurance
protection as hereinafter specified. Coverage in excess of that specified herein also shall be acceptable. Such
insurance shall be carried with an insurance company authorized to transact business in the State of Texas and
shall cover all operations is connection with this contract, whether performed by the Contractor or a
subcontractor, or separate policies shall be provided covering the operation of each subcontractor. A certificate of
insurance specifying each and all coverages shall be submitted prior to contract execution.
PROOF OF COVERAGE SHALL BE FURNISHED TO THE CITY OF LUBBOCK IN THE FORM OF
A CERTIFICATE OF INSURANCE ALONG WITH A COPY OF THE ADDITIONAL INSURED
ENDORSEMENT. THE INSURANCE CERTIFICATES FURNISHED SHALL NAME THE CITY OF
LUBBOCK AS A PRDLARY ADDITIONAL INSURED AND PROVIDE A WAIVER OF
SUBROGATION IN FAVOR OF THE CITY OF LUBBOCK AS REQUIRED BELOW, OR IN THE
ALTERNATIVE, SHALL BE ACCOMPANIED BY A STATEMENT FROM THE CONTRACTOR TO
THE EFFECT THAT NO VIDRK ON THIS PARTICULAR PROJECT SHALL BE SUBCONTRACTED.
IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE TO THE OWNER ALL
PROOF OF COVERAGE INSURANCE DOCUMENTS INCLUDING WORKERS COMPENSATION
COVERAGE FOR EACH SUBCONTRACTOR
A. General Liability Eustirance (Primary Additional Insured and Waiver of Subrogation required)
The contractor shall have Comprehensive General Liability Insurance with limits of $1,000,000
Combined Single Limit in the aggregate and per occurrence to include:
Premises and Operations
Products & CoYnpleted.Operations Hazard
Contractual Liability .
Personal Injury & Advertising Injury
Heavy Equipment Endorsement
B. Owner's and Contractor's Protective Liability Insurance — NOT REQUIRED
C. Comprehensive Automobile Liability Insurance (Primary Additional Insured and Waiver of Subrogation
Required)
The Contractor shall lave Comprehensive Automobile Liability Insurance with limits of not less than;
Bodily Injury/Property Damage, $300,000 Combined Single Limit, to include all owned and non -owned
cars including: Employers Non -ownership Liability Hired and Non -owned Vehicles. The City is to be
named as a primary additional insured on this policy for this specific job and copy of the endorsement
doing so is to be attached to the Certificate of Insurance.
D. Builder's Risk Insurance/Installation Floater Insurance.
The Contractor shall obtain a Builder's Risk policy in the amount of 100% of the total contract price
(100% of potential loss) naming the City of Lubbock as insured
E. Umbrella Liability Insurance — NOT REQUIRED
F. Worker's Compensation and Employers Liability Insurance (Waiver of Subrogation required)
Worker's Compensation Insurance covering all employees whether employed by the Contractor or any
Subcontractor on the job with Employers Liability of at least $500,000.
Definitions:
Certificate of coverage ("certificate") - A copy of a certificate of insurance, a certificate of
authority to self -insure issued by the commission, or a coverage agreement (TWCC-81, TWCC-
82, TWCC-83, or TWCC-84), showing statutory workers' compensation insurance coverage for
the person's or entity's employees providing services on a project, for the duration of the project.
Duration of the project - includes the time from the beginning of the work on the project until the
Contractor's/person's work on the project has been completed and accepted by the governmental
entity.
Persons providing services on the project ("subcontractor" in Section 406.096, Texas Labor
Code) - includes all persons or entities performing all or part of the services the Contractor has
undertaken to perform on the project, regardless of whether that person contracted directly with
the Contractor and regardless of whether that person has employees. This includes, without
limitation, independent contractors, subcontractors, leasing companies, motor carriers, owner -
operators, employees of any such entity, or employees of any entity which furnishes persons to
provide services on the project. "Services" include, without limitation, providing, hauling, or
delivering equipment or materials, or providing labor, transportation, or other service related to a
project. "Services" does not include activities unrelated to the project, such as food/beverage
vendors, office supply deliveries, and delivery of portable toilets.
2. The Contractor shall provide coverage, based on proper reporting of classification codes and
payroll amounts and filing of any coverage agreements, which meets the statutory requirements
of Texas Labor Code, Section 401.011(44) for all employees of the contractor providing services
on the project, for the duration of the project.
The Contractor must provide a certificate of coverage to the governmental entity prior to being
awarded the contract.
4. If the coverage period shown on the Contractor's current certificate of coverage ends during the
duration of the project, the Contractor must, prior to the end of the coverage period, file a new
certificate of coverage with the governmental entity showing that coverage has been extended.
5. The Contractor shall obtain from each person providing services on the project, and provide to the
governmental entity:
(a) a certificate of coverage, prior to that person beginning work on the project, so the
governmental entity will have on file certificates of coverage showing coverage for all
persons providing services on the project; and
(b) no later than seven days after receipt by the Contractor, a new certificate of coverage
showing extension of coverage, if the coverage period shown on the current certificate of
coverage ends during the duration of the project.
6 The Contractor shall retain all required certificates of coverage for the duration of the project and
for one year thereafter.
7. The Contractor shall notify the governmental entity in writing by certified mail or personal
delivery, within 10 days after the Contractor knew or should have known, of any change that
materially affects the provision of coverage of any person providing services on the project.
8. The Contractor shall post on each project site a notice, in the text, form and manner prescribed by
the Texas Workers' Compensation Commission, informing all persons providing services on the
project that they are required to be covered, and stating how a person may verify coverage and
report lack of coverage.
9. The Contractor shall contractually require each person with whom it contracts to provide services
on the project, to:
(a) provide coverage, based on proper reporting of classification codes and payroll amounts
and filing of any coverage agreements, which meets the statutory requirements of Texas
Labor Code, Section 401.011(44) for all of its employees providing services on the
project, for the duration of the project;
(b) provide to the Contractor, prior to that person beginning work on the project, a certificate
of coverage showing that coverage is being provided for all employees of the person
providing services on the project, for the duration of the project;
(c) provide the Contractor, prior to the end of the coverage period, a new certificate of
coverage showing extension of coverage, if the coverage period shown on the current
certificate of coverage ends during the duration of the project;
(d) obtain from each other person with whom it contracts, and provide to the Contractor:
(1) a certificate of coverage, prior to the other person beginning work on the project;
and
(2) a new certificate of coverage showing extension of coverage, prior to the end of
the coverage period, if the coverage period shown on the current certificate of
coverage ends during the duration of the project;
(e) retain all required certificates of coverage on file for the duration of the project and for
one year thereafter;
(f) notify the governmental entity in writing by certified mail or personal delivery, within 10
days after the person knew or should have known, of any change that materially affects
the provision of coverage of any person providing services on the project; and
(g) contractually require each person with whom it contracts to perform as required by
paragraphs (a) - (g), with the certificates of coverage to be provided to the person for
whom they are providing services.
10. By signing this contract or providing or causing to be provided a certificate of coverage, the
Contractor is representing to the governmental entity that all employees of the Contractor who
will provide services on the project will be covered by worker's compensation coverage for the
duration of the project, that the coverage will be based on proper reporting of classification codes
and payroll amounts, and that all coverage agreements will be filed with the appropriate insurance
carrier or, in the case of a self -insured, with the commission's Division of Self -Insurance
Regulation. Providing false or misleading information may subject the Contractor to
administrative penalties, criminal penalties, civil penalties, or other civil actions.
11. The Contractor's failure to comply with any of these provisions is a breach of contract by the
Contractor which entitles the governmental entity to declare the contract void if the Contractor
does not remedy the breach within ten days after receipt of notice of breach from the
governmental entity.
10
FJ G
Proof of Coverage
Before work on this contract is commenced, each Contractor and subcontractor shall submit to the Owner
for approval five Certificates of Insurance covering each insurance policy carried and offered as evidence
of compliance with the above insurance requirements, signed by an authorized representative of the
insurance company setting forth:
(1) The name and address of the insured.
(2) The location of the operations to which the insurance applies.
(3) The name of the policy and type or types of insurance in force thereunder on the date borne by
such certificate.
(4) The expiration date of the policy and the limit or limits of liability thereunder on the date borne
by such certificate.
(5) A provision that the policy may be canceled only by mailing written notice to the named insured
at the address shown in the bid specifications.
(6) A provision that written notice shall be given to the City ten days prior to any change in or
cancellation of the policies shown on the certificate.
(7) The certificate or certificates shall be on the form (or identical copies thereof) contained in the job
specifications. No substitute of nor amendment thereto will be acceptable.
(8) If policy limits are paid, new policy must be secured for new coverage to complete project.
(9) A Contractor shall:
(a) provide coverage for its employees providing services on a project, for the duration of the
project based on proper reporting of classification codes and payroll amounts and filling
of any coverage agreements;
(b) provide a certificate of coverage showing workers' compensation coverage to the
governmental entity prior to beginning work on the project;
(c) provide the governmental entity, prior to the end of the coverage period, a new certificate
of coverage showing extension of coverage, if the coverage period shown on the
Contractor's current certificate of coverage ends during the duration of the project;
(d) obtain from each person providing services on a project, and provide to the governmental
entity:
(i) a certificate of coverage, prior to that person beginning work on the project, so
the governmental entity will have on file certificates of coverage showing
coverage for all persons providing services on the project; and
(ii) no later than seven days after receipt by the Contractor, a new certificate of
coverage showing extension of coverage, if the coverage period shown on the
current certificate of coverage ends during the duration of the project;
(e) retain all required certificates of coverage on file for the duration of the project and for
one year thereafter;
(f) notify the governmental entity in writing by certified mail or personal delivery, within 10
days after the Contractor knew or should have known, of any change that materially
affects the provision of coverage of any person providing services on the project;
(g) post a notice on each project site informing all persons providing services on the project
that they are required to be covered, and stating how a person may verify current
11
coverage and report failure to provide coverage. This notice does not satisfy other
posting requirements imposed by the Texas Worker's Compensation Act or other
commission rules. This notice must be printed with a title in at least 30 point bold type
and text in at least 19 point normal type, and shall be in both English and Spanish and
any other language common to the worker population. The text for the notices shall be
the following text provided by the commission on the sample notice, without any
additional words or changes:
REQUIRED WORKERS' COMPENSATION COVERAGE
"The law requires that each person working on this site or providing services related to
this construction project must be covered by workers' compensation insurance. This
includes persons providing, hauling, or delivering equipment or materials, or providing
labor or transportation or other service related to the project, regardless of the identity
of their employer or status as an employee."
"Call the Texas Workers' Compensation Commission at 8001372-7713 or 5121804-4000
(httpJ1www.twcc.state.br.us/twcccontacts.himl) to receive information of the legal
requirements for coverage, to verify whether your employer has provided the required
coverage, or to report an employer's failure to provide coverage; " and
(h) contractually require each person with whom it contracts to provide services on a project,
to:
(i) provide coverage based on proper reporting of classification codes and payroll
amounts and filing of any coverage agreements for all of its employees providing
services on the project, for the duration of the project;
(ii) provide a certificate of coverage to the Contractor prior to that person beginning
work on the project;
(iii) include in all contracts to provide services on the project the following language:
"By signing this contract or providing or causing to be
provided a certificate of coverage, the person signing this
contract is representing to the governmental entity that all
employees of the person signing this contract who will
provide services on the project will be covered by workers'
compensation coverage for the duration of the project, that
the coverage will be based on proper reprinting of
classification codes and payroll amounts, and that all
coverage agreements will be filed with the appropriate
insurance carrier or, in the case of a self -insured, with the
commission's Division of Self -Insurance Regulation.
Providing false or misleading information may subject the
Contractor to administrative penalties, criminal penalties,
civil penalties, or other civil actions.";
(iv) provide the Contractor, prior to the end of the coverage period, a new certificate
of coverage showing extension of coverage, if the coverage period shown on the
current certificate of coverage ends during the duration of the project;
(v) obtain from each other person with whom it contracts, and provide to the
Contractor:
(1) a certificate of coverage, prior to the other person beginning work on the
project; and
12
(2) prior to the end of the coverage period, a new certificate of coverage
showing extension of the coverage period, if the coverage period shown
on the current certificate of coverage ends during the duration of the
project;
3
(vi) retain all required certificates of coverage on file for the duration of the project
and for one year thereafter;
' (vii) notify the governmental entity in writing by certified mail or personal delivery,
within 10 days after the person knew or should have known, of any change that
materially affects the provision of coverage of any person providing services on
the project; and
(viii) contractually require each other person with whom it contracts, to perform as
G-71. required by paragraphs (i)-(viii), with the certificate of coverage to be provided
to the person for whom they are providing services.
29. DISABLED EMPLOYEES
Contractors having more than fifteen (15) employees agree to comply with the Americans with Disabilities Act of
1990, and agree not to discriminate against a qualified individual with a disability because of the disability of such
individual in regard to job application procedures, the hiring, advancement, or discharge of employees, employee
compensation, job training, and other terms, conditions, and privileges of employment.
30. PROTECTION AGAINST CLAIMS OF SUBCONTRACTORS LABORERS MATERIALMEN AND
FURNISHERS OF MACHINERY, EQUIPMENT AND SUPPLIES
Without limiting, in any way, manner or form, the indemnity provided by Contractor in paragraph 27 hereof, the
Contractor agrees that it will indemnify and save the Owner and all of its officers, agents and employees,
harmless .against any and all claims, liabilities, losses, damages, expenses and causes of action arising out of, in
any way, manner or form, the demands of subcontractors, laborers, workmen, mechanics, materialmen and
furnishers of machinery and parts thereof, equipment, power tools, and supplies, incurred in the performance of
this contract and the project which is the subject matter of this contract. When Owner so desires, the Contractor
shall famish satisfactory evidence that all obligations of the nature hereinabove designated have been paid,
discharged or waived.
31. PROTECTION AGAINST ROYALTIES OR PATENT INVENTION
The Contractor shall pay all royalties and license fees, and shall provide for the use of any design, device, material
or process covered by letters patent or copyright by suitable legal agreement with the Patentee or owner thereof.
Without limiting, in any way, manner or form, the indemnity provided by Contractor in paragraph 27 hereof, the
Contractor shall defend all suits or claims for infringement of any patent or copyrights and shall indemnify and
save the Owner, and all of its officers, agents and employees harmless from any loss on account thereof, except
that Owner shall defend all such suits and claims and shall be responsible for all such loss when a particular
design, device, material or process or the product of a particular manufacturer or manufacturers is specified or
required in these contract documents by Owner; provided, however, if choice of alternate design, device, material
or process is allowed to the Contractor, then Contractor shall indemnify and save Owner, and all of its officers,
agents and employees harmless from any loss on account thereof. Notwithstanding anything herein to the
contrary, if the material or process specified or required by Owner and/or this contract is an infringement, the
Contractor shall be responsible for such loss unless it gives written notice of such infringement to the Owner's
Representative prior to bidding.
13
32. LAWS AND ORDINANCES
The Contractor shall at all times observe and comply with all federal, state and local laws, ordinances and
regulations, which in any manner affect the contract or the work, and without limiting, in any way, manner or
form, the indemnity provided by Contractor in paragraph 27 hereof, Contractor shall indemnify and save harmless
the Owner, and all of its officers, agents, and employees against any claims arising from the violation of any such
laws, ordinances, and regulations, whether by the Contractor, its employees, or subcontractors. If the Contractor
observes that the plans and specifications are at variance therewith, he shall notify the Owner's Representative in
writing prior to bidding and any necessary changes shall be adjusted as provided in the contract for changes in the
work. In the absence of timely written notification to Owner's Representative of such variance or variances
within said time, any objection and/or assertion that the plans and specifications are at variance with any federal,
state or local laws, ordinances or regulations shall be deemed waived. If the Contractor, its employees or
subcontractors perform any work contrary to such laws, ordinances, rules and regulations, and without such notice
to the Owner's Representative, Contractor shall bear all costs arising therefrom.
The Owner is a municipal corporation of the State of Texas and the law from which it derives its powers, insofar
as the same regulates the objects for which, or the manner in which, or the conditions under which the Owner may
enter into contracts, shall be controlling, and shall be considered as part of this contract to the same effect as
though embodied herein.
33. SUBCONTRACTING
The Contractor agrees that it will retain personal control and will give its personal attention to the fulfillment of
this contract. The Contractor further agrees that subletting of any portion or feature of the work, or materials
required in the performance of this contract, shall not relieve the Contractor from its full obligations to the Owner,
as provided by the contract documents.
34. TIME FOR SUBSTANTIAL COMPLETION AND LIQUIDATED DAMAGES
It is hereby understood and mutually agreed by and between the Contractor and the Owner, that the date of
beginning and time for completion as specified in the contract documents, of work to be done hereunder are
essential conditions of this contract; and it is further mutually understood and agreed that the work embraced in
this contract shall be commenced as provided in the contract documents.
If the Contractor should neglect, fail, or refuse to substantially complete the work within the time herein specified,
then the Contractor does hereby agree as part of the consideration for the awarding of this contract, the Owner
may withhold permanently from Contractor's total compensation, the sum of $250.00 (TWO -HUNDRED
FIFTY PER DAY, not as a penalty, but as liquidated damages for the breach of the contract as herein set forth
for each and every working day that the Contractor shall be in default after the time stipulated for substantially
completing the work.
It is expressly understood and agreed, by and between Contractor and the Owner, that the time for the substantial
completion of the work described herein is reasonable time for the completion of the same, taking into
consideration the average climatic range and conditions and usual industrial conditions prevailing in this locality.
The amount is fixed and agreed upon by and between the Contractor and the Owner because the actual damages
the Owner would sustain in such event would be difficult and/or impossible to estimate, however, the amount
agreed upon herein is a reasonable forecast of the amount necessary to render just compensation to Owner, and is
expressly agreed to be not disproportionate to actual damages as measured at time of breach.
IT IS FURTHER AGREED AND UNDERSTOOD BETWEEN THE CONTRACTOR AND OWNER THAT
TIME IS OF THE ESSENCE OF THIS CONTRACT.
14
4S
04, 35. TIME AND ORDER OF COMPLETION
It is the meaning and intent of this contract, unless otherwise herein specifically provided, that the Contractor
shall be allowed to prosecute its work at such time and sessions, in such order of precedence, and in such manner
as shall be most conductive to economy of construction; provided, however, that the order and time of prosecution
shall be such that the work shall be substantially completed as a whole and in part, in accordance with this
contract, the plans and specifications, and within the time of completion designated in the bid; provided, also, that
when the Owner is having other work done, either by contract or by its own force, the Owner's Representative
may direct the time and manner of constructing work done under this contract so that conflicts will be avoided
and the construction of the various works being done for the Owner shall be harmonized.
The Contractor shall submit, at such times as may reasonably be requested by the Owner's Representative,
schedules which shall show the order in which the Contractor intends to carry on the work, with dates at which
the Contractor will start the several parts of the work and estimated dates of completion of the several parts.
36. TIME OF PERFORMANCE
We The Contractor agrees that it has submitted its bid in full recognition of the time required for the completion of
this project, taking into consideration the average climatic range and industrial conditions prevailing in this
locality, and has considered the liquidated damage provisions of paragraph 34 hereinabove set forth and expressly
t� agrees that it shall not be entitled to, nor will it request, an extension of time on this contract, except when its
work has been delayed by an act or neglect of the Owner, Owner's Representative, employees of the Owner or
other contractors employed by the Owner, or by changes ordered in the work, or by strike, walkouts, acts of God
14
or the public enemy, fire or flood. Any request for extension shall be in writing with the written request for same
setting forth all justifications, in detail, for the request, and submitted to Owner's Representative within twenty
(20) calendar days of the occurrence of the event causing said delay. A failure by Owner's Representative to
affirmatively grant the extension no later than twenty (20) calendar days of written submission by Contractor shall
be deemed a denial, and final. Further, in the absence of timely written notification of such delay and request for
extension, as provided herein, any request for extension by Contractor shall be deemed waived.
37. HINDRANCE AND DELAYS
In executing the contract, the Contractor agrees that in undertaking to complete the work within the time herein
fixed, Contractor has taken into consideration and made allowances for all hindrances and delays incident to such
work, whether growing out of delays due to unusual and unanticipated circumstances, difficulties or delays in
securing material or workmen, or any other cause or occurrence. No charge shall be made by the Contractor for
hindrance or delays from any cause during the progress of any part of the work embraced in this contract except
where the work is stopped by order of the Owner or Owner's Representative for the Owner's convenience, in
which event, such expense as in the sole judgment of the Owner's Representative that is caused by such stoppage
shall be paid by Owner to Contractor.
38. QUANTITIES AND MEASUREMENTS
No extra or customary measurements of any kind will be allowed, but the actual measured or computed length,
area, solid contents, number and weight only shall be considered, unless otherwise specifically provided. In the
event this contract is let on a unit price basis, then Owner and Contractor agree that this contract, including the
specifications, plans and other contract documents are intended to show clearly all work to be done and material
to be furnished hereunder. Where the estimated quantities are shown, and only when same are expressly stated to
be estimates, for the various classes of work to be done and material to be furnished under this contract, they are.
approximate and are to be used only as a basis for estimating the probable cost of the work and for comparing
their bids offered for the work. In the event the amount of work to be done and materials to be furnished are
expressly stated to be estimated, and only when same are expressly stated to be estimated, it is understood and
-» agreed that the actual amount of work to be done and the materials to be furnished under this contract may differ
15
somewhat from these estimates, and that where the basis for payment under this contract is the unit price method,
payment shall be for the actual amount of work done and materials furnished on the project.
39. PROTECTION OF ADJOINING PROPERTY
The Contractor shall take proper means to protect the adjacent or adjoining property or properties in any way
encountered, which may be injured or seriously affected by any process of construction to be undertaken under
this agreement, from any damage or injury by reason of said process of construction; and Contractor shall be
liable for any and all claims for such damage on account of his failure to fully protect all adjacent property.
Without limiting, in any way, manner and form, the indemnity provided by Contractor in paragraph 27 hereof, the
Contractor agrees to indemnify, save and hold harmless the Owner, and any of its officers, agents and employees,
against any and all claims or damages due to any injury to any adjacent or adjoining property, related to, arising
from or growing out of the performance of this contract.
40. PRICE FOR WORK
In consideration of the furnishing of all necessary labor, equipment and material and the completion of all work
by the Contractor, and on the delivery of all materials embraced in this contract in full conformity with the
specifications and stipulations herein contained, the Owner agrees to pay the Contractor the price set forth in the
bid proposal attached hereto, which has been made a part of this contract, and the Contractor hereby agrees to
receive such price in full for fin-nishing all materials and all labor required for the aforesaid work, also, for all
expenses incurred by Contractor and for well and truly performing the same and the whole thereof in the manner
and according to this agreement, the attached specifications, plans, contract documents and requirements of
Owner's Representative.
41. PAYMENTS
No payments made or certificates given shall be considered as conclusive evidence of the performance of the
contract, either wholly or in part, nor shall any certificate or payment be considered as acceptance of defective
work. Contractor shall at any time requested during the progress of the work furnish the Owner or Owner's
Representative with a verifying certificate showing the Contractor's total outstanding indebtedness in connection
with the work. Before final payment is made, Contractor shall satisfy Owner, by affidavit or otherwise, that there
are no outstanding liens against Owner's premises by reason of any work under the contract. Acceptance by
Contractor of final payment of the contract price shall constitute a waiver of all claims against Owner, Owner's
agents and employees, which have not theretofore been timely filed as provided in this contract.
42. PARTIAL PAYMENTS
On or before the tenth day of each month, the Contractor shall submit to Owner's Representative an application
for partial payment or, if the Contractor does not submit such application, the Owner's Representative shall
determine the amount to be partially paid. Owner's Representative shall review said application for partial
payment if submitted, and the progress of the work made by the Contractor and if found to be in order, shall
prepare a certificate for partial payment showing as completely as practical the total value of the work done by the
Contractor up to and including the last day of the preceding month. The determination of the partial payment by
the Owner's Representative shall be in accordance with Paragraph 14 hereof.
The Owner shall then pay the Contractor on or before the fifteenth day of the current month the total amount of
the Owner's Representative's Certificate of Partial Payment, less 5% of the amount thereof, which 5% shall be
retained until final payment, and further, less all previous payments and all further sums that may be retained by
Owner under the terms of the contract documents.
Any partial payment made hereunder shall not constitute a waiver by the Owner of any and all other rights to
enforce the express terms of the contract documents, and all remedies provided therein, as to any and all work
16
Elperformed, to be performed and/or materials delivered hereunder, including, but limited to, work to which said
partial payment is attributable.
43. SUBSTANTIAL COMPLETION
Contractor shall give Owner's Representative written notice of substantial completion. Within thirty-one (31)
working days after the Contractor has given the Owner's Representative written notice that the work has been
substantially completed, the Owner's Representative and/or the Owner shall inspect the work and within said time,
if the work be found to be substantially completed in accordance with the contract documents, the Owner's
Representative shall issue to the Owner and Contractor a certificate of substantial completion. Notwithstanding
f the issuance of a certificate of substantial completion, Contractor shall proceed with diligence to finally complete
the work within the time provided in this contract.
44. FINAL COMPLETION AND PAYMENT
The Contractor shall give written notice to Owner's Representative of final completion. Upon written notice of
final completion, the Owner's Representative shall proceed to make final measurement to determine whether final
completion has occurred. If the Owner's Representative determines final completion has occurred, Owner's
Representative shall so certify to the Owner. Upon certification by Owner's Representative of final completion,
Owner shall pay to the Contractor on or before the 31 st working day after the date of certification of final
completion, the balance due Contractor under the terms of this agreement. Neither the certification of final
completion nor the final payment, nor any provisions in the contract documents shall relieve the Contractor of the
obligation for fulfillment of any warranty which may be required in the contract documents and/or any warranty
or warranties implied by law or otherwise.
45. CORRECTION OF WORK
Contractor shall promptly remove from Owner's premises all materials condemned by the Owner's Representative
on account of failure to conform to the contract documents, whether actually incorporated in the work or not, and
Contractor shall at its own expense promptly replace such condemned materials with other materials conforming
to the requirements of the contract documents. Contractor shall also bear the expense of restoring all work of
other contractors damaged by any such removal or replacement. If Contractor does not remove and replace any
such condemned work within a reasonable time after a written notice by the Owner or the Owner's
Representative, Owner may remove and replace it at Contractor's expense.
Neither the final payment, nor certification of final completion or substantial completion, nor any provision in the
contract documents shall relieve the Contractor of responsibility for faulty materials or workmanship, and
Contractor shall remedy any defects due thereto and pay for any damage to other work resulting therefrom, which
shall appear within a period of one (1) year from the date of certification of final completion by Owner's
Representative.
19 46. PAYMENT WITHHELD
The Owner or Owner's Representative may, on account of subsequently discovered evidence, withhold or nullify
the whole or part of any certification to such extent as may be necessary to protect itself from loss on account of -
(a) Defective work not remedied and/or work not performed.
(b) Claims filed or reasonable evidence indicating possible filing of claims.
(c) Damage to another contractor.
When the above grounds are removed, or the Contractor provides a surety bond satisfactory to the Owner, in the
amount withheld, payment shall be made for amounts withheld because of them.
17
47. CLAIM OR DISPUTE
It is further agreed by both parties hereto that all questions of dispute or adjustment presented by the Contractor
shall be in writing and filed with the Owner's Representative within fifteen (15) calendar days after the Owner's
Representative has given any direction, order or instruction to which the Contractor desires to take exception.
Timely written notice of dispute as provided in this contract of any decision by Owner's Representative or Owner
shall be a condition precedent to the bringing and/or assertion of any action or claim by Contractor of any right
under this Contract. If the matters set forth in the notice of dispute are not granted or otherwise responded to by
Owner's Representative within fifteen (15) calendar days of receipt of notice of dispute by Owner's
Representative, said objections shall be deemed denied. Any decision by the Owner's Representative, or deemed
denial by the Owner's Representative, shall be final and conclusive in the absence of fraud. It is further agreed
that the acceptance by the Contractor of the final payment shall be a bar to any and all claims of the Contractor,
and constitute a waiver of the right to assert any claim against Owner, Owner's agents and employees and
Owner's Representative, by Contractor.
48. NON-COMPLIANCE AND/OR ABANDONMENT BY CONTRACTOR
In case the Contractor should (1) abandon and fail or refuse to resume work within fifteen (15) calendar days after
written notification from the Owner or the Owner's Representative, or (2) if the Contractor fails to comply with
the written orders of the Owner's Representative, when such orders are consistent with this contract, then the
Surety on the bond shall be notified in writing and directed to complete the work and a copy of said notice shall
be delivered to the Contractor. In the event a bond is not required by law, or otherwise obtained by the
Contractor, no further notice of such non-compliance to Contractor shall be required.
After receiving said notice of abandonment or non-compliance , the Contractor shall not remove from the work
any machinery, equipment, tools, materials or supplies then on the job, but the same, together with any materials
and equipment under the contract for work, may be held for use on the work by the Owner or the Surety of the
Contractor, or another contractor, in completion of the work, and the Contractor shall not receive any rental or
credit therefore (except when used in connection with Extra Work, where credit shall be allowed as provided for
under paragraph 24 of this contract); it being understood that the use of such equipment and materials will
ultimately reduce the cost to complete the work and be reflected in the final settlement.
In the event the Contractor, or Surety, whichever is applicable, should fail to commence compliance with the
notice hereinbefore provided within ten (10) calendar days after service of such notice, and/or shall fail to proceed
with diligence to complete the project as contemplated and in compliance with all terms and provisions of the
contract documents, then the Owner may exercise any and all remedies available to it pursuant to law, contract,
equity or otherwise, including, but not limited to, providing for completion of the work in either of the following
elective manners:
(a) The Owner may employ such force of men and use of machinery, equipment, tools, materials and
supplies as said Owner may deem necessary to complete the work and charge the expense of such labor,
machinery, equipment, tools, materials and supplies to said Contractor, and the expense so charged shall
be deducted and paid by the Owner out of such moneys as may be due, or that may thereafter at any time
become due to the Contractor under and by virtue of this Agreement. In case such expense is less than
the sum which would have been payable under this contract, if the same had been completed by the
Contractor, then said Contractor shall receive the difference. In case such expense is greater than the sum
which would have been payable under this contract, if the same had been completed by said Contractor,
then the Contractor and/or its Surety shall pay the amount of such excess to the Owner; or
(b) The Owner, under sealed bids, after notice published as required by law, at least twice in a newspaper
having a general circulation in the County of location of the work, may let the contract for the completion
of the work under substantially the same terms and conditions which are provided in this contract. In case
of any increase in cost to the Owner under the new contract as compared to what would have been the
18
cost under this contract, such increase shall be charged to the Contractor and the Surety shall be and
remain bound therefore. Should the cost to complete any such new contract prove to be less than that
which would have been the cost to complete the work under this contract, the Contractor or his Surety
shall be credited therewith.
In the event the Owner's Representative elects to complete the work, as described above, when the work shall
have been finally completed, the Contractor and his Surety shall be so notified and certification of completion as
provided in paragraph 44 hereinabove set forth, shall be issued. A complete itemized statement of the contract
accounts, certified to by Owner's Representative as being correct shall then be prepared and delivered to
Contractor and his Surety, if applicable, whereon the Contractor or his Surety, or the Owner as the case may be,
shall pay the balance due as reflected by said statement within 30 days after the date of certification of
completion.
In the event the statement of accounts shows that the cost to complete the work is less than that which would have
been the cost to the Owner had the work been completed by the Contractor under the terms of this contract, or
when the Contractor and/or his Surety, if applicable, shall pay the balance shown to be due by them to the Owner,
then all machinery, equipment, tools, materials or supplies left on the site of the work shall be turned over to the
Contractor and/or his Surety, if applicable. Should the cost to complete the work exceed the contract price, and
the Contractor and/or his Surety, if applicable, fail to pay the amount due the Owner within the time designated
hereinabove, and there remains any machinery, equipment, tools, materials or supplies on the site of the work,
notice thereof, together with an itemized list of such equipment and materials shall be mailed to the Contractor
and his Surety, if applicable, at the respective addresses designated in this contract; provided, however, that actual
written notice given in any manner will satisfy this condition. After mailing, or other giving of such notice, such
property shall be held at the risk of the Contractor and his Surety, if applicable, subject only to the duty of the
Owner to exercise ordinary care to protect such property. After fifteen (15) calendar days from the date of said
notice the Owner may sell such machinery, equipment, tools, materials or supplies and apply the net sum derived
from such sale to the credit of the Contractor and his Surety, if applicable. Such sale may be made at either public
or private sale, with or without notice, as the Owner may elect. The Owner shall release any machinery,
equipment, tools, materials, or supplies that remain on the jobsite and belong to persons other than the Contractor
or his Surety, if applicable, to their proper owners.
The remedies provided to Owner by law, equity, contract, or otherwise, shall be cumulative, to the extent
permitted by law. It is expressly agreed and understood that the exercise by Owner of the remedies provided in
this paragraph shall not constitute an election of remedies on the part of Owner, and Owner, irrespective of its
exercise of remedies hereunder, shall be entitled to exercise concurrently or otherwise, any and all other remedies
available to it, by law, equity, contract or otherwise, including but not limited to, liquidated damages, as provided
in paragraph 34, hereinabove set forth.
49. LIMITATION ON CONTRACTOR'S REMEDY
The remedies of Contractor hereunder shall be limited to, and Owner shall be liable only for, work actually
j performed by Contractor and/or its subcontractors as set forth in the contract documents, and Owner shall not be
liable for any consequential, punitive or indirect loss or damage that Contractor may suffer in connection with the
project which is the subject matter of this contract.
50. BONDS
The Contractor is required to furnish a performance bond in accordance with Chapter 2253, Government Code, in
the amount of 100% of the total contract price in the event that said contract price exceeds $100,000 and the
Contractor is required to furnish a payment bond in accordance with Chapter 2253, Government Code, in the
amount of 100% of the total contract price in the event that said contract price exceeds $25,000. All bonds shall
be submitted on forms supplied by the Owner, and executed by an approved Surety Company authorized to do
19
business in the State of Texas. It is further agreed that this contract shall not be in effect until such bonds are so
furnished.
51. SPECIAL CONDITIONS
In the event special conditions are contained herein as part of the contract documents and said special conditions
conflict with any of the general conditions contained in this contract, then in such event the special conditions
shall control.
52. LOSS OR EXPENSE DUE TO UNUSUAL OR UNANTICIPATED CIRCUMSTANCES
Unless otherwise specified herein, all loss, expense or damage to the Contractor arising out of the nature of the
work to be done, or from the action of the elements, or from any unforeseen circumstance or from unusual
obstructions or difficulties, naturally occurring, man made or otherwise, which may be encountered in the
prosecution of the work, shall be sustained and borne by the Contractor at his own cost and expense.
53. INDEPENDENT CONTRACTOR
Contractor is, and shall remain, an independent contractor with full, complete and exclusive power and authority
to direct, supervise, and control its own employees and to determine the method of the performance of the work
covered hereby. The fact that the Owner or Owner's Representative shall have the right to observe Contractor's
work during Contractor's performance and to carry out the other prerogatives which are expressly reserved to and
vested in the Owner or Owner's Representative hereunder, is not intended to and shall not at any time change or
effect the status of the Contractor as an independent contractor with respect to either the Owner or Owner's
Representative or to the Contractor's own employees or to any other person, firm, or corporation.
54. CLEANING UP
The Contractor shall at all times keep the premises free from accumulation of debris caused by the work, and at
the completion of the work Contractor shall remove all such debris and also its tools, scaffolding, and surplus
materials and shall leave the work room clean or its equivalent. The work shall be left in good order and
condition. In case of dispute Owner may remove the debris and charge the cost to the Contractor.
55. HAZARDOUS SUBSTANCES AND ASBESTOS
Hazardous Substances (herein so called), as defined in the Comprehensive Environmental Response,
Compensation, and Liability Act (42 U.S.C.S. §9601(14)) and the regulations promulgated thereunder, as same
may be amended from time to time, hydrocarbons or other petroleum products or byproducts and/or asbestos, in
any form, shall not (i) be utilized, in any way, manner or form, in the construction of, or incorporation into, the
Project; or (ii) be brought upon, placed, or located, by any party, on the Project site, or any other property of the
City, without the written consent of the Owner's Representative. If Contractor believes that the utilization of a
Hazardous Substance, hydrocarbons or other petroleum products or byproducts and/or asbestos is necessary in the
construction of the Project, or that it is necessary to place and/or otherwise locate upon the site of the Project or
other property of the City, a Hazardous Substance, hydrocarbons or other petroleum products or byproducts
and/or asbestos, Contractor shall notify the Owner's Representative, and request consent therefrom, at least
twenty (20) days prior to such action. Owner's Representative may grant or deny the request of Contractor and
provide whatever requirements such consent, if granted, is conditioned upon, in its sole and absolute discretion. If
the request of Contractor is not granted, or otherwise not responded to, by Owner's Representative within five (5)
days of the receipt of said request, said request shall be deemed to be denied.
In the event Owner's Representative shall consent to the request of Contractor, Contractor shall be responsible for
ensuring that all personnel involved in the Project are (i) trained for the level of expertise required for proper
performance of the actions contemplated by this Contract and, in particular, in all aspects of handling, storage,
20
`r
disposal and exposure of Hazardous Substances, hydrocarbons or other petroleum products or byproducts and/or
asbestos; and (ii) are provided and utilize all protective equipment, including without limitation, personal
protective gear, necessary to provide protection from exposure to Hazardous Substances, hydrocarbons or other
petroleum products or byproducts and/or asbestos.
}
21
CURRENT WAGE DETERMINATIONS
:d
RE: RESOLUTION NO. 2002-110483, NOVEMBER 14, 2002
Craft
Acoustical Ceiling Installer
Air Conditioner Installer
Air Conditioner Installer -Helper
Asbestos Worker
Asbestos Supervisor
Bricklayer
Bricklayer -Helper
Carpenter
Carpenter -Helper
Cement Finisher
Drywall Hanger
Electrician
Electrician -Helper
Equipment Operator -Heavy
Equipment Operator -Light
Fire Sprinkler Fitter -Journey
Fire Sprinkler Fitter -Apprentice
Floor Installer
Glazier
Insulator-Piping/Boiler
Insulator -Helper
Iron Worker
Laborer -General
Mortar Mixer
Painter
Plumber
Plumber -Helper
Roofer
Roofer -Helper
Sheet Metal Worker
Sheet Metal Worker -Helper
Welder -Certified
EXHIBIT A
City of Lubbock
Building Construction Trades
Prevailing Rates
Hourly Rate
11.50
12.00
7.50
9.00
12.50
12.50
7.00
11.00
7.00
9.00
11.00
15.00
8.00
10.00
9.00
18.00
10.00
9.50
10.50
10.50
7.00
11.00
6.00
6.00
9.50
12.50
7.00
9.00
7.00
10.00
7.00
11.00
1
EXHIBIT C
Prevailing Wage Rates
Overtime Rate
The rate for overtime (in excess of forty hours per week) shall be as required by the Fair Labor Standards Act.
EXHIBIT D
Prevailing Wage Rates
Legal Holiday Rate
The rate for legal holidays shall be as required by the Fair Labor Standards Act.
E
I
FA
L
No Text
LUBBOCK MUNICIPAL BUILDING PARKING STRUCTURE REPAIR
STRUCTURE REPAIRS:
Repair the Parking Structure as indicated on sheets S 1 and S2, including the drilling of the piers.
STRUCTURE DEMOLITION:
The intent of Option 2 is to remove the entire parking structure and related components. Once the
04 structure is removed. The existing building and infrastructure must be repaired to an acceptable level
matching existing structure. Option 2 includes, but not limited to:
1. Columns designated as follows going from north to south and west to east: IA (north-west), 1B
(north-east), 2A&B, 3A&B, 4A&B, 5A. The wing walls are designated as northwest, northeast
and southeast.
2. The following columns and wing wall shall be removed: 1B, 2B, 3B, 4B, and northeast wing
wall. Remove base of columns and wing walls enough below existing grade to allow for the
' proper patching of standard 3000 PSI concrete. Finish to match existing concrete surfaces near
work area.
3. Remove column IA. Patch wall flush with existing and marble-crete shall match existing.
Llr
7 4. Columns 2A, 3A, 4A and 5A shall be cut off at a level to allow for the proper patching,
infill, etc. to match existing wall height. Patch marble-crete as required if damage
occurs to these columns.
5. Southeast wing wall shall be removed back to the same plan as the east -west wall. Remove base
of wing wall enough below existing grade to allow for the proper patching of standard 3000 PSI
concrete. Finish to match existing. Patch wall, where wing wall existed with marble-crete,
matching other wall sections.
6. Northwest wing wall shall remain. Repair marble-crete/plaster in areas where supporting steel
F� members are removed to match existing areas with reclaimed marble-crete aggregate. Maintain
same plan at upper and lower levels to provide uniform appearance. Install to cap, channel
p pP P Pp p P
trim and facia as required to obtain uniform appearance.
7. Remove existing light fixtures under canopy. Owner has option to keep as many as needed.
Others to be contractor's responsibility. Disconnect electrical power back to nearest, interior
junction box. Notify Owner prior to disconnecting power to lamps.
8. All finishes shall match existing. Reclaim as much marble-crete material as require to get
patched area to match existing condition. Provide small (2'x2') sample for proposed marble-
`° crete to Owner for acceptance, prior to permanent installation.
9. Remove flashing along upper level at roof level. Patch plaster/marble-crete as required to
provide uniform condition that matches existing.
10. Relocate flag light to new Iocation on existing main building. Fixture shall be located to allow
for proper illumination of flagpoles.
11. All channel trim and facia cap, as required, shall match existing.