Loading...
HomeMy WebLinkAboutResolution - 2006-R0504 - Agreement- TIBH Industries Inc & Marian Moss Enterprises- Landscape Maintenance - 10_13_2006Resolution No. 2006-RO504 October 13, 2006 RESOLUTION Item No. 5.36 IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock BE and is hereby authorized and directed to execute for and on behalf of the City of Lubbock an Agreement for landscape maintenance in the North Overton Development and any associated documents by and between the City of Lubbock and TIBH Industries, Inc., and Marian Moss Enterprises of Lubbock, Texas and a copy of which Agreement is attached hereto and which shall be spread upon the minutes of this Council and as spread upon the minutes of this Council shall constitute and be a part hereof as if fully copied herein in detail. Passed by the City Council this 13tb day of October , 2006. ATTEST: Re cca Garza, City Secretary APPROVED AS TO CONTENT: U&& Victor Kilnkan Director of Purchasing & Contract Management APPROVED AS TO FORM: Dev.res i My F.'Vtojl.-� September 20, 2006 Re: North Overton Development Dear Marta, Attached is the proposal contract for the North Overton Development. Please have the appropriate staff review the contract and comment. Once approval has been given, I will finish by securing Marian Moss signatures and my own then deliver the contract to you. Please note that the prices are based on the current plans we were asked to look at. The number of square feet, number of trees, number of irrigation zones and number of curbside receptacles are based on the plans that are currently involved. As new areas are opened for services, we can amend this contract to add whatever is need to accommodate the City's needs. Also, please note that no seasonal color areas were priced In this contract. According to the plans we were given, there are not such areas currently to be done. We have given a price per square foot so that it can be locked into the contract. When these areas open up all that will need to be done is amend the contract to add the square footage. Marian Moss Enterprises and TIBH Industries, Inc. appreciates this opportunity and the continued support that is being given to the disabled of the City of Lubbock. Cordially, Larry Sargee TIBH Industries, Inc. Field Training Coordinator Senior Marketing Representative Region #1 Cc: Marian Moss Enterprises p %WorksWonders A State rnftiatf+ve Creetino Jobe for Twwns wfth OlsabUN s Contract Number: 7286 Resolution No. 2006-RO504 CONTRACT FOR STATE USE PROGRAM THIS AGREEMENT IS MADE by and between City of Lubbock, hereinafter called CITY OF LUBBOCK, T113H Industries, Inc., hereinafter called TIBH, and Marian Moss Enterprises, hereinafter called PROVIDER. WITNESETH WHEREAS, Chapter 122 of the Texas Human Resources Code authorizes CITY OF LUBBOCK to purchase services and products from blind and severely disabled persons and establishes procedures for such purchase, said statute, authority and procedures hereinafter referred to as the State Use Program; and, WHEREAS, The Texas Committee on Purchases of Products and Services of Blind and Severely Disabled Persons has lawfully promulgated rules for the State Use Program at Title 40 of the Texas Administrative Code, Chapter 189; and, WHEREAS, pursuant to the rules, CITY OF LUBBOCK has determined to set aside a service or product generally described as North Overton Maintenance to be once and for all dedicated to the State Use Program and said service or product to be furnished by PROVIDER; however, said service or product can be removed from State Use in accordance with said rules and as further provided in Article 17 of this agreement; and, NOW, THEREFORE, in consideration of the mutual covenants and agreements herein contained, CITY OF LUBBOCK, TIBH, and PROVIDER mutually agree as follows AGREEMENT Article 1. Contract Period This contract shall become effective on October 13, 2006 and terminate on October 14, 2009, unless termination occurs as otherwise provided in this agreement. This contract can be renewed for two additional one-year terms with mutual agreement from both parties under the same terms and conditions. Article 2. Scope Of Work PROVIDER shall undertake, perform, and complete all work authorized in Attachment A, Scope of Work, at the locations and costs described in Attachment B, Item Quantity Sheet. Article 3. Compensation The amount payable under this agreement shall be according to the attached payment schedule, except as authorized in Article 9, Changes in Work. PROVIDER shall submit periodic requests for reimbursement using forms acceptable to CITY OF LUBBOCK. Such requests shall be made for work performed or products furnished by PROVIDER. Compensation shall be made in accordance with the rates established in Attachment B, Item Quantity Sheet. PROVIDER hereby assigns all payments due it by CITY OF LUBBOCK to TIBH. CITY OF LUBBOCK shall make payment directly to TIBH on behalf of PROVIDER and no liability shall attach to CITY OF North Overton Maintenance -City of Lubbock Page 1 of 28 Contract Number: 7286 LUBBOCK by PROVIDER's assignment to TIBH. TIBH shall deduct a 6% fee and shall compensate PROVIDER the remaining 94%. Article 4. Insurance Before beginning work, PROVIDER shall obtain appropriate insurance coverage and furnish documentation of such coverage to CITY OF LUBBOCK. Appropriate coverage is listed and marked below. Do not sign this agreement unless the appropriate box is marked. [ ] PROVIDER is a state agency. PROVIDER, being a State Agency, acknowledges that it is not an agent, servant or employee of the City of Lubbock, and it is responsible for its own acts and deeds and for those of its agents or employees during the term of this contract. [X] PROVIDER is not a state agency. 1. PROVIDER must provide CITY OF LUBBOCK with evidence of insurance coverage as follows: Worker's Compensation - The Contractor shall elect to obtain worker's compensation coverage pursuant to Section 406.002 of the Texas Labor Code. Further, Contractor shall maintain said coverage throughout the term of the Contract and shall comply with all provisions of Title 5 of the Texas Labor Code to ensure that the Contractor maintains said coverage. Any termination of worker's compensation insurance coverage by contractor or any cancellation or non -renewal of worker's compensation insurance coverage for the Contractor shall be a material breach of this Contract." The contractor may maintain Occupational Medical and Disability Insurance in lieu of Workers' Compensation. In either event, the policy must be endorsed to include a wavier of subrogation in favor of the CITY OF LUBBOCK. The Contractor shall also provide the CITY OF LUBBOCK proof of Employers' Liability in an amount no less than $500,000 will be included with the certificate. If at any time during the life of the contract or any extension, the contractor fails to maintain the required insurance in full force and effect; all work under the contract shall be discontinued immediately. Any failure to maintain the required insurance may be sufficient cause for the City to terminate the contract. 2. Commercial General Liability Policy including premises/operations, products/completed operations. The Commercial General Liability Policy requires a $500,000 combined single limit for injury or death of any person(s) and property damage, arising out of one occurrence. With an endorsement for heavy equipment coverage. The CITY OF LUBBOCK shall be named a primary additional insured. The certificate of Insurance must reflect wording which states that the policy shall be primary and non-contributory with respect to any insurance carried by the contractor. 3. Automobile liability with a limit of $300,000 combined single limit for bodily injury and property damage arising out of any one occurrence. The cost of such insurance shall be a direct cost of operation by the Provider. Such policies shall contain a covenant of the North Overton Maintenance -City of Lubbock Page 2 of 28 Contract Number: 7286 insurance company requiring thirty (30) days written notice first to be given to CITY OF LUBBOCK before cancellation, reduction, or modification. The CITY OF LUBBOCK shall be named a primary additional insured. 4. If a subcontractor is employed, the subcontractor shall provide a written certification to the Provider that the subcontractor is providing insurance coverage equal to the limits described above and the Provider shall provide CITY OF LUBBOCK written certification to this effect. The certificate of Insurance shall name the City of Lubbock as a primary additional insured and such certificate shall reflect wording which states the policy shall be primary and non-contributing with respect to any insurance or self-insurance of the City of Lubbock. However, when the Provider and subcontractor agree in writing for the Provider to provide workers' compensation insurance coverage for all employees of the Provider and subcontractor employed on the project, the Provider shall provide a copy of said agreement to the Provider's workers' compensation insurance carrier within 10 days of execution, and provide a written certification of said agreement to CITY OF LUBBOCK. 5. Certificates of Insurance along with a copy of the additional insured endorsement shall be provided to the CITY OF LUBBOCK prior to beginning any work. CITY OF LUBBOCK shall be named as an Primary Additional Insured on Automobile and General Liability and a Waiver of Subrogation in favor of CITY OF LUBBOCK shall be provided on all policies. 4. If a subcontractor is employed, the subcontractor shall provide a written certification to PROVIDER that the subcontractor is providing workers' compensation insurance coverage for all employees of the subcontractor employed on the project, and PROVIDER shall provide CITY OF LUBBOCK written certification to this effect. However, when PROVIDER and subcontractor agree in writing for PROVIDER to provide workers compensation insurance coverage for all employees of PROVIDER and subcontractor employed on the project, PROVIDER shall provide a copy of said agreement to PROVIDER's workers compensation insurance carrier within 10 days of execution, and provide a written certification of said agreement to CITY OF LUBBOCK. Article 5. Records PROVIDER and TIBH agree to maintain all books, documents, papers, drawings, accounting records, and evidence pertaining to costs incurred and work performed hereunder, hereinafter called the records, and shall make such records available at its office during the contract period and for three years from the date of final payment under this contract. PROVIDER and T113H shall allow access to the records by duly authorized representatives of CITY OF LUBBOCK for the purpose of making audits, examinations, excerpts, and transcriptions. Article 6. Indemnification PROVIDER and TIBH each shall save harmless CITY OF LUBBOCK from all claims and liability due to the acts or omissions of PROVIDER or TIBH, their agents or employees to the extent North Overton Maintenance -City of Lubbock Page 3 of 28 Contract Number: 7286 provided by law. Article 7. Disputes If a dispute arises about the services authorized under this agreement, PROVIDER shall immediately notify CITY OF LUBBOCK and TIBH. Every effort shall be made to resolve the dispute. If, however, the dispute cannot be settled in an amount of time deemed reasonable by CITY OF LUBBOCK, CITY OF LUBBOCK shall terminate this agreement in accordance with Article 13, Termination. TIBH shall coordinate with CITY OF LUBBOCK to furnish another Provider under THE STATE Use Program, and a new agreement shall be entered into for the services or products set aside under the terms of this agreement. If another Provider cannot be found to provide the services or products, TIBH shall notify CITY OF LUBBOCK in writing no later than thirty days from the date of termination of this agreement. Upon receiving such notice, CITY OF LUBBOCK shall at is own option complete the work with its own forces or enter into a contract using appropriate procedures other than the State Use Program, except that PROVIDER and T113H shall not thereby be absolved of legal responsibility for such work. Article 8. Remedies Violation or breach of the terms of this agreement by PROVIDER or TIBH shall be grounds for termination of the contract. This agreement shall not be considered as specifying the exclusive remedy for any default, but all remedies existing at law and in equity may be availed by either party and shall be cumulative. Article 9. Changes in Work If at any time during the course of this agreement it becomes necessary for PROVIDER to perform services or provide a product not identified in the original Attachment A, Scope of Work, PROVIDER shall notify CITY OF LUBBOCK and request authorization to proceed. CITY OF LUBBOCK shall notify PROVIDER in writing if the additional work is deemed necessary and shall authorize PROVIDER to proceed with the increased work. if at any time during the course of this agreement it becomes necessary for CITY OF LUBBOCK to cancel or otherwise make changes in the services or products authorized in Attachment A, Scope of Work, CITY OF LUBBOCK shall so notify PROVIDER in writing and PROVIDER shall cancel or otherwise change the work as instructed by CITY OF LUBBOCK. PROVIDER shall not request compensation for any work so canceled. If the maximum amount payable established in Article 3, Compensation, is exceeded as a result of the additional or changed work, CITY OF LUBBOCK shall provide additional compensation at the rates specified in Attachment B, Item Quantity Sheet. If rates have not been specified for the additional work tasks, CITY OF LUBBOCK, PROVIDER, and T113H shall mutually agree to the rates, provided, however, that rates are reasonable and consistent with rates normally charged for the work. Any additional compensation must be authorized in writing and approved by all parties in accordance with Article 10, Supplemental Agreements. This agreement may be amended to reflect additions to work performed with the appropriate amount of North Overton Maintenance -City of Lubbock Page 4 of 28 Contract Number: 7286 compensation being added to Attachment B "Item Quantity Sheet". Article 10. Supplemental Agreements If PROVIDER finds that any work requested under this agreement will change the scope, character, complexity, or nature of the work, the time period, the method of payment, or the maximum cost hereunder, a written amendment must be executed within the time period established in Article 1, Contract period. Any such amendment shall be deemed to be a supplemental agreement to this document. If CITY OF LUBBOCK finds it necessary to require changes in completed work because of errors made by PROVIDER, CITY OF LUBBOCK shall require PROVIDER to correct the work at no cost to CITY OF LUBBOCK and without amendment to the agreement If the changes are made at the request of CITY OF LUBBOCK and are not because of errors of PROVIDER, CITY OF LUBBOCK shall compensate PROVIDER as authorized in Article 4, Changes in Work. Article 11. Inspection of Work CITY OF LUBBOCK shall have the right at all reasonable times to inspect or otherwise evaluate the work performed or being performed hereunder and the premises in which it is being performed. If any inspection or evaluation is made on the premises of PROVIDER, PROVIDER shall provide all reasonable facilities and assistance for the safety and convenience of the inspectors in the performance of their duties. All inspections and evaluations shall be performed in such a manner as will not unduly delay the work. Article 12. Reporting PROVIDER or TIBH shall promptly advise CITY OF LUBBOCK in writing of events which have a significant impact upon the work performed under this agreement, including: 1. Problems, delays, or adverse conditions which will materially affect the ability to attain program objectives, prevent the meeting of time schedules and goals, or preclude the attainment of project work units by established time periods. This disclosure shall be accomplished by a statement of the action taken, or contemplated, and any CITY OF LUBBOCK assistance needed to resolve the situation. 2. Favorable developments or events that enable meeting time schedules and goals sooner than anticipated or producing more work units than originally projected. Article 13. Public Safety and Convenience The safety of the public and the convenience of traffic are of prime importance under this agreement. Unless otherwise provided, PROVIDER's performance of this agreement shall not interfere with city activities or traffic on the roadways. Article 14. Protection of Property PROVIDER shall take proper precautions to protect all adjacent property that might be damaged or injured by any process of work. In case of any such injury or damage resulting from PROVIDER's acts or omissions, PROVIDER shall restore at its own expense the damaged property to a condition, similar or equal to that existing before such injury or damage was done, or it shall otherwise remedy such injury or damage in a manner acceptable to CITY OF LUBBOCK, TIBH, and the property holder or owner involved. If CITY OF LUBBOCK must intervene and repair any damage not repaired by PROVIDER, all such repairs shall be made at PROVIDER's expense. CITY OF LUBBOCK shall deduct the costs associated with North Overton Maintenance -City of Lubbock Page 5 of 28 Contract Number: 7286 the repair from the amount due and payable to PROVIDER, or PROVIDER shall otherwise compensate CITY OF LUBBOCK for the cost of repair. Article 15. Subcontracts PROVIDER shall not sublet or transfer any portion of the work authorized in this contract unless specifically authorized to do so in writing by CITY OF LUBBOCK. Subcontractors shall comply with the provisions of this contract, and subcontracts in excess of $25,000 shall include the required provisions of this contract. No subcontract shall relieve PROVIDER of his or her responsibility under this contract. Article 16. Gratuities Employees of CITY OF LUBBOCK shall not accept any benefits, gifts, or favors from any person doing business with or who reasonably speaking may do business with the State under this agreement. Any person doing business with or who reasonably speaking may do business with CITY OF LUBBOCK under this agreement may not make any offer of benefits, gifts, or favors to CITY OF LUBBOCK's employees except as mentioned here above. Failure on the part of PROVIDER to adhere to this policy may result in termination of this contract. Article 17. Termination This agreement may be terminated before the completion date established in Article 1, Contract Period, by any of the following: A. Termination of either party requires a ninety (90) day written notice prior to any cancellation. Such written notice must state the reason for cancellation. B. By CITY OF LUBBOCK, giving notice in writing to PROVIDER and to TIBH, as consequence of failure by PROVIDER or TIBH to perform the services herein set forth in a satisfactory manner and within the limits provided, with proper allowances being made for circumstances beyond the control of PROVIDER and TIBH. C. By either party upon the failure of the other party to fulfill its obligations as set forth in the Scope of Work attached hereto and labeled Attachment A, giving written notice one to the other establishing the effective date of termination. D. By satisfactory completion of all services and obligations described herein. Should CITY OF LUBBOCK terminate this agreement as herein provided, no costs other than costs due and payable at the time of termination shall thereafter be paid to PROVIDER or TIBH. In determining the value of the work performed by PROVIDER prior to termination, CITY OF LUBBOCK shall consult with TIBH but CITY OF LUBBOCK shall be the sole judge. Payment for work at termination shall be based on work completed at that time. If PROVIDER defaults in performance of this agreement or if CITY OF LUBBOCK terminates the agreement for fault on the part of PROVIDER or TIBH, CITY OF LUBBOCK shall give consideration to the actual services or products provided up to the date of default. Article 18. Compliance with Laws PROVIDER and T113H shall comply with all federal, state and local laws, statutes, ordinances, rules and regulations, and the orders and decrees of any courts or administrative bodies or tribunals in any matter affecting the performance of this contract, including, without limitation, workers' compensation laws, minimum and maximum salary wage statutes and regulations, and licensing laws and regulations. When North Overton Maintenance -City of Lubbock Page 6 of 28 Contract Number: 7286 required, PROVIDER and TIBH shall famish CITY OF LUBBOCK with satisfactory proof of compliance. Article 19. Successors and Assigns CITY OF LUBBOCK, TIBH, and PROVIDER each binds itself, its successors, executors, assigns, and administrators to the other parties to this agreement and to the successors, executors, assigns, and administrators of such other party in respect to all covenants of this agreement. PROVIDER has assigned all payments due by CITY OF LUBBOCK under this agreement to TIBH. Payments should be sent to the following address according to Articles 3 & 19. TIBH industries, Inc. 300 Highland Mall Blvd., Suite 302 Austin, Texas 78752 The Payee Identification Number is: 17522473119001 North Overton Maintenance -City of Lubbock Page 7 of 28 Contract Number: 7286 Article 20. Signatory Warranty The undersigned signatories each hereby represents and warrants that each is an officer of the organization which he or she has executed this contract and that each has full and complete authority to enter into this agreement on behalf of the agency. IN WITNESS WHEREOF, the parties hereto have executed triplicate counterparts to effectuate their agreement, but this agreement shall not be valid until signed by a duly authorized representative of each ply. City of Lubb �. 410-40 ` David A. Miller City Mayor Attest: Becky Garza City Secretary Ap r to C t n Rob Allison Assistant City Manager Development Services Approved as to Form tUsi—st-anntt City Attorney Marian Moss Ente ns s Mike McDaniel, Executive Director Attest: a c Ann Miller Corporate Secretary Appr ved for State se Program Larry Sargee, Sr. Marketing Representative TIBH Industries, Inc. North Overton Maintenance -City of Lubbock Page 8 of 28 Contract Number: 7286 CITY OF LUBBOCK SPECIFICATIONS FOR THE NORTH OVERTON LANDSCAPE MAINTENANCE I. GENERAL PROVISIONS 1.0 DEFINITIONS 1.1 Agent - An employee of the City of Lubbock, who is appointed by the City to monitor the work and actions of the contractor. 1.2 City - The City of Lubbock, Texas, municipal corporation in Lubbock County, Texas. 1.3 City Council - City Council of the City of Lubbock, Texas. 1.4 Contract - The contract consists of the following: Notice to bidders; General Provisions; Specifications; Plans; Addenda; Bid; Agreement; Performance Bond; Insurance; Encumbrance; Notice to Proceed; and Change Orders. These form the agreement whereby the Contractor shall furnish all labor, equipment, tools, materials, and perform all work necessary to satisfactorily accomplish the proposed plan, sponsored by the City. 1.5 Contract Time - The number of allowable days to complete the contract. 1.6 Contractor - The individual, firm, partnership, joint venture, or corporation contracting with the City to perform work. 1.7 Cycle - The complete service of all sites in a Group one time. 1.8 Excluded Damage — Damage caused by vandalism, pedestrians, vehicles, animals (except insects and/or rodents), or other unusual factors. It does not include damage caused by the Contractor's actions, lack of reasonable care, pest damage (such as insects), diseases or plant loss due to lack of water caused by an irrigation system programming error, irrigation system breakage or irrigation malfunction. 1.9 Existing Conditions, Examination of Site — Within fifteen (15) days from the date of Award of Contract, the contractor shall make a thorough examination of the current conditions at the site. As part of the examination, the contractor shall create an inventory list of the name and quantity of each plant in each planter and confirm the existing quantities in each planter meet or exceed those shown on any previous plant inventories. The contractor shall make a list of all landscape items at the site that he/she believes are broken, missing, not healthy or otherwise not in compliance with these specifications. A copy of this list, along with an additional itemized quote for correcting each item, shall be given to the Agent. Upon confirmation of each item, the Agent will either give the contractor written authorization to make the correction or a written release from responsibility for the item. North Overton Maintenance -City of Lubbock Page 9 of 28 Contract Numb 1.10 Extra Work - Work over and above that called for in the contract. 1.11 Mayor - The duly appointed official of the City of Lubbock, Texas, empowered by the City Charter to enter into a contract in behalf of the City. 1.12 Notice to Proceed - Written notice to the Contractor issued and signed by the authorized Agent stating the date on which the Contractor should proceed with work as stated in the contract. 1.13 Community Services Director - The individual who shall act on the City's behalf to ensure compliance with the contract requirements, such as but not limited to, acceptance, inspection and delivery. 1.14 Review Committee - A committee chosen by the City of Lubbock, to analyze and recommend to City Council the best contractor(s) to perform the tasks governed by the contract. 1.15 Specifications - The directions, provisions, and requirements pertaining to the method and manner of performing the work or to the quality of the materials and equipment to be furnished under the contract. 1.16 Subcontractor - Any individual, firm, partnership, or corporation licensed or otherwise authorized by law to do business in Texas, to whom the Contractor, with written consent of the City, sublets a part of the work. 1.17 Surety - The corporation, partnership or individual, duly authorized and admitted to do business in Texas and licensed by the State of Texas to issue surety bonds, who is bound with and for the Contractor to assume legal liability for the faithful performance of the contract. 1.18 Unit Price - Payment to the contractor based on a unit or portion of the work performed. 1.19 Work - All work, including the furnishing of staff, equipment, materials, and other incidentals necessary for the performance of the contract. All work will be in the public right-of-way per attached exhibit. 2.0 TERMS AND CONDITIONS 2.1 Work: It is the intent for the Contractor to provide for completion in every detail the work described herein. The Contractor shall provide all labor, tools, transportation, materials, and equipment necessary to complete the work in accordance with specifications provided and terms of the contract. The attached "Overton Park Right of Way Maintenance Map" indicates the completed landscaped areas and the landscaped areas to be completed in the future. Bidders are to provide unit pricing that will be applied to landscaped areas as they are completed and accepted for maintenance. North Overton Maintenance -City of Lubbock Page 10 of 28 Contract Number: 7286 2.2 Specification Change: During the term of the Contract, the City may change maintenance frequencies, thereby increasing or decreasing maintenance frequencies. Unit pricing will be used to determine cost adjustments. All changes shall be in writing. 2.3 Changed Condition: If the Contractor finds latent conditions which differ from those outlined in the contract or specifications which differ from customary work, and which the Contractor could not have discovered during the investigation of the site prior to the bid, and in which such condition increased the expense to the Contractor, immediate written notice shall be promptly mailed to the Community Services Director. The Contractor shall afford the City the opportunity to inspect the same. After inspection by the City, the Contractor shall not delay work pending a decision to be made by the City regarding the claim. Failure of the Contractor to give prompt written notice and afford the City the opportunity to inspect the condition, before it is disturbed, shall be deemed a waiver by the Contractor of all claims and extra compensation arising out of the alleged condition. If the City determines that the Contractor is entitled to extra compensation by reason of increased expense to the Contractor and caused by the condition, and finds that the condition requires work not covered in the contract, a change order may be executed for additional compensation which shall be agreed upon by all parties involved. Additional time may be granted if the City deems additional time is necessary to accomplish the job. No change order or combination of change orders shall exceed twenty-five percent (25%) of the total contract. 2.4 Clean-up: As specified in the Maintenance Standards Specifications, beginning on page 10, all work shall be cleaned up and waste materials removed from the site. No equipment shall be left at maintenance sites and all material removed from the job shall be at the Contractor's expense. If materials or waste are not removed from the site, written notification from the Agent shall be delivered to the Contractor. The Contractor shall have forty-eight (48) hours to remove the material in question. If the material in question is not removed in the forty-eight (48) hour period, the City shall remove the material and the Contractor shall be charged for the expense. Payment to the city for said expenses shall be deducted for the Contractor's payment. If such conditions continue, the contract may be terminated due to breach of contract. 2.5 Preservation and Restoration of Property: The Contractor is responsible for the preservation of all City owned and adjacent property owner lands expose which the Contractor may come into contact with. The Contractor shall use every precaution necessary to prevent damage to trees, shrubs, above and below ground structures, utilities and any other form of property. Should damage occur, it is the Contractor's responsibility to report the damage to the Community Services Director or his Agent as soon as possible but not exceeding twenty-four (24) hours from the time damage occurred. If damage occurs as a result of Contractor's actions, the Contractor shall be held responsible to repair or replace the damaged property at their own expense. Time required to repair damaged property shall be expedient and to the approval of North Overton Maintenance -City of Lubbock Page 11 of 28 Contract Number: 7286 the Community Services Director or his Agent. If the damage is not repaired in the agreed upon time period, the City may after forty-eight (48) hours notice from the Community Services Director or his Agent, proceed to repair the damage. The Contractor shall be held financially responsible for the repair work and the cost shall be deducted from the Contractor's payment. 2.6 Equipment: The Contractor shall provide everything necessary to fulfill the requirements of this contract. All equipment shall meet all applicable Federal, State and Local laws and regulations. Contractors equipment is subject to inspection and approval of the Community Services Director or his Agent. All manufacturers safety features must be operational, in good repair and in proper positions during operation. All equipment shall be professional grounds maintenance quality and in good condition throughout the course of the contract. If the Community Services Director or his Agent deems the equipment faulty or if the equipment is damaging the turf or other surfacing materials in anyway, the Contractor shall remove the equipment from the premises. Contractor shall not impede other grounds maintenance operations during the course of those maintenance operations. 2.7 Service Boundaries: The service area may be bounded by hard surfacing materials, sidewalks, or non -curbed turf areas. The successful bidder shall be responsible for all areas defined by turf or hard surfacing. However, the successful bidder is not responsible for edging of un-curbed turf. Although the mowing contractors are required to operate mowing equipment in a manner that directs the clippings away from plant beds, the nature of mowing equipment will at times allow some clipping debris to drop into planting areas. Clipping debris in the beds or grass plants that become established are the responsibility of the successful flower and shrub bed contractor and shall be removed as a part of the ongoing maintenance of the bed areas. 2.8 Termination of Contract: This contract shall remain in effect until the expiration date for performance of services ordered. Termination of either party requires a ninety (90) day written notice prior to any cancellation. Such written notice must state the reason for cancellation. 3.0 CONTROL OF WORK 3.1 Authority of the Community Services Director: It is understood by all parties that the work is to be done to the satisfaction of the Community Services Director or his authorized agent(s). The Community Services Director shall interpret all specifications, and shall determine the acceptability of all work. The Community Services Director shall decide the classification, quality, and amount of all work done and shall determine the amounts to be paid under the contract. The Community Services Director shall be the sole administrator of claims and his decision shall be final, conclusive and binding on all parties. 3.2 Authority of the Agent: The Community Services Director may appoint an Agent or Agents to serve as an inspector. The Agent(s) shall be allowed to inspect all work North Overton Maintenance -City of Lubbock Page 12 of 28 Contract Number: 7286 at any time. The Agent shall not be allowed to alter, revise, add, or delete anything from the contract or specifications. An Agents duties shall include keeping the Community Services Director notified as to the progress of the job and the procedures involved in completing the job. The Agent shall call to the attention of the Community Services Director and the Contractor any deviation of contract or specifications, but failure of the Agent or of the Community Services Director to call to the attention of the Contractor any deviation of the contract or specifications shall not constitute acceptance of said work. The Agent shall have the authority to suspend any work pending a decision by the Community Services Director. 3.3 Extra Work: Extra work being done by the Contractor without authorization through change orders, or work which is not shown on the contract or specifications, shall be considered as unauthorized work; and if performed shall be at the risk of the Contractor. The Community Services Director reserves all rights to refuse payment for such work. 3.4 Unauthorized Work: All work and/or materials which do not conform to the contract and specifications, and work done contrary to written instructions of the Agent or Community Services Director shall be done at the expense of the Contractor. The Contractor may be ordered to remove or remedy such work at its own expense. If Contractor damages adjacent property, the Contractor shall remedy such property at its own expense. 3.5 Final Inspection: Final Inspection of the site shall take place by the Community Services Director or his appointed Agent as soon as possible after the completion of the project. If the project is completed in cycles, the project shall be inspected after each cycle by the Agent. The Contractor shall be allowed to be present at the examination. If the inspection reveals any defective work, the Community Services Director or his Agent may require the work to be remedied before final acceptance is granted. All said remedies shall be at the expense of the Contractor. 3.6 Laws and Regulations: The Contractor and any subcontractor(s) shall at all times comply with all local, county, state and federal laws. The Contractor and his subcontractor shall abide by all Labor Laws observed by the State of Texas. The Contractor shall comply with all Federal, State and Local Environmental Protection Laws, and regulations. The Contractor shall comply with all applicable Federal, State and local laws and regulations regarding pollution of rivers, lakes, streams and other waters. The Contractor shall store, handle, use and dispose of chemicals, fuels, oils, greases and other materials in a manner that prevents them from entering surface or ground waters. Upon receipt of notice of noncompliance of environmental protection provisions, the Contractor shall take immediate corrective action at the Contractor's expense. If the Contractor fails or refuses to immediately take corrective action, the City may issue an order stopping all or part of the work until satisfactory corrective action has been taken. 3.6.1 Prior to any application of chemicals, the Contractor shall request, in writing, approval from the Community Services Director or his Agent. The request shall include the target pest and the type of chemical(s) to be used. If North Overton Maintenance -City of Lubbock Page 13 of 28 Contract Number: 7286 permission is granted, all applications shall be performed through a Licensed Applicator, licensed by the Texas Structural Pest Control Board. Upon completion of the operation, the Contractor shall provide to the Community Services Director or his Agent, a copy of the Pesticide Application Documentation that the Contractor records pursuant to the requirements of the Structural Pest Control Board. 3.7 Advertising: Contractor shall not advertise or publish, without City's prior consent, the fact that the City has entered into this contract, except to the extent necessary to comply with proper request for information from an authorized representative or the Federal, State or Local Government. 3.8 Special Events: The Contractor shall schedule work to enhance public use and restrict conflict with scheduled events. Special event schedules will be submitted to the Contractor by the Community Services Director or his Agent to arrange for maintenance schedule adjustments as may be required. The Community Services Director or his Agent will attempt to notify the contractor forty-eight hours prior to an event that requires flower or shrub bed maintenance schedule adjustments. 3.9 Citizen Contact: The Contractor is granted the privilege of doing work on City owned property, but does not have exclusive use of the property and must respect the activities of patrons while doing work on City owned property. The Contractor shall take all precautions necessary to insure that adjacent property owners are not disturbed. Should a Contractor's worker be contacted by a citizen visiting the property they are maintaining, proper assistance shall be given to the citizen. Should the worker not know the answer to the citizen's question, the worker should know whom to refer the citizen to. The City shall provide a list of City representatives and phone numbers for various City functions. The Contractor shall provide employees with this information and insure that each crew has this information available. 3.10 Identification and Character: Contractor's vehicles shall be marked with the contractor's company name, on both sides and in lettering that is a minimum of two inches tall and of an easily read typeface. In lieu of lettering, Contractors may submit easily recognizable Company Logos for approval by the Parks Department. All employees of the Contractor shall have a name badge for identification, either clip on or incorporated with a uniform. This identification shall be worn at all times that the employee is at the job site. The Contractor shall provide uniforms of a different color than City employee uniforms. Uniforms may not be torn or ragged and shall present a professional appearance. Additionally, the Contractor will at all times require employees to remain fully dressed and will not allow employees to wear unbuttoned clothing while on City property. 3.10.1 The Contractor shall prohibit the use of intoxicating substances by its drivers and crewmembers while on duty or in the course of performing their duties under this Contract. 3.10.2 Employees driving the Contractor's vehicles shall at all times possess and carry a valid State of Texas Drivers License appropriate for the weight and North Overton Maintenance -City of Lubbock Page 14 of 28 Contract Number: 7286 type of vehicle being driven. Contractors are specifically required to ensure that a Texas Commercial Drivers License is obtained where applicable for the type(s) of vehicles in use. 3.10.3 The Contractor's employees, officers, agents and Subcontractors shall, at no time, be allowed to identify themselves or in any way represent themselves as being employees of the City of Lubbock. 3.11 Safety: The Contractor is responsible for maintaining a safety program that insures compliance with all current requirements of the Federal Occupational Safety and Health Act of 1970. The Contractor is responsible for safety on the project site and the City shall take no action to interfere with the Contractor's safety program. Failure to maintain compliance with this act shall be grounds for termination of the contract. 4.0 INDEMNITY INSURANCE 4.1 Contractor shall indemnify, hold harmless, and defend the City of Lubbock, its officers and employees from and against any and all liability or alleged liability without fault and liability by virtue of the obligations that the City of Lubbock assumes toward its indemnity(s) insofar as applicable to this Contract or the work to be performed hereunder and including cost of suit, attorneys' fees, and all other related costs and expenses of whatever kind or character arising directly or indirectly from any cause whatsoever in connection with or incidental to this Contract or the work to be performed hereunder, including such injury or harm as may be caused in part by any neglect, act, or omission of the City, its officers and employees, excepting only such injury or harm as may be caused solely by an act or omission of the City, its officers and employees. Notwithstanding the foregoing, the Contractor specifically agrees to so indemnify, hold harmless, and defend the City from and against any and all such liability, suits, action, legal proceedings, claims, or demands that may be made or pursued by an employee of Contractor, or of any subcontractor, or materialsman, or anyone acting on behalf of contractor in connection with or incidental to this Contract which are alleged to be attributable to any condition of or upon the City's property facilities, materials, or equipment, including where such condition and resulting injury or harm is caused in part by any negligent act or omission of City, its officers and employee, but excepting only such injury or harm as may caused solely by an act or omission of City, its officers and employees. Contractor agrees to waive any and all claims and suits covered by this indemnity agreement and agrees that any insurance carrier involved shall not be entitled to subrogation under any circumstance against City, its officers and employees. 4.2 The Contractor shall secure and maintain insurance for the duration of the contract. Proof of the Contractor's liability insurance shall be provided prior to receipt of a signed contract. The following insurance is required. North Overton Maintenance -City of Lubbock Page 15 of 28 Contract Number: 7286 4.2.1 Workman's Compensation Insurance covering all employees whether employed by the Contractor or any Subcontractor on the job including Employers Liability of at least $500,000 aggregate. Commercial General Liability Insurance at minimum combined single limits of $500,000 per occurrence and $500,000 general aggregate for Bodily Injury and Property Damage, which coverage shall include Products/Completed Operations ($500,000 Products/Completed Operations Aggregate), with have equipment coverage and XCU Hazards Coverage for Products/Completed Operations must be maintained for at least two (2) years after the work is completed. Coverage must be written on an Occurrence Form. Contractual Liability must be obligations contained in the contract. Commercial Automobile Liability Insurance at minimum combined single limits of $300,000 per occurrence for owned, non -owned, and hired coverage. Excess Umbrella Liability Insurance at minimum limits $500,000 combined single limit. 4.2.2 A Comprehensive General Liability Insurance form may be used in lieu of a Commercial General Liability Insurance form. However, if the successful bidder chooses this alternative, he must get specific requirements from the City of Lubbock. 4.3 All policies or certificates shall also contain the following endorsements: 4.3.1 Name insured wording which includes the Contractor, Subcontractors, and the City of Lubbock with respect to general liability and automobile liability. 4.3.2 All liability policies shall contain cross liability and severability of interest clauses. 4.3.3 A waiver of subrogation in favor of the City of Lubbock for all types of insurance coverages. 4.3.4 The policy shall be endorsed to require the insured to immediately notify the City of Lubbock of any changes in the insurance coverage. 4.4 All insurance shall be purchased from an insurance company that meets the following requirements. 4.4.1 A Best financial grading of A.VII or better 4.4.2 Licensed and admitted to do business in the State of Texas and is a subscriber to the Texas Guaranty Fund. 4.5 All insurance must be written on forms filed with and approved by the Texas State North Overton Maintenance -City of Lubbock Page 16 of 28 Contract Number: 7286 Board of Insurance. Certificates of insurance shall be prepared and executed by the insurance company or it's authorized agent and shall contain provisions representing and warranting the following: 4.5.1 The company is licensed and admitted to do business in the State of Texas. 4.5.2 The company's forms have been approved by the Texas State Board of Insurance. 4.5.3 Sets forth all endorsements as required above. 4.6 The City of Lubbock shall receive at least sixty (60) calendar days notice prior to cancellation or termination of insurance. 4.7 The Contractor shall understand and agree that they are an independent contractor and that they are not an employee of the City, and that the City will not provide Worker's Compensation, health or accident insurance, general liability insurance, or any other form of insurance coverage of any kind which would cover the Contractor or their employees, if any, in and under the terms of the Bid. 5.0 CONTRACT TERM 5.1 The term of the contract shall be for a period of three (3) years, unless terminated or extended in accordance with the provisions of this contract. 6.0 PROSECUTION AND PROGRESS OF WORK 6.1 Notice to Proceed: Notice to proceed shall be mailed to the Contractor by certified letter. The Contractor shall have ten (10) working days from the day he receives the letter to actively proceed with the work. 6.2 Contract Time: All work is schedule driven, therefore, the Contractor's work force and equipment needs shall vary throughout the contract's time period. The normal work schedule shall fall within the time frame of Monday through Friday 6:00 a.m. to 6:00 p.m. 6.3 Weekends, Holidays and Nights: Work on weekends, holidays, and nights shall be at the discretion of the Contractor. Should the Contractor find it necessary to work during this time, notice of his intention to do so shall be given to the Community Services Director or his Agent at least seventy-two (72) hours prior to doing so. The City reserves the right to deny such work that interferes with heavy park usage or special events. 6.4 Weather: Weather will affect the progress of grounds maintenance at times and contractor shall recognize this and have a plan of action and/or resources available to North Overton Maintenance -City of Lubbock Page 17 of 28 Contract Number: 7286 proceed in an expedient manner. Should weather conditions alter schedules, the Contractor shall notify the Agent at the beginning of the next workday. It is the Contractor's responsibility to provide quality workmanship. If weather conditions prevent such quality, the Contractor shall suspend work and resume work as soon as weather allows. if the Agent or Community Services Director finds that weather conditions are inappropriate for maintaining high quality work, they may notify the Contractor and suspend work. The suspension of work by the Agent or Community Services Director shall not in any way allow the Contractor to find grounds for adjustments in contract time or provide for extra compensation. 6.5 Character of Work: All workers, supervisors, managers, and subcontractor(s) employed by the Contractor shall be competent and careful workers skilled in their respective trades. The Community Services Director or his Agent may remove from the work site any person employed by the Contractor who does not represent the City in a professional manner or does not follow the instructions given to him. If any person misconducts theirself, is incompetent, or negligent in the performance of their duties, they may be removed from the work site and shall not return until the Contractor receives written consent from the City's Representative. Should the Contractor continue to employ such individual to continue work under this contract, the City reserves the right to withhold payment and/or nullify the contract. 6.6 Assigning or Subletting the Contract: The Contractor shall not assign or sublet the contract, or any portion of the contract, without written consent from the Community Services Director or his Agent. The City's permission to sublet any contract shall not be construed as making the City a party of such subcontract. No subcontractor shall release the Contractor of its surety or its liability and obligation to fulfill all transactions made under the contract. Should consent be given, the Contractor shall insure the Subcontractor or shall provide proof on insurance from the Subcontractor that complies with all Insurance requirements contained in paragraphs, 4.0-4.7, Indemnity Insurance. 6.7 Payment: The Contractor shall receive compensation for services provided for in the contract on a monthly basis. Upon the end of each month, during the contract period, the contract shall submit an invoice for 1/12th of the Annual Maintenance 'Cost. Any Extra Work shall be shown on the same monthly invoice and identified as "Extra Work." Extra Work billing should designate hourly labor cost, parts/materials costs and a description of the work performed. Payment shall be determined by the form included in this package as Exhibit 1 and approved by the Community Services Director or his Agent. II SPECIFICATIONS 1.0 Seasonal Color Program Standards 1.1 General: Successful contractor shall have ten (10) days from receipt of the Notice to North Overton Maintenance -City of Lubbock Page 18 of 28 Contract Number: 7286 Proceed to commence contract maintenance activities 1.1.1 The areas to be serviced at each location include all of the area within the bed. The perimeter of the planting bed will be defined by the rim of raised planters, concrete curbing, sidewalks, or edged turf areas. 1.1.2 Contractor shall be responsible for the purchase and planting of all flowers in the identified beds. Flowers shall be planted on 6 inch centers in the row and 6 inches between rows. A triangular pattern shall be used to stagger the plants in alternate rows. 1.1.3 Anticipated planting dates are April 26th - May 21st, and September 6th - 17th. Actual planting dates shall be determined by existing environmental conditions. The Contractor may propose planting schemes with flower varieties of their choosing or from the following flower varieties; Marigold, Periwinkle, Petunia, Nicotiana, Statice, Nasturtium, Purple Fountain Grass, Verbena, Dusty Miller, Begonia, Impatiens, Pansy, Ornamental Cabbage, Flowering Bulbs, Ornamental Kale, & Dianthus. The variety(s) of flowers selected for each bed area shall be coordinated with and approved by the Community Services Director or his Agent. L1.4 Contractor shall provide a planting schedule to the Parks Department within fifteen days of Award of Contract and will notify the Community Services Director or his Agent of any changes in the schedule prior to the schedule change. 1.2 Maintenance: Maintenance routines shall be determined by environmental conditions and weed growth. 1.2.1 Preparation and Planting: Plant material from the previous season shall be removed and the bed area shall be tilled to a depth of 8 to 10 inches prior to planting. Fully rooted plants with a minimum pot size of 4 inches shall be used. They shall be removed from their container and planted at the same depth in the freshly tilled soil. The soil around the new plants shall be firmed and immediately irrigated. 1.2.2 Watering: Vendor attention is called to the fact that not all beds have automatic irrigation systems and may require hand watering (quick coupler outlet or hose bib provided). Unless sufficient rainfall occurs, Contractor shall thoroughly water new plantings a minimum of three (3) times per week for the first two (2) weeks and a minimum of once weekly thereafter. It shall be the contractor's responsibility to insure sufficient moisture is present to promote healthy vigorous and fully leafed plants that remain in full bloom throughout their growing season. 1.2.3 Cultivation: The minimum frequency is once weekly for the removal of weeds, spent blooms, and litter. North Overton Maintenance -City of Lubbock Page 19 of 28 Contract Number: 7286 1.2.4 Mulching: Soils in planting bed areas shall be kept covered with organic, shredded, composted mulch. A minimum of a two (2) inch layer of mulch is being kept up at all times. 1.2.5 Fertilization: Contractor shall be responsible for applying sufficient fertilizer to promote vigorous plants that remain in full bloom. For summer annuals, the contractor shall apply a 100 percent sulfur coated 10-15-10 granular fertilizer at the rate of 1 pound of actual N per 1,000 square feet after planting and twice more during the growing season. For fall plantings, the contractor shall apply a 100 percent sulfur coated 10-15-10 granular fertilizer at the rate of 1 pound of actual N per 1,000 square feet after planting and once more at the first of spring. Contractor shall insure that fertilizer residue is removed from foliage and blooms and shall apply sufficient water to incorporate the fertilizer into the soil. 1.2.6 Pesticide Application: Contractor shall be responsible for insuring that plant health and appearance is maintained by applying corrective insecticides, fungicides or other pesticides as required to control pest populations. The successful bidder may also apply pre or post emergent herbicides as required to control noxious weed growth. The pesticide to be used shall be discussed with the Community Services Director or his agent and not applied until approved for use until receipt of written approval. At all times the individual applying the pesticide shall be licensed by the Structural Pest Control Board for the specific category involved. The applicator shall also be required to follow manufacturer's recommendations for product usage and all applicable State and Federal Laws concerning pesticide applications, rinsate disposal, and container disposal. 1.3 Shrubs and Ground Cover Plantings: Shrubs and/or Ground Cover plantings contained within beds containing annual plantings are the responsibility of the successful annual flower program contractor. Maintenance of these plantings shall be performed in accordance with the Planting Bed Maintenance. 1.4 Litter Control: Contractor shall insure that all litter is removed from beds weekly. 1.5 Debris Removal: Contractor shall be responsible for the disposal of all debris removed from beds and shall not place the debris in the curbside receptacles or dumpsters. 2.0 Planting Bed Maintenance Standards 2.1 General: Successful contractor shall have ten ( 10) days from receipt of the Notice to Proceed to commence contract maintenance activities. 2.1.1 The areas to be serviced at each location include all of the area within the bed. The perimeter of the planting bed will be defined by the rim of raised planters, concrete curbing, sidewalks, or edged turf areas. North Overton Maintenance -City of Lubbock Page 20 of 28 Contract Number: 7286 2.1.2 Contractor shall provide a maintenance schedule to the Parks Department within fifteen days of Award of Contract and will notify the Community Services Director or his Agent of any changes in the schedule prior to the schedule change. 2.2 Maintenance: 2.2.1 Pruning: A: Coniferous evergreen shrubs shall be pruned once per growing season as required to keep them within the planting area and as required to remove damaged or diseased branches. B: Broadleaf evergreen shrubs shall be pruned once per month to maintain an even but free form shape that complements the natural shape and growth patterns of the plant. Unless other wise specified, plants shall not be pruned into ball or box shapes. C: Deciduous shrubs shall be pruned as required to keep them within the planting area, to remove damaged or diseased branches, and to promote uniform growth patterns. Unless otherwise specified, they shall not be pruned into ball or box shapes. D: Ground cover plantings such as Vinca Major shall be trimmed in the March to remove dead stems and foliage. E: Ground cover plantings of prostrate junipers or creeping vines shall be pruned as required to keep them within the bed area, to remove dead, diseased or damaged branches, or to control their vertical ascent. 2.2.2 Watering: Vendor attention is called to the fact that not all beds have automatic irrigation systems and may require hand watering (quick coupler outlet or hose bib provided) to supplement the moisture received as overspray from turf irrigation or rainfall. It shall be the contractor's responsibility to insure sufficient moisture is present to promote healthy vigorous plant growth. 2.2.3 Cultivation: The minimum frequency is once weekly for the removal of weeds and litter. At the contractors discretion the beds may be mulched with mulch provided by the Parks Department. The contractor will be responsible for loading the mulch and delivering it to the beds from the Parks Department's stockpile. 2.2.4 Mulching: Soils in planting bed areas shall be kept covered with organic, shredded, composted mulch. A minimum of a two (2) inch layer of mulch is being kept up at all times. 2.2.5 Fertilization: Contractor shall be responsible for applying sufficient fertilizer to promote vigorous plant health. At a minimum, the contractor shall apply a 100 percent sulfur coated 16-4-8 w 2% iron granular fertilizer at a rate of l pound of actual N per 1,000 square feet in May and July. Contractor shall insure that fertilizer residue is removed from foliage and North Overton Maintenance -City of Lubbock Page 21 of 28 Contract Number: 7286 shall apply sufficient water to incorporate the fertilizer into the soil. 2.2.6 Pesticide Application: Contractor shall be responsible for insuring that plant health and appearance is maintained by applying corrective insecticides, fungicides or other pesticides as required to control pest populations. The successful bidder may also apply pre or post emergent herbicides as required to control noxious weed growth. The pesticide to be used shall be discussed with the Community Services Director or his agent and not applied until approved for use until receipt of written approval. At all times the individual applying the pesticide shall be licensed by the Structural Pest Control Board, or any other applicable agency, for the specific category involved. The applicator shall also be required to follow manufacturer's recommendations for product usage and all applicable State and Federal Laws concerning pesticide applications, rinsate disposal, and container disposal. 2.3 Litter Control: Contractor shall insure that all litter is removed from beds weekly. 2.4 Debris Removal: Contractor shall be responsible for the disposal of all debris removed from beds and shall not place the debris in curbside receptacles or dumpsters. 3.0 Turf and Hardscape Maintenance Standards 3.1 General: Successful contractor shall have ten (10) days from receipt of the Notice to Proceed to commence contract maintenance activities. The decision to end the maintenance season shall be made by the Community Services Director or his Agent. The Contractor shall be notified of the City's decision by letter. 3.1.1 The areas to be serviced for each site include all turf areas. Contractor is responsible for safe and careful operation of mowing equipment around plant material and structures to prevent damage and to prevent clippings from contaminating shrub or color beds. 3.1.2 Contractor shall provide a maintenance schedule to the Parks Department within fifteen (15) days from the date of Award of Contract and will notify the Community Services Director or his Agent of any changes in the schedule prior to the schedule change. 3.2 Mowing: Mowing commencement and conclusion shall be at the discretion of the Agent(s) or Community Services Director. Mowing frequency shall be determined by turf growth and occur up to once per calendar week, evenly spaced. Mowing costs are to be determined at a rate of twenty-nine (29) cycles per calendar year. Any cycles more that twenty-nine (29) shall be billed as Extra Work. Turf shall be cut at a height of one (1) inch; unless otherwise directed by the Community Services Director or his agent, clippings shall be bagged or recycled and all hardscapes shall be cleaned after each service. Mowing equipment shall be a reel mower or rotary/recycler. Mowing height shall be raised at the discretion of the Agent or Community Services Director and last through the remainder of the season. All North Overton Maintenance -City of Lubbock Page 22 of 28 Contract Number: 7286 equipment must be of appropriate size for each site and approved by the Community Services Director or his Agent. 3.3 Edging: All sidewalks and curbs shall be edged to a depth of one inch and shall be performed concurrently with mowing operations. String trimmers or curb dressers may not be used for edging. Chemical edging is not permitted. 3.4 Trimming: All string trimming must be done to achieve a height uniform with the mowing height. Trimming must be performed around trees, plant beds, buildings, signs, fences, and any other plants or structures. All hard surfaces, sidewalks, streets, parking areas and street medians must be kept free of grass, weeds and debris. This task must be completed the same day the mowing is performed. 3.5 Litter & Debris: All Litter and other types of Debris such as motor vehicle parts, rocks, gravel, and dirt, shall be removed by the contractor. Litter and Debris removal shall be performed concurrently with other maintenance operations. 3.6 Hardscape Maintenance: Hard surfaced medians and right of ways shall be kept free of debris. This will also include the curb areas. Hardscape maintenance cycles will be the same as snowing cycles. Any cycles more than twenty-nine (29) cycles per year shall be billed as additional work. 3.7 Disposal: Contractor shall be responsible for the disposal of Litter and Debris from the areas maintained. Disposal shall be accomplished by delivery to the City of Lubbock Landfill or by placement in dumpsters belonging to the Contractor. No Litter or Debris shall be disposed of in residential dumpsters, curbside trash receptacles, or those belonging to Commercial Businesses. 4.0 Tree Maintenance Standards 4.1 Trees shall be maintained in a healthy, vigorous growing condition, free from disease and large concentrations of pests. 4.2 Prune trees only to remove dead, diseased, broken, dangerous, or crossing branches, and as required below. Pruning of this type is a minor, non -reimbursable, cost to be included as part of the regular maintenance. 4.3 Prune trees only in appropriate months as determined by an arborist. Prune in accordance with generally accepted standards for proper pruning. 4.4 Discard all tree trimmings off -site using a legal method. 4.5 Any tree found to be dead or missing shall be replaced with plant material of identical species at the landscape maintenance contractor's expense, unless the loss was due to excluded damage. If the loss resulted from excluded damage, replacement will be paid for as extra work. Submit a quote for replacement within two weeks of the loss. Replacement trees shall equal in size to the originally installed tree at the time it was planted at the site. North Overton Maintenance -City of Lubbock Page 23 of 28 Contract Number: 7286 4.6 Replacement trees shall be approved for size and appearance by the owner's authorized representative prior to planting. 4.7 The cutting blades on pruning shears, clippers, blades, saws, etc. shall be sterilized after pruning each tree to minimize the possibility of spreading disease. When pruning trees known or suspected to be diseased, cutting blades shall be sterilized after each cut. Sterilize blades by dipping them in a solution of 1 part bleach and 9 parts water or heavily spray them with a disinfectant spray, such as Lysol. After dipping or spraying, wait 20 seconds before using again. 4.8 Mulching: Soils in tree planting bed areas shall be kept covered with organic, shredded, composted mulch. A minimum of a two (2) inch layer of mulch is being kept up at all times. 5.0 Irrigation Standards 5.1 Water Application & Scheduling: 5.1.1 Hand water as needed to supplement natural rainfall and maintain plantings in a healthy, stress -free condition. It is the contractor's responsibility to make sure that plants receive adequate water regardless of weather conditions. 5.1.2 It is the responsibility of the contractor to conserve water and assure that all watering rules and regulations are followed. Any penalties, fines, or citations for watering ordinance violations shall be paid by the contractor. 5.1.3 Irrigation shall be made by the use of the permanent irrigation systems. Hand water as needed to supplement the permanent system. Failure of the irrigation system to provide full and proper coverage shall not relieve the landscape maintenance contractor of the responsibility to provide adequate irrigation. It is the contractor's responsibility to make sure that the irrigation system is maintained and operates properly. 5.1.4 The contractor is responsible for the complete operation and maintenance of the irrigation systems, except as noted below. The contractor shall examine the irrigation system for damage or malfunction weekly and shall report damage or malfunction to the owner's authorized representative in writing. If the contractor fails to report the broken or malfunctioning irrigation system components within two weeks of the breakage or malfunction, the contractor shall be responsible for all damages resulting from the broken irrigation system component. 5.1.5 Adjust watering times each week. Do not overeater plantings. Use multiple - start times and short run times to prevent run-off. Drip systems should be left on for sufficient time to allow for saturation of the root zone. Shorter runs with drip irrigation do not provide sufficient water penetration for healthy root development. Avoid multiple -start times with drip systems if possible. Do not allow run-off from any irrigation. North Overton Maintenance -City of Lubbock Page 24 of 28 Contract Number: 7286 5.1.6 When breakdowns or malfunctions exist, the contractor shall hand water, if necessary, to maintain all plant material in a healthy condition. If the irrigation repairs are major and will be billed as additional work (see items that qualify for extra work as outlined below), the labor costs for hand watering may also be submitted for payment as noted in the General Requirements section of these specifications. Do not wait for approval to begin hand watering if it is required to save the plantings. 5.2 Irrigation System Scheduled Maintenance: 5.2.1 Each valve zone shall be observed for signs of damage on a weekly basis during the irrigation season. 5.2.2 The landscape maintenance contractor shall maintain the irrigation system, including cleaning of filter screens yearly or more often as needed, and flushing pipes, as part of this contract. 5.2.3 Drip irrigation systems need periodic flushing to remove sediment. When flushing is necessary, it shall be performed as part of this contract. Drip systems shall be flushed at least once a year. Open ends of drip lines and run for at least 15 minutes at full flow to flush. It may be necessary to install flush outlets in order to flush the drip system. 5.2.4 Run-off of water from irrigation systems into or onto streets, sidewalks, stairs, or gutters is not permitted. The contractor shall immediately shut down the irrigation system and make adjustments, repairs, or replacements as soon as possible to correct the source of the run-off. 5.3 Irrigation System Repair: 5.3.1 The landscape maintenance contractor shall replace or repair, at the landscape maintenance contractor's expense, any irrigation components damaged, unless due to excluded damage. Repair shall be made within two weeks of the day the damage occurred. If the damage was due to excluded damage, the irrigation repairs will be paid for as extra work. The contractor shall make notification of needed repairs within two weeks of the day the damage occurred. Regardless of the cause of damage, the contractor shall take immediate action to prevent further damage by shutting off the damaged part of the irrigation system and commencing with hand watering as needed. As soon as possible after receiving written authorization to proceed, the contractor shall make repairs. The following items are considered to be minor repairs: damaged or clogged sprinkler nozzles, adjustment of sprinkler patterns or arcs, adjustment of sprinkler position (i.e.; raise, lower, or straighten sprinkler head), replacement of clogged, broken, or missing barbed -style drip emitters, replacement or repositioning of drip distribution tubing smaller than 1/2 inch or 15 mm diameter. These minor repair items shall be corrected by contractor at contractor's expense. North Overton Maintenance -City of Lubbock Page 25 of 28 Contract Number: 7286 5.3.2 Any replacement of irrigation system components shall be made with materials of the same manufacturer and model as the original equipment. Substitutions of materials other than original equipment will be approved only when the original equipment has been discontinued and is no longer available for purchase at any location. The substituted equipment must be completely compatible with the original and must be approved in advance by the owner's authorized representative. 5.33 All repairs to the system shall be identical to the original installation, unless approved otherwise in advance by the owner's authorized representative. If a change to the installation will result in lower future maintenance costs, less frequent breakage, or an increase in public safety, request authorization to make the change from the owner's authorized representative. 5.3.4 The contractor shall check the entire irrigation system weekly for items such as dry spots and missing or malfunctioning irrigation components. Check for leaking valves, water running across sidewalks, water standing in puddles, or any other condition which hampers the correct operation of the system or the public safety. The contractor shall carefully observe plant materials for signs of wilting, indicating a lack of water. Plants which die due to irrigation failure will be considered to have died due to the contractor's negligence and shall be replaced at the contractor's expense. 5.3.5 Plastic sprinkler nozzles with bad patterns shall be replaced with new nozzles of the same gallon age and arc as part of the regular maintenance of the sprinkler system. Do not attempt to clean plastic nozzles by sticking knife blades or wire into the openings. The plastic will be scratched and the pattern will be ruined. Brass nozzles may be carefully cleaned if needed. 5.3.6 Irrigation Systems: The contractor shall inspect and test all components and zones in the irrigation system monthly and shall reset zone times according to seasonal evapotranspiration changes. Minor adjustments and repairs such as head -emitter cleaning or replacement, filter cleaning, small leaks, and minor timer adjustments shall be made by the contractor, with the City paying for parts. Once a year, the contractor will recalibrate each zone following Cooperative Extension Service recommendations. During weekly maintenance, the contractor will note and report to client any symptoms of inadequate or excessive irrigation, draining problems, etc. 5.3.7 Repairs of irrigation system beyond the above scope will be charged to the client at an hourly rate per person plus parts. Contractor shall bill the City for parts according to the current Manufacturers List Price or a discount thereof. The contractor will notify the City of the nature of the problem before repairs are made. 6.0 Curbside Receptacle Maintenance: 6.0.1 The Contractor will be responsible for emptying all curbside litter receptacles. The Contractor will provide trash receptacle liners to be placed North Overton Maintenance -City of Lubbock Page 26 of 28 Contract Number: 7286 in each receptacle after removal of litter and debris. Contractor shall be responsible for the disposal of litter and debris. Disposal shall be accomplished by delivery to the City of Lubbock Landfill or by placement in dumpsters belonging to the Contractor. No litter or debris shall be disposed of in residential dumpsters, curbside trash receptacles or those belonging to Commercial Businesses. 6.0.2 The Contractor will empty curbside litter receptacles on Mondays and Thursdays of each week. Agent could request additional frequencies for curbside receptacle maintenance. Additional maintained beyond the Monday/Thursday schedule shall be deemed as Extra Work. North Overton Maintenance -City of Lubbock Page 27 of 28 Contract Number: 7286 NORTH OVERTON LANDSCAPE MAINTENANCE CONTRACT PRICING ITEM FIRST PHASE ESTIMATED COST PER EXTRA WORK FIRST PHASE CONTRACT QTY MONTH COST COST COST Seasonal Color $.55 $50.00 Program Square Foot Per Hour Section 1 per month Planting Bed $34.00 $50,00 Maintenance 6,341 Per 100 $25,871.28 $77,613.84 square feet square foot Per Hour Section 2 per month Turf and $10.50 Hardscape $325.00 Maintenance 29 76,439 Per 1,000 $5,618.00 $16,854.00 cycles square foot Per Cycle Section 3 per month Tree $2.50 $50.00 Maintenance 130 $3,900.00 $11,700.00 Per tree per Hour Section 4 per month $86.67 per Irrigation 14 Zones Zone $58.50 Maintenance $14,560.00 $43,680.00 Verbal Per 100 Per Hour Section 5 Confirmation square foot per month Curbside $46.00 Receptacle $6.50 Maintenance 29 per month $16,008.00 $48,024.00 Per Container Per receptacle Section 6 $65,957.28 $197,871.84 TOTAL COST FIRST PHASE CONTRACT COST PERIOD North Overton Maintenance -City of Lubbock Page 28 of 28 OVERTON PARK RIGHT OF WAY MAINTENANCE MAP MARSHA SHARP FREEWAY III II IIII == III II Ili 111 III IIII 111 11 - 3 C !1lI11111111 - �= n2 i :� � nuutttnt _tutl 1!1 111 11 IIII = _ II!! 111 111 Alf I11 III .� :..: C III III IIII III IIl111=.__� III 11 111 III II 111 irin111lnuw OVERTON AREA MAP410 NORTH Mrs SHEET NO, TRACT TfK NT. TRACT SHEET NO. LM-1 1A H-L 1A-1 LM-2 IR 1A-2 LM-3 2A H-L 2A-1 LM-4 IR 2A-2 LM-5 2B H-L 2B-1 LW-6 H-L 2B-2 LM-7 IR 2B-3 LM-8 IR 28-4 LM-9 2C H-L 2C-1 LM-10 R 2C-2 LM-11 4 H-L 4-1 LM-12 H-L 4-2 LM-13 H-L 4-3 LM-14 H-L 4-4 LM-15 IR 4-5 LM-16 IR 4-6 LM-17 1R 4-7 LM-18 IR 4-8 LM-19 8 H-L 8-1 LM-20 I H-L 8-2 LM-21 H-L 8-3 LM-22 IR 8-4 LM-23 IR 8-5 LM-24 IR 8-6 LM-25 11 H-L 11-1 LM-26 IR 11-2 'H-L HARDSCAPE AND LANDSCAPE •OIR IRRIGATION IR 14-10 NOTE: LM-DU_ OVERTON PARK MAPS ARE TO BE USED FOR REFERENCE AND IN CONJUNCTION WITH WRITTEN SPECIFICATIONS PROJECT NAME: NORTH OVERTON PARK RIGHT OF WAY MAINTENANCE 'SHEET: G—ODI PROJECT ADDRESS LUMOCK, TEXAS TRACT SHEET ISSUE OVATE: 5-1—M 44 REVISIONS: PSC PROJECT +:. (132771.05 120 Im 1A NORTH 410 NORTH R.O.1a. LANDSCAPE MAINTENANCE SCHEDULE - TRACT 7A FIImos: PE %M SF R/AIMIG KOS 971 sr rt LO FREE - Lm ft 6 sCE FREE - C+Ew B" 7 e PEDESUM WM 9 SrRm LKM 1 M a KKK a Out Una RECEPT l � 1aR ow RAGE 3 PROJECT NAME: NORTH OVERTON PARR W f OF WAY W&TENANCE _ SHEET: LH-1 PROJECT ADDRESS LU89OCK, TEXAS TRACT SHEET IA-1 ISSUE DATE: 5-1-06 REVISIONS: -- -- PSC PROJECT j: , OU771.06 m R NORTH TRAU 1 A MA IiL Um OLENNA G000ACRE BLVD. mcm IOC AVENUE ®\ 14Do NORTH 1A trtWENANCE AREA ALONG GLENNA GOOWM BLVD. N09M M LEGEND R.D.W. IRW ATION MAINTENANCE SCHE01xE - TWr x sim MINI QUAIp111 r KIM I6 �� I © N DOUBLE arErX VALVE � Cl-IA-2 ElotIRM o AI I a K rLow (GPM) R s m TON VALVE � 4 CONTROLLER NUMBE 11tACT IA 5 TRACT NU163ER1LOGITIOM 4 NA AL WILL VALVE 2 �Aw TRACT IA SITE PLAN MAP 6 NUMBER OF ZONES ON CONTROLLER 2 3 5 is ZONE W C0&VE z OVERTON AREA YAP Nam ow WSAGAlON 971 SF S:3a:"C:1 it}�°ee: e"C ..0 PARK R1Gfff OF WAYWVNTEN4ICE SHEET: eO, PROJECT ADDRESS LUBBOCK. TE%Ju TRACT SHEET IA-2 * ISSUE DATE: 5-I-O6 " g::: REVISIONS:,4• " PSC PROJECT /:. O3.B771.06 M F=171 ,.11a► . ►.,� w .. �,. IRTJ OVERTON AREA YAP rmm ................... pree.ene.e.ree °ri:eeeoe ii 1q 8f .ee; pvaeesoee•eveee.ev TRACT 1A SITE PLAN YAP 01"N NORTH e1w NORTH R.O.W. LAN(W-APE WWTENANCE SCHEDW — TRACT 2A Srd@X TAN Qumm WMSCA E PLANTM ems 12-%4 SF IA63 SF * 10 TREE — Lm Oak 6 *CE TREE — Co" Elm 12 O PEDESnUN L1f M 11 WREE( LR?OS 0 �! B OMC1f 7 OlA LMM R MIKLE 4 1 BK RAM 3 PROJECT NAPE: NORTH OVERTON PARK RQIT OF WAY MAINTENANCE _ _ SHEET: LM-3 PROJECT ADDRESS LUMMK. TEXAS TRACT SHEET 2A-1 ISSUE DATE: 5-1-06 �} REV1SIOHS: PSC PROJECT 038771.06 C N PROP" LK FcJ M-W2 Al4 TRACT 2A MAINrErWCE ill MAC DAVIS LANE NORTH f III I� III I II' II III'lll l II I II I illw li i I N'i d I il'uill d N N �,Nf i Nl! IN N N IN,'�N II Il,�'N M 9 Imo__ i OyER(ON AREA WIF „ TRACT 7a SITE PLAN YAP AS dtlaC M J31t P 1 RdrAT10N 2GFE > R 1IM 2 VALVE SIZE Cl-2A- 3 ZONE FLOW (GPM) 4 CONTROLLER NUMBER 5 TRACT NUAAMAD(ATION 6 NUMBER OF ZONES ON CONTROLLER 2 5 R.O.W. I RCAT10N WATENANCE SCHEUR.E — TRACT 2A s,omm RTa afANTm NMTTR MMR 1 MA'iIER VALVE 1 m INGAWN CaMIR IM 1 M MAMA RAJt VALVE 5 a 201E If w 2 O OUR7f CaA'LLE)t 3 --- Lw g11lA1TCN IAJ SF ........0 .... SSSS°seiiSSe9uI�SSS PROJECT NAME: NORTH OYERTON PARK RIGNTT Of IW17 MAINTENANCE SHEET: LM-4 ......e:::e6 :::: PROJECT ADDRESS LUBBOCU. TEXAS TRACT SHEET 7A-2 `0.:1 - ISSUE DATE: 5-1-M e �N•� REVISIONS: PSC PROJECT 03.8771.06 eoureuuas.ox .� TRACT 29 MAMENANCE AREA ALONG AVENUE X r2e -_- OVERTON AREA MAP TRACT 2B SITE PLAN MAP PROJECT NAME: NORTH OVERTON PARK RIGHT OF WAY Mi~MMANCE SHEET: LM-5 PROJECT ADDRESS LUBBOCK, TEXAS TRACT SHEET 16-1 ISSUE DATE: 5-1-06 REVISIONS: \ PSC PROJECT j:. 018771.06 C® NORTH R.O.W. ILANOSCAPE MANTEMVa SCHEME - TRACT 28 sram RIM MINIM MINI HARD5 AWE 7.042 SF FLAMM ®5 es2 SF * CE WE - OW. Elm 2 * CP TREE - Chiwee Pielaclw 5 i Ul 116:E - Lie Oak 3 *SD TREE - Shwr"d Oak 6 • KD51MW UEHIS 6 c�A MUM 2 o a eEnai s OIA U UM RECU M 3 r RR RISE mau TRACT 2B SITE PLAN YAP Stl*loL REM akW@Tv ETFiB)WAK MW SF PLwn"G BEDS 551 5F +CE TREE — CWw Bm 6 iCP TREE — DkAft PWoc. 3 + La TREE — Lie Oak 4 s9O TREE — Shwwvd Oak 4 o PEDESBMR LKM 9 o-O I STREEE LKM 2 �B BEx6H S OlR LRSQE REtPTACIE 4 x BR I UK wa 0 PROJECT NAME; NORTH OVERTON PARK RIGHT OF WAY IrwfTEWWCE SHEET; U1-6 PROJECT ADDRESS LUBBOCK, TE)LS i%"a TRACT SHEET 28-2 155UE DATE: 5- I -06 REVISIONS: l _ PSCPROJECT /:. 03.8771.06 LEGEND Al AS owxm BY: /py�� R.O.W. IRRIGATION YAINTEMANCE SCHR ULE - TRACT 28 1 IRR�AT1011 ENE NUrI�ER l © Syron OEM OIAwRT1' x ■ - 9L 2 VALVE SIZE T CI-2A-2 ti WATER EEac VALVE 0 3 ZONE FLOW (GPM) WATER IEIER a TRACT 2B 4 CONTROLLER NUMBER ® Mm VALVE a ♦\yam L 5 TRACT NUTAEER/LOCATION A � v m FAMTIDN COKTROU.ER o 6 NUMBER OF ZONES ON CONTROLLER 2 3 5 e MMAMA BALL AMA WLrE VALVE2 ^ ® WIr)I COMFIER 2 MRTON AREA NAP TRACT 28 SITE PLAN NAP - - - M a:Ee::aEaves:EB?E PROJECT NAME: NORTH OVERTON PARIL RGff OF WAY MATNTEMANCE SHEET: LM-7 :o:e.:::vo:::vEa PROJECT AOORESS LU�OCK. TEXAS TRACT SHEET 28-3 M M ISSUE DATE: 5-1-M MI REVISIONS: �•" % ._ __: PSC PROJECT /:. 038771.05 /N B1 ITRACT 2B MAINTENANCE AREA ALONG GLENNA GOODACRE BOULEVARD 'NORTH ®® LEGMa mom or. TRACT 2B A5 1 >>IRIGILTION Z!OIE kow10 om 1 S ZONE FLOW (GPM) ®® Al 4 CONTROU.M MAWB9 TRACT NIJYBER/IMTION �4 R 6 NVILBER OF ZONES ON CONTROLLER 2 3 5 OYERTON AREA YAP hz& " TRACT 20 SITE PLAN MAP R.O.W. WWATKk1 YAWTEWWCE SCHEDULE - TRACT 2B s"ma mu QUAI W OD WTER METER 1 N MUBLE CHECK W vE 1 0 IKLM MLVE O m WJWAMN CONTROLLER 1 w WNINL BALL VALVE 2 201E VALVE 2 46 OLKCK COUPLER 2 "7 aw NOWAI N B51 SF PROJECT NAME: NORTH OLIERTON PARK RG(T OF WAY MAWTENANCE SHEET: LM-8 PROJECT ADDRESS LUBBOCK, TEXAS TRACT SHEET 28-4 ISSUE DATE: 5-1-08 REVFAONS: ^17/ � PSC PROJECT /: 03 8774.06 AVENUE [tBl6;CgCi41 M�a M v NORTH vo 410 NORTH R.O.W. LMMSCAPE WINTENANCE SCHEIME - TRACT 2A srdoOt M31 CIvxw 1WBISCAFE 9,2M SF _ RAMtIIC BEDS 971 SF + lD TREE - live 0* 6 ♦ CE TREE - Codv Elm 7 s PEllES1" C1GM5 9 SII U UGX1S f M B BENCH B OIA UM RECEPGICLE 4 iBR wwo 1 2 6Ae:aE:::: PROJECT NAME: NORTH MWON PARK MGM OF WAY W#MNANCE SHEET: W- w.euu.veu.ne.° PROJECT ADDRESS LUBBOCK.TEXAS B TRACT $HEFT ISSUE DATE: 2C-1 5-1-W REVISIONS: _- PSC PROJECT /:. 03.8771.06 ___ !4 0! W-01 UNIVEftSfIY AVENUE &TMRAC�T= IwIN WANCE AREA ALONG UNNERSITY AVENUE NORTH ---�a� A -A_ p --- 2 1lF,-6 Y+i � �:? GLERNA GOODACRE BLVD. I } NORTH tI R.O.W. IRRIGATION MNNTENANCE SCHEDULE- TRACT 2CO N WLBLE CHM VALVE , o VASTER VALVE , m IFIRIG IN CWM LLER MAMIAL 94L WYE 2 0 ZONE VALVE I 16 CINCH CMPLER 2 ORP NOWA1gN 271 Sf PROJECT NAME: NORTH OVERTON PART( RIGHT OF MEIN MAINTENANCE SHEET: LM-10 PROJECT ADDRESS LUMn. TEMS TRACT SHEET 2C-2 ISSUE DATE: 5-1-06 REVISIONS: r PSC PROJECT WA771.06 B� TPACT 4 MA NTENA ALONG AVENUE X - -- VR AP%k TRACT 4 SITE PLAN MAP OYEATON AREA YAP A® R.O.W. LMOSCAPE kWNTEW4CE SCHEDULE - TRACT 4 SVM30L REM OLWMTY HAR[WAK 5,010 SF "061C BEOS 465 SF it SD TREE - Shammed Oak 5 * CE TREE - Cedor Eh 7 e PEOM70MI L1GM 11 ---M STREET LPI S O � B BENCJI O OLR LIf1ER RECEPTACLE 1 t BR I BRIE RA(Z O PROJECT NAME: NORTH OVER70N PART( RIGHT Of MAY W4IHTEMWE SHEET: LM-11 PROJECT ADDRESS LUBBOCK, TEXAS 4 TRACT SHEET 4-1 6SUE DATE: 5-1-* REVISIONS: ■ --- PSC PROJECT /:. 03.0771.06 u sisst��m�s�� N W oil r V W W i��YOO �.Y�CO TRACT 4 AIANTO A M ALM AVENUE IXI 0-14 TRACT 4 SITE PLAN YAP OVERTON AREA YAP ® S\ 10 NORTH R.O.W, LANDSCAPE WINTENANCE SCFEM&E - TRACT 4 S911BOL I ITEM OIIARTTTY NARDSCAPE 6.568 SF PUWTW BEDS 605 SF i LO TREE - Shwrwoard Ook 9 i CE TREE - CWw Elm 5 It SO TREE - Cr 4 e PEDESTRIAN UGHTS 12 ZZ SIREEI LXDiTS 1 O LR LITTER RECEPTACLE J 9R Wt RACK 0 PG I I%1 CM11AH GNU 1 RL I PrWKTRLAN WIM RECEM LIGHTING 1 10 PROJECT NAPE: NORTH OVERTON PARK WA OF WAY WWTENANCE SHEET: LY-13 PROJECT ADDRESS LUMXK. TOM TRACT SHEET 4-3 i ISSUE OATS 5-1—M REVISIONS: PSC PROJECT j:. OS8771.O6 (J®cc 'a $ �cc B1 TRACT 4 MAINTENANCE ALONG AVENUE IN (VZ n TRACT 4 SITE PLAN YAP OVERTON AREA YAP NORTH Q ®® R.O.W. LANDSCAPE YNNTENANCE SCHEDULE — TRACT 4 ITEM QIIMIIRI HARGSCAPE 3M SF PIINTW BEGS 405 SF + SQ TREE - Shwmmrd Oak 2 + CE TREE - Color Dm I I e PEDESTRM LKIRM 10 �i STREET LIGHTS 0 MIST�:)OL S ENDf 0 O LR i UTTER RECEPTACLE 2 1 BR W RACK 0 T6 TREE GAVE 4 PROJECT NAME: NORTH OVERTON PARK RIGHT OF WAY WMENANCE SHEET: LY-14 PROJECT ADDRESS LUBBOCK, TEXAS TRACT SHEET 4-4 ISSUE DATE: 5-1-06 REVISIONS: t _ PSC PROJECT /:. 03.8771_06 4 w ��m AVEIIUE x LLA7BD AS Amm BY: �! 1 MMGIITI011 ZONE NUMBER I VALVE SIZE I 1-4-3 3� tl 3 ZONE MY (GPM) CWT 4 CONTROLLER NUY(ER 5 Vic NU11OR/LOCATION B NUMBER OF ZONES ON CONTROLLER 2 3 5 G TRACT 4 SITE PLAN MAP OY91TON AREA MAP +, ,w�lq�iggqi ibq�ggq A R.O.W. IRRIGATION MAINTENANCE SCHEDIA.E - TRACT 4 SYMB(L flw OUANTRY WATER WU 0 N DOUBLE CHECK WE 0 0 WESTER WVE 0 0 RRCATKW CONTROLLER a WYIML SRI VALVE 3 e ZONE VALVE 0 IW OLKK COUPLER 4 -- - - MIR RWATION 465 SF PROJECT NAME: NORTH OVERTON PARK RIGHT OF WAY MAINTENANCE SHEET: LM-15 PROJECT ADDRESS LUBM. TEKAS TRACT SHEET 4-5 ISSUE DATE: 5-1-05 REVISIONS: r',_ _ PSC PROJECT i:. WA771.06 LE LEGEND AS MTICATED BY: 1 F16Ai10I1 ZONE NUM 1 2 VALVE SIZE ] ZONE FLOW (GPM) .5 4 CONTROLLER NUMBER S TRACT NLAWB AOCA]ION 6 NUMBER OF ZONES ON CONTROLLER 3 5 UVLXIUN AIRA MW kow" IK%l 4 Sllt MM4 MW NORTH Ao"*k R.O.W. IRRIGATION MAINTENANCE SCHEDULE - TRACT 4 SYMBOL ITEM QLWMTY WATER METER 1 N DOUBLE CHECK VALVE I ® WA B VALVE I 60 OWATION COMTROUB 0 MANUAL BALL VALVE 4 0 ZONE VALVE 2 GM CDUPL.ER 3 -- ---= DRIP OtCATRNK 6M SF PROJECT NAME: NORTH OVERTON PARK RIGHT OF WAY WMTENANCE SHEET: LM-16 PROJECT ADDRESS LUBM. TEXAS TRACT SHEET 4-6 ISSUE DATE: 5-1-05 REVISIONS: PSC PROJECT 03.8771.06 ID NORTH B1 TRACT 4 MAINTENANCE ALONG AVENUE W20 ®Z / v BI L.1:i7MD AS IDIM _ I Rltg6A o IdHi MII TN 1 2 VALVE SIZE 1 1-4-3 TRACT 4 3 ZONE FLOE (GPM) �® 4 CONTROLLER NUMBER y`�J 5 TRACT NUMEIERAMTION 6 NUMBER OF ZONES NN1 CONTROLLER 2 3 5 OVERTON AREA MAP ZMI TRACT 4 SITE PLAN MAP R.O.W. IRRIGATION MAINTENANCE SCHEDULE - TRACT 4 SYY80L ITEM OuANTIIW WATER METER 0 r.i DOUBLE CHECK VALVE O 0 MASTER VALVE 0 w INKATION CONTROLEER 2 N MANUAL BALL VALVE 1 ® ZONE VALVE I 0 OUKM COUPLER 2 ------- DAP NOGATKIN tsB 5F PROJECT NAME: NORTH OVERTON PARK RQff OF VKY MAINTENANCE SHEET: LM-17 PROJECT ADDRESS LUINBOCK, TDJOLS TRACT SHEET 4-7 ISSUE DATE: 5-1-O6 REVISIONS: ... - PSC PROJECT 03A771.06 AVENUE w TRACT 4 MAN ENANCE ALONG AVME ,HAdNpN�Ni �NNlftiaNN� iiiNNkit�!!! 9 11Dp 8l TRACT 4 MNNTENANCE ALONG AVENUE W -- - WORTH too LEGEND TRACT 4 AS IMMAliD 8Y: QD--` Al I WRK,AiION ZONE MAID 191 2 VALVE SZE CI-4-3 3 ZONE FLLE (GPM)4 CONTROLNUMBER 1 5 TRACT KWHERAOCATION 6 NUMBER OF ZONES ON CONTROLLER 2 3 5 OVERTON AREA MAP roan, TRACT 4 SITE RAN MAP R,OX. IRRIGATICIN MAINTENANCE SCHEDULE - TRACT 4 Smm 0EY OUN IM HATER METER 0 N DOUBLE CHECK VALVE 0 0 MASTER 1BILVE 0 ® IRIWATRIN CONTROLLER 0 w MANUAL BALL VALVE I 0 ZONE VALVE 0 DUCK CO" I - -d DRIP MIOAIIDII 405 ST PROJECT HAYS: NORTH OVERTON PARK RIGHT OF MY W4NTENANCE SHEET: LY-18 PROJECT ADDRESS LuBm, TEAMS TRACT SHEET 4-8 \ ISSUE DATE: 5-1-M REVISIONS: PSC PROJECT M771,06 II I., �I_SIsloF.:L R TRACT 8 MNTENANCE ALONG MAC DAMS LANE NORTH 120 R.O.W. LANDSCAPE MAWMNANCE SCHEDULE - TRACT 8 SrADL REY 01RNTR't INNO5CAPE 6.439 SF OM PIAKW BEDS 333 SF f to TREE - Lke pot 12 4 PEBiSTBNW UMM 14 --�m STREET UQIfTS 0 M B am 2 O LR UTTER RECEPTACLE 3 t BR Ba RACK 0 FWMCG CFilWlil CRATE 105 SF RIM:e:: :::::::::::::::T PROJECT MI+WE: NORTH OVERTOH PARK RIGHT OF WAY t1AJNTEMANCE SHEET: 1y-19 o6SSe l8CQg88SoSC PROJECT ADDRESS LUBBOCK, TEXAS i TRACT SHEET 8-1 '1 ISSUE DATF- 5-1-M REASIONS: :...:• "'" _ PSC PROJECT U8771.06 """:S'iS8S8 'ra °e'euirrrro re ererroea ............... ri R.O.W. LMiDSCAPE MOTENANCE SCHEDULE — TRACT 6 SYMBOL ITEM OLUNIITY MAADSCAK "74 SF PLANING BEDS 339 SF + LID TREE — L1na Oak 4 +CE TREE — Cador LTm S +St1 TREE — 9kw m O Oak , e PEDES1M LIGHTS 11 L!J B BDICH 2 O LR L7LIER RECEPTACLE 3 1 OR BW RACX 0 L M CHMNF.L GRATE 4i SF PROJECT NAME: . NORTH OYERTON PARK MIT OF WAY MAINTENANCE SHEET: LM—TO PROJECT ADDRESS LUBM. TEXAS TRACT SHEET B ISSUE BATE: —1-06 REYTSIDNS: r PSC PROJECT 03,0771.06 AVENUE V 190 AWN a s1t id R.O.W. LVOSCAPE MAMEN064CE SCHEDULE - TRACT 8 SYMODL nfm QuwnTY iNNAROSGIPE I" SF PLW WG Bm5 141 SF +iCE TREE - CWw Elm 5 e PmES m Lon _ 4 —e WEET UGJ0 0 OMB B01CH 0 OUT UTTER RECEPTACLE 2 BR BEE RAC¢ 0 `.................. PROJECT NAWf; NORTH OVERTON PARK ROff OF WAY WW1fEWNCE _ SHEET: LL-21 PROJECT ADDRESS LUBBOCK, TEXAS r' TRACT SHEET 6-3 ISSUE DATE: 5-1-06 • si REMON5: .:.:":.•' \ A PSC PROJECT /:. 03.6771.06 .................. TRACT 8 MNNTE#dAidCE ALONG MAC DAMS MAC DAVIS LANE =4" MAC DAVIS LANE LEGBd AS Man BY: 0- 1 IRWA" ZONE MAW ,El 2 VALVE 9ZE C1-8-2 3 TONE L(GPM) 4 CONTROLLER NUMBER 5 TRACT NWBERAOCATION 6 NUMBER OF ZONES ON CONTROLLER 2 3 5 /\ 1900 /\ 14D R.OX IRRIGATION MNNTEWINCE SCHEDULE — TRACT 8 sYA60L ITEM OUAMRTY WATER METER 0 N DOUBLE CHECK VALVE 0 0 MISTER VALVE O m IRWATIDN CONTROLLER O M MWIAL BALL VALVE 3 a IONE VALVE 0 0 DUIM COUPLER 3 ---- - 00 IRRGATX 333 5F ..:::............. s::::::::: PROJECT NAME: MDRTH OVERTON PARK A!p{1 Or NAY WIMif1EWMCE SHEET: LM-22 eeu. TRACT SHEET 8-4 :a°eoae:o°O°e°oo'v:°v PROJECT ADDRESS LUmwC TDA ,� ::: g' 3 ISSUE WE: 5-1-06 �I `: 6 REVTS*NS: M.'° `� PSC PROJECT j: 03.8711.06 10 mc ow 1.Imal AVENUE V LEGEND AS PUCAM 9P: 1 NMGATION ZOIE KIM 1IM 2 VALVE 3 ZONE FLOLO TY (GPM) 4 4 CONTROLLER NUMBER 5 TRACT NlIM/LQCATION 6 NUMBER OF ZONES ON CONTROLLER 2 5 "-2 *w J n NORTH n R.O.W. IRRIGATION MAINTENANCE SCHEDULE — TRACT 8 SrAm ITEM NATER METER93M N DOUBLE CHECK VALVE 0 MASTER VALVE 0 RWAIM CONTROLLER 7SF w ANIMAL BALL VALVE 0 ZONE VALVE OUK]c COUPLER ------- DRIP FAGATgN PROJECT NAME: NORTH OVERTON PARK RIGHT OF WAY MAINTENANCE SHEET: LM-23 PROJECT ADDRESS LUBBDCI(, TEXAS TRACT SHEET B-5 ISSUE BATE: 5-1-05 REVISIONS: PSC PROJECT j:. OJA771.06 Em y a Y No Text AREA CURRENTLY UNDER COMSTRJCRON AVENUE V Al TRACT 11 MAINTENANCE AREA ALONG AVENUE V NOUN OVERTDN AREA MAP a IiICAIED BW. W— I IRRIGATION IONS Wimp 2 VALVE SZE S ZONE ROW pm) A CONTROLLER NAM 5 TRACT WUIIBER/LOCATKIN 6 NUMBER OF ZONES ON CONTROUER TRACT II SITE PLAN MAP AREA CURRENTLY TRACT 11 MAINTENANCE r 1:20 r I- I-/-% 14 ALONG MAIN STREET � R.O.W. IRRIGATION MAINTENANCE SCHEDULE - TRACT 2C snm my awmn WEIR METER I DOUBLE OM V&VE I Man VALVE , H WAX BALL WLVE 2 0 ZONE VALVE S ® am COUPLER 2 --- _ - WAP MAIM I am SF PROJECT NAME: NORTH OVERTON PARK RICHE OF WAY MAINTENANCE SHEET: LM-26 PROJECT ADDRESS LUMOCK, TDW TRACT SHEET II-2 l ISSUE DATE: 5-1-D6 REVISIONS: 1 / PSC PROJECT 03b771.06 No Text No Text No Text No Text tt,kA gas 9ellg O f (VA jj7 W W I F- F- U U W W W� f� w�— i sus 0 .my A r. Ego Eo I pit —�e R ,H z oil h "I is i n 13AV GLENNA 120 MEDIAN MAINTENANCE h 3l 1� AS NOTED M': (D- 1 WWGAllON ZONE NUIEIER 1Im ` 2 VALVE SZE �CI-2A-2 3 ZONE FLOE (GPM) V \ 4 CONTROLLER NIMffR KEEP 5 TRACT NUISERAOCATION ®I® 5 NUMW OF ZONES ON CONTROLLER 5 t OVERTON AREA MAP mom ? a GLENNA SOOOACRE ME[LIAN SITE PLAIT MAP PROJECT NAME: NORTH OVERTON PARI( RLGHT OF WAY WMENANCE PROJECT ADDRESS LUBBOU, TEXAS ME R.O.W. WWATION MAINTENANCE SCNEOLa GLENNA GODOACRE MEONN SYMBOL HEY Ouwrry MATFR IIEFER I N DOUBLE DIM VALVE 1 ® MASTER ACME I MWATON CONTROLLER 1 MANUAL DIM VALVE 2 0 201E VALVE 5 s DISK FL1iR 5 apla3m R5 FLUSH Wf.VE - DIW rWATIOH i I60 s SHEET: LJA-34 TRACT SHEET GGEI-6 ISSUE [LATE: . 5-1-06 REVISIONS: PSC PROJECT +:. 43.8771.05 As MaGATED UHF.. l jJ`- 1 FAWA M iOtE RI�R i El ' VALVE SIZE 1 �1-4A-2 3� 3 ZONE FLOW (OPLI) 4 CONTROLLER NUMBER ®I ®� 5 TRACT NUMBER/LOCATION 4 6 �I 5 NUMBER OF ZONES ON CONTROLLER Z 3 5 K x > ®� J w 1— OvERTON AREA NAP roam � K GLENNA GDOGACRE MEDUAN SITE PLAN MAP ` @ ® X RTHl R.O.W. BiRIGATION WNNTEN44U SCHEDULE Q N A GOODACRE MEDAN SYMBOL ITEM DUw rm WATER METER 1 N DOW DECK WIE I ® MASTER VALVE I ® WiR ATIN 100NTROLLER D MANUAL W VALVE 2 a ZONE VALVE 5 0 am COUPLER 4 ♦ DIN FM 5 a PRESSURE REDUCER 5 e ----_-- FLUSH VALVE DRP WWATok 4 Base SF PROJECT HAVE: NORTH OVERTON PARK RIGHT OF WAY MAINTENANCE SHEET: LM-35 PROJECT ADDRESS LUWOCK, TEXAS TRACT SHEET CTB-9 ISSUE DATE: 5-1-06 REVISIONS: r \ PSC PROJECT i:. 03.8771.06 T G W 2 5i ■ 0 01 TRACT A MAINTENANCE AREA ALONG AVENUE w L� CITY BUS STOP J B1TRACT A MNMNANCE AREA ALONG AVDM w Mom �.�.� R.0.19. LANDSCAPE iWNTENANCE SCHEDULE - TRACT A OVERTON AREA YAP TRACT A "CW" TRACT A SITE PLAN MAP PROJECT NAME: NORTH OVERTON PARK RIGHT OF WAY LVIALNTEWVICE SHEET: LM-37 PROJECT ADDRESS Ll k TEXAS TRACT SHEET A-1 ISSUE DATE: 5-1-M REVISIONS: — - PSC PROJECT 039771.06 SYIB01. OEM WUMfrtT WaSCAPE 5.401 SF PtA M BE05 M SF t SO TREE — 9kowd Oak 1 +CY NU — Color Orn 2 iCP NU — WoM PWaCha 1 *es TREE — m cypnm a O PEOESiRMN UDM I1 �— STREET Lfi1fTS 0 ®B BEICM 3 OlR ur1ER 1111ACUE 2 t BB 1 BILE RKX 1 TG TREE GRATE 4 TRACT 10 TRACT A mKotANCE AREA ALONG AVMUE W NORTH TWA R.OM. LANDSCAPE YAWT "NCE SCHEDULE - TRACT A snleal m1 mwm H41EI5f R 4,474 SF PUWTWC KM 346 5F + 50 TREE - %..d Od 0 4-ME TREE - C■ W Elm 5 +CP TREE - CIA■te Pit10cM 0 +R6 TREE - Bold 2 ■ PEDESTROM UCMS 7 ll.-- I STREET mm I 8 RDIM 2 O LR 11T1ER RECEPfAQE I I N ORE RACK I TG TREE GRATE I P1i PUXSTRM W4DGE 1 R RECESSED LGHT 10 OYEMI AFFA MAP NORTH TRACT A SITE PLAN YAP e......... PROJECT NA#IE: NORTH OVERTON PARK RIGFIT OF WAYYr4NTENANCE eii°aii....awaae SHEEP: W—.S6 eieiC ua.—a-mmo PROJECT ADDRESS LUBBOCK, TEXAS TRACT SHEET A-2 ::T ISSUE DATE: 5-1-06 T m �% REVISIONS: yOil•YOYi��OOO�WiOo PSC PROJECT j: 03.8771.06 TRACT A IWNTOWCE AREA ALONG GLENNA GOODACRE BLVD. NORTH Al ,gyp ®® TRACT A hWNTQr{ANCE AREA ALONG GLENNA GOODVICRE BLVD. NOWT" B1 R3i.I. lA1escWE Ylw►oMlwoe salEolae - TAACf OVERTON AREA YAP TRACT A . rim -- TRACT A SITE PLAN YAP SYMML MY aumm WRQSCAPE 6,410 SF PLIINTTNO 9E05 423 SF # 90 TM - Shnmid Oak 11 x CE TREE - clot Ekn 2 • CP TREE - Chnae POW* 0 +as TREE - OW Cyprm 0 0 PED STRMN LKM 13 a-- STREET LI MS 1 =19 9i o 1 OIF LITTER RECEPTACLE 2 TO TREE ORATE ............e .. PROJECT NAYE: NORTH OVERTON PARK RIGHT OF WAY YNNTENANCE SHEET: LY-34 ............8 0.. PROJECT ADDRESS LU�OCK, TE7ulS TRACT SHEET A-3 ISSUE DATE: 5-1-06 ei �� REVISIONS: L 1-01, PSC PROJECT j: 03A7711.06 C® @jTRACTT A MOBEMANCE AREA ALONG AVENUE V NORTHto TRACT A MAINTENANCE AREA ALONG Ia OVERTON AREA YAP \® NORTH 10.9. L440SCAK MWMT@IA110E St 111E — TWICT A PB PEOfSiR1N! BRCCE 1 rratm+ ---- . --A ntm TRACT A SITE PLAN MAP AL PROJECT HAVE: NORTH OVERTON PARK RIGHT OF WAY YWTEN4NCE SHEET: . LY-40 PROJECT ADDRESS UJIMCK. TEXAS TRACT SHEET A-4 ISSUE DATE: 5-1-06 REVISIONS: —� t r PSC PROJECT B33771.06 &TTPAACI A MNNTENAtM AREA ALONG AVENUE V NINTH 1m TRACT A OVJ?RfOTI AREA NAP r�ORin ' �'ink T" — TRACT A SITE PLAN NAP R.O.W. LANDSCAPE MAINTENANCE SCHEDULE — TRACT A srdm II4I 0 MRIY WJMSCPPE 2.760 SF PLANING BE05 120 SF f SO TREE — 5henmd Oak 1 •CIE M — Cedr Bm 5 ,& P TREE — C*i PWWM 0 +es TREE — BoM DAwm 0 a PEOESIRM tOM S Or— I SOW LJGM15 0 MIG IEIICM + 4 LN UTTER RECEPTACLE f I it EK RACK 9 TG TREE GPATE I GG t]1AFN41 F�fATE 14 SF PROJECT NAME: . NORTH OVERTON PARK RIGHT OF WAY MWMN ANCE SHEET: . LAT-41 PROJECT ADDRESS LULWCK, TEXAS TRACT SHEET A-5 ISSUE DATE: 5-1—w REYLSIONS: _� i - PSC PROJECT +:. 03,8771.06 MAJN STREET 410 TRACT A MNNTDW4CE AREA ALONG MN STRW NORTH B1 TO OWRTON FREA YAP TRACT A ®®BEE i B1 (� TRACT A SITE PLAN IIAP orN ®10 NORTH R.o w. LANDSCAPE wmTEmANCE SCHEDl1LE - TRACT A HEY cam WJMWAPE 7,575 SF PLWW BEDS too SF TREE — ML.m OckTREE IGR — Lh* OakPEDESIm AJCHIS 1O STREET LIGHTS 0 I101CH UTTER RECEPTACJE 2 WE PACK D TG TREE CRATE 10 OG OWIMM CRATE D SF PROJECT NAME: NORTH OVERTON PARK RIGHT OF AWAY MNIITENANCE SHEET: 1.16-42 PROJECT ADDRESS LLOBOCK. TEXAS TRACT SHEET A-6 ISSUE DATE: 5-1-06 REVISIONS: PSC PROJECT j:. 03,8771.06 SIM A MANTOW CE AREA ALONG AVENUE W im PROPERTY LIME AVENUE W AVENUE W ® CITY BUS STOP NORTH B1 TRACT A MOM NANCE AREA ALONG AVENUE W NORTH OVERTON AREA MAP LEcM® TRACT A AS IN DWED BY: � I idrsCATION ZONE NIMIKR 1 ® B1 3 ZONE � L(GPM) 4 CONTROLLER NUMBER 5 TRACT WU*IER/LOGTON At 6 NUMBER OF ZONE$ ON CONTROLLER 1 3 S R-O.M. NWAT10N MWTENANCE SCHEDULE - TRACT A s"m REM OUAmm MAU METER 0 H 000W CHECK VALVE 0 ® MASTER VALVE 0 MRICAl" CONIRDUFR 0 MAMAAL BALL VALVE 0 0 ZOIE 4ALVE 1 A OUCK WUPLER 5 _ ----- ow MAGOON 285 SF TRACT A SITE PLAN MAP PROJECT NAME: NORTH DMON PART( RIGHT OF WAY WAR{TENANCE SHEET: LM-43 PROJECT ADDRESS LUMM, TEXAS TRACT SHEET A-7 ISSUE DATE: 5-1-06 REVISIONS: PSC PROJECT j: 03.8771.06 1�j B� TLCT A MAINTENANCE AWA &ONG AVENUE W NORTH LEGEND TRACT A AS � Al E lamm 110 f2 SIZE 1-7A- ZONE ®®i i ] ZONE FLOW (GPM) 5 CONTTRACROLLER NRR/�IACAT1pN .. 6 NtWR OF ZONES ON CONTROLLER 2 5 NORTH R.O.M. IRMATION MAWTENANCE SCHEDULE — TRACT A sn®oL m 01MNTITY w1ER NETER a r14 aOUBIf tNCLIt VALVE a 0 riSTEA +Ave a a /[ANaYTION cnNtaauor a . WMML WILL VALVE a 0 2dE 'YN.4i 1 0 OUIfX Co" 2 -----_ OAP AtlpG1ION 316 SF OVERTON AREA TRACT A SITE PLAN MAP PROJECT MME: NORTH OVERTON PARK RIG1iT OF WAY MARITEWINCE _ LMs44 PROJECT AOORESS LUBBOICK, TEXAS TRACT SHEET ISSUE DATE: 5-1-06 .. REVWN5- .................. i f - PSC PROJECT !: 03.8771.06 A MAINTENANCE iff TRACT A Is GLENNA WOOACRE BLVD. 0k 49 bp NORTH GLENNA GOOWCRE BLYD. 14 PROPERTY LWE w MCE AREA ALONG GLENNA GOODAME BLVD. NORTH J.TI ROT A LEGEND AS NVAM W (� —� I SiBliAT10N IONE NI 1 2 VALVE SIZE Cl-2A-2 3 ZONE FLOW (GPM) 4 CONTROLLER NUMBER 5 TRACT NUMBER/LOCATION '\ 5 NUMBER OF ZONES ON CONTROLLER 3 ((S OVERTCN AREA MAP NMWH TRACT A SITE " MAP PROJECT NAME: NORTH OVERTON PARK WA Of WAY MAINTENANCE iTe"'SE8$B:ES"°! PROJECT ADDRESS LUBBOCK. MIA5 Si rii 'jai $�1° RA.N, MgiliiA W MAr1 OW CE SOMuF - TRACT A slam MA a1INRAIV ORR Mm a ry DOUBLE CHM WLYE a 0 MA51EB VALVE o O 110SAM DOrrFAUX a MANX BALL VRLYE a 0 ZawE VALVE 1 it Qm Cwuol 2 IFBICAm 12] SF SHEET: LM-45 TRACT SHEET A-9 ISSUE DATE: 5-1-06 REVIS40N5: PSC PROJECT j:. M771.06 AVENUE V • m M AREA ALONG AVENUE V u= 7 AVENUE Y r - C® NORTH TRACT A MANiENANCE AREA ALM AVENUE V NORTH B1 RA./. 1RIIWW YANTIDIVI IX 5C771FOULf - TRACT A OYERTON AREA NAP TRACT A� LEGEND As NMTM By. BI 1 R VAU ZONE NUMBER 1ml 3 V� FU (GPM)C1-7A-2 4 CONTROLLER NUMBER •� s.u� 5 TRACT NUYBER/LO[LOG a110N R NUMBER Of ZONES ON CONTROLLER Z 3 5 vml om Lu INTR Wo 0 r.� me occK OLVL 0 ® NASTER VALVE o ® MrATO OONRKKIER 1 Wmw GALL VALVE 0 a 201E VALVE 2 0 wo Cowin 2 ___ ow RRr mN 111 S: NOWH TRACT A 511E PLAN NAP PROJECT NAME: NORTH OVERTON PARK RIGHT Of WAY MAINTENANCE SHEET: LM-46 PROJECT ADDRESS LUBBOCK, TExAS TRACT SHEET A-10 ISSUE DATE: 5-1-06 REVISIONS: -�i PSC PROJECT j:. o3.s771.06 AVENUE V -1--- PROPERTY of TRACT A kWNTENAANCE AREA ALONG AVENUE V NORTH um now M. - OVERTON AREA MAP MORTH TRACT A Ai TRACT A SITE PLAN NAP AWW V I \® NORTH R.MW. IRRIGATION fWNTENANCE SCHIMAE — TRACT A s>an eta MM at spin MMR a ?'A ODW CHM VALVE o 0 MWO VALVE a O WW ATMN 6oR18 um 0 N YVAML Ml VALVE 0 0 zow WIWE 0 a Q= caIR.ER 1 -- 7-H-1 DMP MAIM 1217 PROJECT NAME: NORTH OVEflON PARK WIT OF WAY IMMEW)KE SHEET: LY-47 PROJECT ADDRESS LLCM. TWS TRACT SHEET A-11 ISSUE ELATE: 5-1—M REVISIONS: \�® PSC PROJECT 1:. 03.8771.06 MAIN STREET MAIN STREET 10 " _® i TRACT A b. OVERTON AREA MAP /1L1111H TRACT A SITE PLAN NAP 0\ 4910 NORTH 00 lip NORTH R.O.W. IRRIGATION WMTENANM SCHEDULE - TRACT A sr4m REN OU NM HATER NETfR a N Daw CHECK W LYE 0 0 am WAVE 0 Q FACO N C11NTFOLLER 0 +� MANUAL WI VALVE 0 0 MW WAVE - 1 0 MCK CDJP1ER 0 ------ ow RRIGTA011 1 150 .................... ...6... PROJECT NMFE: NORTH WRTON PARK RIGHT OF WAY M4NTENANCE SHEET: LY-48 PROJECT ADDRESS LLIBBOCX. TEXAS TRACT SHEET A-12 ISSUE DATE: 5-1-06 •• REVISIONS: M MU.".." r - � _� PSC PROJECT /: 03277108 a 9 ai 0 nw�'n � � Boa o0o m m x rRj T w N 0 LEGEND AS MOO= 1 IRRITU ZQNNE NUMBTn N 2 VALVE SIZE 1 1-2A- 3 ZONE FLON (GPM) 4 CONTROLLER NUW3ER 5 TRACT NIMIERAOCATION 6 NUMBER OF ZONES ON CONTROLLER 3 5 R.O.W. IRRIGATION MAINTENANCE SCHEDULE - ROTARTY SVA18Dl 1 ITEM QUANTITY WATER METER I �+ DOUBLE CHECK VALVE I ® MASNER VALVE I ® RRIDATKIN CONTROLLER I MANUAL BALL VALVE • 0 ZONE VALVE 3 • QUACK CO-" Z • DISK FILTER 1 • PRES'AJRE REDUCER I 6 FLUSH VALVE 9 - DRIP fetlOATION $773 SF z x s ArN 14 D NORTH PROJECT NAME: NORTH OYERTON PARK RIGHT OF MAZY MAINTENANCE SHEET: LM-50 PROJECT ADDRESS LUBBOCK. TEXAS TRACT SHEET R-2 ISSUE DATE: 5-1-06 REVISIONS: ^7\ PSC PROJECT /:. 03.8771.06 LANE TRACT 14 tM 7PERTY-LINE AREA ALONG AVENUE T AVENUE T MA AVENUE i �� �1 TRACT 14 MAINTENANCE AREA ALONG AVENUE T NO® 120 � . Al • TRACT 14 Is r /\ �. OVERTON AREA MAP TRACT 14 SITE PLAN 1LAP R.O.W. LANDSCAPE MAMTENANCE SCHEDULE - TRACT 14 S1'm I IIEAI OAlpW IIARI15 K 4¢56 SF RANTM ADS 635 SF + 9D TREE — Swwnnmd Dow 6 fCE TREE — CWw Ewn 14 6 PEDESTRM UM 9 ---AI SFREET L,CM 1 4�J 9 BD CH 2 OLR UTTER RECEPTACLE 2 I m an RACK , PROJECT NAME: NORTH OVERTON PARE( RIGHT OF WAY MAENTEMAWE SHEET: LM-51 PROJECT ADDRESS LUBBOCX, TEMS TRACT SHEET 14-1 ISSUE DATE: 5-1-06 REVISIONS: ^,L,� PSC PROJECT 03.8771.06 W 14 CE AREA ALONG AVENUE T �I�IWVH F4 l - rip OVERfON AREA MAP UPON TRACT 14 Al �►�w+ii TRACT 14 SITE PLAN MAP 7TH STREET __ _fROPqa UNE_ _ 4M NORTH R.O.w. LSOSCAWE W TD ANCE SCHEDULE - TRACT 14 9A2:: .:MAA PROJECT NAME: NORTH NERTON PARK RIGHT OF WAY 114NTEW.YCE SWET: UY-52 PROJECT ADDRESS LUNDCK. TEXAS TRACT SHEET 14-2 ISSUE DATE 5-1-M ...REYISKINS: :9 \ PSC PROJECT 03.8771.06 -L1 I 1 I I 1 1 1 11 1 1 1 1 1 1 0] is PROPERTY LINE ie R.O.W. LA40SCAK WAiMTE)MM SCFIMM - TRACT 14 M OSWE 5,31e 9F HAWMc RM 97 SF + 50 mu - 9wffo d oa 3 • q¢ llu - aimm pwo:. s .e4 mm - aw aet 11 0 PEDESTI M UM 7 --m 5111EEi MIS I ra a tIp+CM Y O tR tIiIER A£l7:PUCtE 1 I HxE RAGE I PROJECT NAW: MDM [1YM(W PWbt MIT OF ptJ1Y WWEW Jff SHEET: LM-53 PROJECT ADDRESS UJRSOCK, TEXAS TRACT SHEET 14-3 ISSUE DATE: 5-1-06 REVf510N5: _- - PSC PROJECT +:. 03B771.06 AVENUE R IFF ~�`�'�! ---� T14 hWNTOPME AREA ALONG AVENUE R e AlRIwCT 1 Q m& n OVERTON Ai�A YAPmmw °: H.: R.O.W. LNOSGIPE AMNTENANCE SCKDULE - TRACT 14 L 61 Al TRACT 14 SITE PLAN IWP PROJECT NAMP NORTH OVERTON PARK WHY OF MY W MWACE SHEET: LY-54 PROJECT ADDRESS LUBBOCK. TEXAS TRACT SHEET 14-4 ISSUE DATE: 5-1-06 ` REVISIONS: T PSC PROJECT +: 039771.06 AVENUE R PROPERTY LINE XF� wrol", In. co" TRACT 14 MAINTENANCE AREA ALONG AVENUE R 1:20 77 OYERTON AREA MAP Id>fnlr TRACT 14 SITE PLAN MAP (A AV NORTH R.O.W. LANDSCAPE MAINTENANCE SCIEDULE _ TRACT 14 SYMatY REY OtWlillr HYiDSGNE 1198 SF PIANIM BFUS 377 SF * SO 1REY — SNWWWd Oat 2 *CE IRE — Codw EM II ■ PEDES" UWM 5 e a am I VITA I UM RECEPtACIE to I W RACK '.ii::MM e:88888Y88..; PR(LECT NAME: NORTH OVEIMI PARK MTTT OF NAY WMTENANCE SHEET: LM-55 BeL�o88:;888888888 PROJECT ADDRESS LUBM, TEXAS TRACT SHEET 14-5 ppYY. e.on.e.s w I� ie ISSIf£ DATE. 5-1-06 vu REVISIONS: ........Yoa.e... .........:r�, - PSC PROJECT /:. U8771.06 0 RA.w. E aMENI AVENUE T ;1 TRACT 14 YMNfDIA M ARFA AUM AVDK T NOWT �a1 me EASEIENr �I -----------.--------- ----- iAVENUE T s1 TRACT 14 UNTENANCE AREA ALONG AVENUE T NOM 1.L.►7G D R.O.W. IRRIGATION MAINTENANCE SCHEDULE - TRACT 14 AS OW-9 D or �� A` 1 1 NRGATION ZO 11UJ1�R T ■ 2 VALVE SIZE CI-14-2 ' ZONE FM (C PU) 1 4 CONTROLLER NUWR NINIBER TRACT 14 5 TRACT NLIYRERAOCATION 2 3 1 6 I� 6 NUMBER OF ZONES ON CONTROLLER 5 i..- 'i L SI'IM REM 01NMmY WARR IIEITR D �+ OOLKiIE CIECK VALVE 0 A am VALVE 0 0 mwm OOmROmm O i wj& aul W VE 2 0 _ 201E VMVE O ® OIACK COUPLER 2 _---_-- DO 0TIG004 5m SF OVERTON AREA MAP �® TRACT 14 SITE PLAN YAP PROJECT NAME: NORTH OVERTON PARK RIGHiT OF WAY MAINTENANCE SHEET: LM-56 Oe :: •e::: PROJECT ADDRESS LUBM, TEXAS TRACT SHEET 14-6 :i• ISSUE DATE: 5-1-06 T REVISIONS: •:ii n i Ie �s F5C PROJECT +:. 0.3.8771-DB iAVENUE T Al 14 MAMENANCE AREA ALONG AVENUE T NORTH OVERTON AREA MAP jN TRACT 14 r Al B1 1.—j TRACT $4 SITE PLAN MAP M = - F 7TH STREET n LEGEND A5 MWATED W. I(p-- 1 INAIGA a ZONE NU116ER 1IM 2 VALVE SIZE 1 CI-14-2 ZONE FLOW (GPM) 4 4 CONTROLLER NUMBER 5 1RACT NUMBER/LL1C90 6 NUMBER OF ZONES ON CONTROLLER 2 5 R.&W. IRRIGATION MAHTENANCE SCHEDULE - TRACT 14 mm gumm WER WU o r i OOIIBIF OCM WIVE O 0 WSIEN VALVE O C FFrA uN cmam a 1 MUM BAIL V&VE 1 0 ZOIE VALVE 0 S wo COVPIfR 1 ------ I Off WWATITII 1 fill SF PROJECT NAME: NORTH OVERTON PARK RIGHT OF WAY MANTENANCE SHEET: . LM-57 PROJECT ADDRESS LUBBOCK. TEXAS TRACT SHEET . 14-7 ISSUE DATE: . 5-1-06 REVISKWS: PSC PROJECT 1: CIU771.06 7TH STREET �Flp Al TRH 14 IrWO MM AREA ALOW 7TH STREET NORTH PROPERTY 7TH STREET 7 i► 1 TRACT 14 kWDWCE MG 7T ARFA & H STREET NORTH OVERTON AREA JAIAP41*011 mm LEGEND A5 WIY1ID BY: �` 1 ITRUDUK)li 2ONE NlR�il 1IM 2 VALVEZONE 512E 1 �1-th CONE 3 fLOFLOW(CPA} TRACT 14 4 CONTROLLER NUABER 5 TRACT NIAM/LOCATION AI B & 11UABER OF CONES ON CONTROLLER a2 3 S TRACT 1�4 � PLAN MAP ROM. IRRIGATION IMTENANCE SCHEDULE - TRACT 14 s"An M31 OWNITIY IINIER WM 1 N DOOBI.E DmIECK V11.VE 1 0 WM VALVE 1 p MCAYMON COUWAiER 0 M NA BALL VALVE 5 @ 1RAEVALVE 2 ® OM 0011P1ER --- -- WMP M?lgRJ om PROJECT NAME: NORTH OVERTON PARK RIGHT Of WAY WYNTENANCE SHEET: . LA-58 PROJECT ADDRESS LUBBOCK. TEXAS TRACT SHEET 14-8 ISSUE DATE 5-1-W REYLSJONS: PSC PROJECT 031771,08 14 4 Tv AVENUE R �i., iwWwwi wwra� meawn nnan�. Inuwm puruu TRACT 14 NmAi REAR I I� r_ �\j r 01kflfON AREA WP TRACT 14 SITE PLAN YAP R.O.W. EASEMENT AVENUE R UNE AS MWATEO O1" �'r 1 TION 20AIE MAR 110 2 VALVE 1 �I-14 3 ZONE FIOLO w (GPM) 4 CONTROLLER NUMBER 5 TRACT NU11BERAOCATION 6 NUM" OF ZONES ON CONTROLLER 2 3 S R.O.W. IRRIGATION MAINTENANCE SCHEDULE - TRACT 14 SIMM ITEM otwffff DIETER w" 0 N DOUBLE CXECIL VALVE 0 Y4WER VALVE 0 p AWIC1MN CONTROLLER 0 MOM GALL VALVE 2 e ZONE VALVE 0 m OUICN COUPLER 2 - j- DRIP RVATION 351 $F PROJECT NAME: NORTH OVERTON PAW RIGHT OF WAY MAINTENANCE SHEET: LY-59 PROJECT ADDRESS LU NW. TEXAS TRACT SHEET 14-9 ISSUE DATE: 5-1-06 REVISIONS: L— PSC PROJECT j:. =711.05 i i AVENUE R Lau A A A R.O.W. EASEMENT I I— AVENUE R 'PROPERTY LINE R.O.W. EASEMENT 14 MAINTENANCE AREA ALONG AVENUE R NM IS LEGEND AS KI CAWI W. (D- I iOiGAT10N ZONE NIN"R 110 2 VALVE 512E C1-14- 3 zap FL)1T (GPM) 4 CONTROLLER NUMBER 5 TRACT NUMBER/LOCATION 6 NUMBER OF ZONES ON CONTROLLER 3 5 4....:.::.:..:..:. PROJECT NAME: . NORTH OVERTON PARK RIOF1f OF YYAY MAINTENANCE PROJECT ADDRESS LUBBDCR, TEXAS .................. R.O.W. AWATION MAINTENANCE SCHEME - TRACT 14 Srdm REtl 0YM00Y WATER IMIIFR 0 ri DOWLE CHECK +LYE 0 Aa NA51ER VALVE 0 0 WAWATWN CONTROLLER 0 M W[ML SALL VALVE 1 e ZOLE WYE 0 0 0A1110L COUPLER 1 ------_ DRP NINATION 377 SF SHEET. LU-60 TRACT SHEET 14-10 ISSUE DATE: . 5-1-06 REVISIONS: \ PSC PROJECT E:. W771.06 OVERTON PARK RIGHT OF WAY MAINTENANCE MAP MARSHA SHARP FREEWAY MAIN STREET n loop OVERTON AREA MAP NOffrH m SHEET NO, TRACTR%L TRACT SHEET NO. LM-1 1A 1A-1 LM-2 1 A-2 LM-3 2A 2A-1 LM-4 2A-2 LM-5 2B 2B-1 LM-6 H-L 2B-2 LM-7 IR 28-3 LM-8 IR 2B-4 LM-9 2C H-L 2C-1 LM-10 IR 2C-2 LM-11 4 H-L 4-1 LM-12 H-L 4-2 LM-13 H-L 4-3 LM-14 H-L 4-4 LM-15 IR 4-5 LM-16 IR 4-6 LM-17 IR 4-7 LM-18 IR 4-8 LM-19 8 H-L 8-1 LM-20 H-L 8-2 M-21 H-L 8-3 LM-22 IR 8-4 LM-23 IR 8-5 LW-24 IR 8-6 LM-25 11 H-L 11-1 LM-26 IR 11-2 'H-L HARDSCAPE AND LANDSCAPE '•IR IRRIGATION LM-60 IR 14-10 NOTE: OVERTON PARK MAPS ARE TO BE USED FOR REFERENCE AND IN CONJUNCTION WITH WRITTEN SPECIFICATIONS :.... ... PROJECT NAPE: NORTH WE1710N PARK R1GHf O F MAY lN11ffEMKE SHEET: G-001 :i:°s:::•a:a•°o°e°od eeo �Ynae�Y.oueP Sere PROJECT ADDRESS LUBBOCK, TEXAS/ TRACT SHEET ISSUE DATE: 5—t-06 �� �• REVISIONS: PSC PROJECT J: 03.8771.06 �A TRACT 1A MAINTir 4MM AREA & MdG UNKRSIM AVENUE NORTH Al ,� 1x PROJECT HAVE: NORTH OVERTON PARK RIGHT OF WAY AIAIHIENANCE PROJECT ADDRESS LURBOCK, TEXAS ,o"%A ®b NORTH R.O.W. UWOSCAPE MAINTEMa SCHEDULE - TRACT 2A SYIIBk1l I1E11 OIIANRIY IWDSCAPE 92A SF RANIIIG KM 971 5F i 1D M - Un flak 6 iCE MM - Cody Elm 7 s pEOpIRWI LI7TI5 9 Sim UpRS 1 li B omm I d Ut UIIER RECDWI 4 I BR m RACY 12 r�A�►11V�. . L� SHEET: W-I TRACT SHEET IA -I ISSUE DATE: 5-1-06 REVMONS: P5C PROJECT j:. 018771.06 rm4 5 MIR 41, � I ic UNIVERSITY AVENUE � ••_' A� TRACT 1A MAINTENANCE AREA ALONG UNNERSITY AVENUE NORTH TRACT 1A MIA I IV t GLENNA GOODACRE BLVD. FM FM M FM AS MUM BT T 1 MltiNO ZONE MNITTEli i 2 VALVE SIZE t Cl-IA-2 l°J 3 ZONE FLOW (GPM) .5 4 CONTROLLER MIYBER 5 TRACT N WMAOCATION 6 NI1NM OF ZONES ON CONTROLLER Z 5 r. 11 D AREA ALONG UNIVERSIM AVENUE NORTH 410 NORTH R.O.W. 60GATCN MAIN ENM CE SCHEDULE - TRACT 2C rnNML FIX Gummrc wWR w" , N OWD E CHUM VALVE 1 0 NYL m VALVE , ® marAym comouR MANUAL BALL VALVE Z 0 ZONE VALVE t • Q= cm"2 ------- DW tNUMN Q7, SF PROJECT NAME: NORTH OVERTON PARK RIGHT OF WAY WANIEWWCE _ SHEET: W-2 PROJECT ADDRESS LOBM, TDIAS TRACT SHEET 1A-2 ISSUE DATE: 5-1-M REVISIONS: s- PSC PROJECT j:. 4 ARM AS No Text ��Nlill l 11 MINI I IIh�NI II I I!� I II I'IN N N iN' � N I���i�a��d N IN �di N I N IWi��IN N IN!�N � 1��'' LEGEND A3 pO1ClIlED B1° W'"�' 1 N ZONE NIrI�R i 2 VALVE SIZE I CI-2A-2 ZONE ] ZONE ROW (CPM) 4 CONTROLLER NUMBER 5 TRACT NINWAOCATION 6 NUMBER OF ZONES ON CONTROLLER Z ] 5 oO 1410 NORTH R.O.W. IRRIGATION MAINTENANCE 9CNEOULE - TRACT 2A SYMIUL RT8 OUMI M WRTER METER F N RGUBIE CREM VALVE ® FAG9 N COM MLEA I M MANUAL BALL YNLVE S 0 ZONE VALVE 2 CUU w 3 ---- -- DRP NOOION 106! SF OW" AKA NAP � TRACT 2A SITE PLAN YAP PROJECT NAME: NORTH OVERTON PARK RK;HT Of WAY MAINTENANCE SHEET: LW-4 pullp.11..111H PROJECT ADDRESS . WWOCK, TEXAS TRACT SHEET 2A-2 S: ISSUE DATE: 5-1-M .:.:.:::.. :.. P5C PROJECT j:. O]B77L p6 28 YAmnMANCE AREA ALONG AVENUE x M F � i®®NIA® A OVERTON AREA IWPPROJECT NAME; •$' MP111.figBeCl PROJECT ADDRESS V M Jl r•T T 7 Al BT TRACT 2B if TRACT 2B SiTE PWI WP NORTH OVERTON PARK RIG7{T OF WAY MAINTENANCE LLCM. TEXAS Nbf�TH R.O.W. LANDSCAPE MAINTENANCE SCHEME — TRACT 2B SrA& mar MMKM rNppscAPE 7M2 5F VLMTM Bms 632 SF f CE TREE - Color Bm 2 i CP TRCE — Okewa PW*Che 5 + IA TREE — I" Oak 3 i SD TREE — ShwMed Ook 6 a KoEsnahN LTCHIS 6 g-O STREET Lrp115 2 9 BENCH 3 OLA TTER URECEPrAC E 3 SHEET: LW-5 TRACT SHEET 2B—I ISSUE DATE: 5-1-06 REVISIONS: � r PSC PROJECT j: 03.8771.06 c: •7. �T *r� , �,�1"M �-'7 III"' ' �"# �I \�\1:\\\�'�1�. �- 888 S:SS �S:ABS PROJECT ADDRESS LUBBDCK. TEKAS PROJECT NME: NORTH OVERTON PART( RIGHT OF WAYWINTEw1MICE SHEET: LM-6 TRACT 5i1€ET 4B 2 .a6t�o ISSUE DATE: 5-1—m :A 4 PSC�PRWECT j:. 03.8771.05 • w • • PROPERTY M B1 ,TRACT 2B irWKTENANM AREA ALOW AVME X W)RTH "ow OVERTON AREA YAP rgmH LEGEND Ai AS WMTEO By: 81 1 IRIMAM MNE KMBER 1 2 VALVE SIZE CI-2A-2 TRACT 28 4 CCO� ONE �( MJMBER 5 TRACT WMBER/LOCATI OV 6 NULW OF ZONES ON CONTROLLER 2 3 5 TRACT 2B SITE PLAN YAP ROM. IRFbCATO1N WMTENANCE SCHMILE — TRACT 20 SrdQ0L Mli WUMTaY MATER YE" a N 0allBI.E DM VALVE 0 • WM YAWS 0 03 ARRKAYON CONTRmis a WNAW BALL VALVE 2 0 MW OLVE _ 2 PROJECT NAME: NORTH OVERTON PARK WHT OF WAY WWRENANCE SHEET: LAI-7 PROJECT A00RESS . LUBBOCK. TEM TRACT SHEET 28-3 ISSUE DATE: 5-1-06 REV45ION5: 90, PSC PROJECT %:. 03.8771.06 AVENUE x _ OM • rPROPERTY LINE win lK CI-28-18 \l • Al TRACT 2B "NTDW4CE AREA & MG AVENUE x NORTH m PROPERTY UNE Ln TRACT 2B MANTENANCE AREA ALONG GLENNA GOODACRE BOULEVARD OVERTON AREA MAP LEGEND TRACTd2B AS M01ED W: I ROGATIONZONE MAW2 VALVE SIZE C1-2A-2rx� flow 3 z(cPM�4 CONTROLLER NUMBER 5 TRACT NUMBER/LOCATION 6 NUMBER OF ZONES ON CONTROLLER 2 3 5 TRACT 2B SITE PLAN MAP ww ffm an S R.O.W. ROGATION WMTENANCE SCHEDULE - TRACT 2B snm ITEM OTwBRY LID rWER METER 1 1-4 DOIW CHECK W VE 1 0 MASIER 1LVE D c AAWTM CONTROLLER 1 LLWAIAI BALL VALVE 2 a ZONE VALUE 2 • Q= COUPLER 1 ORP RVAMN ... 651 SF ::e::::as:u:::::: PROJECT NAME: NORTH OVERTON PARK R16HT OF WAY MAINTENANCE SHEET: W—B OOgOOC PROJECT ADDRESS LUBBOCK, TExAS i " TRACT SHEET 28-4 ISSUE DATE: 5-1-06 .1 miff". ' REVISIONS: M '.� L \ ! _ PSC PROJECT /:. 03.8771.05 BLVD. �v NORTH /\ ®10 NORTH ROX LANDSCAPE WNTDWa SCHEDULE - TRACT 7A PROJECT NAME: NORTH OVERTON PARK RIGHT OF MAY WWTENANCE SHEET: W-9 PROJECT ADDRESS LUMOCK, TCM TRACT SHEET 2C-T ISSUE DATE: 5-1-06 REVISIONS: r -- PSC PROJECT j:. 032771.06 o z �A a m TRACT 4 MAKrENANCE AUM AVENUE x �►�$ M A—% TRACT 4 STTE PLAN YAP OVERTON AREA NAP 40 RO.w. LANDSCAPE MAINTENANCE SCHEDULE — TRACT 4 s3Ba. MN QLWMTY IiIV+OSCAPE 5,010 SF PLANTING BEDS 465 SF + SO TREE - Snwmwd Odc 5 i CE TREE - Cater Elm 7 s PEDESItMN LGNTS 11 ---M STREET UM O A!f R BENCH D OlR UTTER REGEP ACiE t I OR BIKE RACK 0 El .........".....•. PROJECT NAME: NORTH OVERTON PARK RIGHT OF WAY 1VJNIENANCE ...3..a....,... SHEET: LM-11 • ::BS-glu�i PROJECT ADDRESS LU�OM MM i TRACT SHEET 4-1 `0eil ISSUE DATE: 5-1-06 REVISIONS: ................. ,- —_-- PSC PROJECT f. — 03J9771.06 AVENUE X a a K OMERfpI AREA YAP ,mm RACT T4 SITE PLAN YAP RL RL RL R.O.Y. LANDSCAPE MAINTENANCE SCHEDULE - TRACT 4 snow m OTMNRIY HARDSCAPE 6150 SF 99 PLAMri1G BEDS GM 5F t LD TREE - S wourd Oak 9 t CE TREE - Cedar Elm 5 It 90 TREE - vyft 4 n PEDESTRIAN LICJJTS 12 —d STREET LIGHTS 1 AI B KNCH 3 a LR LITTER RECEPTACLE 3 i 0R 1 BIKE RAM 0 M PEDESTRAN @ROM 1 � 1O PROJECT NAME: NORM MERTON PARK W-441 OF WAY MAINTENANCE SHEET: LY-12 PROJECT ADDRESS LLNOCK. TEXAS TRACT SHEET 4-2 ISSUE DATE: 5-1-06 REVGONS: PSC PROJECT . 032771.06 iI:.��+ii! Or-% TRACT 4 SITE PLAN YAP MUM AREA YAP ONM R.O.W. LANDSCAPE MAINTENANCE SCHEDULE — TRACT 4 S'I'100L m OtRRmTT HeRDSrAK GM SF PI WTW BEGS W5 SF it LU TREE — Shwmiord Ook 9 + CE TREE — Cedw Ekn S -A SO TREE - 4 a PEOESTRM LK M 12 —� STREET LIGHTS 1 =16 MICH 3 OLR UIIER RECEPTACLE 3 t OR ORE RACK .9... PB PEDESTRYN BRIM 1 10 PROJECT NAME: NORTH OrERTON PARI( RIGHT OF WAY MAINTENANCE SHEET: LM-13 PROJECT ADDRESS LUBM. M(A5 TRACT SHEET 4-3 ISSUE DATE: 5-1-05 REVISIONS: %. t PSC PROJECT j:. 03.8771.06 7 - TRACT 4 !MAINTENANCE ALONG AVENUE W Al ,ao ((♦ TRACT 4 MAINTENANCE ALONG AVENUE W z TRACT 4 SITE PUN YAP OVERTON AREA YAP mom® R.O.W. LWSCAPE UNN1ENANCE SCHEDULE — TRACT 4 St IM flu QUANTITY wMSCAPE 3m SF t+IANTIM ems 405 SF it SO TREE - 9mmmord Oak 2 �A CE TREE - C4ft Elm IT- 0 PEDESTRIAN UWOS 10 ----E STREET LIDM 0 B BENCH 0 OUT 1 LITTER RECEPTACLE 2 t OR BK RACK O TO TREE CRATE 4 "s:A::e:".::U PROJECT NAME: NORTH U&MON PARK RK HT OF RACY YAWTENANCE SHEET: EY-14 � e. o °e PROJECT ADDRESS LUCIDDCK, TDI S TRACT SHEET 4-4 : a �'9: \ ISSUE DATE: 5-1-06 REVISIONS: ....:: PSC PROJECT f: 03.8771.06 I. E E AVENUE x LEM- 4 hWKMWCE ALONG AVENUE X *� $ IRRIRRI? -� �E'1q� -- gYcilf �- Ig1q -- Ngll[Mgtl_ IglIE�IigA. - ` ME" x TRACT 4 MAINTENANCE ALONG AVENUE X �! a� uama an LEGEND R.O.W. IRRIGATION MAINTENANCE SCHEDULE - TRACT 4 4 M TRACT 4 AS BAxd1FD 8Y �'" T AMAGAION IONS NN�ER 1 • fi 81 # 2 VALVE SIZE 3 ZONE FLOW (GPM) 1-4-3� N NUkM Al 5 TRACT IAIYBER/LOCATIDN 6 NUMBER OF ZONES ON CONTROLLER Z 3 5 S1+M ITEM aIw+1ITY WATER IETER 0 nl DMIM CHECK VALVE .. 0 0 WM VALVE 0 Ra MAIM CONTROLLER 0 M MUM B1LL VALVE 3 0 ZONE VALVE 0 ® QUICK COUPLER 4 —= DRP FMT06 465 SF TRACT 4 SITE PLAN YAP DMUM AREA YAP am PROJECT NAME: NORTH OM WON PARK WIT OF WAY WINTEWCE SHEET: LY-15 �s58:e peBgZ�":'6� PROJECT ADDRESS LUBBOCK, TEXAS TRACT SHEET 4-5 :I ` M ISSUE DATE: 5-1-46 �M� REVISIONS:: L.MLL_� �/ 1>•�] PSC PROJECT %:. U8771M ....... .o.eee.e�% — -- — —' TRACT 4 wwNRNANM ALONG AVENUE X NORTH -I■I C111 kS 1Wc ROC 4 fim ITRACT 4 ar OVERTON AREA MAP ® TRACT 4 SITE PUN WW ....'siii�esi9PROJECT NAME: NORTH OVERTON PARK RGHT OF WAY MAINTENANCE Sao:i�a9:o�� A67C PROJECT ADDRESS LUBBOCK. TEXAS • 4"Ml J AS IIMGIED BY: 1 IiiTJLTIOM ZONE wumm 1Im I VALVE SNIP 1-4-3 TONE iFLO• {CPY} T, 4 CONTROLLER NUMBER 5 TRACT NUMBER/LOCATIOM 6 NUMBER OF ZONES ON CONTROLLER I ] 5 R.O.W. IRRIGATION MAINTENANCE SCHEDULE — TRACT 4 SrAM ITEM SATER METER N DOUBLE CHECK VALVE 0 WASTER AALVE ® WWAIION CONTROLLER D M MANUAL BALL VALVE as TONE VALVE ® OM CDUPLER ORIP FRGATION SHEET: LM-16 TRACT SHEET 4-6 ISSUE [LATE: 5-1-M REVISIONS: PSC PROJECT /:. OM771A6 GLENiA GOOOACRE BLVD. if Do TRACT 4 MAMENANCE ALONG GLENNA GOODACRE NORTH 1= TRACT 4 MIANtENANCE ALONG AVENUE W U"IUM AMA YAW it A D, AS IIomm BF {�� t (OGUION ZO1 Nlti it X23 2 VALVE SIZE3 ZONE FIJJW (GPM)4 CONTROLLER NUMBER5 TRACT WMERAOCATION 5 NUMBER OF ZONES ON CONTROLLER NORM IKAY„1 4 NIC YLm MW PROJECT NAME: NORTH DVERTON PARK R*TT OF WAY MAINTENANCE SHEET: LAI-17 PROJECT ADDRESS LUBM. TEXAS TRACT SHEET 4-7 ISSUE DATE: 5-1-06 REVISIONS: \_ PSC PROJECT j: 032771.06 R.O.W. IFUWATION MAINTENANCE SCHEDULE - TRACT 4 srdEm L ITEM OUMRIIY WATER METER 0 r.i DOUILE CHECK VALVE 0 0 MASTER VALVE 0 La 00CATON CONTROLLER 2 w MANUAL BALL VALVE I ® ZONE VALVE I QLWa'L COUPLER 2 ------_ rWM IRRICAMM 458 $f t AVENUE W TRACT 4 MA TENANCE ALONG AVENUE W Hm 211 AVENUE W Ipk�q 0 LEGEND TRACT 4 AS II "m I� ,r11�� 1 mmTION LONE I R 1 2 VALVE SIZE CI-4-3 3 ZONE FLOW (GPM) BI 4 6 �® CONTROLLER NUMBER 5 TRACT DCATIDN 6 NUMBER OFZ016 ON CONTROLLER OVERTON AREA MAP Xi TRACT 4 SITE PLAN MAP IflflNfliiNAA( �NNNENNN� 0 Dd$d�1f� Ao` ADo NORTH R.O.W. IRRIGATION MAINTENANCE SCHEDULE - TRACT 4 SrIIBOI I ITEM Ouffilm WATER KIM 0 N DOUBLE CHECK VALVE 0 MISTER VALVE 0 IO IRWATON CONTROLLER D „ MANUAL BALL VALVE 1 0 TONE VALVE 0 OLUtJI COUPLER 1 - DRIP WATION 4O5 SF 8°""eveS;;e:ve:T PROJECT NAME: NORTH OVERTON PARK RIGHT OF WAY MAWTENAWE SHEET: LM-18 aS.SSS...B......aS PROJECT ADDRESS Luffi K TEXAS TRACT SHEET 4-8 ISSUE DATE: 5-1-06 I: ndl. 11 REVISIONS: PSC PROJECT f: 03.8771.06 to MAC DAVIS LANE R.O.W. LANDSCAPE MAINTENANCE SCHEDULE - TRACT 0 Sim am 0UN111FT N ROSO PE 6.439 SF RANTM BEGS 333 SF It LO FREE ^ UNs Oak 12 o PEDE51RM UCR15 14 --G STREET LCMS 0 rB BEMM 2 LITTER RECEPTACLE J aLR BR BKE RACK 0 IECGI C11kNi I CRATE 105 SF PROJECT NAME: NORTH OVERTON PARK R10Hf OF NAY MWrENANCE SHEET: LM-19 PROJECT ADDRESS LUMOCk TEXAS TRACT SHEET 8-1 ISSUE DATE: 5-1-06 REMSMS: 1 PSC PROJECT 03A771.06 R.O.W. LANDSCAPE YNNTENAIICE SCHEDULE - TRACT 8 symn I1EH OLII MTY HARDSCAPE 5,374 SF PLANTING BEGS 3M SF + LA TREE — LRv Ook 4 ,A CE TREE — CMor Bm 5 +SO TREE — S Wmwd Oak I s PEOESIRM l GHIS 11 STREET LIGHTS 1 MMB BEhM 2 OIR LITTER RECEPTACLE 3 BR M RICK O Cwima GRATE 42 SF PROJECT NAPE: NORTH OVERTON PARK RIGHT OF WAY ILAYTTENANCE SHEET: LY-20 PROJECT ADDRESS LUBBOCK, TE)ULS TRACT SHEET 8-2 ISSUE DATE; 5-1-06 REVISIONS: i — PSC PROJECT 03.8771.06 AVENUE V SO ; J %Z CI R.O.W. LANDSCAPE IJAJNTENANCE SCHEDULE — TRACT 8 srmn TIEu DUARM Zm wMSCAK I"SF' PLANTMC BEDS 141 SF i CE TREE - Cedor EYn 5 • PEDESTRAN UGHTS 4 —O STREET UR115 0 � 8 BENCH D OlA UTTER RECEPTACLE 2 i BR BIB RACK 0 :RKM Of WAY MAINTENANCE SHEET: LM-21 :;:A::::E'�eOe PROJECT NAME: NORTH OMERION PARK SSC s""g8i�_98e PROJECT ADDRESS LUBBOCK. TEXAS TRACT SLfEET . 8-3 ISSUE DATE: 5-1—M J 9 REVGONS: ::}..a:' �ai'• PSC PROJECT j:. L mni.D6 . MAC DAMS LANE 8 MAC DAMS LANE TRACT 8 MAINTENANCE ALONG MAC DAVIS I 1:20 1 U lJ m . . AS MMTW BT: T-- I IRRIrJBTION ZOAIE NUM ER Tml 2 ZONE 1 �CI-8-2� 3 ZONE FLOW (cPu) 4 CONTROLLER NUMBER 5 TRACT NU118 AOCATM 6 NUMBER OF ZONES ON CONTROLLER 2 3 5 :.. PROJECT NAME: NORTH NUTON PAW KW OF WAY "TEMANCE •rnnwnrrr•rura C:�egoSSE: PROJECT ADDRESS . LjJMDCX, TEICA! .� t • T: Tter . . /44 410 /e 10 NORTH R.O.W. IRRIGATION kWNTEWJa SCHEDULE - TRACT 8 SMTw 11EIA 01U4 m TAATTR METER 0 N DOUBLE CHECK IAYLZE 0 ® MASTER NUKE 0 ® N911G um CONTROLLER 0 N MAMA BALL WILE 3 0 ZONE VALVE 0 ® T>1 o COUPLER 3 TRAP MOTION 333 Sf SHEET: LY-22 i TRACT SHEET 8-4 SSUE DATE: 5-1-06 REYISi - '\ r PSC PROJECT 018771.06 1:1 a CI-8-2 -- — MAC DAVIS LANE- TRACi 8 IYWM'£WWCE ALONG MAC DAVIS LANE NORTH 10 AVENUE �V II N�I;I;I'1 IE illl:l+l:illl OI�I;P;flllll ' TRACT 8 pA WEWCE ALONG AVENUE V NORTH l:m s..u..eauolee�i ii'eee.eea. r U. 9'S8 • i •o LEGEND m Iro1DATEB 1 Ni@CATION mNE NUE9ER 1 2 VALVE WE CT-8-2 3 ZONE FLOW ( 4 CONTROLLER NUM NUMBER 5 TRACT NUMBERAOCATION 6 NUMBER OF ZONES ON CONTROLLER 2 5 R.U.W. IW"T" MAINTENANCE SCHEDULE - TRACT 8 SrAM ffEm QuWmr EATER METER 1 N OMW CHECK VALVE 1 @ MASTER VALVE 1 OT WSXA ON CONTROLLER L w MANUAL RAIL VALVE N @ ZONE VALVE 2 OM COUPLER 2 - --- _ Off R EATION S39 SF PROJECT NAME: NNORTH OVERTON PARK RW OF WAY MWffNANCE SHEET: . LY-23 PROJECT ADDRESS LUBBOCK, TEXAS ! TRACT SHEET .8-5 E ISSUE DATE: 5-1-06 1 REVISIONS: PSC PROJECT . 03.8771.05 AVENUE V AS kNOK qm r. (D-' I SWAMN ZONE NLIW 1 2 VALVE SIZE 1 �C1-6-2� 3 IONE FLOW (GPM) 4 CONTROLLER NUMBER 5 TRACT NLIM/LOCI TION 6 RUMBER OF ZONES ON CONTROLLER 2 3 5 R.O.W. IRR"TION MAINTENANCE SCHEDULE - TRACT 8 SYLABOL RE8 at mlr WATER IEIER 0 N DDLI E CHECK VALVE 0 ID MASTER VALVE 0 m NtirATION CONTROLLER 0 w MOM kWl VALVE 2 ra ZONE VALVE 0 MCK COUPLER 2 ---_-__ ORIP 91WATIDN 141 SF PROJECT NAME: NORTH OVERTON PARK RIGHT OF WAI WMNTENANCE SHEET: . LM-24 PROJECT ADDRESS LU080CK, TEXAS TRACT SHEET . 8-6 kSSUE DATE: 5-1-% REVISIONS: �� PSC PROJECT E:. 03.8771.06 No Text AREA TRACT 11 MAINTENANCE AREA ALONG AVENUE V AREA CLAiIMY TRACT 11 MAINTENANCE AREA ALONG MAIN I:20 \^L1 1:20 /\ i► rr'o1 TRACT 11 MAINTENANCE AREA ALONG FAIN STREET N09M uuu cm�cr rp AVENUE U C1 TRACT 11 MAINTENANCE AREA ALONG AVENUE V NOUN 1:20 R.O.W. IiiRIGATION MAINTENANCE SCHEDULE — TRACT 2C IfWER WIN I rnr DOUBLE CMMX YALYE I ® FOUR* CpRROII.ER I WMAL Ml VALK 2 • ZONE VALW 5 0 2 - ----- OW MWA110N 000 SF PROJECT NAME: NORTH MOON PARK RIGHT OF WAY MAAWTENANCE SHEET: LY-25 PROJECT ADDRESS . LIJBIM, TDA5 TRACT SHEET 11-2 ISSUE DATE: 5-1—W REVISIONS: PSC PROJECT 03.8771.06 No Text No Text No Text No Text 3.:rooeeeo.v ,jail M O �nr sa Hn F � k �r ti J I Ipp -MENOW W� 6 We w�— =7 kil —•e ao�— a a 5 J�j �I 1 n-i 3Av w. n ... a os� —j �AD, W C) W Ix 0 a IHz O x.m, ! . ill a' E, t2 x a N �s i 1 ---------------------------------------------- GLENNA GOOM � IAN paAINTENAIdCE NORTH A� ,� AS RQGTED EPt Q�-- I VINATION ZONE MAW i10 2 VALVESIZE I-7A-2 ZONE � o B 3 ZONE FLOTf (GPM)I 4 CONTROLLER NUMBERIMP 5 TRACT 4 6 ACCATION 6 NUMBER OF ON CONTROLLER Z 5 - 0YUM AREA MAP Ma1N CLFNNA GOOOACRE MEDIAN SITE PLAN MAP RQ.W. fW ATION MARflENA M.E SCHEDULE GILD A GOOOM IMEOIAN SYMBOL RTM pUMM WATER KIER 1 N OOLIBLE CHM WLYE I a MASIER WLK 1 ■ IWANON DMITAXITR O YA1rIM. BNL WLAE 2 ZONE VALVE 5 m mKx COUPLER 4 Ht OISL FLTER 5 A FRES&K REDUCER 5 -- _` FLUSH VALVE 00WRGUgN s > ff ...............I. . PROJECT OVERTON ... « PARK RIGHT OF WAY IMINTENAIICE iN. el3391 1 iiiig PROJECT ADDRESS LLIWOCN, TEXAS TRACT' SHEET GG8-9 «i .. ISSUE DATE. 5-1-W PSC PROJECT j:. 03.8771.06 coaaaaaoaao IHZ R 4E b� 99 OVERTON AREA NAP AL V) NORTH ®� NORTH R.O.W. LIIIOSM WYNTENANCE SCHEOUI.E - MACT A tRl11E 1 TRACT A SITE PLAN W A MU PROJECT NAME NORTH MRTON PARK RK4iT OF wAY IIMNTENANCE SHEET: LAI-37 PROJECT ADDRESS L.UBBOCK, TEXAS ram TRACT SHEET A-1 ISSUE DATE: 5-1-06 REVISIONS: l — PSC PROJECT /; OU771.06 is E AREA ALONG AVENUE W NORTH TRACT A OVERTON AREA YAP N5&�Rmr —' 11iACT A SITE PLAN YAP RAW LANDSCAPE YAWTENANCE SCHEDULE - TRAM A s�IeaE nm auvnm HARDSCAPE 4,474 SF Kmrw KM 345 SF + 9a TREE - 9onwd Oak a i CE TREE - CWW Elm 5 ♦ IP TREE - CMnm PWbft a rt m TREE - Bold 2 PEDESTRIAN UWM 7 Bs� STREET UCHTS 1 R!B BENCN ! e lR LITTER RECEPUClE 1 I BR Off RACK 1 FC TREE CFAW 1 p9 PEDESTRIM BRWE I AL RECfm WIT 10 PROJECT NAME: NORTH OVERTON PARK RICHE OF UTAY MAINTENANCE SHEET: LM-38 PROJECT ADDRESS LUNW, TEXAS TRACT SHEET A-Z ME DATE: 5-1-)6 RNSKNIS: PSC PROJECT j: 03.9771.06 w ,m OVERTON AREA MAP yLLLLOfICepeisi BLLLLSSLLL:LLLLL'L e.Lnaa........L. e. L..LYBoLLL It 'T'•,; NM a &A-.�� Al Bt P TRACT A srrn- TRACT A SITE PLAN MAP PROJECT NAME: NORTH OVERTON PARK RK;Hf OF WAY MAWdTENANCE PROJECT ADDRESS UIBM. TEXAS /0 ®D NORTH ®op NORTH R.O.W. LVOSCAPE MAMTENMrCE SCHEDULE - TRACT A Srdn Ilse QYXMY KWA ME C41e S: PLMW REDS 423 SF + SD TREE - Slwmod Oak 11 +CE TREE - Odor Elm 2 +CP TREE - OWN Pialodw 0 +115 TREE - a* 0 a PEGESTAMN LOM 13 6- STREET UGHTS 1 me OD" I OtR ERTf7i RECEPTACLE 2 1 Olt UK AMOK 0 TG TREE WE 3 SHEET. LA-39 TRACT SHEET A-3 ISSUE DATE: 5-1-06 REVISIONS: PSC PROJECT 03.8771.06 4% SI Cie 1111,11 MIN all 11 I 00 tig i��g� &TWRACT A "NMWCE AREA ALONG AVENUE V NORTH - OVERTON AREA W4P TRACT A TRACT A SITE PLAN MAP RAW _ LANDSCAPE MAINTEWHNCE SCHEDULE - TRACT A swam mit awmm HARTISGWE 2.760 S>' FUMING BM 125 SF * S0 Tuff - Slw,e rd Oak 1 s IE TREE - Cow Elm 5 • CP TREE - Owme Pa,aAe 0 It as TREE - aWd C 0 • PMESTRM LIGHTS a 0— STREET LOM 1 0 111111019 WIN I OUR UTTER W",MAm I r BR aNE RAgc 0 TG TREE CRATE 6 CG OWAM GRATE 14 SF PROJECT NAME: NORTH OVERTON PARK RIGHT OF NAY MAINTENANCE SHEET: LY-41 PROJECT ADDRESS LUMCK. TEXAS TRACT SHEET A-5 ISSUE DATE: r 5-1-06 REVISIONS: � PSC PROJECT %:. (13.8771,06 TRACT 1.20 OVERTON AREA YAP MAINTENANCE AREA ALONG MAIN STREET OWN NORTH bb NORTH R.O.w. LFAIOSGNE YNNTENANCE SCHEDULE - TRACT A Sr11 m m OLWITRr FAFIDS'APE 7.575 SF PlA11TMC WM 160 SF + SO TREE - SAwnwd Oat 2 aLO TREE - Lne Oak 9 e PEOESMIM LOBS 10 i-- STREET UGMS 0 me INI CH 2 OLR I LRIER RECEPUCLE 2 TG TIM ORATE 10 CO CFWNEL WAX 0 SF TRACT A SITE PLAN YAP PROJECT NAME: NORTH OVERTON PARK RIGHT OF WAY MNNTERANCE SHEET: L11-42 PROJECT ADDRESS LUBBOCK, TEXAS TRACT SHEET A-6 ISSUE DATE: 5-1-06 REVISIONS: PSC PROJECT 03.8771.06 A PROPERTY UK AVENUE w A ftx r EgCITY BUS STOP NORTH TRACT A MAKO ONCE AREA ALONG AVENUE W NORTH B1 ,� .m�" 6YERTON AREA MAP RD.1II. INWATION MWJD MICE SCMEDIAE - TRACT A LEGEND Ii4RR WM D TRACT A ISWAM ZW 1 ® m M SM VALVE W. mum afcg WiW U 2 VALVE SIZE CI-2A-2 a RMTO iM01.IFRID1 3 ZONE FLOW D 4 CONTROLLER (GPM) MANUAL m ZONE YAL� aLx o S TRACT KAM/LOCATION QWm GPLER 9u5 6 NUMBER OF ZONES ON CONTROLLER 2 3 5 D11P IeeAWN 1 ?ffi SF TRACT A SITE PLAN NAP PROJECT NAME: . NORTH OVERTON PART( RIGHT OF WAY IWNTENANCE SHEET: LM-43 PROJECT ADDRESS LLCM, TEXAS TRACT SHEET A-7 ISSUE DATE: . 5-1-06 REMONS: 't - PSC PROJECT j:. 039771.06 w ,s Bi TRACT A hW MANCE AREA ALONG AVENUE W NORTH LEGMQ _ A17HACT A AS INWM I VALVE Sal N7RRilIT10N IdE IAIYR 1 � 3 ZONE ROW (GPM) �'- PIPl°J � � � 4 CONTROLLER NUMBER .� 5 TRALt NIAW/LOCATION 6 NUMBER Of ZONES ON CONTROLLER Z 5 MRTON AREA MAP ZF, ----A wm TRACT A SITE PLAN MAP R.D.W. MWATION MAINTENANCE SCHEDULE - TRACT A 5 ism I IIEN a jwm ry DOWLE CNECK VALVE 6 MASTER VALVE O m Ma AYMN W ROl1ER a M MNKIAL ML wLVE a a ZONE VALVE 1 O a" WUPIFR 2 --- - am WNKATION 346 SF PROJECT NAME: N" 04ERION PARK RIGHT OF WAY WMTENINCE SHEET; LU-44 PROJECT ADDRESS LUBBDCU, TEXAS TRACT SHEET A-8 ISSUE DATE: 5-1-M REVISIONS: PSC PROJECT /:. 03.8771.06 GLENNA GODDACRE BLVD. mpEm LINE- 1 W TRACT A MAINTENANCE AREA ALONG GLENNA G00WRE BLVD. NORTH GLENNA GOODACRE BLVD. a PRDPERTY UNE La - I `�I ®® �1 TRACT A MAINTENANCE AREA ALONG GLENNA G001 WORE BLVD. NORTH /y- . R.0.WM IRK.ATK* MAINTENANCE SCHEDJLE - TRACT A Y v TRACT A v LEGEND AS INDICATED BY: (}` I AWATK,N ZONE NUMBER , ml 3 VA V tSow (GPM) , C, ©z\ Tl TROLLFA NUMBER/LUCR I 1 r 5 TRACT NUMBER/LCKaTKIN SYMBOL RT71 MAIM WTER *TER 0 CHECKVALVE 0 Q) MASTER VALVE 0 p I s"WN CONTROLLER 0 MANUAL ILL WEVE D 0 ZONE YW.YE , $I WO COUPLER 2 __--_-- DRIP MIAWU* 423 5F 6 NUMBIR OF ZONES DH CONTROLLER MRTO N AREA MAP Nam TRACT A SITE PLAN MAP �Sll:�li=Iil�m =6 PROJECT NAME: NORTH OVERTON PARK MIT OF WAY MAINTENANCE SHEET: LM-45 ��PROJECT ADDRESS . LUBBOCK, TEXAS TRACT SHEET A-9 t: 1S5UE DATE: 5-1-06 1% REVISIONS: PSC PROJECT /:. 03.8771.06 WVE111E Y a9mu---ml 0 TRACT A MAINTENANCE AREA ALONG AVENUE V NORM 12 O4ERTON AREA YAP Npa`. 7 :E AREA ALONG AVENUE V NORTH am ." R.O.E. W&TION MAINTENANCE SCHEDULE - 1RACT A C�+,Ci�n srlga 1RY auwmrr TRACT AAI LE�� tIVWD OE a N 001181E GEtK wV.YE a 1. AS lt0 -qu By: 0 IUSTER VALVE a 1 IRNo IXIN mNE 1 El o IRAIf1TE)N cL1W OE , Bt INMNI BALL WOE a 2 vxvE SIZE Cl-TA-Z 0 >'aIE tiALVE r 3 ZONE ROE (ON) 9 Or COUPLER r 4 CONTROLLER NUMBER - --- 5 TRACE MMBER/LOCATION t>AP RtlC+UION SIt sr 5 NUMBER OF ZONES ON CONTROLLER r 3 5 TRACT A SITE PLAN NO PROJECT NAME: NORTH 0KWM PART( RIGHT OF EAT iiWEWJ CE SWEET: LY-46 PROJECT ADDRESS LUIBODCK, TEXAS TRACT SHEET A-10 ISSUE DATE: 5-1-06 REVISIONS: —__i ` PSC PROJECT 033771.05 TRACT A MAINTENANCE AREA ALONG AVENUE V 1.20 AVENUE V Y � PROPERTY LINE, a D 1 TRACT A MAINTENANCE AREA ALONG AVMUE V NORTH au+ �a ■,n OVERTON AREA YAP TRACT A NORTH R.O.W. fAWATION YNNTEIWICE SCHEDW - TRACT A AtIBOt. ITEM DAVM METER METER - - a ni DK ike CHECK VALVE a ® MASTER VALVE a q "WAMN woo -a a MUM BALL WYE a 0 ZONE VALVE a --= DNB' MAIM 123 SF TRACT A SITE PLAN YAP PROJECT NAME: NORTH OYERMN PARK RIGHT OF MY "FENANCE SHEET: LY-47 PROJECT ADDRESS LUBBOCK. TEXAS TRACT SHEET A —I t ISSUE DATE: 5— T --06 REVISIONS: t w PSC PROJECT OU7706 IM WM STREET ANN STREET 00 ®10 B1 TRACT A M E �► MAIN MEET NORTH - ,.. mft . OVERTON AREA HAP TRACT A -L , � I TRACT A SITE PLAN YAP NORTH R.O.N. iiR ATIDN wmTEmml SCHEDULE - TRACT A SAM I oni WWMY ALTER Mm D N MILE CHECK VALVE D 0 K%M 'VALUE D D] I GATON CONTROLLER D W)m BALL WIVE D m ZONE VALVE T a" GOLIPLER 4 DRF WSCAMN 160 PROJECT NAME: NORTH MERTON PARK RIGHT OF WAY IWNTEWME SHEET: LU-48 PROJECT ADDRESS LUBM, TEXAS TRACT SKEET A-12 ISSUE DATE 5-1-M REWSIONS: PSC PROJECT /:. OU771.05 9 PA r I ooaee e 8 w* m �91 A r 9 0 LEGEND AS RImmo RY: Ci}T I &VA" z MJIBER 1 2 VALVESIZE , �, 2A 2� 3 ZONE FLOW (CPY) CONT 111111J11({{ yyyyyy��VVVV6����77 4 CONTROLLER NU11♦1ER 5 TRACT INWBERAOCATION 6 IIUMW OF ZONES ON CONTROLLER 2 3 5 R.O.W. IRROTION MAINTENANCE SCHEDULE - ROTARTY SYMBOL OEM QUAIIIIIY INTER METER I na OOI8 DEU VALVE I ® Kwm VALVE I m RCXM OONIROLLER I MNm (TALL HALVE 4 0 ZONE VALVE 3 • wo COUPLER 2 • DISK RLTER , A PRESS A REDUCER , 9 FLUSH VALVE 9 - DRIP WWATION 3.773 SF z •, r o MAC DAVIS LANE gas IMM® 0 ,• ROTARY SITE PLAN MAP OIIERTON AREA MAP MAC 4 n4 WTMY MNUI- NORTH D 1 I� PROJECT NAME: NORTH OVERTON PARK RICER OF MY WRNTEMNNCE SHEET: LM-50 PROJECT ADDRESS LUBM, TE,cAS TRACT SHEET R-2 ISSUE DATE: 5-1-06 REVISIONS: - PSC PROJECT j:. 03.8771.06 LANE TRACT 14 l:n DWERTON AREA YAP or PROPERTY UNE T MCI 14 '7 -- TRACT 14 SITE PUW YAP AYCNUL I (AV NORTH R.O.W. IANOSCAPE "TEIUNCE SCHEME - TRACT 14 SYIBOC In Gwwm INIIDSM 4.4.16 SF PI�YIIIIIC S am SF TRFD ♦ SO TREE - 9 umiw0 DO 6 CE TREE- CMw DYn 14 ■ FUXStRMN UGKM 9 ---■ MEET UCHIS 1 OMMM B WiCH 2 O LA I UTTER RECEFMU 3 Pon mm Ro 1 PROMM NAME_ NIWH OYERTON PARK MGKT OF RAY WINIEVWE SHEET: W-51 PROJECT ADDRESS lJUM. TEXAS TRACT SHEET 14-1 ISSUE DATE: 5-1-06 REVISIONS: 4 % PSC PROJECT /:. 03.8771.06 M STREET 4 TRACT 14 a. 01,10TIM AREA iiliP TRACT 14 SITE PLAN YAP PROPERn LINE_- Cv NORTH 40p NORTH R.O.W. LANDSCAPE MINTEN+AICE SCHEDULE — TRACT 14 s>�Nn HEY oummr 1NApp$,6K 5.631 SF PLAITING BM 671 SF + SO TREE — SMxrawd Oak 2 +CE TREE — Codw Elm 6 +BID TREE — Ow oak 7 ■ PEDESTM UGHM 7 ----G WEET LIISIM 2 10 9 BENCH +Du L" RE ollICIE AlEj Nap BILE RKK PROJECT NAME: NORTH DWON PARK RIGHT OF WAY MINTENNWCE SHEET: EY-52 PROJECT ADDRESS LUBBO . TEXAS TRACT SHEET 14-2 ISSUE DATE. 5-1-M REVISIONS: PSC PROJECT 03$771.06 901LMD ' :f 133Md OSd :SSSSS:SSSSCaSSSSS :SNOISIA321 �(a CSSS 90-1-9 :31YO 3nSS1 '•S C-H ' 133HS IOVSi SWR 'M t11 SS3bM iONO2id aa°s°e� CS -MI i ' 733HS 3.3NM131" AYIM 3O IM XWd NOIMW HIWN :3i1YN 133i'O8d .3:SS....:........ .SS:SSSS::S9$Sa:S9 XMi 3WI i _ 3nn433u ain z N5K3e l SIF�JI1133ILM< soon wAII53Md u "0•"-3X s ■r+�a nKnq - 33tl1Mil c WO R�4S - 333MI"LBOSM DNWWtd ears 3dris" aMNM ::3u f 1 IONW - MUMS 3YWN31NNn 3dY35O W 'IA'O- i U � dYM NYld 11S M1 Dft ,: dm v" NOUM fT7�f I ri loft -. - ON HIUMwa ® 174M I HU %vow V3W 3ONVWhA�1 t t 13M � � v MI A< AVENUE R 14 Im TRACT 14 OTERTd7 no NAP Mm" TRACT 14 SITE PLAN MAP R.O.W. LAN DSCAFE MAINTENANCE SCHEDULE - TRACT 14 SrnBOL I OW GUNM wROSCAPE 4.r6 SF PUININIC BEDS %I SF 450 1 TREE - Suaffmd Dok 3 +CE TIaFE - ilw ' P'WAdW if 0 PEOESTMN LOn 7 —0I STAEET 1161(f5 2 ®8 DENCN SLR uynm Rf6EPTAw i I RAFJ(1 D PROJECT NAME: NORTH MERTON PARK WHT OF WAY MAINTENANCE SHEET: LM-54 PROJECT ADDRESS LU61M, TEXAS TRACT SHEET 14-4 ISSUE DATE: 5-1-06 REVISIONS: J - PSC PROJECT j:_ 03.8771.06 / . - (Wh m,o1 TRACT 14 MAINTFlrM M ARFA &ONG AVENUE R NOM 1m OVERfON ARFA VAP noRtw TRACT 14 SITE PLAN LAP R.O.W. LANDSCAPE WWTENANCE SCHEDULE — TRACT 14 FNR WAPE 3.108 ff PlAKW BEDS 3T7 St' + m TREE — 9wmnwd Oak 2 •CE TREE — Cadw Elm 11 a PEOESmpN UCHJS S ---m STREET U(M , � a DOCH t OtR 1 UTTER Kwum , °eo.............. eiee:sa :e° *IS'* PROJECT MAYE: NORTH MERTON PARK RIGHT OF WAY WNFffMKE _ SHM: LY-55 "' PROJECT ADDRESS LUBBDCK, TEXAS TRACT SHEET 14-5 ■..°■ ia°M. '•,i ISSUE DATE: 5-1-06 M.Ill, ! „ REVISIONS: PSC PROJECT j; , 03A771.05 4 AVENUE (AW11 @jTRACT 14 MAINTENMM AREA ALONG AVENUE T "�' 1s R.O.M. EASEMENT CpAa lwlm I ww[low E �eJ011Oil AVENUE T 1 s i \ w 91 ,TRACT 14 MAINTENANCE ARFA ALONG AVENUE T NOWT" OVERTOP! AREA YAP mom AS .aGOFD� Btr: � '— A' 1 I i RIGGA 0R ZONE Mali 110 2 VALVE SIZE t i-14-2� 3 ZONE FLOIf (GPM) Rt 4 CONTROLLER NLAIBER TRACT 14 5 TRACTNUMB NULF ZONES O ON YiM B NIJY�R OF IONES 011 CONTROLLER 2 3 5 �a TRACT 14 SITE PLAN YAP R.O.W. IRRIGATION IYIINTENANCE SCFiE01A.E - TRACT 14 SABOI I ITIM OlA,i m PATER WO a N 001.1111E CHECK VALVE 0 ® NASIER VALVE a 0 RA(AMM COKTMAIR 0 w VAK K ROLL VALVE 2 0 ME VALVE 0 DUCK CD" 2 -- ___ DNP WIMAIMM 6M SF PROTECT NAPE: . NOMM O1 UMMI FM MW OF MAT IMINTEMINCE SHEET: LM-56 PROJECT ADDRESS LUBBOCK, TEXASTRACT SHEET 14-6 ISSUE DATE. rj, 5-1-06 REVISIONS: PSC PROJECT 03,8771.05 i Tom_ I R.O.W. EASENENI TRACT 14 MAINTENANCE AREA ALONG M CI-14-2 m FM AVENUE T T NORTH - 8 £ =03 im Ell ___=_ m _ 7TH STREET V o B� TRACT 14 MAINTENANCE AREA ALONG 7M STREET NORTH LEGEND NDICATED fff; I IRRWAT10N ZONE NUMBER 1 + 2 VALYE SIZE CI-14-2 ` TRACT 14 3 ZONE FLOW (GPM) 1 / 4 CONTROLLER NUMBER 5 r( y .. Al 1TION TRACT NUMBER OF�RZONESGON 6 OCONTROLLER 2 3 lJ lJ OVERTON AREA MAP pomm TRACT 14 ATE PLAN NAP R.O.W. IRRIGATION MAINTENANCE SCFEDUEE - TRACT 14 SHwp I in M MII]Y WATER VMR 0 N OOUKE CHECK VALVE 0 Ja MWI R VALVE 0 !, WWATIDN CONTROLLER t MWK BOLL VALVE 1 8 zow WUIE 0 0 OIACK COUPLER 1 ------_ DRIP WPoGUION B7, SF 11.11 '.. •_':� PROJECT NAME: NORTH OMERTON PARK ROO OF wAY IMIiIENANCE 3- M1. PROJECT ADDRESS LUBBOCK. TEXAS SHEET: LM-57 TRACT SHEET 14-7 I ,J s : TI( ISSUE DATE: 5-1-06 'a :e •.�' REVISIONS: :_!� PSC PROJECT j:. 03.8771.06 _J- 1 I _ L--- L_ L---I I a TRACT 14 MAINTENANCE AREA ALONG 7TH T 1.20 'TRACT 1 120 7TH STREET LEGEND PROPERTY LINE AS WKRCJTEO By.. ( — T MRRIOATION ZONE NUMBER KLER a VALVE SIZE 1-14-a .] ZONE FLOW (CPMj4 CONTROLLER NUMBER 5 TRACT NUMBER/LOCATION 6 NUMBER OF ZONES ON CONTROLa 5 _r! W ®J� 9 10 NORTH :-7 NORTH R.O.W. tlMTION MAINTENANCE SCHEME - TRACT 14 snm REY 0UAK IY WATER METER i N DOUBLE CHECK VALVE 1 0 wu' u V/LVE t a MWATION CONMROUo 0 AVAAL TAML VALVE 5 0 ZOAE VALVE 2 0 OIMMX CWPLER 1 2 ------= ORP MOWN 8B7 SF PROJECT NAME: NORTH OVERTON PARK RKrYiT OF WAY WIIRENANCE SHEET: LM-58 PROJECT ADDRESS LUBBOCK, TEXAS TRACT SHEET 14-8 ISSUE DATE: 5-1-06 REVISIONS: PSC PROJECT j:. 03,8771.G6 AVENUE R Lai R.O.W. EASEMENT ALL AVE" R 1 AYFNUE R OVERTOM AREA YAP OY�•YY•i�fl iii� uQ�•s..�niYiu • , ifl C".i:07••iie•oYJICO7 PROPERTY LINE FF a — F LLVLNl/ R.O.W. IRRIGATION WMFD NCE SDIkM - TRACT 14 1 IMII IGIl 1 © IKIR 11EfER D 2 VALVE SIZE C1-14-2 N DOUBLE DFn WYE a TRACT 14 4 CCOONTR(OL ERFLOW ` R 3' O s awo CDNONXLEF 0 An 5 TRACT NIMERAOCATIOM 4 WMA owl W&E 2 5 MAW OF ZONES ON CONTROLLER 2 3 S a! 2DIIE ' LYE 0 ------ Oupf COIRLER 2 ,� _---- OFi FBLIiAT1aM S51 $F MINIM TW 14 SITE PLAN MAP PROJECT NAW- M M MM FWK RIGHT OF W MMMMWICS SWEEP: LU-59 PftKCf AODRE55 UJMM YEW TRACT SHEET 14-9 ISSUE DATE 5-1-M REVISIONS: PSC PROJECT 032771.06 1 R AVENUE R R.O.W. EASEMENT C� AVENUE R LINE -'-` R.O.M. EASEMENT TRACT 14 11WNTOW CE AREA ALONG AVENUE R NORTM vl 10 - OVERipM AREA MAP mmm B I ] MUM R.O.W. IRWATION MAWTD ANCE Sp1E ME - TRACT 14 AS WmEo t1r (]y—; A, 1 MRRIGAT10M 7MME NUM6EA 1El Z VALVE SUE 1 CI-14- FLOWTRACT 14 4 ZONE GPM 0 NTRW.ER iN1A W 5 TRACT MAWERAOCITION b NUMBER OF ZONES ON OONTROl1ER Z 5 SWIM OEM OINNCn WTER WM O nA COUPLE akU VALVE 0 m NASe VMLVE 0 D WCCATR>f1 CONINOILER O MLRAL NAIL VALVE 1 0 ZONE VALVE 0 ® WCK COUPLER I -�- = OW RNWATION 377 5F NOWA TRACT 14 SITE PLAN MAP PROJECT NAME: MOM OyE1 ON FM R16NT OF MAY M MIDMMCE SHEET: LM-60 PROJECT AOOIM LUMBO K, TOM TRACT SHEET 14-10 ISSUE DATE: 5-1-06 REMONS: — - PSC PROJECT (: 03$771.DS