RESOLUTION
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock BE and is hereby authorized and
directed to execute for and on behalf of the City of Lubbock, an Amendment No. 5 to the
Agreement for Engineering Services between the City of Lubbock and Parkhill, Smith &
Cooper, Inc. for the design and construction of Milwaukee Avenue between 34`}' Street
and 98th Street. Said Amendment is attached hereto and incorporated in this Resolution
as if fully set forth herein and shall be included in the minutes of the Council.
Passed by the City Council this 24th day of February 2006.
GAL, MAYOR
ATTEST:
R ecca Garza, City Secretary
APPROVED AS TO CONTENT:
APPROVED AS TO FORM:
ohn Knight, kssistank-C"ity Attorney
ccdocs/PS&C Amend.res.#5
2.10.06
I
6751
AMENDMENT NO.5
TO
AGREEMENT FOR ENGINEERING SERVICES
CITY OF LUBBOCK, TEXAS
AND
PARKHILL, SMITH & COOPER, INC.
THIS Amendment No. 5 to Agreement for Engineering Services ("Amendment No. 5"),
dated effective this * Iday of � �<z , 2006, is by and between Parkhill, Smith &
Cooper, Inc. ("Engineer"), of 4222 85 h Str e� t, Lubbock, Texas, a corporation duly chartered
under the laws of the State of Texas, and the City of Lubbock, Texas ("Owner"), a Texas home
rule municipal corporation.
WHEREAS, pursuant to Agreement for Engineering Services, dated on or about
April 22, 2004, Resolution No. 2004-RO210 (the "Original Agreement"), Engineer agreed to
provide engineering services to Owner related to the design and construction of
Milwaukee Avenue, between 34`h Street to 98`h Street, in the City of Lubbock, Texas ("Project");
and
WHEREAS, the Original Agreement was amended pursuant to that certain Amendment
No. 1 to Agreement for Engineering Services (the "Amendment No. I"), dated effective
June 29, 2004 (Resolution No. 2004-R0300), as ratified by that certain Ratification of
Amendment No. 1 to Agreement for Engineering Services (the "Ratification"), dated on or about
July 21, 2004 (Resolution No. 2004-R0368); and
WHEREAS, the Original Agreement was amended to that certain Amendment No. 2 to
Agreement for Engineering Services (the "Amendment No.2"), dated effective
September 16, 2004 (Resolution No. 2004-R0425); and
WHEREAS, the Original Agreement was amended to that certain Amendment No. 3 to
Agreement for Engineering Services (the "Amendment No.3"), dated effective
September 28, 2004 (Resolution No. 2004-R0468).
WHEREAS, the Original Agreement was amended to that certain Amendment No. 4 to
Agreement for Engineering Services (the "Amendment No. 4"), dated effective March 24, 2005
(Resolution No. 2005-RO122).
WHEREAS, Owner and Engineer now desire to amend the Original Agreement, as
amended by Amendment No. 1, Amendment No. 2, Amendment No. 3 and Amendment No. 4,
as follows:
1. "ATTACHMENT `A', SCOPE OF SERVICES", and "ATTACHMENT `13%
COMPENSATION" to the Original Agreement are Hereby amended by adding
ATTACHMENT "A" , ATTACHMENT "B" and ATTACHMENT "C" to this
Amendment No. 5.
CITY OF LUBBOCKPTEXAS
MARC MCDOUGKL, MAYOR
ATTEST:
Reb cca Garza, City Secretary
APPROV AS TO NTENT:
arry Hert
City Engineer
APPROVED AS TO FORM:
�oh�n'M. Knigh
Assistant City Attorney
PARKIOLI,OSMIW & COOPER, INC.
Edwin E.Ti c " Davis, P.E.
Vice President
ATTEST:
-" —
(7y Dawson, P.E.
Poject Manager
ATTACHMENT A
TO
AMENDMENT NO. S
TO
AGREEMENT FOR ENGINEERING SERVICES
Owner: City of Lubbock, Texas
Project: Milwaukee Avenue paving from 34`h Street to 98`h Street
SCOPE OF SERVICES
The scope of services for Amendment No. 5 is as follows. Work will not proceed until Owner
has authorized Engineer in writing to proceed.
ADDITIONAL STUDY AND REPORT PHASE SERVICES - Milwaukee Avenue and 98th
Street Intersection.
PROJECT KICKOFF
1. Assemble available information from Consultant's files.
2. Meet with City Departments to review existing information. Receive City provided
information. Review City expectations for the Project. Departments include Street Engineering,
Traffic, Parks, Storm Drainage, Right -of -Way and Utilities.
3. Meet with adjacent developers/landowners to review future plans for the property
adjacent to the Project. Meet with all developers with one general meeting. Meet with the three
(3) major developers independently in a subsequent meeting.
4. Prepare Meeting Minutes to document the above meetings with City Departments and
adjacent developers/landowners. Deliver 10 copies to City for review and comment.
5. Meet with City to review meeting minutes. Revise and submit 10 final copies for
distribution.
PRELIMINARY ALIGNMENTS - 981h STREET & MILWAUKEE AVE.
INTERSECTION
General: Evaluate alternative alignments for 98th Street and Milwaukee Avenue
intersection. Consider future alignments of Milwaukee Avenue south of 98th Street and future
alignment of 98th Street west of Milwaukee Avenue. The 981h Street and Milwaukee Avenue
intersection should be as close as practical to the section corner to lessen the impacts on the
intersecting roadways and adjacent land use. The key consideration is Playa 94. With all
proposed alignments, analyze impacts to existing and future utilities. For all proposed
alignments, assume no outfall (drainage) improvements from Playa 94. Use existing studies to
determine 500 year flood elevation.
1. Intersection Alternative 1: Proposed Milwaukee Avenue curves to the east south of 98th
Street to follow the east edge of Playa 94, minimizing cut and fill requirements. Develop
schematic to maintain Milwaukee Avenue and 98th Street above the 500 yr, flood plain elevation
(1 cut and fill plan). Prepare preliminary roadway schematic and opinions of probable cost.
2. Technical Memorandum No. 1 (TM#1): Prepare TM#1 addressing possible alignments
of Milwaukee from 92nd Street to 94th Street based on Intersection Alternative 1 analysis.
Deliver 10 draft copies to City for review and comment within eight weeks of notice to proceed.
Revise and submit 10 draft copies for distribution within one week of receipt of review
comments from Owner.
3. Intersection Alternative 2: Proposed Milwaukee Avenue and 98th Street are centered on
the section lines. Develop a schematic level cut and fill plan to maintain Milwaukee Avenue and
98th Street above the 500 yr. flood plain elevation (1 cut & fill plan). Cut and fill plan to be
based on 500 year land reclamation for private use. Prepare preliminary roadway schematic and
opinion of probable cost.
4. Intersection Alternative 3: Proposed 98th Street follows the north edge of Playa 94 west
of Milwaukee Avenue, minimizing cut and fill requirements. Develop schematic to maintain
Milwaukee Avenue and 98th Street above the 500 year flood plain elevation. Prepare
preliminary roadway schematic and opinions of probable cost.
5. Prepare Technical Memorandum No. 2 (TM#2) for the alternatives described above.
Provide City with 10 draft copies.
6. Meet with City to review TM#2. Revise and submit 10 final copies for City review and
decision.
ADJACENT DEVELOPER/LANDOWNER COORDINATION
1. Arrange for and conduct a meeting with adjacent developers/landowners to review the
preliminary alignments. Conduct one meeting with all developers. Conduct subsequent
individual meetings with the three major developers. Document meeting discussions and
decisions.
2. Prepare Meeting Minutes to document the above meetings with adjacent
developers/landowners. Deliver 10 copies to City for review and comment.
PROTECT MANAGEMENT AND COORDINATION
1. Project Progress Meetings: Two per month, four month Preliminary Phase duration =
total of 8 meetings. Combine two of these meetings with other meetings planned. Includes
preparing Agendas and Meeting Minutes.
2. Contract Management: Four month duration.
3. Quality ControVQuality Assurance.
DELIVERABLES
1. Ten copies of all meeting minutes.
2. Ten copies of draft and final Technical Memoranda.
ATTACHMENT B
TO
AMENDMENT NO.5
TO
AGREEMENT FOR ENGINEERING SERVICES
Owner: City of Lubbock, Texas
Project: Milwaukee Avenue paving from 34 h Street to 98a' Street
COMPENSATION
ADDITIONAL STUDY AND REPORT PHASE SERVICES
A. GENERAL
1. The Engineer will be paid on an hourly rate basis shown in Table B-1 and subcontract
personnel services will be billed at cost. Engineer and subcontractor reimbursable
expenses will be billed at cost plus 15 percent surcharge. Reimbursable expenses are
shown in Table B-1.
2. The Engineer agrees to use its best efforts to perform services as defined herein
within the billing limits stated below.
3. It is understood and agreed the maximum billing of each of the items listed below are
based on the start of Services being authorized not later than April 1, 2006. If start of
Basic Services is not authorized by date given, it is understood and agreed that the
upper billing limit will be adjusted accordingly by a supplement to the Agreement.
4. Monthly payments shall be made to the Engineer by the Owner based on Engineer's
statement. The statement shall be itemized to indicate the amount of work performed
and the associated reimbursable expenses and subcontract costs.
5. The uncontested amount of each statement shall be due and payable upon receipt by
the Owner. Carrying charges of 1-1/2 percent per month from the billing date shall be
due for accounts that are not paid within 60 days after the billing date.
6. The Engineer shall keep records on the basis of generally accepted accounting
practices of costs and expenses and which records shall be available for inspection by
Owner during normal business hours.
7. The Engineer shall provide adequate resources to complete the services described
herein within four (4) months of the date of the Owner's notice -to -proceed to the
Engineer.
B. SERVICES
1. The maximum billed for Services including personnel services and reimbursable
expenses for the Engineer is shown as follows:
ADDITIONAL STUDY AND REPORT PHASE SERVICES
Personnel Reimbursable
Services Expenses
Parkhill, Smith & Cooper, Inc. $ 57,904 $ 3,761
TOTAL SERVICES NOT TO EXCEED WITHOUT AUTHORIZATION
$ 61,665
ENGINEERING SERVICES COMPENSTATION SUMMARY
Persomiel
Reimbursable
Totals
Services
Original Study and Report
Expenses
Agreement $ 100,320
$ 22,510
$122,830
Amendment No. 1
Design Services
$ 435,779
$ 531,456
$ 967,235
Amendment No. 2
Geotechnical
Investigations
$ 2,842
$ 27,646
$ 30,488
Amendment No. 3
Revised Stop
Order
-
-
-
Amendment No. 4
Traffic Signal
Design
$ 18,961
$ 1,222
$ 20,183
Amendment No. 4
Bidding and
Construction
Period Services
$ 371,251
$ 90,056
$ 461,307
Amendment No. 5
Milwaukee
Avenue & 98`h
Street
Intersection
Study and Report
$ 57,904
$3,761
$ 61,665
Totals
$987,057
$ 676,651
$1,663,708
C. ADDITIONAL SERVICES
Additional services must be authorized in writing by Owner.
1. The maximum billed for Additional Services will be determined by mutual consent
before the Additional Services are authorized by the Owner.
2. The Engineer shall start the performance of the authorized Additional Services within
ten (10) days of the receipt of notice to proceed and will complete the Additional
Services within the time period determined by mutual consent before the Additional
Services are Authorized by the Owner.
TABLE B-1
PERSONNEL SERVICES RATES
TO
AMENDMENT NO.5
TO
AGREEMENT FOR ENGINEERING SERVICES
Owner: City of Lubbock, Texas
Project: Milwaukee Avenue from 341h Street to 98`h Street
COMPENSATION
Hourly fees listed herein will apply until January 1, 2007. Hourly fees shall be adjusted beyond
January 1, 2007 by multiplying the hourly fee by the Consumer Price Index increase published on or
after January 1, 2007 and each successive year thereafter.
A. PERSONNEL SERVICES
Category of Personnel
/HR
Principal -in -Charge
148.00
Project Manager or Senior Professional Engineer
126.00
Senior Professional Engineer
112.00
Professional Engineer
96.00
Engineer -In -Training
81.00
Technician/Designer
73.00
Drafter/CADD Operator
66.00
Clerical
58.00
B. REIMBURSABLE EXPENSES
The following expenses are reimbursable:
1. Travel, subsistence and incidental costs.
2. Use of motor vehicles on a monthly basis for assigned vehicles and on a current
mileage basis or rental cost basis for vehicles used for short periods.
3. Long distance telephone costs and project "onsite" telephone costs.
4. Reproduction of reports, drawings and specifications.
5. Postage and shipping charges for project -related materials.
6. Computer time charges, including program use charges.
7. Rental charges for use of equipment.
8. Cost of acquiring any other materials or services specifically for and applicable to
only this Project.
ATTACHMENT C
TO
AMENDMENT NO.5
TO
AGREEMENT FOR ENGINEERING SERVICES
Owner: City of Lubbock, Texas
Project: Milwaukee Avenue from 30 Street to 981h Street
TASKING, MAN-HOURS, REiMBURSABLES, SUBCONTRACTORS AND SCHEDULE
CITY OF LUBBOCK, TEXAS
ENGINEERING SERVICES
MILWAUKEE AVENUE AND 98th STREET INTERSECTION ALIGNMENT ANALYSIS - AMENDMENT NO. 5, STUDY AND REPORT PHASE SERVICES
ESTIMATE OF MAN-HOURS, WORKSHEET 1
TABLE C-11 MAN HOURS
08-Feb-06
Task
Prin.
Proj.
Sr.
Prof.
UT
Tech,
Drafter
Clerical
Total
Total
in
Mgr.
Prof.
Engr
I
or
CARD
Hours
Extension
Charge
Engr.
Designer
,<<<<<<<<<<< Rates >>>>>>>>>>>>
$148.00
$126.00
$112.00
$96,00
$81.00
$73.00
$66.00
$58.00
1
Assemble available information from Consultants files
4
81
8
20
$1 .680
Meet with City Departments to review existing information, receive
City provided information and to review C4 expectations for the
Project. Departments inclucle Engineering, Traffic, Parks, Storm
2
Drainage, Right -of -Way and Ulififies.
3
5
8
4
2
22
$2,102
Meet with adjacent clevelopers/Lindowners to review future plans for
the property adjacent to the Project. Meet with all developers with
one general meeting. Meet with the three (3) major developers
3
independently
12
141
4
30
$3,89
Prepare Meeting Minutes to document meetings with City
Departments and adjacent developers/landowners. Deliver 10
4
copies to City for review and comment.
2
8
4
14
$1,536
Meet with City to review meeting minutes. Revise and submit 10
5
final copies for distribution.
3
5
2
10
$1,190
Page 1 of 6
CITY OF LUBBOCK, TEXAS
ENGINEERING SERVICES
MILWAUKEE AVENUE AND 98th STREET INTERSECTION ALIGNMENT ANALYSIS - AMENDMENT NO. 5, STUDY AND REPORT PHASE SERVICES
ESTIMATE OF MAN-HOURS, WORKSHEET 1
TABLE C-1 MAN HOURS
OB-Feb-06
Task
Prin.
Proj.
Sr.
Prof.
EIT
Tech.
Drafter
Clerical
Total
Total
in
Mgr.
Prof.
Engr
or
CADD
Hours
Extension
Charge
Engr.
Designer
($)
<<<<<<<<<<<< Rates >>>>>>>>>>>>
$148.00
$126.00
$112.00
$96.00
$81.00
$73.00
_
$66.00
$58.00
—
_7
w"
7777777=
'4 T21
Intersection Alternative 1: Proposed Milwaukee Avenue curves to
the east South of 98th Street to follow the east edge of Playa 94,
minimizing cut and NI requirements. Develop schematic to maintain
Milwaukee Avenue and 98th Street above the 500 yr, fk)od plain
elevation (1 cut and fill plan). Prepare prelim" roadway
I
schematic and opinions of probable cost.
2
8
24
401
74
$6,528
Technical Memorandum No. 1 (TM#1): Prepare TM#1 addressing
possible alignments of Milwaukee from 92nd Street to 94th Street
based on Intersection Alternative 1 analysis, Dealer 10 draft copies
to City for review and comment. Revise and submit 10 draft copies
2
for distribution.
2
91
10
3
24
$2,264
Intersection Alternative 2: Proposed Milwaukee Avenue and 98th
Street are centered on the section lines. Develop a schematic level
cut and fill plan to maintain Milwaukee Avenue and 98th Street
above the 500 yr. flood plain elevation (1 cul & fill plan). Cut and fill
plan to be based on 500 year land reclamation for private use.
Prepare preliminary roadway schematic and opinion of probable
3
cost,
1
4
12
20
37
$3,264
Page 2 of 6
CITY OF LUBBOCK, TEXAS
ENGINEERING SERVICES
MILWAUKEE AVENUE AND 98th STREET INTERSECTION ALIGNMENT ANALYSIS - AMENDMENT NO.5, STUDY AND REPORT PHASE SERVICES
ESTIMATE OF MAN-HOURS, WORKSHEET 1
TABLE C-1 MAN HOURS 08-Fete-06
Task
Prin.
Proj.
Sr.
Prof.
EIT
Tech.
Drafter
Clerical
Total
Total
in
Mgr.
Prof.
Engr
or
CADD
Hours
Extension
Charge
Engr.
Designer
($)
«o <<<<«<c< Rates »»»»»»
$148.00
$126.00
$112,00
$96.00
$81.00
$73.00
$66.00
$58.00
Intersection Attemative 3: Proposed 98th Street follows the north
edge of Playa 94 west of Milwaukee Avenue, minimizing cut and fill
requirements. Develop schematic to maintain Milwaukee Avenue
and 98th Street above the 500 year food plain elevation. Prepare
4
preliminary roadway schematic and opinions of probable cost.
2
8
24
40
74
$6,528
Prepare Technical Memorandum No. 2 (TM fi2) for the alternatives
5
described above. Provide City with 10 draft copies.
2
16
8
8
4
38
$3,656
Meet with City to review TM q2. Revise and submit 10 final copies
6
-
for City review and decision.
3
6
8
20
4
41
$3,660
J_
Page 3 of 6
CITY OF LUBBOCK, TEXAS
ENGINEERING SERVICES
MILWAUKEE AVENUE AND 98th STREET INTERSECTION ALIGNMENT ANALYSIS - AMENDMENT NO. 5, STUDY AND REPORT PHASE SERVICES
ESTIMATE OF MAN-HOURS, WORKSHEET I
TABLE C-1 MAN HOURS 08-Feb-06
Task
Prin.
Proi.
Sr.
Prof.
EIT
Tech.
Drafter
Clerical
Total
Total
in
Mgr.
Prof.
Engr
or
CARD
Hours
Extension
Charge
Engr.
Designer
4)
<<<<<<<<<<<< Rates >>>>>>>>>>>>
$148.00
$126.00
$112.00
$96.00
$81.00
$73.00
$66.00
$58.00
A-T
Mew
Arrange for and conduct a meeting with adjacent
developers/landowners to review the preliminary alignments. One
meeting with all developers. Individual meetirigs, with the three
1
major developers. Document meeting discussions and decisions.
13
31
8
8
1
61
$7,000
Prepare Meeting Minutes to document the above meetings with
adjacent developers/landowners. Deliver 10 copies to City for
2
review and comment.
2
4
6
$484
Page 4 of 6
CITY OF LUBBOCK, TEXAS
ENGINEERING SERVICES
MILWAUKEE AVENUE AND 98th STREET INTERSECTION ALIGNMENT ANALYSIS - AMENDMENT NO. 5, STUDY AND REPORT PHASE SERVICES
ESTIMATE OF MAN-HOURS, WORKSHEET I
TABLE C-1 MAN HOURS 08-Feb-06
Task
Prin.
Pr0j.
Sr.
Prof.
EIT
Tech.
Drafter
Clerical
Total
Total
h
Mgr.
Prof.
Engr
or
CARD
Hours
Extension
Charge
Engr.
Designer
<<<<<<<<<<<< Rates >>>>>>>>>,>>
$148.00
$126.00
$112.00
$96.00
$81.00
$73.00
$66.00
$58.00
66,d`t+N'+r'-w
Project Progress Meetings:
&
Two per month
Four month Study and Report Phase duration
Total of 8 meetings (combine 2 meetings with planned review
meetings)
1
Includes preparing Agendas and Meeting Minutes
18
36
121
66
$7,896
Contract Management:
2
Four month duration
4
8
4
16
$1,832
3
Quality Control
40
40
$4,480
1
1
Page 5 of 6
CITY OF LUBBOCK, TEXAS
ENGINEERING SERVICES
MILWAUKEE AVENUE AND 98th STREET INTERSECTION ALIGNMENT ANALYSIS - AMENDMENT NO. 5, STUDY AND REPORT PHASE SERVICES
ESTIMATE OF MAN-HOURS, WORKSHEET 1
TABLE C-1 MAN HOURS 08-Feb-06
Task
Prin.
Pro!.
Sr.
Prof.
EIT
Tech.
Drafter
Clerical
Total
Total
in
Mgr.
Prof.
Engr
or
CARD
Hours
Extension
Charge
Engr.
Designer
($)
«««««« Rates »»»»»»
$148.00
$126.00
$112.00
$96.00
$81.00
$73.00
$66.00
$58.00
',;°...,
•T•',. --icef
,..
�s ,�a
:a`
t
e
"'k_.v,.
J` Sz:y, .
Total Hours
67
164
40
68
16
136
42
40
573
5 �
�. iW�l M'�id, 7yT�., � [. qM A� ,}. •V," k�'
hsa^. .. c°i�n �
S 1t+ yeti,.
'�
a..'m i"`
f _,w-Ji.�'`:
,/L"a sx.:
i_ ^^�t%e ,-A
!-. rn x%s.. y
i &'d's Y -
� .,i-.*,...s ft....
Totals for Workshset 1 — Study and Reports
PSC
$9,916
SM664
$4,480
$6,528
$1,296
$9,928
$2,772
$Z320
$57,904
Page 6 of 6
CITY OF LUBBOCK, TEXAS
ENGINEERING SERVICES
MILWAUKEE AVENUE AND 98TH STREET INTERSECTION ALIGNMENT ANALYSIS - AMENDMENT NO. 5, STUDY AND REPORT PHASE SERVICES
ESTIMATE OF REIMBURSABLE EXPENSES, WORKSHEET 2
TABLE C-2 REIMBURSABLE EXPENSES
08-Feb•06
Reimbursable Expenses
TOW
PSC
Mileage
285
Miles
®
$0.45
per mile
$127
PSC
blueline prints (aerials, contours, markup work sets)
50
Sheets
®
$2.55
per sheet
$128
PSG
8.5 x 11 and 11 x 17 Reproductions, misc.
500
Sheets
0
$0.10
per sheet
$50
PSC
Long Distance Telephone
1
Project
a
$50.00
per project
$50
PSC
Fax
10
Pages
0
$1.00
perpage
$10
PSC
Postage, shipping and delivery, misc.
4
Mailings
a
$8.00
per mailing
$32
PSC
CADD charges
0
Hours
®
$8.00
per hour
$0
PSC
Preliminary and final report copies to City
20
sets
a
$35.00
per set
$700
Subtotal for surcharge
$1,096
HRA
Subcontract personnel - Hugo Reed & Associates
1
LS
a
$2,500.00
$2,500
Subtotals for Worksheat 2 — Study and Report Phase
PSC
PSC Reimbursables $1,096
PSC
Contract Surcharge for Reimbursables = 15% $164
HRA
Subcontract Personnel - Hugo Reed & Associates $2,5W
Total $3,761
Page 1 of 1
CITY OF LUBBOCK, TEXAS
ENGINEERING SERVICES
MILWAUKEE AVENUE AND 98th STREET INTERSECTION ALIGNMENT ANALYSIS - AMENDMENT NO. 5, STUDY AND REPORT PHASE SERVICES
PROPOSED SCHEDULE
TARI F r-1 qrHFnt]LF
CA-Feb-ffi
Week
Task
1 2 3 4 5 6 7 8 9 io 11 12 13 14 15 16_
PROJECT KICKOFF
I
Assemble available Wormation from Consultants flies
Meet with City Departrrwts to review existing information. receive
City providedirilormationand to review Cy meclationstar the
Project. Departments mitgle Gr9naertrU Traffic, Parks, Storm
2
Drainage, Right-d-Way and Utilities.
Meet with adjacent dweloperstlandowners to review future plans for
the property adjacarit to the Project. Meet with all developers with
one general meeting. Meet w& the three (3) meter developers
3
irdeperelaottly
Prepare Meeting Minuies to docurnem meetings With City
Departments and adjacent de velopers"landowners Dealer 10
4
copies to City for review and comment.
with Cty to review meeting minutes. Revise and submit 10
IMeet
iffeloupies fordistribution.
PRELIMINARY ALIGNMENTS - INTERSECTION
X-1
rtersection Alternative 1: Proposed Milwaukee Ave" curves to
he east south of 981h Street to follow The east edge of Playa 94,
minfirmizinfi cut and fill requirements. Develop schematic to maintain
Milwaukee Avenue and 98th Street above the 500 yr, flood plain
elevation (1 cut arid fill plan). Prepare preliminary roadway
I
schematic and opinions of Probable cost
Technical Memorandurrt No. I (TMV1): Prepare TM#1 addrewing
pos*le alignments or Milwaukee from 92nd Sir" to 94th Street
based on Intersection Alternative I analysis. Dealer 10 draft copies
to city for review and comment. Revise and 'ubrnt 10 draft copies
2
tordistritaution,
Intersection Alternative 2: Proposed Milwaukee Avenue and 90m
Street are centered on the section r"s. Develop a schematic level
cut and fill plan to maintain Milwaukee Avenue and 9811, Streel
above the 500 yr, lbod plain elevation 0 cut & fill plan). Cut and till
plan to be based an SM year land reclamation for private use.
Prepare preliminary roadway schematic and opinion of probable
3
cost.
Intersection Alternative 3: Proposed 981h Street follows the with
edge of Playa 94 West of Milwaukee Avenue, mirtmaing cut and fill
requirernerts. Develop Schematic to Maintain Milwaukee Avenue
and 98th Street above the SW year hood plain elevation. Prepare
4
Preliminary roadway schematic and op - wbris of Probable CW
Prepare Technical Memorandum No. 2 (TM #2) for the alternatives
5
described above. Provide City with 10 draft Copies
with City 10 review TM #2. ReAse and submit 10 final copies
6
IMeet
for City review and decision.
JADJACENT DEVELOPERn-ANDOWNER COORDINATION
Arrange for and conduct a Meeting with adjacent
daVelOtpOrSibridowners to review the Preliminary alignments. One
meeting with so developers. individual meetings with the three major
1
developers. Document meeting discussions and decisions.
Prepare Meeting Minutes to document the above meetings With
adpcert=rs11amVwrws Dealer
2
re~ anti cornered.
ra
PROJECT MANAGEMENT AND COORDINATION
a
T
OR
—F7,
1�0!
U
Project, Progress Meetings
Two per morith
Few month Study and Report Phase duration
Total of 8 maeftigs (conbine 2 meetings with Planned review
I
meetings)
Includes preparing Agencies and Meeting WnAes
I
Contract Management:
2
Four month duration
IF
N
3
Owlity, Control
Page 1 of 1