HomeMy WebLinkAboutResolution - 2006-R0084 - Amendment No. 5 To Agreement For Engineering Services - Parkhill, Smith, Cooper - 02_24_2006Resolution No. 2006-R0084 February 24, 2006 Item No. 5.17 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock BE and is hereby authorized and directed to execute for and on behalf of the City of Lubbock, an Amendment No. 5 to the Agreement for Engineering Services between the City of Lubbock and Parkhill, Smith & Cooper, Inc. for the design and construction of Milwaukee Avenue between 34`}' Street and 98th Street. Said Amendment is attached hereto and incorporated in this Resolution as if fully set forth herein and shall be included in the minutes of the Council. Passed by the City Council this 24th day of February 2006. GAL, MAYOR ATTEST: R ecca Garza, City Secretary APPROVED AS TO CONTENT: APPROVED AS TO FORM: ohn Knight, kssistank-C"ity Attorney ccdocs/PS&C Amend.res.#5 2.10.06 I 6751 AMENDMENT NO.5 TO AGREEMENT FOR ENGINEERING SERVICES CITY OF LUBBOCK, TEXAS AND PARKHILL, SMITH & COOPER, INC. THIS Amendment No. 5 to Agreement for Engineering Services ("Amendment No. 5"), dated effective this * Iday of � �<z , 2006, is by and between Parkhill, Smith & Cooper, Inc. ("Engineer"), of 4222 85 h Str e� t, Lubbock, Texas, a corporation duly chartered under the laws of the State of Texas, and the City of Lubbock, Texas ("Owner"), a Texas home rule municipal corporation. WHEREAS, pursuant to Agreement for Engineering Services, dated on or about April 22, 2004, Resolution No. 2004-RO210 (the "Original Agreement"), Engineer agreed to provide engineering services to Owner related to the design and construction of Milwaukee Avenue, between 34`h Street to 98`h Street, in the City of Lubbock, Texas ("Project"); and WHEREAS, the Original Agreement was amended pursuant to that certain Amendment No. 1 to Agreement for Engineering Services (the "Amendment No. I"), dated effective June 29, 2004 (Resolution No. 2004-R0300), as ratified by that certain Ratification of Amendment No. 1 to Agreement for Engineering Services (the "Ratification"), dated on or about July 21, 2004 (Resolution No. 2004-R0368); and WHEREAS, the Original Agreement was amended to that certain Amendment No. 2 to Agreement for Engineering Services (the "Amendment No.2"), dated effective September 16, 2004 (Resolution No. 2004-R0425); and WHEREAS, the Original Agreement was amended to that certain Amendment No. 3 to Agreement for Engineering Services (the "Amendment No.3"), dated effective September 28, 2004 (Resolution No. 2004-R0468). WHEREAS, the Original Agreement was amended to that certain Amendment No. 4 to Agreement for Engineering Services (the "Amendment No. 4"), dated effective March 24, 2005 (Resolution No. 2005-RO122). WHEREAS, Owner and Engineer now desire to amend the Original Agreement, as amended by Amendment No. 1, Amendment No. 2, Amendment No. 3 and Amendment No. 4, as follows: 1. "ATTACHMENT `A', SCOPE OF SERVICES", and "ATTACHMENT `13% COMPENSATION" to the Original Agreement are Hereby amended by adding ATTACHMENT "A" , ATTACHMENT "B" and ATTACHMENT "C" to this Amendment No. 5. CITY OF LUBBOCKPTEXAS MARC MCDOUGKL, MAYOR ATTEST: Reb cca Garza, City Secretary APPROV AS TO NTENT: arry Hert City Engineer APPROVED AS TO FORM: �oh�n'M. Knigh Assistant City Attorney PARKIOLI,OSMIW & COOPER, INC. Edwin E.Ti c " Davis, P.E. Vice President ATTEST: -" — (7y Dawson, P.E. Poject Manager ATTACHMENT A TO AMENDMENT NO. S TO AGREEMENT FOR ENGINEERING SERVICES Owner: City of Lubbock, Texas Project: Milwaukee Avenue paving from 34`h Street to 98`h Street SCOPE OF SERVICES The scope of services for Amendment No. 5 is as follows. Work will not proceed until Owner has authorized Engineer in writing to proceed. ADDITIONAL STUDY AND REPORT PHASE SERVICES - Milwaukee Avenue and 98th Street Intersection. PROJECT KICKOFF 1. Assemble available information from Consultant's files. 2. Meet with City Departments to review existing information. Receive City provided information. Review City expectations for the Project. Departments include Street Engineering, Traffic, Parks, Storm Drainage, Right -of -Way and Utilities. 3. Meet with adjacent developers/landowners to review future plans for the property adjacent to the Project. Meet with all developers with one general meeting. Meet with the three (3) major developers independently in a subsequent meeting. 4. Prepare Meeting Minutes to document the above meetings with City Departments and adjacent developers/landowners. Deliver 10 copies to City for review and comment. 5. Meet with City to review meeting minutes. Revise and submit 10 final copies for distribution. PRELIMINARY ALIGNMENTS - 981h STREET & MILWAUKEE AVE. INTERSECTION General: Evaluate alternative alignments for 98th Street and Milwaukee Avenue intersection. Consider future alignments of Milwaukee Avenue south of 98th Street and future alignment of 98th Street west of Milwaukee Avenue. The 981h Street and Milwaukee Avenue intersection should be as close as practical to the section corner to lessen the impacts on the intersecting roadways and adjacent land use. The key consideration is Playa 94. With all proposed alignments, analyze impacts to existing and future utilities. For all proposed alignments, assume no outfall (drainage) improvements from Playa 94. Use existing studies to determine 500 year flood elevation. 1. Intersection Alternative 1: Proposed Milwaukee Avenue curves to the east south of 98th Street to follow the east edge of Playa 94, minimizing cut and fill requirements. Develop schematic to maintain Milwaukee Avenue and 98th Street above the 500 yr, flood plain elevation (1 cut and fill plan). Prepare preliminary roadway schematic and opinions of probable cost. 2. Technical Memorandum No. 1 (TM#1): Prepare TM#1 addressing possible alignments of Milwaukee from 92nd Street to 94th Street based on Intersection Alternative 1 analysis. Deliver 10 draft copies to City for review and comment within eight weeks of notice to proceed. Revise and submit 10 draft copies for distribution within one week of receipt of review comments from Owner. 3. Intersection Alternative 2: Proposed Milwaukee Avenue and 98th Street are centered on the section lines. Develop a schematic level cut and fill plan to maintain Milwaukee Avenue and 98th Street above the 500 yr. flood plain elevation (1 cut & fill plan). Cut and fill plan to be based on 500 year land reclamation for private use. Prepare preliminary roadway schematic and opinion of probable cost. 4. Intersection Alternative 3: Proposed 98th Street follows the north edge of Playa 94 west of Milwaukee Avenue, minimizing cut and fill requirements. Develop schematic to maintain Milwaukee Avenue and 98th Street above the 500 year flood plain elevation. Prepare preliminary roadway schematic and opinions of probable cost. 5. Prepare Technical Memorandum No. 2 (TM#2) for the alternatives described above. Provide City with 10 draft copies. 6. Meet with City to review TM#2. Revise and submit 10 final copies for City review and decision. ADJACENT DEVELOPER/LANDOWNER COORDINATION 1. Arrange for and conduct a meeting with adjacent developers/landowners to review the preliminary alignments. Conduct one meeting with all developers. Conduct subsequent individual meetings with the three major developers. Document meeting discussions and decisions. 2. Prepare Meeting Minutes to document the above meetings with adjacent developers/landowners. Deliver 10 copies to City for review and comment. PROTECT MANAGEMENT AND COORDINATION 1. Project Progress Meetings: Two per month, four month Preliminary Phase duration = total of 8 meetings. Combine two of these meetings with other meetings planned. Includes preparing Agendas and Meeting Minutes. 2. Contract Management: Four month duration. 3. Quality ControVQuality Assurance. DELIVERABLES 1. Ten copies of all meeting minutes. 2. Ten copies of draft and final Technical Memoranda. ATTACHMENT B TO AMENDMENT NO.5 TO AGREEMENT FOR ENGINEERING SERVICES Owner: City of Lubbock, Texas Project: Milwaukee Avenue paving from 34 h Street to 98a' Street COMPENSATION ADDITIONAL STUDY AND REPORT PHASE SERVICES A. GENERAL 1. The Engineer will be paid on an hourly rate basis shown in Table B-1 and subcontract personnel services will be billed at cost. Engineer and subcontractor reimbursable expenses will be billed at cost plus 15 percent surcharge. Reimbursable expenses are shown in Table B-1. 2. The Engineer agrees to use its best efforts to perform services as defined herein within the billing limits stated below. 3. It is understood and agreed the maximum billing of each of the items listed below are based on the start of Services being authorized not later than April 1, 2006. If start of Basic Services is not authorized by date given, it is understood and agreed that the upper billing limit will be adjusted accordingly by a supplement to the Agreement. 4. Monthly payments shall be made to the Engineer by the Owner based on Engineer's statement. The statement shall be itemized to indicate the amount of work performed and the associated reimbursable expenses and subcontract costs. 5. The uncontested amount of each statement shall be due and payable upon receipt by the Owner. Carrying charges of 1-1/2 percent per month from the billing date shall be due for accounts that are not paid within 60 days after the billing date. 6. The Engineer shall keep records on the basis of generally accepted accounting practices of costs and expenses and which records shall be available for inspection by Owner during normal business hours. 7. The Engineer shall provide adequate resources to complete the services described herein within four (4) months of the date of the Owner's notice -to -proceed to the Engineer. B. SERVICES 1. The maximum billed for Services including personnel services and reimbursable expenses for the Engineer is shown as follows: ADDITIONAL STUDY AND REPORT PHASE SERVICES Personnel Reimbursable Services Expenses Parkhill, Smith & Cooper, Inc. $ 57,904 $ 3,761 TOTAL SERVICES NOT TO EXCEED WITHOUT AUTHORIZATION $ 61,665 ENGINEERING SERVICES COMPENSTATION SUMMARY Persomiel Reimbursable Totals Services Original Study and Report Expenses Agreement $ 100,320 $ 22,510 $122,830 Amendment No. 1 Design Services $ 435,779 $ 531,456 $ 967,235 Amendment No. 2 Geotechnical Investigations $ 2,842 $ 27,646 $ 30,488 Amendment No. 3 Revised Stop Order - - - Amendment No. 4 Traffic Signal Design $ 18,961 $ 1,222 $ 20,183 Amendment No. 4 Bidding and Construction Period Services $ 371,251 $ 90,056 $ 461,307 Amendment No. 5 Milwaukee Avenue & 98`h Street Intersection Study and Report $ 57,904 $3,761 $ 61,665 Totals $987,057 $ 676,651 $1,663,708 C. ADDITIONAL SERVICES Additional services must be authorized in writing by Owner. 1. The maximum billed for Additional Services will be determined by mutual consent before the Additional Services are authorized by the Owner. 2. The Engineer shall start the performance of the authorized Additional Services within ten (10) days of the receipt of notice to proceed and will complete the Additional Services within the time period determined by mutual consent before the Additional Services are Authorized by the Owner. TABLE B-1 PERSONNEL SERVICES RATES TO AMENDMENT NO.5 TO AGREEMENT FOR ENGINEERING SERVICES Owner: City of Lubbock, Texas Project: Milwaukee Avenue from 341h Street to 98`h Street COMPENSATION Hourly fees listed herein will apply until January 1, 2007. Hourly fees shall be adjusted beyond January 1, 2007 by multiplying the hourly fee by the Consumer Price Index increase published on or after January 1, 2007 and each successive year thereafter. A. PERSONNEL SERVICES Category of Personnel /HR Principal -in -Charge 148.00 Project Manager or Senior Professional Engineer 126.00 Senior Professional Engineer 112.00 Professional Engineer 96.00 Engineer -In -Training 81.00 Technician/Designer 73.00 Drafter/CADD Operator 66.00 Clerical 58.00 B. REIMBURSABLE EXPENSES The following expenses are reimbursable: 1. Travel, subsistence and incidental costs. 2. Use of motor vehicles on a monthly basis for assigned vehicles and on a current mileage basis or rental cost basis for vehicles used for short periods. 3. Long distance telephone costs and project "onsite" telephone costs. 4. Reproduction of reports, drawings and specifications. 5. Postage and shipping charges for project -related materials. 6. Computer time charges, including program use charges. 7. Rental charges for use of equipment. 8. Cost of acquiring any other materials or services specifically for and applicable to only this Project. ATTACHMENT C TO AMENDMENT NO.5 TO AGREEMENT FOR ENGINEERING SERVICES Owner: City of Lubbock, Texas Project: Milwaukee Avenue from 30 Street to 981h Street TASKING, MAN-HOURS, REiMBURSABLES, SUBCONTRACTORS AND SCHEDULE CITY OF LUBBOCK, TEXAS ENGINEERING SERVICES MILWAUKEE AVENUE AND 98th STREET INTERSECTION ALIGNMENT ANALYSIS - AMENDMENT NO. 5, STUDY AND REPORT PHASE SERVICES ESTIMATE OF MAN-HOURS, WORKSHEET 1 TABLE C-11 MAN HOURS 08-Feb-06 Task Prin. Proj. Sr. Prof. UT Tech, Drafter Clerical Total Total in Mgr. Prof. Engr I or CARD Hours Extension Charge Engr. Designer ,<<<<<<<<<<< Rates >>>>>>>>>>>> $148.00 $126.00 $112.00 $96,00 $81.00 $73.00 $66.00 $58.00 1 Assemble available information from Consultants files 4 81 8 20 $1 .680 Meet with City Departments to review existing information, receive City provided information and to review C4 expectations for the Project. Departments inclucle Engineering, Traffic, Parks, Storm 2 Drainage, Right -of -Way and Ulififies. 3 5 8 4 2 22 $2,102 Meet with adjacent clevelopers/Lindowners to review future plans for the property adjacent to the Project. Meet with all developers with one general meeting. Meet with the three (3) major developers 3 independently 12 141 4 30 $3,89 Prepare Meeting Minutes to document meetings with City Departments and adjacent developers/landowners. Deliver 10 4 copies to City for review and comment. 2 8 4 14 $1,536 Meet with City to review meeting minutes. Revise and submit 10 5 final copies for distribution. 3 5 2 10 $1,190 Page 1 of 6 CITY OF LUBBOCK, TEXAS ENGINEERING SERVICES MILWAUKEE AVENUE AND 98th STREET INTERSECTION ALIGNMENT ANALYSIS - AMENDMENT NO. 5, STUDY AND REPORT PHASE SERVICES ESTIMATE OF MAN-HOURS, WORKSHEET 1 TABLE C-1 MAN HOURS OB-Feb-06 Task Prin. Proj. Sr. Prof. EIT Tech. Drafter Clerical Total Total in Mgr. Prof. Engr or CADD Hours Extension Charge Engr. Designer ($) <<<<<<<<<<<< Rates >>>>>>>>>>>> $148.00 $126.00 $112.00 $96.00 $81.00 $73.00 _ $66.00 $58.00 — _7 w" 7777777= '4 T21 Intersection Alternative 1: Proposed Milwaukee Avenue curves to the east South of 98th Street to follow the east edge of Playa 94, minimizing cut and NI requirements. Develop schematic to maintain Milwaukee Avenue and 98th Street above the 500 yr, fk)od plain elevation (1 cut and fill plan). Prepare prelim" roadway I schematic and opinions of probable cost. 2 8 24 401 74 $6,528 Technical Memorandum No. 1 (TM#1): Prepare TM#1 addressing possible alignments of Milwaukee from 92nd Street to 94th Street based on Intersection Alternative 1 analysis, Dealer 10 draft copies to City for review and comment. Revise and submit 10 draft copies 2 for distribution. 2 91 10 3 24 $2,264 Intersection Alternative 2: Proposed Milwaukee Avenue and 98th Street are centered on the section lines. Develop a schematic level cut and fill plan to maintain Milwaukee Avenue and 98th Street above the 500 yr. flood plain elevation (1 cul & fill plan). Cut and fill plan to be based on 500 year land reclamation for private use. Prepare preliminary roadway schematic and opinion of probable 3 cost, 1 4 12 20 37 $3,264 Page 2 of 6 CITY OF LUBBOCK, TEXAS ENGINEERING SERVICES MILWAUKEE AVENUE AND 98th STREET INTERSECTION ALIGNMENT ANALYSIS - AMENDMENT NO.5, STUDY AND REPORT PHASE SERVICES ESTIMATE OF MAN-HOURS, WORKSHEET 1 TABLE C-1 MAN HOURS 08-Fete-06 Task Prin. Proj. Sr. Prof. EIT Tech. Drafter Clerical Total Total in Mgr. Prof. Engr or CADD Hours Extension Charge Engr. Designer ($) «o <<<<«<c< Rates »»»»»» $148.00 $126.00 $112,00 $96.00 $81.00 $73.00 $66.00 $58.00 Intersection Attemative 3: Proposed 98th Street follows the north edge of Playa 94 west of Milwaukee Avenue, minimizing cut and fill requirements. Develop schematic to maintain Milwaukee Avenue and 98th Street above the 500 year food plain elevation. Prepare 4 preliminary roadway schematic and opinions of probable cost. 2 8 24 40 74 $6,528 Prepare Technical Memorandum No. 2 (TM fi2) for the alternatives 5 described above. Provide City with 10 draft copies. 2 16 8 8 4 38 $3,656 Meet with City to review TM q2. Revise and submit 10 final copies 6 - for City review and decision. 3 6 8 20 4 41 $3,660 J_ Page 3 of 6 CITY OF LUBBOCK, TEXAS ENGINEERING SERVICES MILWAUKEE AVENUE AND 98th STREET INTERSECTION ALIGNMENT ANALYSIS - AMENDMENT NO. 5, STUDY AND REPORT PHASE SERVICES ESTIMATE OF MAN-HOURS, WORKSHEET I TABLE C-1 MAN HOURS 08-Feb-06 Task Prin. Proi. Sr. Prof. EIT Tech. Drafter Clerical Total Total in Mgr. Prof. Engr or CARD Hours Extension Charge Engr. Designer 4) <<<<<<<<<<<< Rates >>>>>>>>>>>> $148.00 $126.00 $112.00 $96.00 $81.00 $73.00 $66.00 $58.00 A-T Mew Arrange for and conduct a meeting with adjacent developers/landowners to review the preliminary alignments. One meeting with all developers. Individual meetirigs, with the three 1 major developers. Document meeting discussions and decisions. 13 31 8 8 1 61 $7,000 Prepare Meeting Minutes to document the above meetings with adjacent developers/landowners. Deliver 10 copies to City for 2 review and comment. 2 4 6 $484 Page 4 of 6 CITY OF LUBBOCK, TEXAS ENGINEERING SERVICES MILWAUKEE AVENUE AND 98th STREET INTERSECTION ALIGNMENT ANALYSIS - AMENDMENT NO. 5, STUDY AND REPORT PHASE SERVICES ESTIMATE OF MAN-HOURS, WORKSHEET I TABLE C-1 MAN HOURS 08-Feb-06 Task Prin. Pr0j. Sr. Prof. EIT Tech. Drafter Clerical Total Total h Mgr. Prof. Engr or CARD Hours Extension Charge Engr. Designer <<<<<<<<<<<< Rates >>>>>>>>>,>> $148.00 $126.00 $112.00 $96.00 $81.00 $73.00 $66.00 $58.00 66,d`t+N'+r'-w Project Progress Meetings: & Two per month Four month Study and Report Phase duration Total of 8 meetings (combine 2 meetings with planned review meetings) 1 Includes preparing Agendas and Meeting Minutes 18 36 121 66 $7,896 Contract Management: 2 Four month duration 4 8 4 16 $1,832 3 Quality Control 40 40 $4,480 1 1 Page 5 of 6 CITY OF LUBBOCK, TEXAS ENGINEERING SERVICES MILWAUKEE AVENUE AND 98th STREET INTERSECTION ALIGNMENT ANALYSIS - AMENDMENT NO. 5, STUDY AND REPORT PHASE SERVICES ESTIMATE OF MAN-HOURS, WORKSHEET 1 TABLE C-1 MAN HOURS 08-Feb-06 Task Prin. Pro!. Sr. Prof. EIT Tech. Drafter Clerical Total Total in Mgr. Prof. Engr or CARD Hours Extension Charge Engr. Designer ($) «««««« Rates »»»»»» $148.00 $126.00 $112.00 $96.00 $81.00 $73.00 $66.00 $58.00 ',;°..., •T•',. --icef ,.. �s ,�a :a` t e "'k_.v,. J` Sz:y, . Total Hours 67 164 40 68 16 136 42 40 573 5 � �. iW�l M'�id, 7yT�., � [. qM A� ,}. •V," k�' hsa^. .. c°i�n � S 1t+ yeti,. '� a..'m i"` f _,w-Ji.�'`: ,/L"a sx.: i_ ^^�t%e ,-A !-. rn x%s.. y i &'d's Y - � .,i-.*,...s ft.... Totals for Workshset 1 — Study and Reports PSC $9,916 SM664 $4,480 $6,528 $1,296 $9,928 $2,772 $Z320 $57,904 Page 6 of 6 CITY OF LUBBOCK, TEXAS ENGINEERING SERVICES MILWAUKEE AVENUE AND 98TH STREET INTERSECTION ALIGNMENT ANALYSIS - AMENDMENT NO. 5, STUDY AND REPORT PHASE SERVICES ESTIMATE OF REIMBURSABLE EXPENSES, WORKSHEET 2 TABLE C-2 REIMBURSABLE EXPENSES 08-Feb•06 Reimbursable Expenses TOW PSC Mileage 285 Miles ® $0.45 per mile $127 PSC blueline prints (aerials, contours, markup work sets) 50 Sheets ® $2.55 per sheet $128 PSG 8.5 x 11 and 11 x 17 Reproductions, misc. 500 Sheets 0 $0.10 per sheet $50 PSC Long Distance Telephone 1 Project a $50.00 per project $50 PSC Fax 10 Pages 0 $1.00 perpage $10 PSC Postage, shipping and delivery, misc. 4 Mailings a $8.00 per mailing $32 PSC CADD charges 0 Hours ® $8.00 per hour $0 PSC Preliminary and final report copies to City 20 sets a $35.00 per set $700 Subtotal for surcharge $1,096 HRA Subcontract personnel - Hugo Reed & Associates 1 LS a $2,500.00 $2,500 Subtotals for Worksheat 2 — Study and Report Phase PSC PSC Reimbursables $1,096 PSC Contract Surcharge for Reimbursables = 15% $164 HRA Subcontract Personnel - Hugo Reed & Associates $2,5W Total $3,761 Page 1 of 1 CITY OF LUBBOCK, TEXAS ENGINEERING SERVICES MILWAUKEE AVENUE AND 98th STREET INTERSECTION ALIGNMENT ANALYSIS - AMENDMENT NO. 5, STUDY AND REPORT PHASE SERVICES PROPOSED SCHEDULE TARI F r-1 qrHFnt]LF CA-Feb-ffi Week Task 1 2 3 4 5 6 7 8 9 io 11 12 13 14 15 16_ PROJECT KICKOFF I Assemble available Wormation from Consultants flies Meet with City Departrrwts to review existing information. receive City providedirilormationand to review Cy meclationstar the Project. Departments mitgle Gr9naertrU Traffic, Parks, Storm 2 Drainage, Right-d-Way and Utilities. Meet with adjacent dweloperstlandowners to review future plans for the property adjacarit to the Project. Meet with all developers with one general meeting. Meet w& the three (3) meter developers 3 irdeperelaottly Prepare Meeting Minuies to docurnem meetings With City Departments and adjacent de velopers"landowners Dealer 10 4 copies to City for review and comment. with Cty to review meeting minutes. Revise and submit 10 IMeet iffeloupies fordistribution. PRELIMINARY ALIGNMENTS - INTERSECTION X-1 rtersection Alternative 1: Proposed Milwaukee Ave" curves to he east south of 981h Street to follow The east edge of Playa 94, minfirmizinfi cut and fill requirements. Develop schematic to maintain Milwaukee Avenue and 98th Street above the 500 yr, flood plain elevation (1 cut arid fill plan). Prepare preliminary roadway I schematic and opinions of Probable cost Technical Memorandurrt No. I (TMV1): Prepare TM#1 addrewing pos*le alignments or Milwaukee from 92nd Sir" to 94th Street based on Intersection Alternative I analysis. Dealer 10 draft copies to city for review and comment. Revise and 'ubrnt 10 draft copies 2 tordistritaution, Intersection Alternative 2: Proposed Milwaukee Avenue and 90m Street are centered on the section r"s. Develop a schematic level cut and fill plan to maintain Milwaukee Avenue and 9811, Streel above the 500 yr, lbod plain elevation 0 cut & fill plan). Cut and till plan to be based an SM year land reclamation for private use. Prepare preliminary roadway schematic and opinion of probable 3 cost. Intersection Alternative 3: Proposed 981h Street follows the with edge of Playa 94 West of Milwaukee Avenue, mirtmaing cut and fill requirernerts. Develop Schematic to Maintain Milwaukee Avenue and 98th Street above the SW year hood plain elevation. Prepare 4 Preliminary roadway schematic and op - wbris of Probable CW Prepare Technical Memorandum No. 2 (TM #2) for the alternatives 5 described above. Provide City with 10 draft Copies with City 10 review TM #2. ReAse and submit 10 final copies 6 IMeet for City review and decision. JADJACENT DEVELOPERn-ANDOWNER COORDINATION Arrange for and conduct a Meeting with adjacent daVelOtpOrSibridowners to review the Preliminary alignments. One meeting with so developers. individual meetings with the three major 1 developers. Document meeting discussions and decisions. Prepare Meeting Minutes to document the above meetings With adpcert=rs11amVwrws Dealer 2 re~ anti cornered. ra PROJECT MANAGEMENT AND COORDINATION a T OR —F7, 1�0! U Project, Progress Meetings Two per morith Few month Study and Report Phase duration Total of 8 maeftigs (conbine 2 meetings with Planned review I meetings) Includes preparing Agencies and Meeting WnAes I Contract Management: 2 Four month duration IF N 3 Owlity, Control Page 1 of 1