HomeMy WebLinkAboutResolution - 2006-R0367 - Change Order To Public Works Contract - Archer Western Contractors, Ltd. - 07_25_2006Resolution No. 2006-RO367
July 25, 2006
Item No. 5.13
RESOLUTION
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the City Council of the City of Lubbock hereby authorizes and directs the
Mayor of the City of Lubbock to execute a Change Order No. 1 to a public works
Contract by and between the City of Lubbock and Archer Western Contractors, Ltd., of
Fort Worth, Texas, for improvements at the Southwest Pump Station, which Change
Order No. 1 and any associated documents, are attached hereto and made a part of this
Resolution for all intents and purposes.
Passed by the City Council this 25th day of July , 2006.
Awl
ATTEST:
Reb cca Garza, City Secretary
AS TO
Fr in, CYief°Water Utilities
APPROVED AS --TO FORM:
andiver, Attorney of
Mres/ArcherWestemChangOrdRes
July 13, 2006
CITY OF LU9130CK
CHANGE ORDER
Change Order #:
1
Contractor:
' Archer Western Contractors, Ltd
Date:
06-27-06
BID/ITB #:
05-127-BM
Contract #:
Project Name:
Southwest Pump Station & 5-MG Tank
Change Order within the scope of the contract means a Change Order that DOES NOT ALTER THE NATURE OF THE THING
TO BE CONSTRUCTED AND THAT IS AN INTEGRAL PART OF THE PROJECT OBJECTIVE. After performance of a
construction contract begins, Change Orders may be approved if necessary to 1) make changes in plans or specifications; or 2)
decrease or increase the quantity of work to be performed or materials, equipment, or supplies to be furnished. This DOES NOT
mean that a department can redefine the project. All work that alters the nature of the thing to be constructed or that is not an
integral part of the project objective must be let out for public bid by the Purchasing Department. Description of change
(alteration, deviation, addition, or deletion) caused by conditions encountered during construction not covered by the
specmcatwns anu armings of the project (attach aaaueonat pages U necessary):
Addition Masonry Screen Wall Footing Changes $95,592.00
Addition Mechanical Seal and Atra-Flex Couling Pump Changes $6,581.00
Addition NSF61 Compliant admixtures to concrete $12,290.00
Credit for Electrical Changes to Primary Feed-$1,375.00
See Attachment for further descriptions:
Change Orders must either be negotiated in the best interest of the City of Lubbock or put out for public bid by the Purchasing
Department. Where the Change Order is negotiated, the Change Order must be fully documented and itemized as to costs,
including material quantities, material costs, taxes, insurance, employee benefits, other related costs, profit and overhead. Where
certain unit prices are contained in the initial contract, no deviations are allowed in computing negotiated change order costs.
ITEMIZED COSTS MUST BE FULLY DOCUMENTED AND ATTACHED TO THIS FORM.
ITEM DESCRIPTION AMOUNT
A. ORIGINAL CONTRACT VALUE: $ 7,831,424.00
B. AMOUNT OF THIS CHANGE ORDER: Council approval required ifover $25,000 $� 11`3 08 ail) F �"
ra ' fi war '� „yA OF
C. PERCENT OF CONTRACT VALUE THIS CHANGE ORDER (B/A):s d "
D. AMOUNT OF PREVIOUS CHANGE ORDERS: $ 0.00
E. TOTAL AMOUNT OF ALL CHANGE ORDERS (B+D): $ 113,088.00
F. PERCENT OF CONTRACT OF ALL CHANGE ORDERS (E/A): 25%Maximum X` -j`_ a/
G. NEW CONTRACT AMOUNT (A+E): $ 7,944,512.00
It is mutually agreed that the above dollar amount and the time extension, as applicable, as set forth in this Change Order constitutes
full compensation to the Contractor for all costs, expenses and damages to the Contractor, whether direct, consequential or otherwise,
in anyway incident to, or arising out of or resulting directly or indirectly; from the work performed or modified by the Contractor
under this Change Order.
PUR-045 (Rev 02/06)
April 7, 2006
Lockwood, Andrews & Newman, Inc.
Attn: Graham Moore
10801 N. Mopac Epwy, Ste 120
Austin, Texas 78759
Phone: 512-338-4212
Fax: 512-338-4942
Re: City of Lubbock Southwest Pump Station
C.M.R.-001: Masonry Screen Wall Footing Changes
Archer Western offers the following proposal for furnishing all labor and materials
associated with the masonry screen wall footing changes per RFI-001. Please note that this
proposal includes a requested construction joint above the 1'-0" by 3'-0" footing, with the
above concrete stem wall being placed at a later date. All additional costs have only
included the changes from the original, to the revised footing details. The total amount for
this change order is: $95,592.00. This pricing is valid for 30 days from today's date.
Do not hesitate to contact this office should you have any questions regarding this matter.
Sincerely,
Jeffry J. Polak
Jeff Polak
Archer Western Contractors, Ltd.
Sr. Project Manager
(817) 640-3898 ext. 4218
CC: File
Jay Vincent
Scott Smiley
2121 Avenue J Suite 103
Arlington, Texas 76006
817-640-3898 (fax) 817-640-8734
Estimate Company lubbock footings
m of �ra, `'4r',t ��.�:,«a ye,r t�-�.;*�. �ro a•, ¢,r;± Xd'+�,;'ai„,x t,�a v, �,�,;. q.� try, t 3*�aa .: �<&; .ib .k �� ,� „...�.
a
A� Y• . .� „ . �,.. t ,'¢ " w d, tee �5`.+'� '� `� _. q ,,,`�a
Project rarrte lubbock footings
Labor at. table TEXAS 9
Equipment rate table EQUIPMENT MATCH HCSS
Report format. Shed by'BID ITEM/AREA
Detail s—.y
t
�.,- ... � .. ....�'. •< _•.. �.. ,_�,_ ;.,��� �� ..�,. ,�� Vim,
lu66ock
19010 GENERAL EXPENSE
unassi'.
_
-
gned..:
Superintendent..
: 0.00 w
0.00�
Oi
0.00..
0-.
000
'.
_ k
-
,0ual!t1' CaMrol_Enpinear _
t o0 a4 .:..._.._
_..zoo
-
_.
!Sunrryinp
W
2.00:
Soom 1,000'.
KS
....
iTaaOng- Concrete
_
183.00 q
18300 .:._._
:'
30p _:.. 54DT,
^ unassigned •
`. '..
_ 40 00:
1,000:
1 544!
'..
.19010 GENERAL EXPENSE
40.00
1 000
1 549a._ _
unass
igned
i
unassi'
9ned '
-
-_i
-`_ _510.00�
venides
B0 ma. :...
1.00
-
'Lcetl Fig /ram 5to lcpile
Z2(1.00 q.;02EX(242
40.000i..
_. _
550
171j
_
96.98:.
Wnt in FA Sto '*P!M
....
q- 02EXCT4t
..
35.000
.. _.
619-._..._
207 1_._....
.._
Structural Eoavaum ..
. _.._Z10A0
- 40300 ry 02EXC322
200t10 _�.
_ 2015'
834.
structural BacMY
220,00cy:02EXC225
75.000
e80
-
-
an. ny
waterrorexMa
1i00 M
-
-
aoo4
0'
.__.._. _
48.45;
.asBlackRebar
8,707001D ._
.. _
_0?S
3,413
028_ 2�438'
-
_ Firm,Greda Wall Foo7^gi -
.... .:. 385000 a1 0300N06M1, _ .....
.
---
_ 1573;
_.
-:
- `.y
_ _ _ -------
Hand Sat Fomre Wag Foo6 npa
i Key Wolf ngc
3,9%00 al jg3CON213
1,97¢00 If 03C0!�13 :
3000
10000
131667 .....
- 19750
23724!
3559
150
050
5,925:
9BB,
--q
Bulkhead 4Va1 Fooan9a
_:.,_
:....t6000 at 03CON2t3 -.
2000-.
BO W
1441.
150-
24Dv,�..
'.
_.... . _ ,Bucket Pour Wet Foo pg
iB2.97 q_ 0300N312
1000
_
19287'
2.659
..
_ ..
�Wste VJaI F000nga
_..... __—
_ 1829 ry T0300N312 , _._
1 000-_
_,,._--_
1819
,
_,.,_ Fl tWW FaoorKry_, -
5,925.OD rQ 03Cc1t4031
50.000
_ _ 15850- _
21549
_
Prop Corunrxeon Jb.
1975.00 of 03CON312
10000
19750
,.,
CUT
..-C .. .. -
5,885.00 d 03COt1312
_
2060001 , .. 2833;-�,
458: _
O10_- ...__.
- 567
.. .. _ _.:...
J.
_ NomWRd— 3000pei
2111.18q:.
�:..
_:,
-;.
83.00. ,...
16,69fi:...
^ unassigned •
,-.
2 327 52
40t607 -
29.923
• unassigned •
2,327.52
40,607
29,823,
2,438.
Estimate Totals
Labor
41,607
2,387.523 nm
Matmid
29,623
Subcontract
3,967
Epuipmant
3.604
169.243 tact
79.021 79,021
FEE
11.653
15.000 %
T
GENERAL LIABILITY INSURANCE
766
0.006 51
1.000 T
TEXAS BONDS
: 1,625
B
SMALL TOOLS
2,326
1.000 $Inv
M
Total 95,592
OI
i
0!
I
1,000
~
2,549!
-
i
21649:
510t
_ Su;
510
ns
v365 .._.._
593
1101
, 1936,
—
7T71
rn;:
1,045
76,472,
_36041
3,6041
76,472
4172006 1:59 PM
Page 2
April 1, 2006
Lockwood, Andrews & Newman, Inc.
Attn: Graham Moore
10801 N. Mopac Epwy, Ste 120
Austin, Texas 78759
Phone: 512-338-4212
Fax: 512-338-4942
Re: City of Lubbock Southwest Pump Station
C.M.R.-002: Mechanical Seal and Atra-Flex Coupling Pump changes
Archer Western offers the following proposal for furnishing all labor and materials
associated with the review comments changing the mechanical seals, and the Atra-Flex
couplings from the horizontal split -case pump submittal. The total amount for this change
order is: $6,581.00. This pricing is valid for 30 days from today's date.
Do not hesitate to contact this office should you have any questions regarding this matter.
Sincerely,
Jeff Polak
Archer Western Contractors, Ltd.
Sr. Project Manager
(817) 640-3898 ext. 4218
CC: File
Jay Vincent
Scott Smiley
2121 Avenue J Suite 103
Arlington, Texas 76006
817-640-3898 (fax) 817-640-8734
CMR-002
Date: April 1, 2006
Soudnwest Pump Station
LAN
City of Lubbock, Texas
Changes to Mechanical Seals, and Couplings on submittal review comments associated with submittal number 11-15130
Archer Western Job Number 205164
JERSEY EQUIPMENT PROPOSAL DATED MARCH 31, 2006
DESCRIPTION
QTY
UIM
UNrrPRICE
LABOR
MATERIAL
EQUIPMENT
SUB
TOTALS
Labor:
adrrrtinistration
2
MH
$ 40.00
$ 80.00
0
MH
$ 20.00
$
0
MH
s 20.00
0
MH
2O.00
$
0
MH
S 20.00
S -
Materials:
JERSEY EQUIPMENT MECHANICAL SEALS
8
EA
$ 484.00
$ 3,872.00
JERSEY EQUIPMENT ATRA-FLEX COUPLING
4
EA
$ 390.00
$ 1560.00
E ui merit:
Subcontract:
1
LS
$
SUBTOTALS:
PAYROLL BURDEN ® 55% OF LABOR
SUBTOTALS:
$ $0.00
$ 5,432.00
$
$
S 5 512.00
$ 44.00
$ 44.00
$ 124.00
9 5,432.00
$
$ 5,556.00
15% OH&P
5% OH&P on subs
BOND & INSURANCE
$ 833.40
$
$ 191.68
TOTAL AMOUNT OF THIS REQUEST FOR CMR-002
s 61581.08
JeRSEY C-QUIPMENT COMPANY
217 S. STEMMONS EXPWY #204
LEWIWILE, TEXAS 7W67
(97M) 420-8789
Mr. Jeff Polak
Archer Western Contractors
2121 Avenue J, Suite 103
Arlington, Texas 76006
Re: Southwest Pump Station, Lubbock
ITT Goulds Pumps Inc.
Dear Jeff :
March 31, 2006
page 1 of 10
THIS SHOP DRAWING HAS BEEN FtMEWED AND
DETERMINED TO BE IN COpApUAiVCE wIn{ZECONTRACT DUCUWjM INCLUDIFGPLASPECIFICATIOAIS AS MOtAFNS
IEO BY ADDENDA, ORDERS Apia FLEW 9RDE�S.
ARCHERVESTERN COMACTORS, LTD.
8Y
DATE^ `o _
Our comments to your March 21 transmittal fetter are as follows : —~-
1. Attached are pages 33-37 from ITT Goulds O&M Manuals regarding
preventive maintenance. Please note there are no components which
should be replaced within one year. The only item in a pump that would
have to be replaced In a year's time would be the packing and these pumps
have no packing. Therefore, no recommended spare parts for one year's
maintenance are required.
2. Please refer to addendum #1, Section 15130 page 3, per. G on Mechanical
seals. The mechanical seals that we have offered meets these
requirements. Your request for a split ring mechanical seal was not specified
and this will be at an additional cost. The cost adder of each requested split
seal above tits seal that was specified Is a not incresse of $484.00 per seal,
or a total of $3,872.00. We will forward data upon your OK.
3_ Please refer to addendum #1, Section 15130 page 3, par. G on Couplings. A
flexible coupling was specified and there were no choice of manufacturers
named. The Cky's request for Atra-Flex couplings is a net increase of
$390.00 per coupling, or a total of $1,560.00. We have attached data.
4. Each pump will include a non -witness performance test and test data will be
included in the final submittals and O&M Manuals.
April 6, 2006
Lockwood, Andrews & Newman, Inc.
Attn: Graham Moore
10801 N Mopac Epwy, Ste 120
Austin, Texas 78759
Phone: 512-338-4212
Fax: 512=338-4942
Re: City of Lubbock Southwest Pump Station
C.M.R.-003: Credit for Electrical changes to primary feed
R49cetved
OR 112006
In Austin
Archer Western offers the following credit for deleting the primary electrical manhole,
and adding the primary termination cabinet. The proposed credit also includes changing the
5" duct to 4". The total amount for this deductive change order is :< $1,375.00>. Please
review the attached information and advise if acceptable.
Do not hesitate to contact this office should you have any questions regarding this matter.
Sincerely,
Jeff Polak
Archer Western Contractors, Ltd.
Sr. Project Manager
(817) 646-3898 ext. 4218
CC: File
Jay Vincent
Scott Smiley
2121 Avenue J Suite 103
Arlington, Texas 76006
817-640-3898 (fax) 817-640-8734
04/05/2906 WED 1�14 FAI 806 745 3102 acre electric colpau �001/003
ACME ELECTRIC COMPANY !
109 EAST 82"O STREET
LUBBOCK$ TX 79404
FAX COVER SHEET
• O: w0big
JEFF POIAX BARRY BROWN
caMPANY: DAM •
ARCHER WESISIM 04/05/06
F" 14umm- 7=ALNO. OF VAOES INCIUDINO COPE&
817-6404M4 3
PHONE Numsmt: C)DiDBR'S ",MRRNC M NUNriISR
lus i YOUR RBPBMNCBNUMRRR:
❑ upwiNT ❑ bolt REVIEW ❑ PLEASE COMM$N? ❑ PLRME REPLY ❑PLEASE RECYCLR
NOTES/COMb!£4NT5:
Jcf&
Please fmd attached our proposal for the ravised duct b=k.
Thanks,
Barry
PHONE 806-745-7720
FAX 806-745-3102
04/05/2008 W D 15:04 FAI 806 745 3102 acne electric company 9002/003
Acme Electric Company PROPOSED MAN" ORnn
No. 00001
108 Bast 821Dd Plmm= $6-745.7720
Lubock,Tx 79404 Fez: 806-743-3102
_...—
TITLE: REVISE PRIMARY DUCTBAM DATE: 4/5/2006
PROJECT: Lubbock Soutbweat Pump Station JOB: 1315
TO: Attn: JEFF POLAK CONTRACT NO:1315
Archer Westerl► Contractors, Ltd.
2121 Ave. I Suite 103
Arlington, Tx 76006
.RE: RF1 To: AWC From: ACME Number: 00001
..�aww��eO��,w«w.w...�.,...,,K.,..�,..�.�.+�....�........ •n,.•..,««w'":"':"»..�.i.»Hn�..w,u,..."'^��w,.�:..�"�`��
Please find attached the cost breakdown for deleting the primary electrical manholo, and adding the primary termindon cabinet.
The proposed dmge also indadoS changing the 5" duct to 4'.
Unit Cost:
$0.00
Unit Tttn:
$0.00
Lump Sum:
($1,375.00)
Lump Tax:
$0.00
Total.
($1,375.00)
APPROVAL:
Br.
Bin Brown JEFF POLAK
Date: Date:
i
041051UM WO 15:04 FAI 806 745 3102 acne electric company �003/003
A
T
X
wallk
J1111TIMP
June 7, 2006
Lockwood, Andrews & Newman, Inc.
Attn: Graham Moore
10801 N. Mopac Epwy, Ste 120
Austin, Texas 78759
Phone: 512-338-4212
Fax: 512-338-4942
Re: City of Lubbock Southwest Pump Station
C.M.R.-004: NSF 61 compliant admixtures to concrete for the 5.0 MG Storage Tank
Archer Western offers the following cost proposal for the addition of NSF 61 compliant
admixtures to the Natgun constructed 5.0 MG Storage Tank. The total amount for this
change order is: $12,290.00. Please review the attached information and advise if
acceptable.
Do not hesitate to contact this office should you have any questions regarding this matter.
Sincerely,
Nt# P Po"
Jeff Polak
Archer Western Contractors, Ltd.
Sr. Project Manager
(817) 640-3898 ext. 4218
CC: File
Jay Vincent
Damon Brooks
2121 Avenue J Suite 103
Arlington, Texas 76006
817-640-3898 (fax) 817-640-8734
CMR-004
Date: June 07, 2006
Southwest Pump Station
LAN
City of Lubbock, Texas
CHANGE DESCRIPTION:
Addition of NSF 61 compliant admixtures to the concrete utilized to construct the 5.0 MG Storage Tank
Archer Western Job Number 205164
Natgun Proposal dated June 6, 2006
DESCRIPTION
CITY
UIM
UNITPRICE
LABOR
MATERIAL
EQUIPMENT
SUB
TOTALS
Labor:
administration
2
MH
$ 40.00
$ 80.00
0
MH
$ 20.00
$
0
MH
$ 20.00
$
0
MH
$ 20.00
$
0
MH
$ 20.00
$
Materials:
0
EA
$
$
0
EA
$
$
Equipment:
Subcontract:
Natgun
1
LS
$
$ 10,252
SUBTOTALS:
PAYROLL BURDEN @ 66% OF LABOR
SUBTOTALS:
$ 80.00
$
$
$ 10,252.00
$ 10,332.00
$ 44.00
$ 44.00
$ 124.00
$
$
$ 10,252.00
$ 10,376.00
15% OH&P
BOND & INSURANCE
$ 1,556.40
$ 357,97
TOTAL AMOUNT OF THIS REQUEST FOR CMR-004
$ 12,290.37
NA1G..s N
Wire -wound Concrete Tanks
Established 1929
June 6,2006
Archer Western Contractor LTD.
2121 Avenue J
Arlington TX 76006
Attn: Mr. Jeffrey J. Polak
Natgun Corporation
11 Teal Rd
Wakefield MA 01880
Telephone 781 246-1133
Facsimile 781 224.5153
REFERENCE: Proposed concrete admixture Change Order
Lubbock TX Southwest Storage Pump Station and 5 MG Storage Tank
Natgun Project no. 06CO2
Jeffrey,
This letter is in reference to the request for change in admixtures for the concrete to be supplied
to the Lubbock, TX project. As you are aware, during the submittal process, NSF 61 compliant
admixtures were requested be utilized on the project.
The contract documents did not refer to an NSF requirement and the request to supply NSF
approved admixtures led to additional costs incurred for the supply of concrete.
Transmit Mix, our Concrete supplier, has passed on his increased cost for the admixtures at five
dollars per cubic yard. A breakdown of the concrete mixes and quantities used is attached. Also
attached is the formal Change Order recapitulation sheet. The total for the change order results
in an increase to contract amount of $10,252.00.
Please submit these costs to the engineer. If there are any questions about this letter or the backup
Please call.
Sincerely,
P.J clnerny
NA GUN CORPORATION
Project Manager
Phone: (o) 781 — 224-5144
(C )214 435-3770
Email: pmcinerny@natgun.com
cc: Ed Holmes, Bob Walsh
CORPORATE OFFICE: 11 TEAL ROAD, WAKEFIELD, MA 01880, TELEPHONE: 781-246-1133
NATGUN Corporation
11 Teal Road
Wakefield, MA 01880
Concrete Increase Duet NSF61 Admixtures
Lubbock, TX
5.0 MG Water Storage Tank
06CO2
mix
Quenti
A
Floor & Footing
694
cy
Floor Pipe Encasement
10
cy
B
Wall Panels
276
cy
Wall Overflow Encasement
5
cy
Dome Panels
530
cy
C
Cove
35
cy
Circumfrenbal Dome Slots
75
cy
Radial Dome Slots
15
cy
D
Clear Cover
110
cy
E
Core Wall
30
cy
Wire Cover
70
cy
F
Wall Slots
15
cy
Concrete Supplier: Transit Mix
1404 N. Gary Rd.
Lubbock, TX 79414
PSI
Increase Due
Total
Mix otals
to Admixtures
3,500
$5.00
Icy
$3,470.00
3,500
$5.00
Icy
$50.00
$3,520.00
5,000
$5.00
Icy
$1,376.00
5,000
$5.00
ky
$25.00
5,000'.
$5.00
Icy
$2,650.00
$4,050.00
5,000
$5.00
Icy
$175.00
5,000
$5.00
Icy
$375.00
5,000
$5.00
Icy
$75.00
$625.00
4,500
$5.00
Icy
$550.00
$550.00
4,500
$5.00
/cy
$150.00
4,500
$5.00
Icy
$350.00
$500.00
4,000
$5.00
Icy
$75.00
$75.00
Total Increase:
$9,320.00
Natgun 10% Mark Up:
$932.00
Grand Total:
$10,252.00
CONCRETE &
MATERIALS COMPANY
A TRINITY INDUSTRINS COMPANYQ
May 28, 2W6
Natgun Corporation
11 Teal Road
Wakefield, MA 01880
Joe Pappo:
The increase you are now seeing on the Invoices you receive Is due to a change in admudures both
due to an increase in dosage rate and cost of the admbdures that are now required. The $5.00 per yd
Increase reflects the changes made.
If you have any questions or concerns, please feel free to call.
Sincerely,
Mark Rice
Area Sales Manager
806-548-6129
1405 N. GARY • LUBSOCK, TEXAS 79415
806-763.6464 FAX 806-763-5040