HomeMy WebLinkAboutResolution - 2006-R0366 - Lubbock Change Order For Glenna Goodacre Paving - Allen Butler Construction, Inc - 07_25_2006Resolution No. 2006—RO366 July 25, 2006 Item No. 5.12 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock BE and is hereby authorized and directed to execute for and on behalf of the City of Lubbock Change Order No. 7 for Allen Butler Construction, Inc., Contract #5631 for Glenna Goodacre Paving and Drainage Improvements in the Overton Park redevelopment area. Said Change Order is attached hereto and incorporated in this Resolution as if fully set forth herein and shall be included in the minutes of the Council. Passed by the City Council this 25th day of July 2006. DAVID A. MILLER, MAYOR ATTEST: Re ecca Garza, City Secretar APPROVED AS TO CONTENT: Rob A ' , utive Di for of Development Service APPROVED AS TO FORM: Linda L. Chamales, Senior Attorney Office Practice Section gs/ccdocs/ChOrder 7-Allen Butler Const.res 7/13/06 CITY OF LUBBOCK CHANGE ORDER Change Order #: 7 I Contractor: Allen Butler Construction, Inc. Date: July 12, 2006 BID/ITB #: 04-153-RW Contract #: 5631 Project Name: Glenna Goodacre Blvd. Paving and Drainage Improvements j Change Order within the scope of the contract means a Change Order that DOES NOT ALTER THE NATURE OF THE THING TO BE CONSTRUCTED AND THAT IS AN INTEGRAL PART OF THE PROJECT OBJECTIVE. After performance of a construction contract begins, Change Orders may be approved if necessary to 1) make changes in plans or specifications; or 2) decrease or increase the quantity of work to be performed or materials, equipment, or supplies to be furnished. This DOES NOT mean that a department can redefine the project. All work that alters the nature of the thing to be constructed or that is not an by the Purchasing Department. Description of change encountered during construction not covered by the (alteration, deviation, addition, or deletion) caused by c specifications and drawings of the project (attach additional curb and autter quantity estimates did not include the of work to be done. Change Orders must either be negotiated in the best interest of the City of Lubbock or put out for public bid by the Purchasing Department. Where the Change Order is negotiated, the Change Order must be fully documented and itemized as to costs, including material quantities, material costs, taxes, insurance, employee benefits, other related costs, profit and overhead. Where certain unit prices are contained in the initial contract, no deviations are allowed in computing negotiated change order costs. ITEMIZED COSTS MUST BE FULLY DOCUMENTED AND ATTACHED TO THIS FORM. ITEM DESCRIPTION AMOUNT A. ORIGINAL CONTRACT VALUE: $1,092,521.96 B. AMOUNT OF THIS CHANGE ORDER: Council approval required jover.t25,000 �z( w C. PERCENT OF CONTRACT VALUE THIS CHANGE ORDER (B/A):�� s D. AMOUNT OF PREVIOUS CHANGE ORDERS: $65089.62 E. TOTAL AMOUNT OF ALL CHANGE ORDERS (B+D): $104,714.02 F. PERCENT OF CONTRACT OF ALL CHANGE ORDERS (E/A): 25%Maximunr � " G. NEW CONTRACT AMOUNT (A+E): 1,197,235.98 It is mutually agreed that the above dollar amount and the time extension, as applicable, as set forth in this Change Order constitutes full compensation to the Contractor for all costs, expenses and damages to the Contractor, whether direct, consequential or otherwise, in anyway incident to, or arising out of or resulting directly or indirectly; from the work performed or modified by the Contractor Ir ATrA 7/25/06 c T. 7/25/06 (7) MAYOR Date (8) CITY SECRETARY Date Council Date: Jul 25, 2006 Agenda Item #: 5.12 Resolution #: 2006—RO366 PUR-045 (Rev 02J06) Glenna Goodacre Boulevard Paving and Drainage Improvements July 12, 2006 Change Order Number 7 ITEM DESCRIPTION QUANTITY UNIT PRICE TOTAL INCREASE QUANTITY: 6. Standard 24" curb and gutter and 24" sawtooth 5,054.133 LF $7.84/LF $39,624.40 curb and gutter, but not including roundabout, City of Lubbock Class A concrete, including all subgrade preparation and jointing, furnished and installed, complete and in -place, per linear foot. SUM = $39,624.40