Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Resolution - 2006-R0376 - Change Order To Public Works Contract - Granite Construction Company - 08/10/2006
Resolution No. 2006-RO376 August 10, 2006 Item No. 5.12 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the City Council of the City of Lubbock hereby authorizes and directs the Mayor of the City of Lubbock to execute a Change Order No. 6 to a public works Contract by and between the City of Lubbock and Granite Construction Company of Lubbock, Texas, for Milwaukee Avenue Paving Improvements-92nd to 34`h Streets, which Change Order No. 6 and any associated documents, are attached hereto and made a part of this Resolution for all intents and purposes. Passed by the City Council this 10th day of August , 2006. ATTEST: Re ecca Garza, City Secreta APPROVED �A_S�TO CONTENT: Larry Hertel, P.E., City Engineer IAPPROVED AS TO FORM: of 1,2006 CITY Of LUM OCK CHANGE ORDER ' Change Order #: ! 6 Contractor: Granite Construction I Date: 6/28/06 BID1ITB #: 05-029-VK Contract #: 9035590405 Project Name: Milwaukee Avenue Paving Improvements - 92nd to 34th Street I Change Order within the scope of the contract means a Change Order that DOES NOT ALTER THE NATURE OF THE THING TO BE CONSTRUCTED AND THAT IS AN INTEGRAL PART OF THE PROJECT OBJECTIVE. After performance of a construction contract begins, Change Orders may be approved if necessary to l) make changes in plans or specifications; or 2) decrease or increase the quantity of work to be performed or materials, equipment, or supplies to be fumished. This DOES NOT mean that a department can redefine the project. All work that alters the nature of the thing to be constructed or that is not an integral part of the project objective must be let out for public bid by the Purchasing Department. Description of change (alteration, deviation, addition, or deletion) caused by conditions encountered during construction not covered by the specifications and drawings of the proect (attach additional a es if necessary): Change the contract to increase the seeding quantity for ROW seeding and add the seeding for channel and park areas at a new price per SY from $1.50 to $1.88. Add work required to clean out 82nd Street culvert and repair existing irrigation systems. Change Orders must either be negotiated in the best interest of the City of Lubbock or put out for public bid by the Purchasing Department. Where the Change Order is negotiated, the Change Order must be fully documented and itemized as to costs, including material quantities, material costs, taxes, insurance, employee benefits, other related costs, profit and overhead. Where certain unit prices are contained in the initial contract, no deviations are allowed in computing negotiated change order costs. ITEMIZED COSTS MUST BE FULLY DOCUMENTED AND ATTACHED TO THIS FORM. ITEM DESCRIPTION AMOUNT A. ORIGINAL CONTRACT VALUE: $17,316,932,50 B. AMOUNT OF THIS CHANGE ORDER: Council approval required ijnver$25,000 5 ^rye k ' C. PERCENT OF CONTRACT VALUE THIS CHANGE ORDER (B/A): y� D. AMOUNT OF PREVIOUS CHANGE ORDERS: $917,731.18 E. TOTAL AMOUNT OF ALL CHANGE ORDERS (B+D): $1,006,069.68 F. PERCENT OF CONTRACT OF ALL CHANGE ORDERS (E(A): 25%Maximum h � G. NEW CONTRACT AMOUNT (A+E): $18,323,002.18 It is mutually agreed that the above dollar amount and the time extension, as applicable, as set forth in this Change Order constitutes full compensation to the Contractor for all costs, expenses and damages to the Contractor, whether direct, consequential or otherwise, in anyway incident to, or arising out of or resulting directly or indirectly; from the work performed or modified by the Contractor under this Change Order. Ordervalid without the followingsignatu lease in n re 3 orikinalswith Contract Cover Sheet to P ire oral Coy r A' r Department): % 712VIOXI I O R ate ROJECT ARC GINEER Date Appro to Content: Approved as to Farm: o E Date ITY NEY ©6©6 (3) OWN P AT A r atD e �lo CAPROJECTS MANAGER D e 6)PlJgCHA§INGANr)etJWiRAefUANAGER Date Change Orders over $25,000 require a Contract Cover Sheet and the following signatures. 8/10/06 A. T. 8/10/06 (7)MAYOR Date (8)CrrS SECRETARY Date Council Date: August 10, 2006 Agenda Item #: 5.12 Resolution #. 2006—RO376 PUR•045 (Rev 02106) City of Lubbock Milwaukee Avenue Paving Improvements 34th Street to 92nd Street Change Order #6 Itemized Costs Item Description Unit Price Quantity Extension 1 Increase Quantity of Seeding in ROW SY $ 1.50 4,639 $ 6,958.50 2 Add seeding in channels and park area SY $ 1.88 38,000 $ 71,440.00 3 Cost for removing silt from 10x2 culvert at 82nd LS $ 6,370.00 1 $ 6,370.00 4 Repair Existing Irrigation Systems LS $ 3,570.00 1 $ 3,570.00 TOTAL for Change Order #8 r Previous change orders%1 TOTAL added to contract as of this change order mew Original contract Value $17,316,932.50 New total J110-41vitQ , X:\2005\2872.05\0VUChange Orders\Change Order H-1temized Costs.xls MEMO TO: Lubbock City Council FROM: Parkhill, Smith & Cooper, Inc. SUBJECT: Milwaukee Avenue Change Order #6 DATE: June 28, 2006 Council Members: PSC Job No: 01.2872.05 This memo provides a detailed explanation of changes to the Milwaukee Avenue Extension Project Requested in Change Order #6. Item #1— Increase Quantity of Seeding in ROW The original plan quantity did not include seeding within the ROW at cross streets such as 82nd street, 666' Street, Spur 327, US 62/82 and 34`h Street. This additional quantity will cover these areas. Item #1 will add $6,958.50 to the contract. Item #2 — Add Seeding in Channels and Park Area The original plan quantity for seeding did not include seeding the banks of the newly cut channel areas. Because of the large area of seeding added and the difficulty in accessing some of these areas, the contractor has requested a new bid price of $1.88 instead of $1.50 per square yard to accomplish this work. Item #2 will add $71,440 to the contract. Item #3 — Remove Silt from existing 10'x 2' Box Culvert at 82nd Street The adjacent land owner expressed concern in the ability of the existing box culvert beneath 82nd Street west of Milwaukee to carry the intended capacity of water unless the silt is removed from the flowline. The City requested a price from the contractor to remove the silt from the culvert. The cost for completing this work is $6,370 on a lump sum basis. Item #4 — Repair Existing Irrigation Systems The Owner requested that the contractor provide a price for repairing and returning private irrigation systems to pre -construction condition. A total of four systems required repair on properties south of 82nd street on the west side of the road. Granite has retained a contractor to perform these repairs as requested at a cost of $3,570. X:1'_005\21872.051CIVIUChange OrdmChange Ordei *M-Exp"txm.DOC PARKHILL, SMITH & COOPER, INC. Engineers • Architects • Planners 4222 85th Street, Lubbock, Texas 79423 Phone (806) 473-2200 Fax (806) 473-3500 1 11hhrV-1r FI Pacn Mirihnri A.Y_-u_ - GRRnITE crosi unar commn! Sly June 13, 2006 Sean Cudnoski, P.E. Parkhill, Smith & Cooper, Inc. 4222 85 h Street Lubbock, Texas 79423 RE: RFI4 PSC-I I Mr. Cudnoski: In response to RFI# PSC-11, Granite Construction, is willing to increase the "Roadway Seeding" quantity shown on your seeding schedule (rev. 06/07/06) at the original bid price. Also, Granite Construction has reviewed the "Channel/Park Seeding" quantities, provided on the same seeding schedule as above, and the bid price will require an adjustment from $1.50/SY to $1.88/SY, an increase of $0.38/SY. If there are any questions or comments please feel free to contact Mike Oliver or I at our office. Regards, 114-� Matt Strother Project Engineer CC: MO DC File #310020 P.O. Box 3130 Lubbock, TX 79452 (806) 748-9170 FAX (806) 748-9468 URRIM crosi union commnu Sly May 18, 2006 Mr. Larry Hertel P.E. City of Lubbock Texas Re: Milwaukee Ave Paving Improvements Mr. Hertel, As requested, the price for removing sediment from the 10' x 2' box culvert crossing 82°d St., west of Milwaukee Ave and regarding the down stream ditch is as follows: Remove silt from existing drainage structure; $6370.00 Regrade existing ditch line north of drainage structure; $8,012.00. Thank you for your consideration in these matters. Sincerely R. Michael Oliver Project Manager Granite Construction Co. Cc: Jeff Badke P.O. Box 3130 Lubbock, TX 79452 (806) 748-9170 FAX (806) 748-9468 -71146c- July 14, 2006 Sean Cudnoski, P.E. Parkhill, Smith & Cooper, Inc. 4222 851' Street Lubbock, Texas 79423 RE: Sprinkler Replacement. Mr. Cudnoski: GRAnITE cons i ucinon commny 1%2 Granite Construction is offering a price of $1,121 per residence (3 residences) to replace the sprinkler systems on the south end of the Milwaukee Ave. project. If there are any questions or comments please feel free to contact Mike Oliver or I at our office. Regards, Matt Strother Project Engineer CC: MO DC File 4310020 P.O. Box 3130 Lubbock, TX 79452 (806) 748-9170 FAX (806) 748-9468 pu:-d 7 26/1-c-- July 20, 2006 Sean Cudnoski, P.E. Parkhill, Smith & Cooper, Inc. 4222 85`° Street Lubbock, Texas 79423 RE: Sprinkler Replacement Mr. Cudnoski: Please add $207 to the sprinkler installation price, submitted on July 14, 2006 due to work in an additional location being performed. If there are any questions or comments please feel free to contact Mike Oliver or I at our office. Regards, Matt Strother Project Engineer CC: MO DC File #310020