HomeMy WebLinkAboutResolution - 6496 - Amendment To Agreement- Compliance Services Group Inc.-Environmental Engineering - 09_09_1999Resolution No. 6496
Sept. 9, 1999
Item No. 25
RESOLUTION
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock BE and is hereby authorized and
directed to execute for and on behalf of the City of Lubbock an Amendment to
Agreement for Environmental Engineering Services by and between the City of Lubbock
and Compliance Services Group, Inc., attached hereto, which shall be spread upon the
minutes of the Council and as spread upon the minutes of this Council shall constitute
and be a part of this Resolution as if fully copied herein in detail.
Passed by the City Council this
A
City Secretary
APPROVED AS TO CONTENT:
9th day of September 1999.
as I
Dan Dennison
Environmental Compliance Manager
APPROVED AS TO FORM:
Richard K. Casner
Natural Resources Attorney
da/ccdocs/CSG-EnviroEngSvc.res
August 31, 1999
Resolution No. 6496
Sept. 9, 1999
Item No. 25
AMENDMENT TO AGREEMENT FOR
ENVIRONMENTAL ENGINEERING SERVICES
This Amendment to Agreement for Environmental Engineering Services (the
"Amendment"), dated this 9' day of September, 1999, is entered into by the City of
Lubbock, a Texas Home Rule Municipal Corporation (the "City"), and Compliance
Services Group, Inc. (CSG').
RECITALS
WHEREAS, by Resolution dated November 16, 1995, the City and CSG entered
into that certain Agreement for Environmental Engineering Services (the "Contract")
providing for, among other things, the investigation of certain sites, and the development
of assessment reports regarding said investigation (the "Investigation Activities"); and
WHEREAS, although the Contract contemplates the Investigation Activities, the
scope and cost for such Investigation Activities was unknown, and subject to negotiation,
at the time of the entering into of Contract; and
WHEREAS, by Resolution dated October 9, 1997, the City and CSG amended the
Contract (the "Amendment") to add certain Investigation Activities to the Contract;
WHEREAS, the City and CSG now desire that the Contract be again amended in
certain respects; and
WHEREAS, the City and CSG have agreed upon the following terms and
conditions to modify the Contract.
NOW, THEREFORE, KNOW ALL MEN BY THESE PRESENTS:
THAT for and in consideration of the mutual covenants contained herein and
other good and valuable consideration, the City and CSG hereby agree, each to the other,
as follows:
1. As of the date hereof, Items No. 5 & 6, on page 11 of the Contract, are
deleted in their entirety and replaced for all intents and purposes by (i) the materials
provided by the Amendment; and (ii) the materials described on Exhibit "A" attached
hereto.
2. As of the date hereof, any and all of the terms and provisions of the
Contract, except as modified and amended hereby, remain in full force and effect.
EXECUTED on the dates as indicated below, but effective for all purposes as of
the date of the Resolution of the City Council of the City of Lubbock authorizing the
executions of this Amendment.
CITY OF LUBBOCK
ATTEST:
"4WA
Ka ie arnell, City Secretary
APPROVED AS TO CONTENT:
I cu
Dan Dennison
Environmental Compliance Manager
APPROVED AS TO
Richard K. Casner
Natural Resources Attorney
COMPLIANCE SERVICES GROUP, INC.
Raymon C. Vaughn, , IH, CSP,
Senior Vice President
RKC:cp Cityatt/Richard/CSG.Amendment
September 1, 1999
DATE:
PROJECT:
SCOPE:
EXHIBIT "A"
PROPOSAL for ENVIRONMENTAL SERVICES
for the CITY OF LUBBOCK, TEXAS
August 30, 1999
Resolution No. 6496
Sept. 9, 1999
Item No. 25
Investigation of Subsurface Water Contamination — COL Fire Training Academy
Referring to Items 5 and 6 on Page 11 of the existing Agreement for Environmental Engineering
Services between the City of Lubbock and Compliance Services Group, Inc., dated November
16, 1995.
I. Basic Services.
Attend coordination meetings with the City of Lubbock environmental staff and with the
TNRCC. [Estimated Cost — $3,000]
IL Well Sampling - Episode #1
(a) Pull existing pumps and pre -purge wells. [Estimated Cost - $19,000]
(b) Perform water well sampling for seven (7) site irrigation or monitoring wells.
Purge three (3) well volumes with measurements conducted for well depth
(feet) and depth to water interface (feet). Complete laboratory analyses for pH,
temperature, and EPA Appendix IX constituents including volatiles (EPA
8260A), semi-volatiles (EPA 827013), organochlorine pesticides /
polychlorinated biphenyls (PCB) (SW 8081), organophosphorous pesticides
(EPA 8141A), chlorinated herbicides (EPA 8151), and metals (EPA 6010,
7470). Provide a simple format report of the laboratory findings. [Estimated
Cost - $42,0001
(c) Store purged groundwater in an on -site tanker storage and discharge into the
COL POTW sewer system upon approval. [Estimated Cost - $6,000]
III. Well Sampling - Episode #2
Conduct a second round of sampling, as requested. [Estimated Cost - $48,000]
IV. Well Closure.
Plug and abandon four (4) irrigation or monitoring wells in accordance with TNRCC
procedures. [Estimated Cost - $47,500]
V. Monitoring Well Upgrades.
Upgrade three (3) irrigation or monitoring wells in accordance with TNRCC procedures
for monitoring wells. [Estimated Cost - $34,500]
FEES: Fees for these services are based on hourly rates in Compliance Services Group, Inc. — Schedule of
Rates for Engineering and Scientific Services and made a part of the original contract (page 6).