Loading...
HomeMy WebLinkAboutResolution - 6455 - CO To Contract - Lubbock Building Services - Buddy Holly Center Renovations - 08_12_1999Resolution No.6455 August 12, 1999 Item No. 45 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock BE and is hereby authorized and directed to execute for and on behalf of the City of Lubbock, a Change Order #2 for Buddy Holly Center Renovations, by and between the City of Lubbock and Lubbock Building Services, and related documents. Said Change Order #2 is attached hereto and incorporated in this resolution as if fully set forth herein and shall be included in the minutes of the City Council. Passed by the City Council this 12th . day of _ August '1999. Y SI N, MAYOR APPROVED AS TO CONTENT/I- b. I /'. -4 4'� 04 Garymith Facilities Manager APPROVED AS TO FORM: William de Haas Competition and Contracts Manager/Attorney rkb/ccdocschangeorder2.res July 29, 1999 Resolution No.6455 August 12, 1999 Item No. 45 CITY OF LUBBOCK MEMORANDUM TO: Bob Cass, City Manager FROM: Gary W. Smith, Facilities Manager SUBJECT: Agenda Comments — August 12, 1999 City Council Meeting DATE: July 27, 1999 Cc: Ron Shuffield, Senior Buyer CITY OF LUBBOCK AGENDA ITEM SUMMARY ITEM #/SUBJECT: # Consider Change Order #2 in the amount of $173,270.10 for Buddy Holly Center Renovations. BACKGROUND DISCUSSION This project will renovate the existing Ft. Worth and Denver South Plains Railroad Depot to provide for the Buddy Holly Center. The total project budget is $2,637,079.00 and is funded through capital project 940-9355, Lubbock Center for the Arts. Of the total amount, $2,036,969.00 is for construction, acquisition, and installation. The City entered into a contract with Lubbock Building Services on October 8, 1998 to provide construction services. The original contract amount was $1,351,000.00. Previously approved change order #1 provided for a change in materials and other related construction works resulting in a cost reduction of $16,708.75.00. Change Order #2 is for additional revisions in the scope of work. Funding for a portion of these changes was requested and approved at revised budget, with the remaining cost paid for by donations from individuals and a grant from the Meadows Foundation (total for these two sources is currently $150,000). Change orders require Council approval if they exceed $25,000. This change order amounts to a 12.8% increase over the original contract amount with a dollar amount of $173,270.10. Change Orders #1 and #2 together comprise 11.6% of the original contract amount for an add of $156,561.35. RECOMMENDATIONS After reviewing the contractor's cost proposals, Facilities Management and the architect, McKinney Architects, feel that the charges are reasonable and justifiable. Facilities Management recommends the award of this contract change order. File:]\bldgsvc\BH CO2 Agenda Comments CITY OF LUBBOCK CHANGE ORDER CHANGE ORDER #: Two (2) CONTRACTOR: Lubbock Building Services DATE: July 26, 1999 CITY OF LUBBOCK BID#: 98184 PROJECT NAME: Buddy Holly Center Renovations DESCRIPTION OF WORK: This change order will change the contract as follows: 1. Additional roofing $63,161.75 2. Change in concrete footing depth 5,080.30 3. Install new ceiling in offices 3,062.45 4. Delete hardware and install new door #25 (523.25) 5. Repoint masonry 4,715.00 6. Move floor outlets in Buddy Holly Gallery 645.15 7. Change in roof detail (2,571.40) 8. Install security system 30,882.00 9. Construct gallery partitions 4,463.00 10. Install floor outlets in Lobby Shop 1,376.00 11. Install five new outlets in Gallery 1 725.65 12. Relocate fire alarm strobes 1,756.05 13. Install four fire alarm strobes as per TDLR review 3,842.15 14. Install conduit for telephone lines 1,239.00 15. Delete track lighting fixtures (2,497.80) 16. Window blinds 5,161.20 17. Install railing at deck 9,614.00 18. Install entry canopy 28,367.10 19. Construct steel fence and steel guitars 11,615.00 20. Relocate wall switches 2,029.75 21. Install storm drain from courtyard 1,127.00 TOTAL AMOUNT OF CHANGE ORDER #2 $173,270.10 ITEM DESCRIPTION A. ORIGINAL CONTRACT VALUE: B. AMOUNT OF THIS CHANGE ORDER: C PERCENT OF CONTRACT VALUE THIS CHANGE ORDER (B/A): D. AMOUNT OF PREVIOUS CHANGE ORDERS: E. TOTAL AMOUNT OF ALL CHANGE ORDER (B+D): F. PERCENT OF CONTRACT OF ALL CHANGE ORDERS (E/A): G. NEW CONTRACT AMOUNT (A+E): VALUE $1,351,000.00 ($16,708.75) $156,561.35 $1,507,561.35 r jyZ41x/ I' E , , CITY MANAGER ATTEST: � hi "RA DARNELL Citydiretary JONtTOR SIGNATURE i WINDY SITTON 1 1 4 8/12/99