HomeMy WebLinkAboutResolution - 2006-R0248 - Contract Change Order No 2 - Allen Butler Construction Inc. - Street Paving - 06_08_2006Resolution No. 2006-RO248 June 8, 2006 RESOLUTION Item No. 5.17 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LU3BOCK: THAT the Mayor of the City of Lubbock BE and is hereby authorized and directed to execute for and on behalf of the City of Lubbock, a Change Order #2 to the Contract for 98`h Street Paving and Drainage Improvements from Slide Road to Juneau Avenue, ITB #05-150-BM, by and between the City of Lubbock and Allen Butler Construction, Inc., and related documents. Said Change Order is attached hereto and incorporated in this resolution as if fully set forth herein and shall be included in the minutes of the City Council. Passed by the City Council this 8th day of June , 2006. DAVID A. MILLER, MAYOR ATTEST: RebeEca Garza, City Secretary APPROVED .kS TO CONTENT: o arty D. He el, City Engineer APPROVED AS TO FORM: f � — M. Knight, Asskfant Ciff Attorney ml/ccdocs/Res-Ch Order2-Allen Butler Construction May 30, 2006 CITY OF LUBBOCK C.IIANGE ORDER Change Order #: , 2 Contractor: Allen Butler Construction, Inc. Date: -N:31 06 BID-1TB R: 05.150-BM Contract a: 90093.8304?0000 Project Nanie: 98" Street Paving and Drainage Improvements , lrotn Slide Rd. to Juneau Ave. Change Order within the scope ofthe contract tteans ,t Change Order that DOES NOT ALTER THE NATURE OE' THE THING TO BE CONSTRUCTED AND THAT IS AN INTEGRAL PART OF THE PROJECT OBJECTIVE. Aber performance of a construction contruct begins, Change Orden tnay be: approved if ne:c,sary to 1) snake changes in plans or specitications: or 2) decrease or inereuse the quantity of work to 1w perforated or materials. Lyuiptnent, or supplies to be funtished. Tltis DOES NOT mean that a department can redefine the project. All work that alters the natuM of the thing to be constructed or that is not an integral part of the p-roimt obiLgive must be let out lair public bid by The Purchasing Department. Description of change (alteration, deviation, addition, or deletion) caused by conditions encountered during constructlon not covered by the specifications and drawings of the project (anac•h addidotm! a es if necessary): Remove existing sanitarysewer, plug and pump sewage to sanitarysewer manhole, install new sewer line and manholes of original size and configuration following corrective earthwork. Change Or de.Ys must either be negotiated its the teat interest of the City of Lubbock or put out for public bid by the Purchasing Department, Where the Change Order is negotiated, The Change Order must be fully documented and iteinized as to costs, including material quuntiticy, material costs, tuxes, insurance, employe; benctits, other related costs, profit and overhead. Where certain unit prices are contained in the initial contract, no deviation, arc allowed in computing negotiated change ordere:osts. ITEMIZED COSTS NIUST BE FI I LY. DOCUMENTED AND ATTACHED TO THIS FORM. iTEM DESCRIPTION ctNIOLNT A. ORIGINAL CONTRACT VALUE: $14.748,004.18 B. AMOUNT OF THIS CHANGE ORDER:c'mu•.Tipp,•ntltrytiirrditnrrr.clS,tnKt C, PERCENTOF CONTRACT VALUE THIS CHANGE ORDER (WA)-. D. AMOUNT OF PREVIOUS CHANGE ORDERS: $23,863.00 E. TOTAL AMOUNT OF ALL CHANGE ORDERS (B-t-DI: $97,780.65 F. PERCENT OF CONTRACT OF ALL CIiANGE ORDERS (E/A):.S ,?itcrinamr • . • '. Oi.t G, N EW CONTRACT AMOUNT (A- E): $14,845,784.83 it is mutually agreed that the above dollar autount and the tone extension, as applicable, asset tenth in this Change Order constitutes full compensation to the Contractor for all costs, expcn,-o s and damages to the Contractor, whether direct, consequential or otherwise, in anyway incident to, or urising out of or resulting directly or indirectly, from the work perforated or modifW by the Coturactor under this ChangeOrdex. Change Orden over 325,000 require a Contract Corer Sheei and thef dloning signatures: Cf u6y� 6/8/06 Ar -� 6/8/06 17).MAYOR bavid A. Miller Date (8) cnN SECRETARY Date Councii Date: June 8.9 2006 Agenda !terna. 5.17 Reqotution *: 2006—RO248 I PUR-045 (Rev 02106) City of Lubbock 98th Street Paving and Drainage Improvements From Slide Road to Juneau Avenue Change Order #2 Itemized Costs Item Description Unit Price Quantity Extension 1 Remove Manhole EA $ 1,500.00 2 $ 3,000.00 2 Remove Sewer Line LS $ 1,000,00 1 $ 1,000.00 3 Temporary Sewage Pump Service LS $ 26,950.00 1 $ 26,950.00 4 Install 274' Sewer line and 2 manholes LS $42,967.65 1 $ 42,967.65 TOTAL for Change Order #2 Previous change orders S 23,863,00 TOTAL added to contract as of this change order 3T,7$t?.B'S Original contract Value $14,748,004.18 New total;t4,&IS;84&�;:" X;�200612668.06\CIVIUChange Orders\Change Oder Not itemized Costs.xis