HomeMy WebLinkAboutResolution - 6428 - Amendment To Contract - Parkhill Smith & Cooper Inc.- Storm Drainage Feasibility - 08_12_1999Resolutiou No. 6428
Aug. 12. 1999
Item No. 79
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock BE and is hereby authorized and
directed to execute for and on behalf of the City of Lubbock, Amendment No. 2, to the
contract for Engineering Services for Storm Drainage Feasibility Study and Design:
Clapp Park to North Fork of the Double Mountain Fork of the Brazos River (the Canyon)
and Overflow Playas Upstream of Clapp Park, by and between the City of Lubbock and
Parkhill, Smith & Cooper, Inc., and all related documents. Said Amendment No. 2 is
attached hereto and incorporated in this Resolution as if fully set forth herein and shall be
included in the minutes of the City Council.
Passed by the City Council this 12th day of August , 1 99.
WINDY SITT , MAYOR
A ST:
Kayt arnell, City Secretary
APPR D AS TO CO ENT:
J��'Llrry D. rtel, P.E.
City Engineer
APPROVED AS TO FORM:
William de Haas
Competition and Contracts Manager/Attorney
rkb/ccdocs/1999stormdiainagefeasibilityamendment2.ies
July 20, 1999
AMENDMENT NO. 2
TO AGREEMENT
CITY OF LUBBOCK, TEXAS
AND
PARKHILL, SMITH & COOPER, INC.
FOR ENGINEERING SERVICES
Resolution No. 6428
Aug. 12, 1999
Item No. 79
ENGINEERING SERVICES FOR STORM DRAINAGE FEASIBILITY STUDY AND DESIGN: Clapp Park to
North fork of the Double Mountain Fork of the Brazos River (the Canyon) and Overflow Playas Upstream of Clapp
Park.
THIS IS AN AMENDMENT TO THE AGREEMENT dated December 19, 1996 and entered into by and
between CITY OF LUBBOCK, TEXAS hereinafter called "Owner" and PARKHILL, SMITH & COOPER, INC.,
hereinafter called "Engineer", of 4010 Ave. R, Lubbock, Texas, a corporation which is duly chartered under the
laws of the State of Texas.
Owner intends to perform a feasibility study for Playa Lake System G.
The purpose of this amendment is to:
I. Establish the Basic Services and Compensation for professional services associated with Playa Lake
System G Feasibility Study. Basic Services and Compensation are described in Attachment A and
Attachment B.
2. Establish the Additional Services and Compensation for professional services associated with Phase II
Design and Bidding Phase Services (Amendment No. 1). Additional Services and Compensation are
described in Attachment A and Attachment B.
3. Establish the Schedule for professional services associated with Phase II Design and Bidding Phase
Services (Amendment No. 1) and Playa Lake System G Feasibility Study. Schedules are described in
Attachment B and Attachment C.
Executed in two counterparts (each of which is an original) on behalf of Engineer by its Vice President
shown below, and on behalf of Owner by its Mayor (thereunto duly authorized) this 12thday of August ,1999.
*W"NIE�
CK
W indy Sitton
Mayor
ATM T
By
a 'e Darnell
Secretary
APPROVED AS TO CONTENT:
By h, �61 /,/—
'Larry D. Hertel, P.E.
City Engineer
ENGINEER
PARKHILL, SMITH & COOPER, INC.
By
Ed . "Butc vrs, P.E.
Vice President
APPROVED AS TO FORM:
By 4 Gft
William de Haas
Competition and Contracts Manager
ATTACHMENT A
TO
AMENDMENT NO. 2
TO AGREEMENT
CITY OF LUBBOCK, TEXAS
AND
PARKHILL, SMITH & COOPER, INC.
FOR ENGINEERING SERVICES
Owner: City of Lubbock, Texas
Project: RFP No. 13681, Engineering Services for Storm Drainage Feasibility Study and Design: Clapp Park to
North Fork of the Double Mountain Fork of the Brazos River (the Canyon) and Overflow Playas Upstream
of Clapp Park.
A DESCRIPTION OF SCOPE OF SERVICES
The scope of services for this Project is as follows. Work will not proceed until Owner has authorized Engineer in
writing to proceed.
SYSTEM G FEASIBILITY STUDY
A. BASIC ENGINEERING SERVICES
Basic engineering services include:
1. System G Feasibility Study as defined by the tasks and man-hours in Exhibit A-1.
2. Public meetings as defined by the tasks and man-hours in Exhibit A- 1.
3. Surveying services as described by the tasks and man-hours in Exhibit A-1.
4. Coordination with local, state and federal agencies as defined by the tasks and man-hours
in Exhibit A-1.
5. Geotechnical services as described by the tasks and man-hours in Exhibit A-1.
6. Environmental studies or investigations as defined by the tasks and man-hours in Exhibit
A-1.
7. Deliver to the Owner one (1) reproducible copy plus ten (10) non -reproducible copies of
any drawings containing the selected alternatives.
8. Deliver to the Owner one (1) complete copy of any supporting data and calculations for
the selected alternatives.
9. Deliver to the Owner one (1) unbound original plus ten (10) bound copies of the final
report.
10. Deliver to the Owner one (1) reproducible copy plus 30 non -reproducible copies of the
executive summary.
11. Disks containing the electronic files associated with the feasibility study.
B. ADDITIONAL SERVICES
1. At the request of the Owner, the Engineer will provide Additional Services as included
herein or upon agreement between Owner and the Engineer defming the extent of such
Additional Services and the amount and manner in which Engineer will be compensated
for such Additional Services.
2. Any work requested by the Owner that is not included in one of the items listed in any
other place will be classified as Additional Services.
3. Additional Services may be authorized by a notice -to -proceed in writing from the City
Engineer and addressed to the Engineer.
PHASE II DESIGN AND BIDDING PHASE ADDITIONAL SERVICES
Phase II Design and Bidding Phase Additional Services are defined by the tasks and man-hours in Exhibit
A-2.
ATTACHMENT B
TO
AMENDMENT NO. 2
TO AGREEMENT
CITY OF LUBBOCK, TEXAS
AND
PARKHILL, SMITH & COOPER, INC.
FOR ENGINEERING SERVICES
Owner: City of Lubbock, Texas
Project: RFP No. 13681, Engineering Services for Storm Drainage Feasibility Study and Design: Clapp Park to
North Fork of the Double Mountain Fork of the Brazos River (the Canyon) and Overflow Playas Upstream
of Clapp Park.
COMPENSATION
A. GENERAL
1. The Engineer will be paid on an hourly rate basis shown in Table B-1 and subcontract personnel
services will be billed at cost. Engineer and subcontractor reimbursable expenses will be billed at
cost plus 15 percent surcharge. Reimbursable expenses are shown in Table B-1.
2. The Engineer agrees to use its best efforts to perform services as defined herein within the billing
limits stated below.
3. It is understood and agreed that the maximum billings of each of the items listed below are based
on the start of Services being authorized not later than August 1, 1999. If start of services is not
authorized by date given, it is understood and agreed that the upper billing limit will be adjusted
accordingly by a supplement to the Agreement.
4. Monthly payments shall be made to the Engineer by the Owner based on Engineer's statement.
The statement shall be itemized to indicate the amount of work performed and the associated
reimbursable expenses and subcontract costs.
5. The uncontested amount of each statement shall be due and payable upon receipt by the Owner.
Carrying charges of 1-1/2 percent per month from the billing date shall be due for accounts that
are not paid within 60 days after the billing date.
6. The Engineer shall keep records on the basis of generally accepted accounting practices of costs
and expenses and which records shall be available for inspection by Owner during normal
business hours.
B. SYSTEM G FEASIBILITY STUDY
1. BASIC ENGINEERING SERVICES
a) The maximum billed for System G Feasibility Study Basic Engineering Services including
personnel services and reimbursable expenses for the Engineer and Subcontractors is shown
as follows:
Basic Basic
Personnel Reimbursable
Services Expenses
Parkhill, Smith & Cooper, Inc. $ 246,752 $ 14,893
Hugo Reed and Associates, Inc. $ 100,436 $ 2,047
Surveying $ 25,000
Geotechnical $ 15.140
TOTAL BASIC ENGINEERING SERVICES NOT TO EXCEED $ 404.268
b) The Engineer shall start the performance of the System G Feasibility Study Basic Engineering
Services within ten (10) days of receipt of notice -to -proceed and will complete the Basic
Engineering Services in accordance with the timeline shown in Attachment C.
ADDITIONAL SERVICES
a) Additional Services must be authorized in writing by the Owner.
b) The maximum billed for Additional Services will be determined by mutual consent before the
Additional Services are authorized by the Owner.
c) The Engineer shall start performance of the authorized Additional Services within then (10)
days of receipt of notice -to -proceed and will complete the Additional Services within the time
period determined by mutual consent before the Additional Services are authorized by the
Owner.
C. PHASE II DESIGN AND BIDDING PHASE ADDITIONAL SERVICES
1. The maximum billed for Phase II Design and Bidding Phase Additional Services including
personnel services and reimbursable expenses for the Engineer and Subcontractors is shown as
follows:
Basic Basic
Personnel Reimbursable
Services Expenses
Parkhill, Smith & Cooper, Inc. $ 2,454 $ 0
Surveying $ 1,932
Other Subconsultant $ 2,078
TOTAL ADDITIONAL SERVICES NOT TO EXCEED $ 6,464
The Engineer shall start the performance of the Phase H Design and Bidding Phase
Additional Services within then (10) days of receipt of notice -to -proceed and will
complete the Phase H Design and Bidding Phase Additional Services in accordance with
the timeline shown in Attachment C.
D. PHASE H DESIGN AND BIDDING PHASE SERVICES (Amendment No. 1)
The Engineer will complete the Basic Engineering Services for Phase H Design and Bidding Phase
Services in accordance with the timeline shown in Attachment C.
TABLE B-1
PERSONNEL SERVICES RATES
AMENDMENT NO. 2
TO AGREEMENT
CITY OF LUBBOCK, TEXAS
AND
PARKHILL, SMITH & COOPER, INC.
FOR ENGINEERING SERVICES
Owner: City of Lubbock, Texas
Project: RFP No. 13681, Engineering Services for Storm Drainage Feasibility Study and Design: Clapp Park to
North Fork of the Double Mountain Fork of the Brazos River (the Canyon) and Overflow Playas Upstream
of Clapp Park.
COMPENSATION RATES
Hourly fees listed herein will apply for the term of Amendment No. 2.
A. Personnel Services
Parkhill, Smith & Cooper, Inc.
Category of Personnel
Rates ($/HR)
Principal -in -Charge
$
117.00
Project Manager or Senior Professional Engineer
$
99.00
Professional Engineer
$
81.00
Engineer -in -Training
$
68.00
Technician or Designer
$
58.00
Drafter/CARD Operator
$
52.00
Clerical
$
39.00
Hugo Reed and Associates
Category of Personnel
Rates ($/HR)
Principal -in -Charge or Officer
$
105.00
Senior Professional Engineer
$
89.00
Professional Engineer
$
79.00
Professional Land Surveyor
$
89.00
Engineer -in -Training
$
58.00
Tecbnician/Designer
$
55.00
Drafter/CADD Operator
$
49.00
Clerical
$
37.00
B. Reimbursable Expenses
The following expenses are reimbursable:
1. Travel, subsistence and incidental costs.
2. Use of motor vehicles on a monthly basis for assigned vehicles and on a current mileage basis or
rental cost for vehicles used for short periods.
3. Telegraph cost, long distance telephone costs and project "onsite" telephone costs.
4. Reproduction of reports, drawings and specifications.
5. Postage and shipping charges for project -related materials.
6. Computer time charges, including program use charges.
7. Rental charges for use of equipment.
8. Cost of acquiring any other material or services specifically for and applicable to only this Project.
EXHIBIT A-1
SYSTEM G FEASIBILITY STUDY
BASIC SERVICES
CITY OF LUBBOCK, TEXAS
ENGINEERING SERVICES FOR STORM DRAINAGE DESIGN
CLAW PARK TO NORTH FORK OF THE DOUBLE MOUNTAIN FORK OF THE BRAZOS RIVER (THE CANYON) AND OVERFLOW PLAYAS UPSTREAM OF CLAW PARK (ALTERNATIVE 2E1
SYSTEM G FEASIBILITY STUDY AMENDMENT NO.2
BASIC SERVICES, ESTIMATE OF MAN-HOURS AND TASKS
File: EXHIBIT A-1 REP No. 13681 19Jul-99 02:42 PM
F—
Trek
PrM.
"
Sr.
Nol.
Not.
FIT
Tachracb0
Do.
CHrk l
Total
Toted
cmt
law.
Ergr.
E .
Lmd
I
or CADD
/bas
Emnebn
W
Otfi_
Sa
.r
Owa
(111
PSC
«««««« Rens »»»»»
$117.00
199.00
$99.00
$81.00
$0.00
I68.00
/68.00
$62.00
$30.00
HR
«««««« Raw »»»»»»
4106.00
$0.00
$89.00
$79.00
$89.00
s68.00
$55.00
s49.00
$37.00
A. Eratuete`adatkg to or�tadbn
PSC
1. Recs'ne mod wa em*V proandwetw 60pmudoo
1
1
$99
$99
HR
from City IR IlraaWwwww a oorwioo is -elage)
0
10
$99
PSC
2. Pectin ntaot of Kid mwpm hom CRY,
2
2
$198
$297
RR
mweap baits of dI9ld-9 fm aWane t
1
2
6
1472
$769
(Myar Npias and war final
PSC
3. Recwye wW -Paste Ikod wl6wa.1 (ptctw,
1
1
2
1187
$936
161
netlmooyl 1— co, ham added ptblic meedrgs
1
1
2
$147
$1.083
PSG
a. Recein & walwte hcifily idvnrotim wW peas ham
1
1
$99
$1,182
HR
TsDOT wW Coy to, e " drWnps st—as, the
Ora _mass.
0
10
11,182
PSC
5. Retrbve ebc4oNc ontfM canmia mope on hrM
1
1
2
$120
$1,302
MR
da Ned ham the Manar 1lnuape Ran.
0
10
$1.302
PSC
S. Eyslwta flood IrMunnoa Awly iof—ti- m Ned
2
2
1198
$1,500
HR
dated Ja 18, 1982 mall Septem6w 2. 1982 ma k
2
1
3
1238
I1,138
appies to atadY area
PSC
]. PacalYa wW w*,M d"Ooperd plam wW wt/ha
1
1
s99
11.835
HR
bee plwis -Rabb from d» CM
s
a
1368
12.191
PSC
8. kmdfy thou orrfoot cootoa mope toot mad to ba
0
10
$2.191
HR
dg1to d to cbsa IPp c6atic -swage
0
10
$2,191
— DELETED —
PSC
9. City to prowle mylw espies of 1996 aerial photopnphY
1
1
$99
12,210
HR
of eW c"d cheers d coves wr1Rp pe— of dta
0
s0
f 2,2N
u 1— eepa to, each oases. mila of —aga saaa tad)
PSC
10. cRy to poy da myw aa0in of ooftoot comma mmpa
1
1
$68
$2.358
HR
for — Make 0 uft" W—wk cwwepe.
0
s0
$2.358
CoruaRaot m wapue fill p rasps oeetled.
PSC
0
s0
12,368
HR
-- Reserved —
0
10
12.368
9. Daiireata pays 6efite9e vase hom cw;yoo to
Lat. 9t toot affect da propct
PSC
1. Use pp.Priel. drmimq—ham M.I. DrNmq
1
1
2
1167
12, 526
MR
Ran.
1
1
2
Ils]
12,672
Page 1 of 12
CITY OF LUBBOCK, TEXAS
ENGINEERING SERVICES FOR STORM DRAINAGE DESIGN
CLAPP PARK TO NORTH FORK OF THE DOUBLE MOUNTAIN FORK OF THE BRAZOS RIVER ITHE CANYON) AND OVERFLOW PLAYAS UPSTREAM OF CLAPP PARK (ALTERNATIVE 2E)
SYSTEM 0 FEASIBILITY STUDY AMENDMENT NO.2
BASIC SERVICES, ESTIMATE OF MAN-HOURS AND TASKS
Film EXHIBIT A-1 RFP No. 13681 19-Jul-99 02:42 PM
Fmn
Tau
PM.
Rol.
Sr.
Prof.
Prof.
EIT
Tsc .id..
Drahw
Cl m.l
Total
TOW
Cwr.4.1dv.
MA.
En1P.
EnR.
L-d
or CADD
Haws
E-ion
TOW
0lhsar
Suer.
D.tl9nw
Opar -
(4)
Isl
PSC
«««««« Bata »»»»»»
$117.00
$99.D0
$99.00
$81.00
$0.00
$68.00
$58.00
$52.00
139.00
HR
««c«c««Ratan»»»»
$106.00
s0.DO
$89.00
$79.00
189.00
s68.00
s55.00
$49.00
$37.00
PSC
2. Dalawats drvwn rasa fo playa not w wl by the
1
3
2
8
4407
$3,079
HR
M.-D..."Plan.
1
2
3
$205
$3.284
(Pta m aut of IH-271US-87 not L¢LAsd)
PSC
3. Cal-i- plays w,W had spnbiburiq w.0 wiMm
2
3
2
7
$506
$3,790
HR
a dmdr was. (Master Dnin Plan wlara aup4csble)
1
1
2
$747
$3.937
(P4yu east of IH�27NS-87 rrot k e dell
PSC
0
$0
$3,937
HR
- Rasawad -
0
to
$3.937
PSC
0
s0
$3,937
HR
- Resarv.d -
0
$0
$3,937
C, Dev.Iopr ff nwa.-b-
PSC
1. Ua dw Mastw Lhsiwps Pis, Luna cogium cwa
1
4
2
7
$475
$4,412
HR
numbw. lsr dw Prpje� - F. W.jetnd h-.
2
2
$178
$4.690
hydmisp caididen. whw. sppficabla
PSC
2. Dipiore .eMuvd land uw aM .arM. Iwtd um sreu
0
!0
s1,690
Hfl
hom mow ree.nt sva0abla cdy swlal pWtognplu.
0
!0
s4,690
IDalmd - ua "able Mfo from pdo aWtllssl
PSC
3. DetwrnBr vaarvioiu percamepe wtd ssxepa
0
$0
64,590
HR
irawaieu. pa-Mas fa -A. dlpleted Iwia uau.
0
40
$4,690
(Deleud - ua sysilabl. IMe hem is b sbrma)
PSC
4. D.velop a area aAnbr fa.sO, ypeaW WW
0
$0
$4,590
HR
uu vddtin lbe . y wa .crndinp m Yawvioua
0
40
$4,690
pwsantape and hyMebpk RwId use based on AMC R
IDW.W - uu avieMa Irdo f.. pe- wudlal
PSC
6. Develop a weighted Days rasnbw fm each playa
1
6
2
9
1611
s6,201
HR
dmka a wit" the study asa to eaistbq
-ndl-
0
s0
$5,201
PSC
6. D-lop a w.iphted awve a bw fw as,th playa
1
8
4
13
4861
$6,052
HR
dwsa a ara vitlwt tb M dy wa for fuNn
1
1
$09
86,141
co4rt based an ".cted Is x! as
(Use Ms.- D- Ran vdwr. ap Al bls)
PSC
7. Dididt. eslafinp lend use. Woad - 1996 serial photos
1
2
18
10
35
$2,217
$5,368
HR
and fMd raponneiss.M. F. .usti v laM ua curve
1
1
$89
40,447
numbr day.loan.nt. ISya G Lola 84.1.1
PSC
8. Pv-. ry - Ides for Va save aAnbw cakulabne
1
3
12
18
32
$2,044
$10,491
HR
to boN.M." and Moo NMidala. mclutla -1.-
0
10
$10,491
I. edh" wsphlaal fa.. to mwnan old.
Page 2 of 12
CITY OF LUBBOCK, TEXAS
ENGINEERING SERVICES FOR STORM DRAINAGE DESIGN
CLAPP PARK TO NORTH FORK OF THE DOUBLE MOUNTAIN FORK OF THE BRAZOS RIVER ITHE CANYON) AND OVERFLOW PLAYAS UPSTREAM OF CLAPP PARK IALTERNATIVE 2E)
SYSTEM G FEASIBILITY STUDY AMENDMENT NO.2
BASIC SERVICES, ESTIMATE OF MAN-HOURS AND TASKS
EBe: EXHIBIT A-1 REP No. 13661 19-Ju09 02:42 PM
Firm
Test
Ain.
Prai.
Sr.
Prof.
Prof.
EIT
Technician
or
ct is l
Told
T-1
Cumul .
Mgr.
Engr.
Erl9r.
Land
a CADD
Howl
E-ion
Taal
Omar
Swv.
Des' mm
OIH-sa
M
III
PSC
«««««« Rat. »»»»»»
$117.00
499.00
$99.00
181.00
10.00
$68.00
158.00
$52.00
$39.00
HR
<c[<[<c[c«c Retse»»»»»»
$105.00
mo0
$89.00
$79.00
$89,00
$58.00
$55.00
$49.00
137.00
PSC
9. Add hldlol.." tope grape 1ovse96 to alactradc
1
2
4
2
9
$873
$11,164
HR
maw for VsJ ukweb-
0
/0
411,194
(addrtions eet of Leke 87 to IH-27AJS-87)
PSC
0
10
$11,164
HR
ry
- Reseed -
0
10
111".
Q. OevNopwatwnMd>eneto# cwpentrxkn'. ..
PSC
1. Develop tines of cane rdon is eds*Q
2
6
!
12
$014
$11,978
HR
cawivans for dni "arse vriNln t atld're
2
2
2
8
$392
$12,370
Use Mots (kdn.9s Pon time d eabtkv - future condition)
PSC
2. Doebp times of ca.prmerion fm Mess condit
1
2
2
5
$339
$12,709
HR
iw dreewge areas rrithM dH prolaet ere
1
2
3
$205
$12,914
IUe Matte Qei^aW Pen rung v _ evsiiwi N
aPn6- - fans. corlai -)
PSC
0
t0
$12,914
HR
- Reserved -
0
t0
$12,914
PSC
0
t0
$12,914
HE
-- Rsswsd -
0
10
412,914
E. A.*- for wtabeem. !lakes"
PSC
t. Evshwte rumH -Maros for ens&N ppndkione W rn d
2
8
10
1742
113.858
HR
opsbeam Playa that cadribute to the study erse
1
1
/B9
113,745
(Se Noss 1)
PSC
2. E.6-s -of v*N-as for %w cordidaw to W
2
6
8
IBDB
$14,351
HR
tpebem playas that eanmMns to t apd' ere
1
1
$89
$14.440
ISe Non 1)
PSC
3. Verify stasis r Lake 28. 29. 30. 84, 84A, 85, 86. 87,
4
e
48
80
$4,452
$18,892
HE
88, 90, 91, 92, 93, 94, 94A, 948, 132, 133, 134 sin
8
24
32
t2,104
620,096
vaileble co-, wfo-afi l (,lest check prig eels!
(No-w fs bb st cWAedmsl
PSC
4. Develop sleve8amres-nwsge den far !ekes east o1
0
10
$20,996
HE
1H-271US-87
0
10
620,990
IDslefed - ro snd'Ns sot of A- PI
PSC
S. Use 70% ry ff fo, a 2inch cram sam hum -h leks'a
0
10
:20,996
HE
drsinsps are a en )meld -kiim far ssah lake. PIA sus
0
t0
20,996
-dams on top of lake gravel wets Mel As spplicabk. N
1.41-rKh -M voh ro seeds leks r nty, 0- *.-d
ease -H volume end rot route to dovmstreem Ides
C
8. Eshun overflowdlrecdon tar Lab 89 eM o-erllos
4
!
2
10
1772
pn(bssed on rvailsde staa9e I O-tion sM
4
!
135a
122, 12!
f""
new ervey) this end'. Assign Lake 89 to a playa system.
Page 3 DI 12
CITY OF LUBBOCK, TEXAS
ENGINEERING SERVICES FOR STORM DRAINAGE DESIGN
CLAPP PARK TO NORTH FORK OF THE DOUBLE MOUNTAIN FORK OF THE BRA20S RIVER (THE CANYON( AND OVERFLOW PLAYAS UPSTREAM OF CLAPP PARK (ALTERNATIVE 2E)
SYSTEM 0 FEASIBILITY STUDY AMENDMENT NO.2
BASIC SERVICES, ESTIMATE OF MAN-HOURS AND TASKS
File: EXHIBIT A-1 REP No. 13681 19-Jul-99 02:42 PM
Fl-
T..k
Pdn.
".
Sr.
Prot.
Prof.
ER
Tc ,kim
defier
C W I
Tool
Tout
Cw uv.
Mpr.
EW.
E.W.
LW
I
CADD
Howl
Ert.nsion
Told
Officer
gum.
DnIgw
Opnnw
It)
(t)
PSC
««<c««« Rne. »»»»»»
1117.00
$99.00
199.00
$81.00
$0.00
$68.00
168.00
$52,00
$39.00
MR
«««««<c R.-»»»»»»
1105.00
$0.00
189.00
t79.00
/89.00
$66.00
$55.00
$49.00
$37.00
PSC
7. Ixor-.si.tin9.9ft pone krto Wk..mr.9e deu
2
2
12
16
$956
$23,082
MR
w.v.R.bk W epFlic.b
4
14
18
$1.168
$24,250
PSC
0
t0
$24,250
HR
- P--d -
0
10
$24,250
w- Mddt1:'�Ip.SM ie.b j44ndttm111
PSC
1. Mode(e istinp condition. I.HEC-1
4
4
20
2e
$2.162
$26,402
HIM15,
25. 100 W 500 yen 24Hf.w tl4aete etwm rvrrt.l
6
6
s634
$28,836
(UN Master deity Pun d ~8 epp8c.de)
PSC
2. Use. wner.0 -pro k model(HEC-2)umodN
2
4
24
30
$2,226
$29,162
MR
Werflpw p. for -W du. serves u kW u do
2
8
10
$642
$29,804
hydrob9ie model e. epoS
IUu Mann d.ku9. PL date ydtne .PPOc.blel
PSC
3. U. d-g. - ft. Item 8 .Iwve
0
10
t29,804
MR
0
10
$29.804
PSC
4. U. sai.tirq condition -ff - ma Mu. Nom
0
10
429,804
MR
Nnn C e-
0
10
$29,804
PSC
S. U.. e.n" c-lb- ti nm of cwlc.ntrldon f-
0
10
t29,804
HR
luwb l) boye
0
10
/29,804
PSC
6. U.. W .rore9. darivM n Item E .bon n
0
10
129,804
MR
bydrpbpic model
0
10
$29,804
PSC
7. Uw W. k*W cw !i . bwn Item E .lava M W.
0
10
129,801
HR
initial c-i-1w hydmlo9ic modM.
0
{0
/29,804
PSC
8. In4lude up4peam .M.t W ca - cwltrlbudrp lake.
0
10
121,104
MR
trom Hem E . . in d hyd, b& model
0
t0
$29,804
PSC
9. UN du 6-yen 24-hour, 25-yen 24-how, 100-yvar
0
t0
29,804
MR
24-bm., W 600-yen 24ilaa d mw ripen.
0
t0
:29,604
PSC
10- Use df. r.inf.8 Mpdu eom TP-40 W 1M ood fl
0
10
MR
In.0 - et.dy I.MWd W e" ft- bo .aaue)
0
10
:29,804
28.804
PSC
11. U" du SCS TyW 11 24-bow - d bil l
0
10
029,804
MR
0
10
129,804
PSC
12. Mo Apr jJ 1999 nwm Penod by woja-En9
0
10
t29,804
MR
.tame we ", n.. by tr.n.letlon, trruW.ition w
0
10
129,804
-o- DELETED
Pepe 4 of 12
CITY OF LUBBOCK, TEXAS
ENGINEERING SERVICES FOR STORM DRAINAGE DESIGN
CLAPP PARK TO NORTH FORK OF THE DOUBLE MOUNTAIN FORK OF THE BRA20S RIVER (THE CANYONI AND OVERFLOW PLAYAS UPSTREAM OF CLAW PARK (ALTERNATIVE 2E)
SYSTEM G FEASIBILITY STUDY AMENDMENT NO.2
BASIC SERVICES, ESTIMATE OF MAN-HOURS AND TASKS
File: EXHIBIT A-1 RFP No. 13681 19-Jul-99 02:42 PM
I-
T.d
p.m.
Prof.
Sr.
Rd.
Rof.
ER
Ttohniclan
Dr.lter
Clx
TOW
Told
Cw "fiv.
Mgr.
1 q ,
Enp.
LxW
I
p CADD
How.
Er[w -
TOW
0lfker
Swv.
Oe.pnx
O_._
111
W
PSC
«««««« Raro. »»»»»a>
$117.00
$99.00
$99.00
$81.00
10.00
IBE.00
$58.00
$62.00
$39.00
HR
«c«<c««<Rm. »a»»»»>
1106.00
$0.00
$89.00
479.00
189.00
/58.00
166.00
1l9.00
137.00
PSC
14. MoE a.i.Uno condition. in.EICPR I Wg 24s
2
8
288
38
12,894
132.89E
HR
west
px -t.9 h. (me week.
1
9
1663
133,251
PSC
0
10
$33,251
HR
- Rt.ervad -
0
10
033.251
G Model tuh✓e'M xtion''.mMroonr .. .
PSC
1. Modal hAvr. coMilione bt HEC-1
2
2
12
18
11.212
$34,463
HR
1
1
189
034,552
(Uw M.w Drain Pl.n model Mar apdka )
PSC
2. Uw a wxx swfa profile m," (HEC-2) M m W
1
!
5
1371
134.927
HR
_dW overflow frft hR ovfWl orx .xvN u Input
1
2
3
1205
$35.128
to fM h'dolooi _" a. aPptl�
(Uw M.- Orin Pfau model whw. spplicaMsl
PSC
3. Um drsina9a xea. hom Hem B Mme
0
f0
:36,128
HR
0
10
35.128
PSC
4. Vw fW . -Boon -H cwv. mmbx. lrpn
0
/0
135, 128
HR
Item Cab..
0
10
135.128
PSC
5. U. hitter carwnipn time. on concenhatwn nam
0
$0
$35028
HR
Itwn Dab-
0
10
$35.128
PSC
6. Um late .Woo. hom Iwm E 15ovt n
0
10
$35.128
HR
hydr~model
0
10
$35,128
PSC
7. V.s kka iddel cprrditioN trwn Itxn E above u lab
0
10
$35,128
HR
mmi cadidan. for hyd l.& model.
0
!0
$35,128
PSC
8. Ntcgrtl. tgxream twat. ooMitioo atmibadn0 IA.
0
10
$35.128
HR
hom Item E prove m dr hydolo9k M4"
0
$0
$35,128
PSC
S. Use dro 5- 24-frow. 26-y.x 24-how, 100-nw
0
10
$35.128
HR
24-hew xtd 500-yex 24hpw dw. atxm.
0
10
$35,128
PSC
10. UM tM rainla8 depth. hom TP♦0 aM fM flood
0
10
$35,128
HR
1n.wenc. study. (SAOWd b. M..I hom Ht - .Darts).
0
EO
$35.128
PSC
11. Um fM SCS TYpa II 24-hw a 696b tian
0
10
$35.128
HR
0
10
135,12.
PSC
12, M." ApJ- 1999 - p.riod by prWectirq
0
10
$35,128
HR
.[pm. ovx o o, uw by henHetion, han.pD.ition a
0
40
$35,129
rotetkn DELETED
Page 5 of 12
CITY OF LUBBOCK, TEXAS
ENGINEERING SERVICES FOR STORM DRAINAGE DESIGN
CLAPP PARK TO NORTH FORK OF THE DOUBLE MOUNTAIN FORK OF THE BRAZOS RIVER (THE CANYON) AND OVERFLOW PLAYAS UPSTREAM OF CLAPP PARK (ALTERNATIVE 2E1
SYSTEM O FEASIBILITY STUDY AMENDMENT NO.2
BASIC SERVICES, ESTIMATE OF MAN-HOURS AND TASKS
File: EXHIBIT A-1 RFP No. 13881 19-Ju1-99 02:42 PM
F m
Tesk
Pdn.
Prof.
Sr.
Prof.
Prof.
ER
Teclnklm
Draflw
OwkN
Tow
T.w
Gew .
MW.
Enla.
Ew.
Lend
vCADD
H-t
Eennekn
TOM
ofik
Surv.
o-yw
Operates
01
(il
PSC
«c««c«« Pats »»»» >
$117.00
$99.00
$99.00
$81.00
$0.00
$68.00
058.00
$62.00
$39.00
HR
c«<cc««« Rstes »»»» >
$105.00
$DOD
$89.00
$79.00
$09.00
$58.00
$55.00
149.00
137AD
PSC
13. Dwelm campenbve lulus n wllm hydmWc
2
12
14
11.014
$36.142
HR
rMdN w WICPR for tM 5. 25, 100 end 600 see wend
2
2
4
$294
$30,438
PSC
14. Model hmre resection emSrdons in WICPf1 usurp
1
4
18
21
41,583
$30,019
HR
2tirdua W week MM.1 b f- weeks
4
4
4232
$38.261
YtnY.
PSC
1. Perform a TNRCC r de y h by rip cods far
2
2
1198
$38,449
HR
PO tiel wbwrfe v emipnrn tl cmf5 with
Woject
0
10
$38,N9
PSC
2. EvAh to bfwmeEon hom TNRCC reoads Beech
5
20
25
11,855
140,304
HR
ralsdve ro panntiel stem ywe rwne m the etWY
0
to
440.304
PSC
3. Cow Ii surysyey tubcon.A-1
4
2
a
$532
W.838
HR
2
8
10
1890
$41.728
PSC
4. Ev m depth m aaeWwete beard m Chy
2
8
10
$742
$42,468
HR
au Pp woes depth recorm eW f _.V s.4Y teat
0
10
$42.488
hales aW TNRCC reads
PSC
5. Eveluen aurvw Mormation ncslvW hen surveys
4
12
16
11,212
$43,600
HR
IFnvahvd flow ekvetime, yabry yrrw, teat baba,
!
6
10
1704
1N,384
lake 89 wwfbw, etc.)
PSC
0
40
N4.384
HR
- Reasrvad -
0
10
144,384
t. 'fax mp'6akretm aeard+-
PSC
1. Rec ne rolls b property vehutlms m aebcud
1
1
$99
144,483
HR
Wapwfiy eff-.d by BOod-Worts arsN m en copy ana
1
1
189
IU,572
PSC
2. Uy Gty inrenlWy Waperty numbw b wulydcN
1
1
2
$167
144,739
HR
papOey ro sash pr-l" eff-I n the stud, wy
0
40
/H,739
PSC
3. U. City w fi dWopetr relay for
1
1
$99
$44,838
HR
des appnpdan m 1r 1 popery
0
10
$44,838
PSC
4. Identity wopetba whwe mfam n hom ua roes is
2
♦
6
1470
$46.308
H1
mWad
2
2
4
$294
$45,802
PSC
0
f0
$45,802
HR
- FW.-.d -
0
10
146,802
!. "Cdoitenete w udktbe
PSC
1. Receive and -abed lacehy n/ormetian had
1
2
7
8
1/85
$46,087
HR
SPS end -Haste for pp -t.1 -beaface c-N-
1
1
aB9
445.156
Page 6 of 12
CITY OF LUBBOCK, TEXAS
ENGINEERING SERVICES FOR STORM DRAINAGE DESIGN
CLAPP PARK TO NORTH FORK OF THE DOUBLE MOUNTAIN FORK OF THE BRAZOS RIVER (THE CANNON) AND OVERFLOW PLAYAS UPSTREAM OF CLAPP PARK (ALTERNATIVE ZE)
SYSTEM 0 FEASIBILITY STUDY AMENDMENT NO.2
BASIC SERVICES, ESTIMATE OF MAN-HOURS AND TASKS
File- EXHIBIT A-1 RFP Nn. 13681 19-J.1-99 02.42 PM
I—
Tank
N..
Prof.
Sr.
Prof.
Pro}.
EIT
Technician
Drafts
CWical
Tots!
TOW
.mu
Cla8va
a
Mgr.
Engr.
Engc
land
w CADD
Eamnebn
TOW
Offiex
Surv.
OaIX
Opantw
It)
It)
PSC
«cc«<c««Rama»»»»»»
6117.D0
$99.00
$9900
$81.00
IODO
$88.00
$58.00
$52.00
$39.00
MR
c««c«c «<Psro.»»»»»»
1106.00
10.00
48900
$79,00
$89.00
458.00
165.00
$49.00
$37.00
PSC
2. R. aM waktm (a 91 Information hpm
ecaw
1
1
3
.3.4
.48,640
MR
LP&L.W w.IWb fa pomnlvl .ub.ur/Ka conf6eb
1
1
$89
646,629
PSC
3. Racaw. aM w.htm fse9by mfamatlon horn
3
3
18
22
61,628
$48,257
MR
Om ww -aktm fw Imbntiel a.baurlaca conflleb
2
8
10
$642
046.899
Iwa[x .M a.Mxy sewxl
PSC
4. Recefre.M wel—facllo klfm from
1
1
2
$167
$49,066
HR
City aM walwla fm Pomwal .ubaamce confab
0
10
$49,066
I.tam aewxl
PSC
S. Re ' aM -akaa baik y informalim tmm
2
4
8
0470
$49.636
MR
C . Cabl. .M waM s fw pwenoul xblurfaca
1
1
$89
$49.625
C-fk.
PSC
B. Receive aM wakum f"d" inf.—Irwn
2
•
8
1470
150,099
MR
Ba0 Tamphan aM waluata fm poW .l xA-rtxe
camels
2
2
/178
160,I73
PSC
7. Receha eM wal— facility krf-0m from
2
1
6
I4]0
$50,743
MR
AT&T.M walwta fw Ppm sl uAm f—co fcta
2
2
1178
.0,921
PSC
8. Receive aM mhtb facility mfom,6m ham
1
1
199
151.020
MR
Pwata d 6 ga..M avahtta fw POtxro.l aub..f—
1
1
189
11 .1.
cpnf5cta lal 6 omty mspl
PSC
9. Identify v 1awero easement confrn b "1
1
2
3
1235
$51.344
HR
aavided .UtiCas idarrtHr tlre'v pm.0 sa.amMb
1
1
te9
/61,433
K. Satxcal[emathmfo.
PSC
1. "y drain down atmn Nwx f p 10D-y Wa WN b
1
1
099
$51.532
MR
Er G —.ft. laku Only between 0H271US 87 I
0
10
$51,532
aM Skb ROW. fpm-.Iwddna M H0 y Gain down
• m wwr xaa .slog 5-year. 25-year, 100-- aM 800-
Year di.crxa xwm avema
PSC
2. 30-dey drain down .mrm .awx hen 10D-Year INm WO fa
1
1
$99
$61,631
MR
Sy— G rorrwxfbw lekm oMy batwean IN-27MS-87 I
0
10
$51,631
aM 55h Road. Run -.Etta. W 30-0ey drain dorm
atwm eewx .i.a ueirq 6-y.x, 2S.. . 100-Yex aM 60O
1'ex di.aab slam ever.
PSC
3. W0 y drain down .corm Nwx fmm loo- a Is" WN for
1
1
$99
651,730
MR
SY.bm G w lalaa oNy between tH�27NS-87 I
0
.0
$51,730
.M Sllda R. Rwah _ or 604 y. down
OWron-un
wx .I.. wing 5-Yex, 25. e , 100-- aM 500-
Y.x diem-. atom wend
Page 7 of 12
CITY OF LUBBOCK, TEXAS
ENGINEERING SERVICES FOR STORM DRAINAGE DESIGN
CLAPP PARK TO NORTH FORK OF THE DOUBLE MOUNTAIN FORK OF THE BRAZOS RIVER (THE CANYON) AND OVERFLOW MYAS UPSTREAM OF CLAPP PARK (ALTERNATIVE 2EI
SYSTEM G FEASIBILITY STUDY AMENDMENT NO.2
BASIC SERVICES, ESTIMATE OF MAN-HOURS AND TASKS
File: EXHIBIT A-1 RFP No. 13681 19-JO-99 02:42 PM
Firm
Tut
Pin.
Prq.
Sr.
Prof.
Rol.
EIT
TecbnI.
debt
C*-W
Total
ToW
Canuletive
Mpr.
r"
Enpr.
Lend
I
«CARD
Rowe
EnenWbn
Tad
OFPc«
Sw
Da1�
Opwata
Ill
I!)
PSC
«««««« Fillet »»»»»»
1117.00
$99.00
$99.00
Sol. Do
10.00
Seem
I58.00
$52.00
039.00
MR
«««««« Retu »»»»»»
1105.00
$0.00
089.00
179.00
189,00
$58.00
$55.00
149.00
$37.00
PSC
{. BOdsY IYain down emrm xwer Irorri IODyeer laka WY far
1
1
199
161,829
MR
SMtem G non�or w lain adY bSln l IN27A18-87
I
0
10
l61,829
end Slide Roed. Rw nekrtlone of 90E y drain down
uv ar else VSf S-i—, 25-Met, tODyew end SOO-
Yw disttata stafm avfKtta
PSC
1. Erslwta tarts sabccan wtd dsvMap aloeRlRp Ports tlru
8
e
8
{8
72
$5,496
Ib7,325
MR
enn Pipe flow W. gli Poole fa mLdd&
12
12
21
11,764
$59,089
sinWnione between Canyon w,d Side Road
PSC
2. Derabp gei— i,W dwaabr S fa nx as idYs
1
8
12
l810
$60,029
MR
atrprnan n e narvwflow tell. bowmen IH-27N5-87
2
2
{
t294
$60,323
aM Shd. Road
PSC
3. Use 1M slam wwtta ban hams F 8 G sbo
0
s0
$60,323
SIR
0
10
$60,323
PSC
{. Use the niMN depth hom TP40 erw hee flood
0
10
460,323
MR
ins—e study JShWSd M id .I ban SMW 1
0
10
l6Q323
PSC
5. Use tM SCS Type 11 21-AVM slam dlebiM
0
!0
:10.323
HR
0
!0
60,323
PSC
6. O W' mWtiale wog— end nn ..lips On Wnione
60
72
180
BID
822
062.328
$122.651
HR
for suvp «arm sewwe /or Seth elunrtlYs n hem K e1rM.
100
120
140
380
l28.600
$141,111
100-Yur lake 1"91 dram down titre for ss W lisbinp pp
eien. Evebedar for LNa 6-veer, 26_' 100•yl- stud
5m— evema.
PSC
7. Pnlrra sommerles of in«kn nodal, fa camp Sr a
21
32
110
188
$13.024
$162,175
MR
erisly4s
10
21
{{
$3,172
$185.347
PSC
8, limars xrrenerlee of final f."bNIw study moddi
10
24
72
138
111.232
1178.679
MR
_Vt.
2{
28
52
$3, 760
lI80, 339
M. Flood Coma W."Si/.-':
PSC
1. Delirela flood level, w contav msln with lVhva'rw
8
8
18
21
58
13,7]B
!I B{,"1
MR
coon' M«nativn me the Lauda oan fperlem
8
10
12
30
I1,860
1185,996
(Deiv a- for IA. Served by norm sewed
PSC
2. Debwab flood levels on cvntaa max hom tM modefiN
51
60
132
72
311
It 4.000
$210,001
MR
of each Siban hem Le above.
61
10
10
134
$9,086
$219,087
IOelinurione fa let awved by tram sew«)
PSC
3. UW V tM Mood levale hom hem LB (IOD-YeSel
24
48
86
18
a
192
Il{,828
l233,913
MR
dnwmi. ntimn.d Watrrty de— b ttw lardy Me
32
58
10
8
10/
18,808
l240,721
IUu hraenp comlw�Y namaWq Iwbl
PSC
/. Ux conavienion opmbN of probNle con hom
1
1
!99
l210,821
MR
hem P below Ifs cal project sru aJyl
0
t0
1210,820
Page 8 of 12
CITY OF LUBBOCK, TEXAS
ENGINEERING SERVICES FOR STORM DRAINAGE DESIGN
CLAW PARK TO NORTH FORK OF THE DOUBLE MOUNTAIN FORK OF THE BRAZOS RIVER THE CANYON) AND OVERFLOW PLAYAS UPSTREAM OF CLAPP PARK (ALTERNATIVE 2V
SYSTEM G FEASIBILITY STUDY AMENDMENT NO.2
BASIC SERVICES, ESTIMATE OF MAN-HOURS AND TASKS
FY141RIT A-1 RFP Nn_ 13Ral 19-J,d-99 n2-42 PM
Fkm
T..k
Pdn.
PIN.
Sr.
Prat.
Prat.
EIT
T.c ,ci.o
0,01,
Cl-"
Taal
T*W
Camd.6v.
a
Mli.
E.W.
E,.W.
Land
a CADO
Hour
E-Ion
To
Olficx
Sw.
D.
Opx.w
(/)
(11
PSC
«««c««< R.tn----
$11T00
$99.00
199.00
681.00
00.00
188.00
I5EL
462.00
139.00
MR
<c«««««Ron> >>>
$105.00
10.00
189.00
179.00
$09.00
158.00
165.00
$49.00
$37.00
PSC
5. D.wmb. bomfit wt rmio for u .N.meuv. from
1
8
1
a
$546
$241,366
MR
k- L 6 Wow. )Con - 100 7..r damp.)
1
/
1
8
l358
12.1,724
PSC
S. Dnnmirr.Iwn.w. wiN-t-.
1
1
$99
$241,823
MR
b-fit o.1 wb
1
1
$89
t241,912
PSC
7. Sun, di0tin, xd rooin.r w mntar mp. phab
8
8
4
20
11,64t
/243,458
MR
d.8nud-al 5uilew wound .tam N--W
24
1DO
a
132
18.32.
l251,]84
M4y I.ku. Rpi.w m I-I'v W' fit m at t
<onrav mWl.
PSC
0
!0
/251,784
MR
- R--I -
0
10
1251,784
PSC
0
10
/251,784
Hit-
R.. 0 -
0
10
1261,184
Ne idf6Fndt�'e Couabutlt>on rnslNode
PSC
1. E-`- 0.1 /... bk, of open cut .wm uw.r
1
1
$99
0251.883
RR
cm.nacripn m.Nod
1
1
189
0251.972
Il dm x,d .vMu.don h 0- Park Phan 11
PSC
2. E-4u d fe "t, M micro-tvr &V II am
1
1
!99
/262,071
MR
-mrooucdon m.1Md
1
1
IBB
1252.160
(W. data xd .r.5 from Clop Part Ph... 11
PSC
0
W
0252,160
)1R
- Ft- -
0
10
$252,450
PSC
0
10
1252,180
Hfl
- ReawM -
0
!0
1252.180
0. G.ot.d kY
PSC
1. C.-ii .v5epn.uh.nt w W to 8 bn YW.. N dv
4
6
12
/940
$253,100
MR
.tudy x..
2
2
$178
$253,278!
PSC
2. Imxpnt fi.ld r.paa a I bp.
2
8
10
$742
$254,020
H0.
1
2
1
1
1 t
6
$410
$254,430
P. o k*- Of Re.4 cafT.
PSC
1. O.v.bp .n opinbn of Prp % mat w n h uwsr
18
24
98
108
244
111.712
1211,182
MR
.lwrVEY. from ft.. L.tm.
24
1
1
.0
48
112
17,096
1278,278
Page 9 of 12
CITY OF LUBBOCK, TEXAS
ENGINEERING SERVICES FOR STORM DRAINAGE DESIGN
CLAPP PARK TO NORTH FORK OF THE DOUBLE MOUNTAIN FORK OF THE BRAZOS RIVER [THE CANYONI AND OVERFLOW PLAYAS UPSTREAM OF CLAW PARK (ALTERNATIVE 2E1
SYSTEM 0 FEASIBILITY STUDY AMENDMENT NO.2
BASIC SERVICES, ESTIMATE OF MAN-HOURS AND TASKS
File: EXHIBIT A-1 RFP No. 13681 19-Jul-99 02:42 PM
Frm
T.Y
PM.
Prof.
Sr.
prof,
Prof.
EIT
TacMklan
Dotter
Ckvkel
ToW
T.W
Cum 4n .
Mgr.
Emr.
Env.
Le
or CADD
Ho
Extension
Tool
DIN—
Su—
Des
Gp—
Ifl
Ifl
PSC
«««««« Rxa »»»»»»
$117.00
$99.DO
$99.00
$81.00
$O.00
$68.00
$58.D0
152.00
$39.00
HR
«««««c< Rata»»»»»»
$105.00
10.DO
689.00
079.00
$89.00
$58.011
$55.00
149.D0
$37.00
PSC
2. 15 perpent com ge y to ha i df d Ie ea ii -Wm
1
2
3
$235
$278,613
HR
of vebede colt
1
2
3
6206
$276,718
O. Pudk
PSC
1. An—i up tP 3 mphborhood m "to p —
9
18
12
18
3
68
$5,166
$283,884
HR
vstm y ex4*V 4formsuon, svidxre eM
12
9
2
22
11,80R
$285,490
twtimmy, City to sM cfuv
PSC
2. Develop w overall pm W echsmatk Mp for uw x
2
♦
♦
10
$678
$286,168
HR
the tvlvibm w m oM (ad Km m Chy map krr
1
1
$89
$206.257
dra 1
PSC
3. 1loM • MN public mwtiv for pub5c input m dv
B
I
8
8
2
30
12,228
1288.183
HR
ehs 1* a ""I Ponsuhaa I advertise foot
♦
♦
8
18
1900
1289,♦83
PSC
♦. Dwelop vaphke m xudy for final pubes meshy
2
8
24
32
RB
11,321
11:3,785
HR
for 6-ysx, 25-y—, 100ywr eM 500ry norm events
♦
8
8
20
11,212
129♦,997
(Grapnh m rwmpvereov Oka between 11427NS-87
eM Sk" ROM(
PSC
5. City vie vovids loostim & a Pu mwtnp
1
1
$99
$295,096
HR
0
10
$295,096
PSC
0
10
$295.096
HR
— Res 0 —
0
$0
1295.096
PSC
0
so
0296.096
HR
— Resw d —
0
10
1296,096
K S.M. we_enx .0.
PSC
1. Eveluxe ab " from a Lent Tool Expect.
0
10
1295,098
HR
Cox pwwwore
Delsled
0
10
$295,098
PSC
2. EVa ehernetivse kom a Bwefit-Q.
6
R
0594
0296.890
HR
Isrsps<Ws
6
6
/53♦
$298,224
PSC
3. Evaluate aft m mee from comment received frvn
♦
♦
$396
12M,620
HR
Publk meelky
♦
♦
$356
$296,976
PSC
♦. Selo Wt mtivs ro recvmmnd
2
1
3
1277
J29],213
HR
2
2
117B
t2971391
Page 10 of 12
CITY OF LUBBOCK, TEXAS
ENGINEERING SERVICES FOR STORM DRAINAGE DESIGN
CLAPP PARK TO NORTH FORK OF THE DOUBLE MOUNTAIN FORK OF THE BRAZOS RIVER FOfE CANYON) AND OVERFLOW PLAYAS UPSTREAM OF CLAPP PARK (ALTERNATIVE 2E1
SYSTEM G FEASIBILITY STUDY AMENDMENT NO.2
BASIC SERVICES, ESTIMATE OF MAN-HOURS AND TASKS
File: EXHIBIT A-1 RFP No. 13681 19-JN-99 02:42 PM
Fkm
Taak
Prin.
Rog.
S .
Prof.
Praf.
EIT
Tochlkim
DraRr
Ch w
Tow
To.
ComNatwa
Mp.
Ew.
E.g,.
Lr,E
w CADD
Howe
E<tatufon
Tool
Off—
Sw
D.a
Op—
IH
111
PSC
«««c««<Rens»»» >» >
$117.00
$99.00
699.00
SSIDD
$0.00
$68.00
$58,00
162.00
639,00
HR
««c«««< lbtal »»» >»»
$105.00
$0.00
$89.00
$79.00
$89.00
$58.00
$55.00
$49.00
$37.00
PSC
1. D.WoP report Pn W-1.1w. aM —ta
2
32
18
12
30
42
18
164
$11,082
$308,473
HR
1a
6
24
11,824
$310,297
PSC
2. Da ,a p 4aawova aw y
16
6
22
11,818
/312.115
HR
0
10
1312, 116
PSC
3. Meet with ataH mwm v not to exceed 7 0a
22
44
66
$5,170
$317.285
NR
1
22
22
$1,958
$319,243
PSC
4. Mewi p wapraf,w,a and awmwiaa
2
28
20
28
18
12
108
I8,l02
i327,846
HR
16
20
14
1
61
13,391
/331,036
T. Co Apta<4Matron
PSC
1. Praamt n N9n po m to CM C"'l
4
12
8
a
30
12,480
1333,616
HR
pea Pwh" itwn µ( --pa, pnaama
prapration
8
6
14
$1,060
$334,576
PSC
2. CPtcmpata Praambtkxi m racwmMMao aN4rroPva
0
10
$334,576
HR
0
10
$334,676
PSC
0
10
$334.676
HR
— Raar.ae —
0
$0
$334,575
<owoawooP -..
PSC
1. Sma irtid <omn<t Mtr m rpuletoq aprrxa
3
3
6
/!14
1334.990
HR
2
2
!
1262
1336, 242
ISama .9m ma M <ontww iw ow Clam Park SNPy)
PSC
2. Sand rapwt wpia4 to erne teV,00w7 n9ar m
4
2
6
$474
6335,716
HR
.".< d m Nmt t akwa
2
2
4
$262
$335.968
PSC
3. A9 Parrttlt wort npt krcMKa4
0
10
$336,968
HR
0
10
$335.908
PSC
0
$0
$335,989
HR
— Raarveo —
0
10
$335,960
V. C.NtY a akoraA<a dn44oaMy contfol
PSC
1. DWtty A m<a. "lity <w l 1 o—igm 6y
80
60
17,020
1341,186
HR
wintipala am /w ofresn
40
40
$4,200
1347,188
PSC
0
10
13l7,188
NA
— R—W —
0
10
1347.188
Page 11 of 12
CITY OF LUBBOCK, TEXAS
ENGINEERING SERVICES FOR STORM DRAINAGE DESIGN
CLAPP PARK TO NORTH FORK OF THE DOUBLE MOUNTAIN FORK OF THE BRAZOS RIVER (THE CANYON) ANO OVERFLOW PLAYAS UPSTREAM OF CLAW PARK )ALTERNATIVE 2E)
SYSTEM G FEASIBILITY STUDY AMENDMENT NO.2
BASIC SERVICES, ESTIMATE OF MAN-HOURS AND TASKS
File: EXHIBfr A-1 RFP No. 13081 19-Jul-99 C2:42 PM
Firm
Talk
Pd.,
Naj.
Sr.
Prof.
Prof.
EIT
T..0 iwi.
On11a
CHrickl
Total
T.W
C_Wser4
or
Mar.
E.W.
Erip.
L4rM
w CARD
)bun
E—W.
T—
ONk4r
Sun.
au
OW.-
IS)
IS)
PSC
«G««««<R1n4»»»»»»
$117.00
199.00
199.00
181.00
10.00
168.00
158.00
152.00
139.00
HR
««««««R—»»»»»»
$105.00
10.00
$89.00
$79.00
189.00
$58.00
166.00
149.00
637.00
PSG
0
10
$347,188
HR
— R—.d —
0
10
$347.188
a
Tou4
119
511
a
334
8
0
2216
111
717
74
4611
PSC
79
511
360
214
0
0
Isis
126
279
54
3241
70%
HR
40
0
482
120
8
0
598
62
Be
20
1418
30%
4659
PSC
.%243
160,689
135.840
.17.3.
10
10
1110,02t
17.30E
114,50E
12,10E
1248,152
71%
HR
14.200
10
$42,898
$9,480
1712
10
034.884
13,410
14.312
1740
1100,43E
2916
1347.188
NOTE 1: Upstream playa lakes that are predicted to be non -overflow for Me 500.year 24-hour storm event (under hrture hydrologic conditions and lake inter water surface elevation) and that
not be expected to contribute to the core project area will be dropped atogetler from further analysis.
Page 12 of 12
CITY OF LUBBOCK, TEXAS
ENGINEERING SERVICES FOR STORM DRAINAGE DESIGN
CLAPP PARK TO NORTH FORK OF THE DOUBLE MOUNTAIN FORK OF THE BRAZOS RIVER (THE CANYON) AND OVERFLOW PLAYAS UPSTREAM OF CLAPP PARK (ALTERNATIVE 2E1
SYSTEM O FEASIBILITY STUDY AMENDMENT NO.2
BASIC SERVICES, REIMBURSABLE EXPENSES
File: 0 EXHIBIT A-1 RFP No. 13681 02:42 PM 19-JUF99
Cumulative
Reimbursable Expenses
Total
Total
PSC
Travel
1
Project
@
$5,500.00
per project
$5,500
$6,600
HR
t
Project
@
$500.00
per project
$600
$6,000
PSC
Blueline prints -- check seta plus three review sets
60
Sheets
@
e2.55
per:heet
1153
16,153
HR
only, 120 sheets, 20 seta
20
Sheets
@
42.55
per sheet
t51
46,204
PSC
Reproductions
3200
Sheet:
@
$0.10
per sheet
$320
$6,524
HR
500
Sheets
@
00.10
per sheet
Bb0
$6,574
PSC
Color reproductions, 11 x 17
1900
Sheets
@
$1.50
per sheet
$2,850
$9,424
HR
0
Sheet.
to
$1.60
par sheet
40
$9,424
PSC
Toll telephone
1
Project
@
$200.00
per project
$200
$9,624
HR
1
Project
@
$200,00
per project
B20O
$9,824
PSC
Fax
200
Pages
@
$1.00
per page
$200
$10,024
HR
200
Pages
@
$1.00
per page
$200
$10,224
PSC
Postage, shipping and delivery
26
Mailings
@
$15.00
per mailing
$376
$10,599
HR
5
Mailings
@
$15.00
per mailing
$75
$10,674
PSC
CADD charges
279
Hours
@
$8.00
per hour
$2,232
$12,906
HR
88
Hours
@
$8.00
par hour
4704
$13,610
PSC
Interface probe rental charges for groundwater
0
Days
@
t0.00
per day
40
$13.610
HR
measurements
0
Days
@
$0.00
per day
00
$13,610
PSC
Myer for reproducible construction drawings, final sets
0
Rolls
@
$320.00
per roll
60
$13,610
HR
0
Rolls
@
$0,00
per roll
$0
$13,610
PSC
Environmental records search (public domain TNRCC)
4
Zip Codes
@
IBO.00
per zip code
$320
$13,930
HR
0
Zip Codes
@
$0.00
per zip code
40
$13,930
PSC
Advertise final public meeting
1
Project
@
$800.00
per project
$800
$14,730
HR
0
Project
@
$0.00
per project
BO
$14,730
Subtotals for Reimbursables
PSC
$12,950
$12,950
HR
$1,780
$14,730
wt Contract multiplier for reimburaables 1.15
$16,939.50
77
` s,:777777-7
CITY OF LUBBOCK, TEXAS
ENGINEERING SERVICES FOR STORM DRAINAGE DESIGN
CLAPP PARK TO NORTH FORK OF THE DOUBLE MOUNTAIN FORK OF THE BRAZOS RIVER (THE CANYON) AND OVERFLOW PLAYAS UPSTREAM OF CLAPP PARK (ALTERNATIVE 2E)
SYSTEM O FEASIBILITY STUDY AMENDMENT NO.2
BASIC SERVICES, SUBCONSULTANT EXPENSES
File: 0 EXHIBIT A-1 RFP No. 13681 02:42 PM 19-Jul-99
Subconsultant Expenses
Total
Subtotal
Geotechnical, hollow stem auger drilling
8 test holes In study area, maximum depth 50 feet, SPT every 5 feet of
depth and at changes in material beginning at 5lest, field soil clessifici
400
Lft
627.50
per foot
$11,000
depth to ground water if encountered, plug test holes when complete,
clear
utilities before drilling, Atterberg limits on a maximum of 24 samples
Clearing test holes with utilities
8
Hours
@
$55.00
par hour
$440
Drafting, word processing, report production
1
Project
@
$100.00
per project
$100
Core drill through rock
60
Lft
@
$60.00
per foot
$3,600
City to provide access permission onto private row
$15,140
Surveying (subconsuhant)
1
Project
@
$25,000.00
per project
$25,000
Allowance for miscellaneous surveying needs tot spot elevations
for subsurface clearances, overflow survey for Lake 89, elevation
confirmstions around playa lakes, building floors, etc.
City to obtain access permission onto private row
$25,000
Map Digitizing
Digitize map coverage where none currently exists, 2D contours only,
0
Maps
@
$0.00
per map
$0
s0
no edge matching -- DELETED —
Subtotals for Subconsultants
140,140
Subtotal from Labor
11347,188
5161940
Subtotal from Reimbursable,
Total Estimated Professional Services fee
$404,268
EXHIBIT A-2
PHASE 2 DESIGN AND BIDDING PHASE ADDITIONAL SERVICES
CITY OF LUBBOCK, TEXAS
ENGINEERING SERVICES FOR STORM DRAINAGE DESIGN
CLAPP PARK TO NORTH FORK OF THE DOUBLE MOUNTAIN FORK OF THE BRAZOS RIVER (THE CANYON) AND OVERFLOW PLAYAS UPSTREAM OF CLAPP PARK (ALTERNATIVE 2E1
CLAPP PARK PHASE 2 DESIGN AMENDMENT NO.2
ADDITIONAL SERVICES, ESTIMATE OF MAN-HOURS AND TASKS
File: Xtrasa.XLS EXHIBIT A-2 RFP No. 13681 19-Ju1-99 02:43 PM
Firm
Task
Prin.
Pro].
Sr.
Prof.
Prof.
EIT
Technician
Drafter
Clerical
Total
Total
Cumulative
or
Mgr.
Engr.
Engr.
Land
or
or CADD
Hours
Extension
Total
Officer
Surv.
Designer
Operator
(s)
Of
PSC
«««««« Rates »»»»»»
$117.00
$99.00
a99.00
$81.00
$0.00
$68.00
$58.00
652.DO
$39.00
HR
«««««« Rates »»»»»»
$105.00
s0.00
889.00
$79.00
089.00
$58.00
$55.00
$49.00
$37.00
do -. a F.-SIC ary cos`
PSC
1. On -site supervision of excavator operator and at weyor
8
18
26
$2.016
$2,016
HR
for uncovering existing storm drain and sanitary sewer
0
$0
92,016
east of Guava Ave.
SC P
2. Reduction of survey notes on existing storm drain east
1
1
2
4
$271
$2,287
HR
of Guava Ave. and plot for LP&L special substation
0
$0
$2,287
PSC
3. Coordination with LP&L on re-routing storm drain due to
1
1
2
$167
$2,454
HR
new sub -station and undocumented Canyon landfill
0
$0
$2,454
PSC
4. Photo documentation of various aspects of July 22, 1999
0
$0
$2,454
HR
flooding (no man-hour changes)
0
$0
$2,454
PSC
s0
$2,454
HR
— Reserved
s0
$2,454
PSC
$0
42,454
HR
-- Reserved
$0
$2,454
PSC
$0
$2,454
HR
— Reserved
s0
$2,454
PSC
$0
$2,454
HR
-- Reserved
$0
12,454
PSC
$0
$2,454
HR
— Reserved
s0
$2,454
PSC
s0
$2,454
HR
-- Reserved
s0
$2,454
PSC
s0
$2,454
HR
--- Reserved
60
$2,454
Totals
0
10
0
0
0
0
20
0
2
0
32
s 2,454
PSC
0
10
0
0
0
0
20
0
2
0
32
100%
HR
0
0
0
0
0
0
0
0
0
0
0
0%
32
PSC
$0
s9.1
60
ao
a0
ao
$1,360
00
1104
s0
s2,a54
100%
HR
$0
$0
10
10
60
s0
/0
$0
s0
s0
$0
0%
s2,454
Page 1 of 1
CITY OF LUBBOCK, TEXAS
ENGINEERING SERVICES FOR STORM DRAINAGE DESIGN
CLAPP PARK TO NORTH FORK OF THE DOUBLE MOUNTAIN FORK OF THE BRAZOS RIVER (THE CANYON) AND OVERFLOW PLAYAS UPSTREAM OF CLAPP PARK (ALTERNATIVE 2E)
CLAPP PARK PHASE 2 DESIGN AMENDMENT NO.2
ADDITIONAL SERVICES, REIMBURSABLE EXPENSES
File: Xtraee-XLS EXHIBIT A-2 RFP No. 13681 02:43 PM 19-Jul-99
Cumulative
Reimbursable Expenses
Total
Total
PSC
Mileage
Miles
@
$0.33
per mile
$0
$0
HR
Miles
@
$0.33
per mile
$0
$0
PSC
Blueline prints -- check eats phis three review sets
Sheeta
@
$2.55
per sheet
$0
80
HR
only, 3 sheets
Sheets
@
$2.55
per sheet
$0
$0
PSC
Reproductions
Sheets
@
$0.10
per sheet
$0
$0
HR
Sheets
@
$0.10
per sheet
$0
$0
PSC
Toll telephone
Project
@
$1,500.00
per project
$0
$0
HR
Project
@
$750.00
per project
$0
$0
PSC
Fax
Pages
@
$1.00
per page
$0
$0
HR
Pages
@
$1.00
per page
$0
$0
PSC
Postage, shipping and delivery
Mailings
@
$15.00
per mailing
$0
$0
HR
Mailings
@
$15.00
per mailing
$0
$0
PSC
CADD charges
Hours
@
$8.00
per hour
$0
$0
HR
Hours
@
$8.00
per hour
$0
$0
FT „.. _
.,
Subtotals for Reimbursables
PSC
$0
$0
HR
$0
$0
wl Contract multiplier for teimbursebies - 1.15
$0
CITY OF LUBBOCK, TEXAS
ENGINEERING SERVICES FOR STORM DRAINAGE DESIGN
CLAPP PARK TO NORTH FORK OF THE DOUBLE MOUNTAIN FORK OF THE BRAZOS RIVER (THE CANYON) AND OVERFLOW PLAYAS UPSTREAM OF CLAPP PARK (ALTERNATIVE 2E)
CLAPP PARK PHASE 2 DESIGN AMENDMENT NO.2
ADDITIONAL SERVICES, SUBCONSULTANT EXPENSES
File: Xtra$$.XLS EXHIBIT A-2 RFP No. 13681 02:43 PM 19-Jul-99
Subconsultant Expenses
Total
Subtotal
Excavator and operator for uncovering existing
$2,078
storm drain east of Guava Ava.
1
Project
@
12,078.00
.per project
$2,078
Surveying Iubconsultant)
Existing storm sewer and Guava sanitary sewer
$1,932
3-man field party
20
Hours
@
$85.00
per hour
$1.700
Office Calculations
2
Hours
$45.00
per hour
$90
RPLS
2
Hours
@
$65.00
per hour
$130
Mileage
35
Miles
@
$0.35
per mile
$12
60
60
e0
e0
e0
Subtotals for Sulreoneultanta
$4,010
,010
04,Ot0
a
Subtotal from Labor
$2,454
80
Subtotal from Reimbursables
Total Estimated Professional Services Fee
s8,464
ATTACHMENT C
SYSTEM G FEASIBILITY STUDY
and
PHASE 2 DESIGN AND BIDDING PHASE
SCHEDULE
y6
6
S
u
z
0
Sq
QpQS
S�
��
��
A
3��
R�K
��g� s3
���� z
.��� �
€x �
�ffi
��
��
��
0
i
t
S
V