HomeMy WebLinkAboutResolution - 121478G - Utility Adjustment Stmt - TDHPT- Water & Sewer Repair I-27 - 12_14_1978KJ:hw -, RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock BE and is hereby authorized and directed to execute for and on behalf of the City of Lubbock a Utility Adjustment Statement to be submitted to the Texas Department of Highways and Public Trans- portation covering utility adjustments, removal or relocation performed in con- junction with highway improvement project No. I 27-7(5)308, I.H.27, attached herewith which shall be spread upon the minutes of the Council and as spread upon the minutes of this Council shall constitute and be a part of this Resolution as if fully copied herein in detail. Passed by the City Council this 14th day of December 1978. 10�a DIRK WEST, MAYOR ATTEST: Eve yn Gaffga, City Secret y r urer APPROVED AS TO FORM: ohn C. Ross, Jr., City Attorney W 4'LQ . Watson, C"i# Engineer 1A 762-6411 P. O. Box 2000 LUBBOCK, TEXAS 79457 Utility Adjustment U-6911 City of Lubbock For adjusting various water and sewer lines as shown on attached plans to clear Interstate Highway 27 from station 330 + 00,to 179 + 00 from Loop 289 North of Lubbock to 1.5 miles North of Monroe Overpass, in accordance with Standard Utility Agreement No. U-6911, Lubbock County, Project 127-7(5) 308, Account No. 9005-27-1. Amount $45,326.83 Work Started: April 28, 1975 Work Completed: September 18, 1978 Dirk West Mayor, City of Lubbock f r t Certificate to be placed on Utility Company' _s.Final Billing This constitutes a final billing of costs of utility adjustment, removal • or relocation work performed in conjunction with highway improvement pro- ject in Lubbock County, Project No. I 27-7(5) 308 Highway I.H. 27 I, Wilford D. Watson , certify that all items appearing hereon represent actual costs and do not exceed current costs for items listed hereon and that this statement, to the best of my knowledge, includes only those items eligible for reimbursement under State Statutes and State Highway and Public Transportation Commission Policies and that amounts deducted from the gross cost due to increase in value of the new utility and salvage value derived from the old utility represent a true and accurate representation of such values. I further certify that these costs, charges and credits, to the best of my knowledge, constitute a complete and final billing of .all costs incurred. Signed Title City En�nee' Company City of Lubbock 'STATE DEPARTMENT OF HIGHWAYS AND *ORM 132 Rev. 11-75 PUBLIC TRANSPORTATION MONTHLY STATEMENT BILLING INSTRUCTIONS; To facilitate handling and prompt payment show Department Order No., Requisition No., and Board or Control No. In spaces provided. Submit statement In quintuple; sign the original only. Submit a separate statement for each requisition. Charges for freight or express, if any, must be supported by the prepaid freight or express bill. NameofFirm City of Lubbock DO, December 4 _1978 Addras P.O. Box 2000, Lubbock, Texas 79457 INVOICE -DATE NUMBER DESCRIPTION QUANTITY UNIT PRICE AMOUNT DEPARTMENT ORDER NO. Adjust various water and sewer lines 45,326.. 83 to clear Interstate Highway 27 from Highway Stations 330 + 00 to 179 + 00 from Loop 289 North of Lubbock -to 1.5 miles North of Monroe Over- pass Final reimbursement for cost of utility adjustment performed in conjunction with highway project in Lubbock County, Account No. 9005-27-1, Project I27-7(5)308 Interstate Highway 27 under agree- ment No. U-6911. 1 Dirk West do hereby certify that 1 am Mayor . and that I am (Title of Person Certifying) duly euthorised to make this certification for and on behalf of City Of Lubbock (Name of payee company/claimant) I further certify that the attached invoice is correct and that it corresponds in every particular with the supplies and/or services contracted for. 1 further certify that +he account is true. correct, and unpaid. (Dale) (Signature) CASH DISCOUNT % DAYS TOTAL 45,326. 83 REQUISITION NO. BOARD Of CONTROL NO. COST DISTRIBUTION sue. NO PRE DETAIL COST ACCOUNTING CODES AMOUNT - 1 AUTM aCECU IIULAT OOR STNO 0 RESEARCH Joe NO PARCEL/UTILITY NO HIGHWAY NO. 0 0 N 3EC 0 0 AS FUNCTION UEI OBJECT OF ErPENgTURE In0-As • tit N l!1 s IPE. H.PR PROJECT DESIGNATOR AGENCY CERTIFICATION— 1 CERTIFY THAT THE ABOVE BERVICts WERE RENOERE0,0R GOODe RECEIVED. AND THAT THEY CORRtsPoNo IN EVERY PARTICULAR WITH THE CONTRACT UNDER WHICH THEY WERE PRGCUREDAND TMAr THE INVOICE Is TRUE. AND UNPAID. LIS CO. !KIND NWY. SPECIAL JOB NO - NAME TITLE CALCULATIONS AND FOOTINGS VERIFIED — SUPPORTING DOCUMENTS COMPLETE I BY SUMMARY OF.FINAL'COST DESCRIPTION ESTIMATE FINAL Line ','A'► 5�490.40 5,057:60 Line "B" 4,500.00 6,868.93 Line "C" 729.00 763.19 Line "D" 546.25 1,241.33 Line "E'► >4,735.40 10,636.10 . Water .Line "AA" 91.00 771.10 Water Line "BB" 5,210.14 7,552,41 Cost to Install 21,302.19 32,890.66 Cost to Replace Damaged Line --------- 7,958.29 Cost to Remove 1,190.40 354.71 Cost of Moving Machinery 350.00 --------- Cost of Wet Ties 450.00 -------- Payroll Additives 2,762.46 2,813.25 Material.Handling (7 1/2%) 734.40 562.18 General Overhead 1,607.37 2,232.11 Total Relocation Cost 28,396.82 46,811.20 Less Salvage Credit 941.00 1,484.37 Net Relocation Cost 27,455.82 45,326.83. Net Overrun $17,871.01 (65%) The principle reason of the 65% overrun is due to the inflation in cost of materials and rising labor cost. The prices used by the City for estimation and construction of water and sewer mains are set by Ordinance. This job was estimated under prices established in April, 1973, and constructed under prices established in April, 1975, reflecting a sub- stantial increase in material cost. Almost $8,000 additional expense was incurred in replacing a water line destroyed by installation of storm sewers. This line was not estimated originally as it was outside of Interstate R.O.W. *This cost is absorbed in the labor cost. s FINAL COST LINE "A" Description Quantity Amount 24" Cast. Iron Pipe 66 L.F. 1,677.06 Standard Manhole (4 ft.) 3 Ea. ,. 549.41 Extra Vertical Feet (Std. M.H.) 27 L.F. 598.18 Plug existing manhole 106.75 Miscellaneous Materials 45.91 Labor for Installation 1,240.29 Equipment Rental 840.00 TOTAL INSTALLATION COST LINE "A" $5,057.60 r FINAL COST LINE "B" Description Quantity Amount 18" V.C.T. Pipe 405 L.F. 2,640.60 Tie to Existing Line 105.25 Miscellaneous Materials 171.50 Labor for Installation 3,711.58 Equipment Rental 240.00 TOTAL INSTALLATION COST LINE "B" $6,868.93 This line was shortened by 83 feet to eliminate cutting the driveway to the Quality Inn Motel. This could be done and still remain behind the proposed curb. Labor was excessively high because it was necessary to keep the spoil material hauled from the worksite and then necessary to haul this material back to the jobsite for backfill. It was also necessary to shore portions of the trench due to the relative closeness of the old ditch and the depth of cut of the new ditch. t FINAL COST LINE "C" Description Quantity Amount 6" Cast Iron Pipe 18 L.F. 48.96 Standard Manhole (4') 1 .. 106.75 Extra Vertical Feet (Std. M.H.) 6 L.F. 150.58 Miscellaneous Materials 16.57 Labor for Installation 440.33 TOTAL INSTALLATION COST LINE "C" $763.19 The manhole was placed to the grades specified by the Highway Department Inspector. When the State had began construction the City was notified that there would be approximately four (4) feet of fill placed.in this area so it was necessary to raise the manhole an additional four (4) feet. 5 r FINAL COST LINE "D" Description Quantity Amount 10" Cast Iron Pipe 18 L.F. 93.78 Standard Manhole (41) 1 Ea. 106.75 Extra Vertical Foot (Std. M.H.) 1 L.F. 25.00 Miscellaneous Materials 1.72 Labor for Installation 1,014.08 TOTAL INSTALLATION COST LINE "D" $1,241.33 The existing manhole was so shallow that it was necessary to completely remove the existing manhole rather than plugging it above the flowline of the sewer. This required more labor than was estimated to break out the concrete bottom of the existing manhole. F- FINAL COST LINE "E" Description Quantity Amount Jointing Materials 360.87 12" Cast Iron Pipe 18 L.F. .. 119.88 12" V.C.T. Pipe 8 L.F. 12.40 Standard Manhole (41) 2 Ea. 346.30 Extra vertical Feet (Std. M.H.) 26 L.F. 619.40 Plug Existing Manhole 26.75 Miscellaneous Materials 98.28 Labor for Installation 6,702.22 Equipment Rental .2,350.00 TOTAL INSTALLATION COST LINE "E" $10,636.10 This line was shortened approximately 9 feet to eliminate blocking Owen Street at the intersection with I.H. 27. The excessive labor and equipment rental cost was due to the depth of the line and to the need for shoring of the entire length of the ditch. The pipe used was a caulked joint pipe and not a rubber gasket type and this also required more time and materials to complete the jointing. FINAL COST WATER LINE Description Quantity Amount 4" Valve and Box 1 Ea. 165.32 Concrete for Blocking 2.5 G.Y. 66.88 Miscellaneous Materials 3.30 Labor for Installation 535.60 TOTAL INSTALLATION COST WATER LINE "AA" $771.10 k r FINAL COST WATER LINE "BB" Description quantity Amount Bore & Install Encasement 75 L.F. 1,200.00 Encasement Pipe 320 L.F. 1,820.00 8" Cast Iron Pipe 396 L.F. 1,686.96 8" A.C. Pipe 208 L.F. 409.76 Cast Iron Fittings 121.67 8" x 8" Tapping sleeve (A.C.) 1 Ea. 141.00 8" Tapping valve 1 Ea. 159.99 12" x 8" Tapping sleeve (C.I.) 1 Ea. 187.15 8" Tapping valve 1 Ea. 156.55 Miscellaneous Materials 36.82 Concrete for Blocking 4.25 C.Y. 120.38 Labor for Installation 1,436.47 Repair Paving Cut 75.66 TOTAL INSTALLATION COST WATER LINE "BB" 7,552.41 The water line had to be rerouted to the south approximately 300'. This is the only water line serving this area. If installed as proposed, these people would have been without water service for 1 to 2 days. By installing a new line to the south, water service was disrupted for only a couple of hours. The only additional expense was the boring of the existing pavement. This cost was mostly offset by not having to install encasement along the existing water main. FINAL COST FOR REPLACING DAMAGEDWATER.LINE IN YUCCA LANE DESCRIPTION QUANTITY AMOUNT 8" AC Pipe 733 L.F. $4,192.76 8" Cast Iron Pipe 54 L.F. 244.62 8" Gate Valve 3 555.42 Valve Boxes 2 17.86 Cast Iron Fittings 449.02 Miscellaneous Materials 2.95 Concrete for Blocking 1 C.Y. 34.00, Labor for Installation 1,083.56 Equipment Rental 600.00 Payroll Benefits 368.39 Warehouse Overhead 409.71 s TOTAL COST FOR REPLACING WATER LINE $7,958.29 This water line was destroyed in the process of installing new storm sewer systems for the proposed Highway installation. TOTAL SALVAGE COST Description guantity Unit Unit Price Amount 12" Cast Iron Pipe 220 L.F. 5.08 1117.60 12" x 8" Cast Iron Tec 1 Ea. 87.72 87.72 12" Valve 1 Ea. 219.22 219.22 4" Valve 1 Ea. 59.83 59.83 TOTAL VALUE OF SALVAGE 1484.37 Total cost of Removal 354.71 1n 4 WATER LINE IAA' / Ir r I r ,o / a � ✓ a�l� o� Exist I o 0 I l 4, II ! �I r� r W I i r wI Install valve and 5 ' stub as shown I ELDORADO ' at proposed R O.W Salvage or I It abandon existing line and va ve. r MOTEL. r \CENTER LINE LOOP � 289 t 1700' / \ WATER LINE 'BB' CITY OF LUBBOCK ENGINEERIAG7DEPARTMErNT RELOCATION OF WATER LINES FOR IH 27 . mujEGT J.O. 1057 SHEET A'TLE 9 'WORK ORDER- SG L,12- I" = I( FILZ NO: ';..R - J —7�- . r _J ��- 8­AC in 16' pl"A CGMP encasement 9 T =m 0+00 Tie I? existing 12" Cl (Wet -tie) We tapping sleeve 6 Volvo (Cl) Valve box 3+37 8'-900 Bend 6+12 Tn to 'sisting 8"AC (Wet -tie) 8X8"toling sleeve & valve (AC) Vain box 3+37 Hale_ Attar inptollml0n is completed, plug exist. 8 AC-5 ' west of station 6+12, and move exist. 12" valve to Ist joint north of station 0+00. Then stub I Joint of 127CI and plug. Salvage old line. 3— 8 — 1075 } — GW010877 - E GWO 10877 1 � a t a1�an _ f _ - __�-'��r-1j e.:._1� v' i' / w. T u.- f ___ _. , •. � i � s ! 1 _ _. Set J.O. 1057 :I N I I c a's,n - u-ie v -E61 e-1r2�a' CITY OF LUMOCK ENGINEERING DEPARTMENT - lj _ RELOCATION OF UTILITIES FOR - _ 1 N 27 R. 0. W. _ ' $ .nam J.O. 2032 GRADES. PROFILES. R ALIGNMENT 16 DAM 16 sulc 0: MORK .ao�a GN010S77 ]ILEN01-0-38] 9 1 O In." I— n — IQ7 ill � o RE -LAY 8" WATER LINE IN YUCCA LANE J 3 2 II 04o0 TIE To EXIsrm 8"AC (WET TIE) 8' 45. SEW DAMAGED BY 1. H. 27 CONSTRUCTION Q O ; v W n ' "- 2443 ex e" TEE Z Q V TIE M EXISTING 8NCI-SOUTH JO 1047 I n I I 4 4 35 8x 4' TEE W WO /-� /1500 z NTo ' I n TIE TO EXISTING 4'CI -SOUTH �+-1a80 11500 _ I 71,75 8•x 8' TEE 8'x 6N REDUCO? ^� 77E To EXISTING 6 C1 -50UTH I � 8"�VALYEl�y 8 R.UG �NofRiN N IIa I I I " PORTIONS OF8'gC LINE HAVE BEEN I . REMOVED. LOCATE REMAINING . UNDAMAGED LINE, RELAY 8"LINE I I ----- —`" AS SHOWN, IN NEW LOCATION. II r I—'"'�---- • NEW LINE MUST GO UNDER 10w0 ' I - HIGHWAY DEPT. STORM SEWER. I I e b, • a �.—��- - c fa8 I INSTALL 8° �ALVE4 L _ STL6 TO R.O.W. UNEfl PLUG. /. I� m I� Ia •� I a n T§ �— — Line B T. N MEADOW DRIVEIf 0 ` 1 U. 1 I ^° m a I o n < + 20 od ro u 4_° o0 10. � \ j '+ ✓-- N•' _ -` I c y - , n w ~ I L A 0 •~ a ''z\ a9e �.0 CL EMSON DR NOTE: �� \� J I to THESE LINES REMOVED DURING I.H. 27 CONSTRUCTION, v ," y��yi 6 ' » N its PLUG'i, BLOCK i INES Ca)R.O.W. Ix �QR/<<° —D '°br-75 I 1 w NOTE- - - - - CU-TAND PLUG WHERE 8 THE NEW ROW. BEGINS I 0) V QI fr ? � W N - Li000e — — oo' oo' oo' oo a too— o •�