BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock BE and is hereby authorized and
directed to execute for and on behalf of the City of Lubbock a Grade Crossing
Endorsement with the Atchison, Topeka and Santa Fe Railway Company, attached
herewith which shall be spread upon the minutes of the Council and as spread
upon the minutes of this Council shall constitute and be a part of this
Resolution as if fully copied herein in detail.
Passed by the City Council this
7th day of
ATTEST:
Evelyn GaTfga, City-Secreta-Tfeq^rer
APPROVED AS TO FORM:
J n C. Ross, Jr., City Yttorney
APPROVED:
Jim r ram, Director'of Plahning
December
�-�
ri AA
f ,4.
. 1978.
t
STATE DEPARTMENT OF HIGHWAYS AND PUBLIC TRANSPORTATION
RAILROAD SIGNAL MASTER AGREEMENT
(rp-
GREEMENT, made and entered into this 114 day of
, 197_L, by and between the State of Texas,
hereinafter called the STATE, and The Atchison. Topeka and Santa Fe
Railway Company , hereinafter called
the RAILROAD.
WITNESSETH:
WHEREAS, the STATE and the RAILROAD propose to install highway -
railroad grade crossing warning systems at the crossings shown on the
list marked EXHIBIT L, attached hereto and made a part hereof,
NOW, THEREFORE, in consideration of the mutual undertakings as
herein set forth, the parties hereto agree as follows:
1. RIGHTS. The RAILROAD hereby gives the STATE and certain
MUNICIPALITIES the right to install the grade crossing warning systems
and to use the crossings across its property at the intersections of
the tracks, highways and streets listed on EXHIBIT L.
2. CONDITIONS. These rights, given hereby, shall not in any way
conflict or interfere with any prior or existing rights of the RAILROAD
at the crossings. It is agreed that if there are future track modifi-
cation at the crossings, the RAILROAD will restore the highways or
streets to proper condition and restore the functional operation of
the warning systems.
3. PLANS AND DESIGN. The STATE and the RAILROAD agree jointly
to prepare plans and estimates based on specifications approved by
the STATE and RAILROAD for the proposed grade crossing warning systems
and after having been approved in writing by the STATE and RAILROAD,
said plans and estimates are to be marked EXHIBIT B, which by reference
to, are to be made a part hereof. No changes are to be made in the
EXHIBIT B without written approval of the STATE and RAILROAD.
4. RESPONSIBILITIES.
a. The RAILROAD, unless otherwise provided, shall make changes
or alterations in the tracks, wire Tines, drainage or other facilities
D-5RR
l 5-26-78
located in the crossing right-of-ways which may be required by con-
struction, to include continuous rail and road operation and restora-
tion to former condition upon completion of the projects.
b. The STATE shall furnish the MUNICIPALITIES (with juris-
diction over streets and roads not on the State Highway System as shown
in EXHIBIT L), appropriate plans which shall be approved by execution
Of ENDORSEMENTS. These ENDORSEMENTS shall constitute full approval of
the projects by the MUNICIPALITIES and shall be marked EXHIBIT E, which
by.reference to, shall be made a part hereof.
c. The STATE shall make reimbursement to the RAILROAD for all
approved work performed, as specified under paragraph 6, "PAYMENTS."
The STATE will be reimbursed from Federal funds for these projects;
therefore, the RAILROAD hereby agrees to abide by directives estab-
lished under the following:
(1)
Federal
Highway Administration, Federal Highway
Program
Manual (FHPM), Volume 1, Chapter 4, Sec-
tion 3.
(Reimbursement)
(2)
Federal
Highway Administration, Federal Highway
Program
Manual (FHPM), Volume 6, Chapter 6, Sec-
tion 2,
Subsection 1, (Railroad -Highway Projects)
(3)
Federal
Highway Administration, Federal Highway
Program
Manual (FHPM), Volume 6, Chapter 6, Sec-
tion 2,
Subsection 2. (Insurance)
(4)
Title VI of the Civil'Rights'Act of 1964.
(5)
State Department of Highways and Public Trans-
portation current policies and practice on sub-
mission
of plans, estimates and billings.
and any supplements thereto or revisions thereof, which, by reference
hereto, are made a part hereof.
5. CONSTRUCTION. The STATE agrees to furnish such construction
stakes and elevations as are required for the installation. The RAIL-
ROAD shall commence the'installation of the individual projects within
two weeks after receipt of WORK ORDER from the STATE for such individual
projects, and shall proceed diligently to completion of the installation.
D-5RR
2 5-26-78
Materials and labor required for the installation of the warning systems
are to be furnished by the RAILROAD. Materials are to be of the kind
and quality detailed in the EXHIBIT B. Assembly of materials should
be undertaken sufficiently in advance 'to assure prompt delivery to the
job site. Payment for any expense whatsoever in connection with the
project will be contingent upon issuance of a WORK ORDER.
6. PAYMENT - LUMP SUM. The estimates for the individual projects
shall show a complete and itemized detailed description for all ma-
terials and breakdowns for labor and equipment to be used on the projects.
The STATE shall review said estimate and if approved by the STATE as a part
of the EXHIBIT B, shall constitute the full agreed -upon LUMP SUN, cost for
the project, subject to Federal Highway Administration approval and
issuance of a letter of authority for construction. The STATE shall
reserve the right of judgement on whether the LUMP SUM properly consti-
tutues the fair price of the scope of work and compatibility with the
needs for the individual projects. Since this agreement is for a LUMP
SUM, there will be no provision for contingencies in the approved estimate.
Upon completion of the individual projects, the RAILROAD will notify the
STATE that the project is complete and request a final inspection. If
the STATE certifies that the project has been installed in substantial
accordance with the plans, specifications and estimate, and is operating
properly, the RAILROAD shall submit a proper billing in the amount of the
agreed -upon LUMP SUM, which.shall be reimbursed promptly by the STATE
and shall be full and final compensation for all materials, labor and
service rendered. If the final inspection by the STATE indicates
corrections or additions are necessary to comply with the approved plans,
the RAILROAD shall make such corrections immediately and prior to payment
of the agreed -upon LUMP SUM. There shall be no provision in this agree-
ment for partial payments; however, payments may be requested for ma-
terials on hand but not in place, under"current STATE policy. The
RAILROAD shall retain adequate cost accounting records for auditing
purposes for a period of three years after payment of the LUMP SUM.
7. MAINTENANCE. The RAILROAD shall maintain and operate these
highway -railroad grade crossing warning systems as installed and in
accordance with the design of operation as shown in the EXHIBIT B.
No changes are to be made in the design, operation or location of the
warning systems without the written approval of the STATE or MUNICIPALITY
of jurisdiction. ,
8. All provisions concerning the STATE
shall automatically cease and terminate upon
projects and payments of the LUMP SUM bills,
herein are not on the State Highway System.
diction in such case shall assume the rights
of the bills.
which are stipulated herein
offical completion of the
where the crossings covered
The MUNICIPALITIES of juris-
of the STATE after payment
3
D-5RR
5-26-78
IN TESTIMONY WHEREOF, the parties hereto have caused these presents
to be executed in duplicate on the day above stated.
THE ATCHISON, TOPEKA AND SANTA FE
RAILWAY COMPANY
By : atiGt•.-
(Title) ASSISTANT TO GENERAL MANAGER
ATTEST:
(Seal)
`1 z�`
Assistant SecrejZry for Railroad
RECOMMENDED:
(Title)
(Title)
APPROVED AS TO FORM:
Attorney for Railroad -
THE STATE OF TEXAS
Certified as being executed for the
purpose and effect of activating
and/or carrying out the orders,
established policies, or work pro-
grams heretofore approved and
authorized by the State Highway and
Public Transportation Commission:
By:
Brid ngineer
Unde authority of State Highway and
Public Transportation Commission
Minute Order No. 70104, dated
June 20, 1975
RECOMMENDED FOR APPROVAL:
�diF�� •
D irectoa F inance
Vpervising Office Engineer
D-5RR
4 5-26-78
EXHIBIT L
PROJECT
FNY., ST.
NO.
COUNTY
OR ROAD
PROJECT NO.
DOT
N0.
LOCATION
1.
Johnson
Willingham
RRP
B061(1)
020
440V
Cleburne
St.
2.
Tarrant
Decatur Ave.
RRP
B626(1)
020
5231
Ft. Worth
3.
Cooke
Broadway St.
RRP
A204(1)
020
607E
Gainesville
4.
Cooke
Scott St.
RRP
A203(1)
020
608L
Gainesville *.
5.
Hutchinson
SH 136
RRP
1155(1)
016
987G
Borger
6.
Randall
SE 34th Ave.
RRP
C017(1)
014
692H
Amarillo
7 . •
Lubbock
29th Dr.
RRP
D008 (1)
017
719A
Lubbock-*
8. ,/
Lubbock
FM 835
RRP
D010(1)
014
981J
Lubbock
9.
Tom Green
Hughes St.
RRP
E707(1)
021
484Y
San Angelo
10.
Shelby
SH 87
RRP
816(1)
023
9391
Center
11.
Fort Bend
SH 288
RRP
3395(2)
022
659D
S. of Arcola
12.
Brazoria
Second St.
RRP
K473(1)
022
649X
In Alvin
•13.
Dallas
Good -Latimer
RRP
S171(1)
022
020X
Dallas *
14
Dallas
Illinois Ave.
RRP
S226(1)
021
9731
Dallas *
15:
Dallas
Westmoreland
RRP
S160(2)
021
943S
Dallas *
Rd.
16.
Dallas
Jupiter Rd.
RRP
S094(1)
021
607H
Dallas *
17.
Dallas
Arapaho Rd.
RRP
S074(1)
021
623S
Richardson
18.
Dallas
Tyler St.
RRP
S163(1)
021
979A
Dallas
19.
Panola
US 79
RRP
U161(1)
023
988F
Carthage
20.
Jefferson
Calder St.-
RRP
V013(1)
023
704Y
Beaumont
21.
Jefferson
North St.
RRP
V012(1)
023
702K
In Beaumont
22.
Hardin
US 96
RRP
V706(l)
024
450P
Silsbee
23.
Jasper
FM 776
RRP
V502(1)
023
881D
Jasper
* Municipality
ENDORSEMENT
The plans for installation of grade crossing warning systems at
the intersection of The Atchison, Topeka and Santa Fe Railway Company
tracks on 29th Dr. crossing DOT No. 017 719A in the
City of Lubbock Project No. RRP D008(1) were trans
mitted by the State Department of Highways and Public Transportation for
review.
Our endorsement by signature hereon constitutes our full approval
of the plans and acknowledgement and approval of the content of the
agreement as pertains to the Municipality. It is understood that there
will be no expense to the City of Lubbock
December 7. 1978.
Late
Approved as to Form:
n ss, r.. yAttorney
C U16B CK, EXAS
Authorized Public Official
Dirk Vests Mayor
APPROVED;`
Jj ertram,`-Di-rec'to r of Planning
EXHIBIT E
COMMISSION
REAGAN HOUSTON. CHAIRMAN
DEWITT C. GREER
CHARLES E. SIMONS
S 0.
f
STATE DEPARTMENT OF HIGHWAYS �
AND PUBLIC TRANSPORTATION
Box 771
Lubbock, TX 79408
November 9, 1978
Project: RRP D008 (1)
Control: 8008-5-1
29th Drive, DOT AAR #17719A
City of Lubbock
Mr. Larry Cunningham
City Manager
Box 2000
Lubbock, TX 79457
Dear Sir:
Nov 1978'
CITY P`�ASI�C ENGIN IRECTOR
OFFICE
B. BERRY
N Lus80CK, CK
Attached are one copy of the Lump Sum Master Agreement with the AT&SF Railway
Company, one copy of the Layout Sheet and three copies of the Ehdorsement.
Will you please execute two copies of the Endorsement and return them to this
office for further processing. You may retain the other.attachuents for your
files.
we will advise you when the Work Order is issued to the Railway Ompany so
that you can oomplete the work that you have agreed to do in connection with
this project. 7he Railway C pany is required to begin work within two weeks
after receipt of the Kbrk Order.
If we can be of further assistance please let us know.
V y yours,
Georg C. Wall Jr.
District Engineer
District Five
WM:fb
Attach i8
3000
w s:
INTERSECTION DETAIL
Scot! 1'� ID
VIc1Wry kW
he sea"
lam
us U
C.-OW r.
tiros z s. a,wr
—GENERAL NOTES —
I. Signal circuits are designed to give 38 seconds operation prior to arrival of fastest
train at this crossing mctudes 3 secor4s for instrument laq-
2- Motion sensor circuits are to be used on this project.
3. Troffic Data: 9,000 VPD of 35 MPH and 4 through trains per clay at 30 MPH and
1 switching moves per day at 30 MPH.
4. 44'5 46 of 4" metal conduit to be furnished and placed by drilling 30" below top of
tie elevation by the railroad company.
5. Fill for instrument "se and signal foundations to be furnished by the State.
6. The railroad company will remove the existing signals and dispose of the foundations.
7. The railroad company will furnish and install o relay box and relay to provide for
interconnection and coordination of the advance warning signals.
8. The State will furnish and install pavement markings and advance warning signals
and the City will maintain both as installed.
TYPICAL SECTION
(In Vicinity Of Crossing)
No scale
—DESCRIPTION OF PROJECT —
Three flashing light signals, Type F (AAR 1489) with 2-22' a 1-32' gate arms.
12" lomp assemblies with high intensity roundels ore to be installed with the lens
spread as shown hereon.
2 bells as shown hereon.
Lamp housings sholl be equipped with 25 watt light globes, operating at a
minimum of 9.0 volts under normal operating conditions.
OF
A. T. a S. F R. R. AND 29th DR IN LUBBOCK