Loading...
HomeMy WebLinkAboutResolution - 2006-R0192 - Amendment No. 7 To Agreement - Parkhill, Smith, & Cooper - Architect_Engineering - 04_26_2006Resolution No. 2006-RO192 April 26, 2006 Item No. 5.19 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock BE and is hereby authorized and directed to execute for and on behalf of the City of Lubbock an Amendment No. 7 to the agreement between the City of Lubbock and Parkhill, Smith & Cooper for architecture/engineering services for the Terminal Building Improvements Project, and all related documents. Said Amendment is attached hereto and incorporated in this Resolution as if fully set forth herein and shall be included in the minutes of the Council. Passed by the City Council this 26th day of April , 2006. MCIDOUGAL, MAYOR ATTEST: Re e ..a Garza, City Secretary AS TO Loomis, Director of A APPROVED AS TO FORM: M. Knight, Aunt sty Attorney gs/cityatt/RES-PSC Amendment -Terminal Bldg Imp March 31, 2006 Resolution No. 2006-RO192 April 26, 2006 Item No. 5.19 March 14, 2006 Mr. James W. Loomis, A.A.E. Director of Aviation Lubbock Preston Smith International Airport Route 3 Box 389 Lubbock, Texas 79403 Re: Amendment No. 7 to Agreement for A/E Services for Airport Improvement Projects: • Terminal Building Improvements Dear Mr. Loomis: We have met with your staff, reviewed the project through the PFC planning process, prepared a Project Information Sheet (Exhibit A) and the Professional Services Budget Sheets (Exhibit B) for the three projects included under this amendment: HVAC Improvements, Carpet Replacement, and the restroom ADA Project. Our understanding of the scope items and a fee proposal for the various tasks associated with these projects are included in the project budget sheets which are attached to this contract amendment. The work associated with each task is subtotaled per project below: HVAC Improvements: Task 1 AC Design Services for the Terminal Buildings HVAC System Fee for Professional Services (Study and Report, Preliminary Design, Final Design and Bidding/Negotiation, lump sum). $274,000 Task 2 AC Construction Phase Services for the Terminal Buildings HVAC System Construction Phase Services (which includes RPR and construction related Engineering Services, lump sum). $92,000 Sub -TOTAL HVAC Improvements $366,000 Carpet Replacement: Task 3CPT Design Services for the Terminal Buildings Carpet Replacement Fee for Professional Services (Study and Report, Preliminary Design, Final Design and Bidding/Negotiation, lump sum). $26,000 Task 4CPT Construction Phase Services for the Terminal Buildings Carpet Replacement Construction Phase Services (which includes RPR and construction related Engineering Services, lump sum). $17,900 Sub -TOTAL Carpet Replacement $43,900 Parkhill, Smith & Cooper, Inc. Engineers ■ Architects ■ Planners 4222 85th Street, Lubbock, Texas 79423 (806) 473-2200 FAX (806) 473-3500 Lubbock EI Paso Midland Amarillo Odessa Mr. James Loomis Page 2 March 14, 2006 Restroom ADA Project: Task 5ADA Design Services for the Terminal Buildings Restroom ADA Project Fee for Professional Services (Study and Report, Preliminary Design, Final Design and Bidding/Negotiation, lump sum). Task 6ADA Construction Phase Services for the Terminal Bldg Restroom ADA Project Construction Phase Services (which includes RPR and construction related Engineering Services, lump sum). Sub -TOTAL Restroom ADA Project TOTAL Terminal Building Improvements $62,100 33 500 $95,600 $505,500 We propose to modify the agreement between the City of Lubbock and Parkhill, Smith & Cooper, Inc. dated January 13, 2005 and to provide these services on a lump sum basis under the provisions of the contract, EXHIBIT B — PAYMENTS TO THE ENGINEER, LUMP SUM METHOD, Paragraph B4.01.A.I I. If the terms of this amendment are agreeable to you, please sign and return one copy of this letter to our office. We will take receipt of this signed letter as our notice to proceed with these services. We look forward to working with you in completing these projects. If you have any questions please call either John Hamilton or myself. Sincerely, Accepted by: AB i CZ�Davis, INC. CITY OF LUBBOCK Bc PEMarc; c ugal Vice President Mayor Enclosures Attest: IN TRIPLICATE By becca Garza City Secretary as to Content: By zx- /goge� l ames W. Loomis, A.A.E. Director of Aviation Approved as to Form: By John . Km Assistant City Attorney R\pmjwtAl9MOO15.99CPALUI UA\Termird Bldg hWAFee & CoW=\Ca&=w=fte%7.DOC No Text LUBBOCK PRESTON SMITH INTERNATIONAL AIRPORT 2006 PFC APPLICATION PROJECT INFORMATION PROJECT: Item 6-3, Terminal Building Improvements PROJECT DESCRIPTION: This project will provide improvements to the existing terminal building. A) The improvements will include repair and replacement of HVAC equipment (air handlers, chillers, ductwork, system controls), B) The replacement of carpet in the passenger area of the concourse (sterile area) and C) The modifications to existing restrooms to meet Americans with Disabilities Act (ADA) requirements. JUSTIFICATION: A) Many portions of the existing HVAC system are reaching 30 years old. In 1994, a portion of the HVAC system was renovated to repair failed components. The system has become unreliable in maintaining the terminal environment properly for passengers and employees of the airlines/airport. This project is Phase 1 of a two phase improvement. Phase 2 will occur in 5 to 10 years after Phase 1. Portions of the HVAC system will be repaired as appropriate and new equipment installed to improve the ability to condition the terminal building, enhancing the safety of both the traveling passenger and the employees at the airport. B) The carpet in the passenger areas of the concourse is exhibiting excessive wear from normal passenger use. Areas of the carpet and seams are potential safety hazards to the passengers. Replacement of the carpet will enhance the safety of the airport terminal building. C) The existing restrooms in the terminal building do not meet the current requirements of the ADA. Modifications to the restrooms will provide proper facilities and allow access by all passengers utilizing the airport. These improvements will also enhance the safety and capacity of the airport to passengers. OBJECTIVE: A) The HVAC improvements will enhance efficiency of the systems, reducing the utility cost for the Terminal Building. This will in turn reduce the amount of costs to the airlines from the increasing energy costs. This will also allow the airport to dependably and adequately condition the air in the terminal building, enhancing the safety of the airport. B) The replacement of the carpet in the passenger areas of the concourse will provide increased safety for the passengers utilizing the airport. C) The modifications to the existing restrooms will provide proper access to all users of the airport, enhancing the safety and capacity of the airport to passengers. 5 1 /06/06 ESTIMATED PROJECT IMPLEMENTATION DATE: / March 2007 ESTIMATED PROJECT COMPLETION DATE: March 2008 TOTAL ESTIMATED PROJECT COST: A) $3,700,000 B) $ 500,000 C) $ 570,000 Total $4,770,000 TOTAL ESTIMATED PFC AMOUNT: A) $1,506,035 B) $ 500,000 C) $ 570,000 Total $2,576,035 EXISTING AND/OR ANTICIPATED AN GRANTS: A) Future AIP Grant - $1,775,865 EXISTING AND/OR ANTICIPATED LOCAL FUNDS: A) $418,100 * See attached table for PFC eligibility calculation 6 1/06/06 II: PARKHILL, SMITH & COOPER, INC. PROJECT BUDGET SHEET auuriarurrrlur ■orroor.rurrr LOCATION CODE: 08 :i/iliii■ilir/.../ .................. PROJECT NAME: LBB Terminal Bldg Impr - HVAC Mod. JOB NO.: 08-2700-06 i' ", ` '! ■� ir. .a �.rr�r TASK: I AC DATE: 03/ 13/06 rrrHOmm.rirliri! r....irrr,r.rrrirr FEE TYPE: Lump Sum PREPARED BY: WSH PRINCIPAL: JRR PROJ. MANAGER: JTH OVERHEAD RATE: PROFIT ON LABOR: �Z7�►OOD PROFIT ON REM: 15.00% („'S¢, PROFIT ON DIRECTS: 15.00% TOTAL FEE: $274,194 LABOR: $262,559 LABOR: $262,559 DIRECTS: $11,635 OVERHEAD: SUBTOTAL: $274,194 REIMB. CONSULTANTS: REIMB. EXPENSES: REM. FEE: DIRECT CONSULTANTS: DIRECT EXPENSES: $10,117 TOTAL FEE: $274,194 LABOR BUDGETS: CODE DESCRIPTION HOURS COSTS 01 Firm Principal 117 $14,742 02 Architect 146 $14,016 03 Engineer 716 $80,192 06 Architect Intern 262 $17,292 07 Engineer -in -Training 1,206 $88,038 14 CADD Operator 724 $41,268 18 Clerical 123 $7,011 Page 1 of 3 FEE ESTIMATING SHEET PROJECT: Temvrlal Bldg Impr - HVAC JOB NO.: 08-2700-06 TASK: t AC SALARY CATEGORY OF PERSONNEL RATE PER HOUR FP ARCH ENG ARCH INT EIT CADD OPT CLERICAL TASK 01 02 03 06 07 14 18 Trips $126.00 $96.00 $112.00 $66.00 $73.00 $57.00 $57.00 TOTAL STUDY AND REPORT PHASE Initial site trip 1 8 8 8 16 40 Predesign Conference 1 4 4 4 1 13 Preliminary Engineering Report develop design criteria 8 4 12 alternate solutions 8 4 8 20 environmental concerns 4 4 8 narrative 8 40 36 2 86 opinion of costs 1 4 8 6 24 43 review with FAA, Owner 1 4 4 PRELIMINARY DESIGN PHASE Misc Mtgs and Conf. 4 16 16 32 Misc site inspections 6 24 44 68 Mechanical drawings 20 40 80 140 Mechanical specifications (outline) 8 4 12 Electrical drawings 6 24 20 50 Electrical specifications (outline) 6 4 10 Structural Analysis 8 16 24 Structural Drawings 8 16 8 32 Structural Specifications (outline) 4 4 8 Architectural Drawings 20 24 40 84 Architectural Specifications (outline) 8 4 12 Review w/owner 1 4 4 4 4 12 28 FINAL DESIGN PHASE Misc Mtgs and Conf 6 8 24 8 40 80 Misc site Inspections 8 8 24 24 60 116 Mechanical Drawings 190 340 300 830 Mechanical Specifications 40 32 24 96 Electrical Drawings 40 160 100 300 Electrical Specifications 24 10 12 46 Structural Drawings 30 40 32 102 Structural Specifications 20 20 8 48 Architectural Drawings 40 60 40 140 Architectural Specifications 10 30 10 50 Review w/owner 1 8 8 8 16 40 Correct Final Documents 1 8 40 30 120 80 32 311 Prepare final opinion of cost 2 4 16 20 24 8 74 Bid Phase Prepare Addenda 4 32 16 40 24 10 126 Answer Bidder Questions 4 32 16 24 76 Attend Pre -Bid 1 4 8 4 16 32 Review Bid 1 4 8 4 4 21 Project Management 80 80 BUDGET SUBTOTALS: HOURS/ Trips - 30 117 146 716 262 1206 724 123 329 SALARY $14742 $14016 $80,192 $17,292 $88,038 $41,268 $7,011 $262,559 11 Pace 2 of 3 EE ESTIMATING SHEET PROJECT- IRECTS LBS Terminal Bldg Impr - HJOB NO.: 08-2700-06 TASK: i AC DIRECT CONSULTANT COSTS SUBTOTAL 611 STRUCTURAL CONSULTANTS 612 MECKELEC CONSULTANTS 613 ENV & CIVIL CONSULTANTS 614 LANDSCAPE CONSULTANTS 616 TESTING CONSULTANTS 616 SURVEYING CONSULTANTS 617 INTERIOR DESIGN CONSULTANTS 618 OTHER CONSULTANTS TOTAL DIRECT CONSULTANTS r--� DIRECT EXPENSES 621 TRAVELILODGING MOTEL DAYS O AIR TRAVEL AIR FARE O PARKING DAYS O CAR RENTAL DAYS O MILEAGE 28 MILES O MEN @ IMANDAY = MEN 0 MAN = /DAY = /DAY = $0.445 O 30 TRIPS = $373.80 SUBTOTAL $374 622 REPRODUCTIONS BLUELINE PRINTS 48 SHTS O $2.56 0 30 SETS a $3,672.00 SEPIA PRINTS SHTS O $8.51 Fa SETS = PRINTING: ORIGINAL SETUP COST 350 ORIGINALS O $0.15 /ORI. _ $52.50 COST PER SHEET 30 SETS O $0.08 lSHT ® 360 SHEETS = $640.00 BINDING COST 30 SETS O $2.00 /SET = $60.00 XEROX SHTS O $0.08 SHT = SUBTOTAL $4,625 623 MODEL/RENDERINGS/PHOTOS Shots O "Shot 624 TELEPHONE 100 Calls O $3.00 /Call $300 625 MEALS DAYS O MEN O /MANDAY 626 FIELD SUPPLIES 628 POSTAGE 75 Mailings O $3.00 /Mailin $225 629 PUBLICATIONS & SUBSCRIPTIONS 630 MISC DIRECT EXP 631 FAX 250 Pages O $1.00 $250 632 TEMPORARY PERSONNEL 633 DRAFTING SUPPLIES 634 OFFICE SUPPLIES 635 CADD 724 HOURS O $6.00 /HOUR $4,344 636 FIELD EQUIP RENTAL 646 SOFTWARE TOTAL DIRECT EXPENSES $10.117 Page 3 of 3 PARKHILL, SMITH & COOPER, INC. PROJECT BUDGET SHEET ss. UUMORMUS LOCATION CODE: 08 :::::: i::::::::::::::::: PROJECT NAME: LBB Terminal Bldg Impr - HVAC Mod. .................. JOB NO.: 08-2700-06 ri • .�i a._e TASK: 2 AC .t ' ' i:Iasiii DATE: 03/ 13/06 ...i FEE TYPE: Lump Sum PREPARED BY: WSH PRINCIPAL: JRR PROJ. MANAGER: JTH OVERHEAD RATE: PROFIT ON LABOR: PROFIT ON REIMB: 15.00% PROFIT ON DIRECTS: 15.00% �cy` `' Q2, 000 TOTAL FEE: $91,968 LABOR: $88,830 LABOR: $88,830 DIRECTS: $3,138 OVERHEAD: SUBTOTAL: $91,968 REIMB. CONSULTANTS: REMM. EXPENSES: REIMB. FEE: DIRECT CONSULTANTS: DIRECT EXPENSES: $2,729 TOTAL FEE: $91,968 ABOR BUDGETS: CODE DESCRIPTION HOURS COSTS 01 Firm Principal 30 $3,780 02 Architect 104 $9,984 03 Engineer 272 $30,464 06 Architect Intern 171 $1 1,286 07 Engineer -in -Training 415 $30,295 l4 CADD Operator 18 Clerical 53 $3,021 Page 1 of 3 FEE ESTIMATING SHEET PROJECT: Terminal Bldg Impr . HVAC JOB NO.: 08-2700.06 TASK: 2 AC SALARY CATEGORY OF PERSONNEL RATE PER HOUR FP ARCH ENG ARCH INT EIT CADD OPT CLERICAL TASK 01 02 03 06 07 14 18 Trips $126.00 $96.00 $112.00 $66.00 $73.00 $57,00 $57.00 TOTAL Project Management 30 30 CONSTRUCTION PHASE Pre -construction Meeting 1 6 6 9 9 3 33 Review submittals 2 8 4 16 4 34 Coordinate w/contractor 10 32 40 100 182 Answer contractor questions 10 32 30 60 16 148 Routine change orders and ASI's 10 32 30 48 16 136 Site trip to review work 54 20 60 24 54 6 164 Prepare Punch List 1 4 16 8 32 4 64 Construction Progress Meetings 16 32 64 64 160 PROJECT CLOSEOUT Review O&M Manuals 4 12 10 26 Final Completion (Punch) 1 4 8 8 24 4 48 Review As-Builts 2 2 8 8 20 BUDGET SUBTOTALS: HOURS/ Trips - 73 30 104 272 171 415 53 104 SALARY $3 780 $9,984 $30 464 $11,286 $30,295 $3 021 $883,830 Pace 2 of 3 EE ESTIMATING SHEET PROJECT: IRECTS LBB Terminal Bldg Impr • H JOB NO.: 08-2700-06 TASK: 2 AC DIRECT CONSULTANT COSTS SUBTOTAL 611 STRUCTURAL CONSULTANTS 612 MECH ELEC CONSULTANTS 613 ENV & CIVIL CONSULTANTS 614 LANDSCAPE CONSULTANTS 615 TESTING CONSULTANTS 616 SURVEYING CONSULTANTS 617 INTERIOR DESIGN CONSULTANTS 618 OTHER CONSULTANTS TOTAL DIRECT CONSULTANTS DIRECT EXPENSES 621TRAVEL/LODGING MOTEL DAYS 0 AIR TRAVEL AIR FARE ® PARKING DAYS ® CAR RENTAL DAYS 0 MILEAGE 28 MILES ® MEN 0 ;MANOAY MEN 0 WAN ;DAY = /DAY $0.445 A 73 TRIPS = $ GIN. 58 SUBTOTAL $910 622 REPRODUCTIONS BLUELINE PRINTS 10 SEPIA PRINTS PRINTING: ORIGINAL SET-UP COST COST PER SHEET BINDING COST XEROX 300 SHTS 0 $2.55 a 30 SETS = $765.00 SHTS 0 $8.51 a SETS = ORIGINALS 0 $0.15 /ORL SETS ® $0.08 /SHT 0 350 SHEETS = SETS 0 $2.00 /SET = SHTS 0 $0.08 /SHT = $24.00 SUBTOTAL $789 623 MODEURENDERINGS/PHOTOS Shots 0 /Shot 624 TELEPHONE 250 Calls 0 $3.00 /Call $750 626 MEALS DAYS 0 MEN @ /MANDAY 626 FIELD SUPPLIES 628 POSTAGE 50 Mailings 0 $3.00 /Maili $150 629 PUBLICATIONS & SUBSCRIPTIONS 630 MISC DIRECT EXP 631 FAX 130 Pages 0 $1.00 $130 632 TEMPORARY PERSONNEL 633 DRAFTING SUPPLIES 634 OFFICE SUPPLIES 635 CADD HOURS 0 $6.00 !HOUR 836 FIELD EQUIP RENTAL 646 SOFTWARE TOTAL DIRECT EXPENSES $2,729 Page 3 of 3 PARKHILL, SMITH & COOPER, INC. PROJECT BUDGET SHEET •■fr/r•fiafa//fiii arlaaaarfarrrr•/.■ LOCATION CODE: 03 riaraaairriaaarrrr rurorrrarurrrrs raarririosanuar PROJECT NAME: LBB Terminal Bldg Impr - Carpet u/uassusrauuf •urrfaarnorr-u .. ,a JOB NO.: 08-2700-06 s1 : :_NV :: .. 51 M .r` ' is anus anus al /` . . 1. TASK: 3CPT •1 1■i:--' , ,. DATE: 03/ 14/06 HOU4asafaso//s rafu/ssfs/aa/ff/e FEE TYPE: Lump Sum PREPARED BY: MWM PRINCIPAL: MWM PROJ. MANAGER: JTH OVERHEAD RATE: PROFIT ON LABOR: PROFIT ON REIMB: 15.00% 42.Lwo PROFIT ON DIRECTS: 15.00% �S►c- � TOTAL FEE: $25,957 LABOR: $23,208 LABOR: $23,208 DIRECTS: $2,749 OVERHEAD: SUBTOTAL: $25,957 REM. CONSULTANTS: REIMB. EXPENSES: REIMB. FEE: DIRECT CONSULTANTS: DIRECT EXPENSES: $2,390 TOTAL FEE: $25,957 LABOR BUDGETS: CODE DESCRIPTION HOURS COSTS 01 Firm Principal 31 $3,906 02 Architect 9 $864 12 Interior Designer 105 $7,665 06 Architect Intern 07 Engineer -in -Training 14 CADD Operator 164 $9,348 18 Clerical 25 $1,425 Page 1 of 3 FEE ESTIMATING SHEET PROJECT: s8 Terminai Bldg Impr • Carr JOB NO.: 08-2700.06 TASK: 3cPT SALARY CATEGORY OF PERSONNEL RATE PER HOUR mwm bpn jld FP ARCH INT DSGN ARCH INT EIT CADD OPT CLERICAL TASK 3CPT 01 02 12 06 07 14 18 Trips $126.00 $96.00 $73.00 $57.00 $57.00 TOTAL Job Get Upilnitial M g/Manacement 1 18 4 22 Code Research Site Survey 4 2 16 18 Update Base Plans 8 24 32 Prepare Bid Documents Floor Plan 4 32 36 Large Scale Pattern Floor Plans 12 40 52 Sections/Details/Schedules 8 32 40 Accessibility Sheet/Cover Sheet 1 4 5 Specifications 6 16 8 30 Bidding Documents OC 4 4 4 8 20 TDLR Submittal 1 1 2 ACM Coordiantoln of Survey 2 2 Review Meetings/Document Corrections 2 2 8 16 4 30 Prepare Color Boards 6 4 10 Asbestos Abatement Plan Not Included Biddlna Phase Issue Bid Documents 3 2 5 Answer Bidder Questions 1 8 2 10 Prepare Addenda 4 2 4 10 Attend Pre Bid 2 1 3 Coordinate w/COL Purchasing 2 2 Review Bids and Letter Recommendation 1 3 1 5 UDGET SUBTOTALS: HOURS/ Trips - 8 31 9 105 164 25 33 SALARY $3 906 $864 $7 665 $9 348 $1,425 $23 208 Pana9nfA EE ESTIMATING SHEET PROJECT: IRECTS LBB Terminal Bldg Impr • CJOB NO.: 08.2700.06 TASK: 3CPT DIRECT CONSULTANT COSTS SUBTOTAL 611 STRUCTURAL CONSULTANTS 612 MECH/ELEC CONSULTANTS 613 ENV 3 CIVIL CONSULTANTS 614 3CPT 615 TESTING CONSULTANTS 616 SURVEYING CONSULTANTS 617 INTERIOR DESIGN CONSULTANTS 618 OTHER CONSULTANTS TOTAL DIRECT CONSULTANTS DIRECT EXPENSES 621 TRAVEULODGING MOTEL DAYS A AIR TRAVEL AIR FARE 0 PARKING DAYS 0 CAR RENTAL DAYS 0 MILEAGE 26 MILES 0 MEN 0 /MANDAY = MEN 0 iMAN = 1DAY = ;DAY = $0.365 0 8 TRIPS = SUBTOTAL $75.92 $76 522 REPRODUCTIONS BLUEUNE PRINTS 24 SEPIA PRINTS PRINTING: ORIGINAL SET-UP COST COST PER SHEET 12 BINDING COST 12 XEROX 650 SHTS 0 $2.55 0 1 SETS = $61.20 SHTS 0 $8.51 0 SETS = ORIGINALS 0 $0.15 /ORI. _ SETS 0 $0.D8 /SHT 0 250 SHEETS = $240.00 SETS 0 $2.00 /SET = $24.00 SHTS 0 $0.08 /SHT = $52.00 SUBTOTAL $377 623 MODEURENDERINGS/PHOTOS Shots 0 !Shot 624 TELEPHONE 10 Calls 0 $3.00 /Call $30 625 MEALS DAYS 0 MEN 0 /MANDAY 626 FIELD SUPPLIES S25 628 POSTAGE 8 Mailings 0 $2.00 /Mailin $16 629 PUBLICATIONS & SUBSCRIPTIONS 630 MISC DIRECT EXP $45 631 FAX 100 Pages* $1.00 $100 632 TDLR REVIEW AND INSPECTION FEE $725 633 DRAFTING SUPPLIES 634 OFFICE SUPPLIES $12 635 CADO 164 HOURS 0 $6.00 /HOUR $984 636 FIELD EQUIP RENTAL 848 SOFTWARE TOTAL DIRECT EXPENSES $2,390 Page 3 of 3 PARKHILL, SMITH & COOPER, INC. PROJECT BUDGET SHEET 41r1.rr1r1r11rrr1 LOCATION CODE: nuun.ruaaaaa oosrrrlrursrra PROJECT NAME: LBB Terminal Bldg Impr - Carpet �a■!!•a........... a .f to ra JOB NO.: 08-2700-06 at 11. ' " to TASK: 4CPT ' 1 DATE: 03/ 13/06 .................. r11r1rrrlr.ruuu FEE TYPE: Lump Sum PREPARED BY: MWM PRINCIPAL: MWM PROD. MANAGER: JTH OVERHEAD RATE: PROFIT ON LABOR: PROFIT ON REIMB: 15.00% PROFIT ON DIRECTS: 15.00%v TOTAL FEE: 17,855 LABOR: $15,947 LABOR: $15,947 DIRECTS: $1,908 OVERHEAD: SUBTOTAL: $17,855 REIMB. CONSULTANTS: REIMB. EXPENSES: RE1MB. FEE: DIRECT CONSULTANTS: DIRECT EXPENSES: $1,659 TOTAL FEE: $17,855 LABOR BUDGETS: CODE DESCRIPTION HOURS COSTS O1 Firm Principal 13 $1,638 02 Architect 12 Interior Designer 164 $11,972 06 Architect Intern 07 Engineer -in -Training 14 CADD Operator 16 $912 18 Clerical 25 $1,425 Page 1 of 3 FEE ESTIMATING SHEET PROJECT: STermmalBldgImpr - Carr JOB NO.: 08-2700-06 TASK: 4CPT SALARY CATEGORY OF PERSONNEL RATE PER HOUR mwm bpn jld FP ARCH INT DSGN ARCH INT EIT CADD OPT CLERICAL TASK 01 02 12 06 07 14 18 Trips $126.00 $96.00 $73.00 $57.00 $57.00 TOTAL Job Set Up/Management 8 6 14 Construction Phase Precon Meeting 1 4 2 6 Shop Drawing Review 16 4 20 Pay Application Review 4 2 8 6 16 Site Review Trips 16 48 48 Punch List and Final Acceptance 3 9 3 TDLR Inspection 1 3 1 4 Close Out 2 4 2 6 Review O & M Manuals 1 Prepare Substantial Completion Cert. 1 2 1 4 Review Release of Liens, Surety 1 1 2 Review GC's As-Bulit Drawings 1 4 16 21 Construction Progress Meetings 16 64 64 BUDGET SUBTOTALS: HOURS/ Trips 43 13 164 16=$:1:42947 SALARY $1,638 $11,972 $912 Pace 2 of 3 EE ESTIMATING SHEET PROJECT IRECTS LBB Terminal Bldg Impr • CJOB NO.: 08-2700.06 TASK: 4CPT DIRECT CONSULTANT COSTS SUBTOTAL 611 STRUCTURAL CONSULTANTS 612 MECH/ELEC CONSULTANTS 613 ENV & CIVIL CONSULTANTS 614 LANDSCAPE CONSULTANTS 615 TESTING CONSULTANTS 616 SURVEYING CONSULTANTS 617 INTERIOR DESIGN CONSULTANTS 618 OTHER CONSULTANTS TOTAL DIRECT CONSULTANTS r DIRECT EXPENSES 621 TRAVEIJLODGING MOTEL DAYS 0 AIR TRAVEL AIR FARE 0 PARKING DAYS 0 CAR RENTAL DAYS 0 MILEAGE 28 MILES 0 $0.445 MEN 0 /MANDAY = MEN 0 /MAN = /DAY = /DAY = Q 43 TRIPS = $535.78 SUBTOTAL $536 622 REPRODUCTIONS BLUELINE PRINTS 10 SEPIA PRINTS PRINTING: ORIGINAL SET-UP COST COST PER SHEET 12 BINDING COST 12 XEROX 500 SHTS 0 SHTS0 ORIGINALS SETS 0 SETS 0 SHTS 0 $2.55 ® 5 SETS = $127.50 $8.51 ® SETS = a $0.15 /ORI. _ $0.08 /SHT 0 SHEETS = $2.00 /SET = $24.00 $0.08 lSHT = $40.00 SUBTOTAL $192 623 MODEL/RENDERINGS/PHOTOS Shots 0 /Shot 624 TELEPHONE 2 Calls 0 $5.00 !Call $10 625 MEALS DAYS 0 MEN 0 /MANDAY 626 FIELD SUPPLIES 628 POSTAGE 30 Mailings f $2.00 /Mailin $60 629 PUBLICATIONS & SUBSCRIPTIONS 630 MISC DIRECT EXP 631 FAX 125 Pages ® $1.00 $125 632 TDLR REVIEW AND INSPECTION FEE $725 633 DRAFTING SUPPLIES 634 OFFICE SUPPLIES $12 635 CADD 16 HOURS ® /HOUR 636 FIELD EQUIP RENTAL 646 SOFTWARE TOTAL DIRECT EXPENSES $1,859 Page 3 of 3 PARKHILL, SMITH & COOPER, INC. PROJECT BUDGET SHEET LOCATION CODE: 03 urrrrrrorrrruu '•"••"""••••••• rrrrrrrrrrrrrrrrra ■u.ous..suur PROJECT NAME: LBB Terminal Bldg Impr - ADA rrnrurn...nrrs of ,-g1-.-!ur- a; JOB NO.: 08-2700-06 a . ... _. -.. .s " '' ••' " '■ TASK: 5ADA I r .. ,. ::.IND;.::r__":: DATE: 03/ 14/06 rusrrrs simm: ""••"�"•"`••• FEE TYPE: Lump Sum PREPARED BY: MWM PRINCIPAL: MWM PROJ. MANAGER: JTH OVERHEAD RATE: PROFIT ON LABOR: PROFIT ON REIMB: 15.00% PROFIT ON DIRECTS: 15.00% TOTAL FEE: $62,118 LABOR: $58,756 LABOR: $58,756 DIRECTS: $3,362 OVERHEAD: SUBTOTAL: $62,1 l 8 REIMB. CONSULTANTS: REM. EXPENSES: REI114B. FEE: DIRECT CONSULTANTS: DIRECT EXPENSES: $2,924 TOTAL FEE: $62,118 LABOR BUDGETS: CODE DESCRIPTION HOURS COSTS 01 Firm Principal 37 $4,662 02 Architect 104 $9,984 03 Engineer 133 $161758 06 Architect Intern 79 $5,767 07 Engineer -in -Training 61 $4,941 14 CADD Operator 249 $14,193 18 Clerical 43 $2,451 Page 1 of 3 FEE ESTIMATING SHEET PROJECT: BB Terminal Bldg Impr - AD JOB NO.: 08-2700-06 TASK: SAGA SALARY CATEGORY OF PERSONNEL RATE PER HOUR mwm bpn jir FP ARCH ENG ARCH INT EIT CADD OPT CLERICAL TASK 01 02 03 06 07 14 18 Trips $126.00 $96.00 $126.00 $73.00 $81.00 $57.00 $57.00 TOTAL Job Set Up/Initial Mtg/Management 1 23 84 4 111 Code Research 5 5 Site Survey 3 6 8 8 8 12 1 43 Update Base Plans 4 4 32 40 Prepare Bid Documents Architectural Floor Plan 2 3 4 16 23 Large Scale Floor Plans 6 8 32 46 Elevations 6 12 24 42 Sections/Details/Schedules 10 8 40 58 Reflected Ceiling Plan 4 6 12 22 Accessibility Sheet/Cover Sheet 1 4 5 Specifications 6 12 14 32 Energy Code Compliance Check 3 1 4 Bidding Documents OC 4 6 12 1 23 MPE Coordination 1 4 8 13 TDLR Submittal 1 3 1 5 ACM Coordination of Survey 2 2 Review Meetings/Document Corrections 3 2 12 5 8 6 36 4 73 Mechanical Mech Drawings 2 3 18 14 35 Mech Specifications 2 6 4 12 Electrical Drawings 2 10 6 18 Electrical Specifications 1 3 3 7 Prepare Opinion of Cost 2 4 2 8 Asbestos Abatement Plans Not Included Bidding Phase Issue Bid Documents 3 16 4 2 25 Answer Bidder Questions 1 8 2 2 2 4 18 Prepare Addenda 2 2 2 4 5 4 19 Attend Pre Bid 1 2 4 1 7 Coordinate w/COL Purchasing 2 1 2 3 Review Bids and Letter Recommendation 1 3 2 1 7 BUDGET SUBTOTALS: HOURS/ Trips - 15 37 104 133 79 61 249 43 70 SALARY $4 662 $9,984 $16 758 $5,767 $4,941 $14 193 $2 451 $58 756 pane 9 of 1 E ESTIMATING SHEET PROJECT: ECTS ill'RECT LBB Terminal Bldg Impr -A JOB NO.: 08.2700.06 TASK: 5ADA CONSULTANT COSTS SUBTOTAL 611 STRUCTURAL CONSULTANTS 612 MECH/ELEC CONSULTANTS 613 ENV 6 CIVIL CONSULTANTS 614 LANDSCAPE CONSULTANTS 615 TESTING CONSULTANTS 616 SURVEYING CONSULTANTS 617 INTERIOR DESIGN CONSULTANTS 618 OTHER CONSULTANTS TOTAL DIRECT CONSULTANTS r--� DIRECT EXPENSES 521 TRAVEL/LODGING MOTEL DAYS ® AIR TRAVEL AIR FARE a PARKING DAYS a CAA RENTAL DAYS a MILEAGE 26 MILES a MEN a /MANDAY = MEN a /MAN = lDAY _ /DAY = $0,445 a 15 TRIPS = $173.55 SUBTOTAL $174 622 REPRODUCTIONS BLUELINE PRINTS 24 SEPIA PRINTS PRINTING: ORIGINAL SET-UP COST COST PER SHEET BINDING COST XEROX 150 SHTS ® $2.55 a 5 SETS = $306.00 SHTS ® $8 51 a SETS = ORIGINALS a $0.15 /ORL _ SETS a $0.08 /BHT a SHEETS = SETS a $2.00 /SET = SHTS a $0.08 /BHT = $12.00 SUBTOTAL $318 623 MODELiRENDERINGS/PHOTOS Shots a ;Shot 624 TELEPHONE 5 Calls* $3.00 /Call $15 625 MEALS DAYS a MEN a /MANDAY W6 FIELD SUPPLIES $25 628 POSTAGE 8 Mailings a $2,00 /Malin $16 629 PUBLICATIONS d SUBSCRIPTIONS 630 MISC DIRECT EXP $45 631 FAX 100 Pa es a $1.00 $100 632 TOILS REVIEW AND INSPECTION FEE $725 633 DRAFTING SUPPLIES 634 OFFICE SUPPLIES $12 635 CADD 249 HOURS ® $6.00 /HOUR $1,494 636 FIELD EQUIP RENTAL 648 SOFTWARE TOTAL DIRECT EXPENSES $2,924 Page 3of3 PARKHILL, SMITH & COOPER, INC. PROJECT BUDGET SHEET /f!/fff!!1f/ff/f!t LOCATION CODE: 03 /i./ttl.!!NUH!. .................. /t!tlti!!/litt!!!! PROJECT NAME: LBB Terminal Bldg Impr - ADA sasosfroorrrrrs JOB NO.: 08-2700-06 i ••, .�_.,. TASK: 6ADA :;..so �.;:..�.:: DATE: 03/ 13/06 tfufsar%�\!1\�f��� FEE TYPE: Lump Sum PREPARED BY: MWM PRINCIPAL: MWM PROJ. MANAGER: JTH OVERHEAD RATE: PROFIT ON LABOR: PROFIT ON REIMB: 15.00% v� f 3315oa PROFIT ON DIRECTS: 15.00% TOTAL FEE: $33,546 LABOR: $31,033 LABOR: $31,033 DIRECTS: $2,513 OVERHEAD: SUBTOTAL: $33,546 REIMB. CONSULTANTS: REIMB. EXPENSES: REIMB. FEE: DIRECT CONSULTANTS: DIRECT EXPENSES: $2, l 85 TOTAL FEE: $33,546 LABOR BUDGETS: CODE DESCRIPTION HOURS COSTS 01 Firm Principal 14 $1,764 02 Architect 106 $10,176 03 Engineer 42 $5,292 06 Architect Intern 154 $ l 1,242 07 Engineer -in -Training 14 $1,134 14 CADD Operator 18 Clerical 25 $1,425 Page 1 of 3 FEE ESTIMATING SHEET PROJECT: Be Terminal Bldg Imp( • AD JOB NO_: 08-2700.06 TASK: 6ADA SALARY CATEGORY OF PERSONNEL RATE PER HOUR mwm bpn jlr FP ARCH ENG ARCH INT EIT CADD OPT CLERICAL TASK 01 02 03 06 07 14 18 Trips $126.00 $96.00 $126.00 $73.00 $81.00 $57.00 $57.00 TOTAL Job Set Up/Management 14 6 20 Construction Phase Precon Meeting 1 4 4 2 10 Shop Drawing Review 12 1 30 2 4 49 Pay Application Review 8 6 12 6 24 Site Review Trips 42 8 2 80 3 93 Punch List and Final Acceptance 4 4 8 3 TDLR Inspection 1 1 4 1 6 Close Out 2 2 3 6 7 2 20 Review O& M Manuals 2 2 6 Prepare Substantial Completion Cert. 1 2 2 2 1 8 Review Release of Liens, Surety 1 1 Review GC's As -Built Drawings 1 2 3 Construction Progress Meetings 16 64 32 96 BUDGET SUBTOTALS: HOURS/ Trips 74 14 106 42 154 14 25 35 SALARY $1764 $10176 $5,292 _$__11,242_ $1,134 $1,425 $31,033 Page 2 of 3 ESTIMATING SHEET PROJECT:LBB CTSCT Terminal Bldg Impr•AJOB NO.' 08-2700-06 TASK: 6ADA CONSULTANT COSTS fRE SUBTOTAL 611 STRUCTURAL CONSULTANTS 612 MECH/ELEC CONSULTANTS 613 ENV 8 CIVIL CONSULTANTS 614 LANDSCAPE CONSULTANTS 615 TESTING CONSULTANTS 616 SURVEYING CONSULTANTS 617 INTERIOR DESIGN CONSULTANTS 818 OTHER CONSULTANTS TOTAL DIRECT CONSULTANTS DIRECT EXPENSES 621 TRAVEL/LODGING MOTEL DAYS a AIR TRAVEL AIR FARE a PARKING DAYS a CAR RENTAL DAYS a MILEAGE 26 MILES a MEN a /MANDAY = MEN a /MAN = /DAY = /DAY = $0.365 a 74 TRIPS $702.26 SUBTOTAL $702 622 REPRODUCTIONS BLUELINE PRINTS 12 SEPIA PRINTS PRINTING: ORIGINAL SET-UP COST COST PER SHEET 500 BINDING COST XEROX 500 SHTS a $2.55 a 1 SETS = $30.60 SHTS a $8.51 a SETS = ORIGINALS a $0.15 /ORI. _ SETS a $0.08 /SHT a 1 SHEETS = $40.00 SETS 0 $2.00 /SET SHTS a $0.06 /SHT = $40.00 SUBTOTAL $111 623 MODEURENDERINGS/PHOTOS Shots a Shot 624 TELEPHONE 150 Calls Q $3.00 /Call $450 625 MEALS DAYS a MEN a ,MANDAY 626 FIELD SUPPLIES 628 POSTAGE 30 Mailings a $2.00 /Mailin $so 629 PUBLICATIONS 6 SUBSCRIPTIONS 630 MISC DIRECT EXP 631 FAX 125 Pages a $1.00 $125 632 TDLR REVIEW AND INSPECTION FEE $725 633 DRAFTING SUPPLIES 634 OFFICE SUPPLIES $12 635 CADD HOURS 0 $6.00 /HOUR 636 FIELD EQUIP RENTAL 848 SOFTWARE TOTAL DIRECT EXPENSES $2,185 Page 3 of 3