Loading...
HomeMy WebLinkAboutResolution - 072778E - Pavement Improvements - Kerr Construction Co - Croslin Industrial Park Addition - 07_27_197878-37-234-627 (28) RESOLUTION g Q RESOLUTION ACCEPTING IMPROVEMENTS ON PORTIONS OF STREETS AND/OR AVENUES AS LISTED BELOW: WHEREAS, in conformance with the paving requirement provisions of City Ordinance 1331, the subdivider of Croslin Industrial Park Addition, Lots 1 and 2, made arrangements with Kerr Construction Company for the construction of paving improvements on.certain streets dedicated in said subdivision under the provisions of said Ordinance prior to the recording of the subdivision plat of Croslin Industrial Park Addition, Lots 1 and 2 including the following streets: E. 1/2 of drainage channel between Queens Street and North Loop 289 Access Road known and designated as New Subdivision Sub -Unit Number 13 of Unit Number 2022. W. 1/2 of drainage channel between Queens Street and North Loop 289 Access Road known and designated as New Subdivision Sub -Unit Number 14 of Unit Number 2022. AND WHEREAS, the construction of the above improvements on the above - mentioned streets was performed under the supervision of the City Engineer, and said improvements have been completed and have been inspected and found to have been constructed in accordance with City specifications and in accordance with the provisions of City Ordinance 1331. THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS. I. That the improvements on said portions of the abovementioned streets be and the same are hereby accepted and the City Engineer be and he is hereby authorized to direct the payment of the City's portion of the cost and to release escrow money. II. This resolution shall take effect and be in force from and after its passage. PASSED AND APPROVED THIS 27TH DAY OF JULY, 1978. irk West, Mayor ATTEST: _tvielyn Gaf fga, City Se re a APPROVED: Wilfor Watson, City Engineer APPROVED: red 0. Sen er, Jr., City ney CONSOLIDATED FINAL ESTIMATE CROSLIN INDUSTRIAL ADDITION, LOTS 1 & 2 Accepted July 27, 1978 QUANTITIES L.F. S.Y. C & G Unit & L.F. Alley Removal Sub -Unit Location C & G Return & Repair NS 2022-13 E. 1/2 of drainage channel between Queens Street and N. Loop 289 Access Road. 283.37 215.95 24.60 NS 2022-14 W. 1/2 of drainage channel between Queens Street and N. Loop 289 Access Road. 283.37 215.95 24.60 TOTAL 566.74 431.90 49.20 COST ESTIMATE 566.74 L.F. Curb & Gutter @ $ 3.95 $2,238.62 431.90 S.Y. Drainage Channel @ $15.40 $6,651.26 49.20 L.F. C & G Removal & Repair @ $ 5.50 $ 270.60 CONTRACT COST $9,160.48 COST DISTRIBUTION Unit & Contract Property Sub -Unit Cost Owner Cost NS 2022-13 $4,580.24 $4,580.24 NS 2022-14 $4,580.24 $4,580.24 TOTAL $9,160.48 $9,160.48