(35_) RESOLUTION
7- �3-7
RESOLUTION ACCEPTING IMPROVEMENTS ON PORTIONS OF STREETS AND AVENUES
AS LISTED BELOW:
WHEREAS, in conformance with the paving requirement provisions of City
Ordinance 1331, the subdivider of Times Square Addition, Lots 3A-3E and 5A-5F,
made arrangements with Harold Stotts Earth Moving Contractors, Inc. for the
construction of paving improvements on certain streets dedicated in said sub-
division under the provisions of said Ordinance prior to the recording of the
subdivision plat of Time Square Addition, Lots 3A-3E and 5A-5F including the
following streets:
74th Street from its intersection with the East lip line of Elgin
Avenue to its intersection with the West property line of Lot
3B known and designated as New Subdivision Sub -Unit Number 22
of Unit Number 2024.
E. 1/2 of Elgin Avenue from its intersection with a line 7.00
feet North of North property line of alley North of 74th Place
to its intersection with the South lip line of Loop 289 Access
Road known and designated as New Subdivision Sub -Unit Number 23
of Unit Number 2024.
AND WHEREAS, the construction of the above improvements on the above -
mentioned streets was performed under the supervision of the City Engineer, and
said improvements have been completed and have been inspected and found to have
been constructed in accordance with City specifications and in accordance with
the provisions of City Ordinance 1331.
THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS.
I.
That the improvements on said portions of the abovementioned streets
be and the same are hereby accepted and the City Engineer be and he is hereby
authorized to direct the payment of the City's portion of the cost and to release
escrow money.
II.
This resolution shall take effect and be in force from and after its
passage.
PASSED AND APPROVED THIS 13TH DAY OF JULY, 1978. M '
irk West, Mayor
ATTEST:
Y
elyn Gaf fga,, City Se4liek2fy
APPROVED:
w
Wilf Watson, City Engineer
APPROVE :
red 0. Senter, Jr., C Attorney
CONSOLIDATED FINAL ESTIMATE
TIME SQUARE ADDITION
LOTS 3A THRU 3E AND 5A THRU 5F
Accepted July 13th, 1978
QUANTITIES
S.Y.
S.Y. S.Y. L.F. Asphalt
Unit & Paving L.F. Valley C & G Paving
Sub -Unit Location 6" Base C & G Gutter Removal Removal
2024-22 74th Street from
E.L.L. of Elgin
Avenue to W.P.L.
of Lot 3B. 3,861.83 1,705.08 96.59
2024-23 E. 1/2 of Elgin
Avenue from 7' N.
of N.P.L. of Alley
N. of 74th Place
to S.L.L. of Loop
289 Access Road. 1,404.66 617.60
TOTAL CONTRACT
QUANTITIES 5,266.49- 2,322.68 96.59
COST ESTIMATE
5,266.49
S.Y.
Paving
6" Base
@
$ 4.30
2,322.68
L.F.
Curb &
Gutter
@
$ 4.25
96.59
S.Y.
Valley
Gutter
@
$20.00
907.56
S.Y.
Asphalt
Paving Removal
@
$ 6.00
408.41
L.F.
Curb &
Gutter Removal
@
$ 6.00
CONTRACT
COST
COST DISTRIBUTION
Unit & Contract Property
Sub -Unit Cost Owner Cost
2024-22 $339680.08 $33,680.08
2024-23 $ 8,664.84 $ 8,664.84
408.41 907.56
408.41 907.56
$22,645.91
$ 9,871.39
$ 1,931.80
$ 5,445.36
$ 2,450.46
$42,344.92