HomeMy WebLinkAboutResolution - 060878N - Application_Contract - OTS, TDHPT - Traffic Engineering Survey Program - 06_08_1978FOS:bsb
V/
RESOLUTION
0
WHEREAS, it is the desire of the City of Lubbock to participate in the Traffic
Engineering Survey Program with the Office of Traffic Safety, State Department of
Highways and Public Transportation;
WHEREAS, the City of Lubbock will follow the recommendations of the Consultant
when such recommendations are practical and within the financial capabilities of the
City of Lubbock;
WHEREAS, it would be in the best interest of the City of Lubbock to appoint
B. H. McDaniel, Traffic Engineering Director, as Project Director and it would be
in the best interest to appoint Larry J. Cunningham, City Manager, as Authorized
Representative of the City of Lubbock; NOW THEREFORE:
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT Larry J. Cunningham is hereby authorized and directed to make the necessa
application and contract to enter into and participate in the Traffic Engineering
Survey Program with the Office of Traffic Safety, State Department of Highways and
Public Transportation, and that B. H. McDaniel be appointed Project Director.
PASSED AND APPROVED this 8th day of
ATTEST:
jTrya Phillips, C SS c etaryusurer
VED AS T6' FORM:
Fred 0. Senter, Jr., Ci
June , 1978.
WEST, MAYOR
COMMISSION
REAGAN HOUSTON, CHAIRMAN
DEWITT C. GREER
CHARLES E. SIMONS
STATE DEPARTMENT OF HIGHWAYS
AND PUBLIC TRANSPORTATION
F, o, Sox 771
Lubbock, Texas 79408
tuy 22 p 1978
South Quaker Jivenue Intersection With
Control 783-1, top 289
Us tbound arld Wes tbound Frontage ltca. ds
Lubbock, Labboek County
Subjects Approval of iighvey Traffic Sill Recoveend+atioa
And Supporting Data for Installation of
Full Traffic Actuated Signislization
Mr. Xarry J. Cwmi.nghm
City Manager
P, 04Box;Z004
labbock. Texas 79457
Dear Mr ..ngha>ca I
ENGINEER -DIRECTOR
B. L. DEBERRY
IN REPLY REFER TO
FILE NO.
Approval of our r'ecomandation for installation of Full. Traffic Actuated signaliaation
at the .intersection of hoop 289 'Frontage loads with South taker Avenue has been
received from our .lu stin Office„ The following documents bave been prepared by this
office for your review and consideration.
1. plans Title Sheet
2. Agreement (Traffic Signal • Type Z•lA)
5. City Sacretaryca Certificate
4. Ordinatce (Traffic Signal)
$. Phan and Specifitati (bl.ueliae Copies)
It is proposed that the Initial, Lnstallation at this Intersection is to be Fixed -Time
operation until such time as,a rul.l Traffic Actuated controller is available.
Upon receipt from the City of these properly executed documents, they will be forwtarded
to our Austin Office for further processing. At a later date your wi.11.receive a fully
executed ;ropy of the Agreement and attachment$ for our files and reeords.
truly,
I
urge w. wall 1, :3x.
Sistriet Engineer
District 'five
WGF:,lets
Snute.