Loading...
HomeMy WebLinkAboutResolution - 060878A - Agreement - State Of TX - Highway Signal Project - 06_08_1978& . &OP 10 S/ 9 S/ tq RESOLUTION A RESOLUTION PROVIDING FOR THE APPROVAL OF THE AGREEMENT DATED June 8, 1978 BETWEEN THE STATE OF TEXAS AND THE CITY OF LUBBOCK, FOR THE INSTALLATION, CONSTRUCTION, EXISTENCE, USE, OPERATION, AND MAIN- TENANCE OF HIGHWAY SIGNAL PROJECT(S) AT THE LOCATION(S) SHOWN ON EXHIBITI, ATTACHED HERETO AND MADE A PART HEREOF, IN THE CITY OF LUBBOCK; PROVIDING FOR THE EXECUTION OF SAID AGREEMENT. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: SECTION 1. THAT the certain agreement dated June 8, 1978 between the State of Texas and the City of Lubbock, for the installation, construction, existence, use, operation, and maintenance of certain high- way traffic signal(s) at the location shown on EXHIBIT 1, attached hereto and made a part hereof, in the City of Lubbock, be and the same is hereby approved, and the Mayor is hereby authorized to execute said agreement on behalf of the City of Lubbock, and to transmit the same to the State of Texas for appropriate action. PASSED: June 8, 1978* APPROVED: June 8, 1978 l Mayor City Attorney RESOLUTION (TRAFFIC SIGNAL) 1-1 4-60-762 D-18 a 1 STATE OF TEXAS X COUNTY OF TRAVIS � This AGREEMENT, dated this 8th day of June 1978, by and between the State of Texas, hereinafter called the "State," Party of the First Part; and the City of Uibbwk UAk County, Texas, acting by and through its duly authorized officers under a - Resolution, passed the - 8th day of June , 1978, hereinafter called the "City," Party of the Second Part, made to become effective when fully executed by both parties: W I T N E S S E T H WHEREAS, the City has authorized the installation of highway traffic signal(s) by Resolution, passed on the 8th day of June 1978, at the location(s) shown on EXHIBIT 1, attached hereto and made a part hereof. A G R E E M E N T NOW, THEREFORE, in consideration of the premises and of the mutual cove- nants and agreements of the parties hereto to be by them respectively kept and performed, as hereinafter set forth, it is agreed as follows: 1. The State will furnish the necessary funds for the actual construction, prepare plans and specifications,install said highway traffic signsl(s), and supervise. construction. 2. The City hereby consents to the construction of the highway traffic signal(s) shown on EXHIBIT l by the approval of the location and manner of construction as shown on the plans and described in the specifications. AGREEMENT (TRAFFIC SIGNAL TYPE E-1A) 11-75-767 D-18 1-4 3. The City will operate and maintain the highway traffic signal(s) upon completion of the installation(s) by the State. 4. The City will pay all power costs for operating the signal(s). 5. The City will obtain written approval of the State Department of Highways and Public Transportation before making any changes in the design of operation and timing of the signal(s) or before removing any part of the in stallation(s). 6. The City will return any and all parts of said highway traffic signal installations) to the State should it (they) be removed by the City for any reasons other than for installation on a State or Federal numbered highway route at a location approved by the State. 7. The City will be responsible for the police enforcement required for securing obedience to the highway traffic signal(s). S. In the event the terms of this Agreement are in conflict with the provisions of any other existing Agreements and/or Contracts between the City and the State, this Agreement shall take precedence over the other Agreements and/or Contracts. AGREEMENT (TRAFFIC SIGNAL - TYPE E-lA. 11-75-767 D-18 2-4 IN TESTIMONY WHEREOF, the parties hereto have caused these presents to be executed in triplicate on the dates shown hereinbelow. Executed on behalf of the City this ATTEST: 8th day of Junje , 1978. I*wBy: Sec etary for City '�� n MAYOR THE STATE OF TEXAS Certified as being executed for the purpose and effect of activating and/or carrying out the orders, established policies, or work pro- grams heretofore approved and authorized by the State Highway and Public Transportation Commission: Executed on behalf f the State this day of -I 1978. APPROVED AS TO FORM General Attorneys fovha City By: 'C f Enginene rr of Maintenance AUTHORITY FOR ECECUTppf-' tionpLJSHED 11NDFfi MINUTE ORDER NO. 70104. _ RECO1vKEIDED FOR APPROVAL: Districbr Engineer Engineer of Traffic AGREEMENT (TRAFFIC SIGNAL - TYPE E-1A) 11-75-767 D-18 3-4 COMMISSION REAGAN HOUSTON. CHAIRMAN DEWITT C. GREER CHARLES E. SIMONS STATE DEPARTMENT OF HIGHWAYS AND PUBLIC TRANSPORTATION P. 0. Box 771 Lubbock, Texas 79408 July 5, 1978 M-783-1-41 Project Designator 5256 Loop 289 Eastbound and Westbound Frontage Road Intersections With South Quaker Avenue Lubbock, Lubbock County District Five Mr. Larry J. Cunningham City Manager P. Q. Box 2000 Lubbock, Texas 79457 Dear Mr. Cunningham: ENGINEE B. AX t M r tue FICEC�`�,� soce, Enclosed for your files and record is one fully executed copy of the signed Agreement (Traffic Signal - Expressway Type E-IA), Resolution and City Secretary's Certificate which have been executed between the State and the City of Lubbock covering State installation and City operation and maintenance of full traffic actuated signals at the intersections of Loop 289 Eastbound and Westbound Frontage Roads with South Quaker Avenue. If you have any questions,.please contact this office. District Engineer District Five WCP: jss Encls. COMMISSION STATE DEPARTMENT OF HIGHWAYS REAGAN HOUSTON. CHAIRMAN AND PUBLIC TRANSPORTATION DEWITT C. GREER P. 0. Box 771 CHARLES E. SIMONS Lubbock, Texas 79408 May 22, 1978 South Quaker Avenue Intersection With Control 783-1, Loop 289 Eastbound and Westbound Frontage Roads Lubbock, Lubbock County Subject: Approval of Highway Traffic Signal Recommendation And Supporting Data for Installation of Full Traffic Actuated Signalization Mr. Larry J. Cunningham City Manager P. 0. BOX 2000 Lubbock, Texas 79457 Dear Mr. Cunningham: ENGINEER -DIRECTOR B. L. DEBERRY Approval of our recommendation for installation of Full Traffic Actuated signalization at the intersection of Loop 289 Frontage Roads with South Quaker Avenue has been received from our Austin Office. The following documents have been prepared by this office for your review and consideration. 1. Plans Title Sheet 2. Agreement (Traffic Signal - Type E-1A) 3. City Secretary's Certificate 4. Ordinance (Traffic Signal) 5. Plans and Specifications (blueline copies) It is proposed that the initial installation at this intersection is to be Fixed -Time operation until such time as a Full Traffic Actuated controller is available. Upon receipt from the City of these properly executed documents, they will be forwarded to our Austin Office for further processing. At a later date you will receive a fully executed copy of the Agreement and attachments for your -files and records. Y tr Georg *eerr It District EDistrict Five WCP : j s s �' �v �p�a��► Encls. �Sl bi r, ��, , kti �� EXHIBIT 1 LOCATION(s) INTERSECTION OF SOUTH QUAKER AVENUE WITH LOOP 289 FRONTAGE ROADS AGREEMENT (TRAFFIC SIGNAL - TYPE E-IA 4-4 I1-75-767 D-18 fib