Loading...
HomeMy WebLinkAboutResolution - 051178K - Street Improvements - WD Turner Construction Company - Multliple Locations - 05_11_1978RESOLUTION M1198' RESOLUTION ACCEPTING IMPROVEMENTS ON PORTIONS OF STREETS AND PARKING LOTS AS LISTED BELOW: WHEREAS, the City of Lubbock accepted Bid No. 4549 on August 25, 1977, CDWO 7721, authorizing the construction of street and parking lot improvements by W.D. Turner Construction Company on portions of the following streets and parking lots: Canyon Drive with parking lot and boat ramp improvements from its intersection with a line 36.00 feet east of the east lip line of Quirt Avenue to a point 96.00 feet east of Canyon Lakes Dam No. 6; known and designated as Sub -Unit Number 19 of Unit Number 2232.. Entrance road and parking lot known and designated as Sub -Unit Number 22 of Unit Number 2232. (At Camp Fire Girls Building on N. University Avenue.) Parking lot known and designated as Sub -Unit Number 23 of Unit Number 2232. (South of Canyon Drive between Avenue U and University Avenue at Canyon Lake No. 2.) Entrance roads, boat ramp and parking lot known and designated as Sub -Unit Number 24 of Unit Number 2232. (At intersection of Avenue X and Grinnell Street, South of Canyon Lake No. 2.) AND WHEREAS, the improvements upon the said portions of the above mentioned streets and parking lots have been inspected and found to have been constructed according to the approved plans and specifications. THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS. I. That the improvements on said portions of the abovementioned streets and parking lots be, and the same are hereby accepted. II. This resolution shall take effect and be in force after its passage. PASSED AND APPROVED THIS ATTEST: riYPhillips, -City retary DAY OF 1973. eAZA& 4'1irk West, yor APPROVED: 0. Senter. Citv At COST ESTIMATE 37,629.00 S.Y. Paving 6" Base 20,6.43.80 L.F. Curb 6 Gutter 784.85 S.Y. Drainage Slab 60.0 L.F. C & G Removal 85.95 L.F. 18" CMP Pipe 3.0 C.Y. Riprap 158.75 Hr. Road Grader 3,276.75 Y.H. Scraper 154.25 Hr. Water Truck 112.00 Hr. Sheepsfoot Roller 1.50 Hr. Pneumatic Roller 178.25 Hr. Dozer @ $ 3.80 $142,990.20 @ $ 3.95 $ 81,543.01 @ $ 17.50 $ 13,734.87 @ $ 6.00 $ 360.00 @ $ 18.89 $ 1,623.60 @ $100.00 $ 300.00 @ $ 55.00 $ 8,731.25 @ $ 4.75 $ 15,564.56 @ $ 25.00 $ 3,856.25 @ $ 35.00 $ 3,920.00 @ $ 20.00 $ 30.00 @ $ 75.00 $ 139368.75 CONTRACT COST $286,022.49 i CONSOLIDATED FINAL ESTIMATE Community Development Paving Program, CDWO 7721 Accepted May 11, 1978 S.Y. S.Y. L.F. L.F. Hr. Hr. Hr. Hr. Unit & Paving L.F. Drain. C & G 18" CMP C.Y. Road Y.H. Water Sheep. Pneu. Hr. Sub -Unit Location 6" Base C & G Slab Removal Pipe Riprap Grader Scraper Truck Roller Roller Dozer 2232-19 Canyon Dr. with parking lot and boat ramp from 36' E. of E.L.L. of Quirt Avenue to 96' E. of Canyon Lake Dam No. 6. 30,370.13 16,578.2 689.70 60.0 85.95 3.0 158.75 3,276.75 154.25 112.00 1.50 178.25 2232-22 Entrance road and parking lot (At Camp Fire Girls Bldg. on N. University Avenue.) 2,044.86 1,213.9 68.48 2232-23 Parking lot (S. of Canyon Dr. bet. Avenue U and University Avenue at Lake 2). 2,672.51 1,432.4 26.67 2232-24 Entrance roads, boat ramp and parking lot (At Avenue X and Grinnell Street, S. of Lake 2). 2,541.50 1,419.3 TOTAL 37,629.00. 20;--643.8 784.85 60.0 85.95 3.0 158.75 3,276.75 154.25 112.00 1.50 178.25