HomeMy WebLinkAboutResolution - 051178K - Street Improvements - WD Turner Construction Company - Multliple Locations - 05_11_1978RESOLUTION
M1198'
RESOLUTION ACCEPTING IMPROVEMENTS ON PORTIONS OF STREETS AND PARKING LOTS
AS LISTED BELOW:
WHEREAS, the City of Lubbock accepted Bid No. 4549 on August 25, 1977,
CDWO 7721, authorizing the construction of street and parking lot improvements by
W.D. Turner Construction Company on portions of the following streets and parking
lots:
Canyon Drive with parking lot and boat ramp improvements from
its intersection with a line 36.00 feet east of the east lip
line of Quirt Avenue to a point 96.00 feet east of Canyon Lakes
Dam No. 6; known and designated as Sub -Unit Number 19 of Unit
Number 2232..
Entrance road and parking lot known and designated as Sub -Unit
Number 22 of Unit Number 2232. (At Camp Fire Girls Building
on N. University Avenue.)
Parking lot known and designated as Sub -Unit Number 23 of
Unit Number 2232. (South of Canyon Drive between Avenue U
and University Avenue at Canyon Lake No. 2.)
Entrance roads, boat ramp and parking lot known and designated
as Sub -Unit Number 24 of Unit Number 2232. (At intersection
of Avenue X and Grinnell Street, South of Canyon Lake No. 2.)
AND WHEREAS, the improvements upon the said portions of the above
mentioned streets and parking lots have been inspected and found to have been
constructed according to the approved plans and specifications.
THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS.
I.
That the improvements on said portions of the abovementioned streets
and parking lots be, and the same are hereby accepted.
II.
This resolution shall take effect and be in force after its passage.
PASSED AND APPROVED THIS
ATTEST:
riYPhillips, -City retary
DAY OF 1973.
eAZA&
4'1irk West, yor
APPROVED:
0. Senter. Citv At
COST ESTIMATE
37,629.00
S.Y.
Paving 6" Base
20,6.43.80
L.F.
Curb 6 Gutter
784.85
S.Y.
Drainage Slab
60.0
L.F.
C & G Removal
85.95
L.F.
18" CMP Pipe
3.0
C.Y.
Riprap
158.75
Hr.
Road Grader
3,276.75
Y.H.
Scraper
154.25
Hr.
Water Truck
112.00
Hr.
Sheepsfoot Roller
1.50
Hr.
Pneumatic Roller
178.25
Hr.
Dozer
@ $
3.80
$142,990.20
@ $
3.95
$
81,543.01
@ $
17.50
$
13,734.87
@ $
6.00
$
360.00
@ $
18.89
$
1,623.60
@ $100.00
$
300.00
@ $
55.00
$
8,731.25
@ $
4.75
$
15,564.56
@ $
25.00
$
3,856.25
@ $
35.00
$
3,920.00
@ $
20.00
$
30.00
@ $
75.00
$
139368.75
CONTRACT COST
$286,022.49
i
CONSOLIDATED FINAL
ESTIMATE
Community Development
Paving
Program, CDWO 7721
Accepted
May 11,
1978
S.Y.
S.Y.
L.F.
L.F.
Hr.
Hr.
Hr.
Hr.
Unit &
Paving
L.F. Drain.
C & G
18" CMP
C.Y.
Road
Y.H.
Water
Sheep.
Pneu.
Hr.
Sub -Unit
Location
6" Base
C & G Slab
Removal Pipe
Riprap
Grader
Scraper
Truck
Roller
Roller
Dozer
2232-19
Canyon Dr. with parking lot and boat
ramp from 36' E. of E.L.L. of Quirt
Avenue to 96' E. of Canyon Lake Dam
No. 6.
30,370.13
16,578.2 689.70
60.0
85.95
3.0
158.75
3,276.75
154.25
112.00
1.50
178.25
2232-22
Entrance road and parking lot (At
Camp Fire Girls Bldg. on N. University
Avenue.)
2,044.86
1,213.9 68.48
2232-23
Parking lot (S. of Canyon Dr. bet.
Avenue U and University Avenue at
Lake 2).
2,672.51
1,432.4 26.67
2232-24
Entrance roads, boat ramp and
parking lot (At Avenue X and Grinnell
Street, S. of Lake 2).
2,541.50
1,419.3
TOTAL
37,629.00.
20;--643.8 784.85
60.0
85.95
3.0
158.75
3,276.75
154.25
112.00
1.50
178.25