HomeMy WebLinkAboutResolution - 011278E - Accept Paving Improvements - Kerr Co - GWO 10,944 - 01_12_1978t
r�
RESOLUTION
RESOLUTION ACCEPTING IMPROVEMENTS ON A PORTION OF A STREET AS LISTED
BELOW:
WHEREAS, THE City of Lubbock passed a resolution on June 9th, 1977
authorizing the construction of street improvements by Kerr Construction Company
on a portion of the following street.
Realignment of Boston Avenue from the South lip line of 34th
Street to alley South of 35th Street, GWO 10,944, known and
designated as Unit 2232-50.
AND WHEREAS, the improvements upon the said portion of the abovementioned
street has been inspected and found to have been constructed according to the
approved plans and specifications.
THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS
I.
That the improvements on said portion of the abovementioned street be,
and the same are hereby accepted and the City Engineer be and he is hereby
authorized to direct the payment of the City's share.
II.
This resolution shall take effect and be in force after its passage.
PASSED AND APPROVED THIS 12TH DAY OF JANUARY, 1978.
/�w 11SIV
oy tass, Mayor
ATTEST:
/� V i •
Treva Phillips, C' y Secretary
F ed 0. Senter, Jr., City Attorney
CONSOLIDATED FINAL ESTIMATE
GWO 10,944
Accepted January 12, 1978
QUANTITIES
S.Y. S.Y.
S.Y. S.Y. S.Y. 10' Wide Concrete
Unit & Paving L.F. Alley Valley Alley Slab
Sub -Unit Location 6" Base C & G Return Gutter Pavement Removal
2232-50 Boston Avenue
Realignment from
S.L.L. of 34th
Street to Alley
South of 35th
Street. 2,201.89 1,052.67 15.77 83.67 115.83 765.41
C.Y. S.Y. C.Y.
L.F. Pavement Concrete S.Y. L.F. L.F. L.F. Native
C & G & Base Driveway 4" Thick Pavement Concrete Sidewalk Dirt
Removal Removal Returns Sidewalk Repair Sawing Curb Backfill
1,102.96 178.90 142.77 595.63 200.00 22.90 50.10 80.00
COST ESTIMATE
2,201.89
S.Y.
Paving 6" Base
115.83
S.Y.
10' Wide Alley Paving
1,052.67
L.F.
Curb & Gutter
765.41
S.Y.
Concrete Slab Removal
15.77
S.Y.
Alley Return
83.67
S.Y.
Valley Gutter
1,102.96
L.F.
Curb & Gutter Removal
178.90
S.Y.
Pavement & Base Removal
142.77
S.Y.
Driveway Returns
595.63
S.Y.
4" Thick Sidewalk
200.00
L.F.
Pavement Repair
22.90
L.F.
Concrete Sawing
50.10
L.F.
Sidewalk Retaining Curb
80.00
C.Y.
Native Dirt Backfill
COST DISTRIBUTION
Unit & Contract
Sub -Unit Cost
2232-50 $40,153.70
@ $ 4.75
$10,458.98
@ $19.50
$
2,258.68
@ $ 5.75
$
6,052.85
@ $ 3.75
$
2,870.29
@ $18.50
$
291.75
@ $19.50
$
1,631.56
@ $ 3.50
$
3,860.36
@ $ 3.50
$
626.15
@ $19.50
$
2,784.02
@ $13.50
$
8,041.01
@ $ 4.50
$
900.00
@ $ 1.00
$
22.90
@ $ 1.50
$
75.15
@ $ 3.50
$
280.00
CONTRACT COST
$40,153.70
City
Cost
$40,153.70
FINAL ACCOUNT
Total City Cost $40,153.70
Less Amount Paid on Monthly Estimate 32,881.05
Final Amount Due Contractor $ 7,272.65