Loading...
HomeMy WebLinkAboutResolution - 011278E - Accept Paving Improvements - Kerr Co - GWO 10,944 - 01_12_1978t r� RESOLUTION RESOLUTION ACCEPTING IMPROVEMENTS ON A PORTION OF A STREET AS LISTED BELOW: WHEREAS, THE City of Lubbock passed a resolution on June 9th, 1977 authorizing the construction of street improvements by Kerr Construction Company on a portion of the following street. Realignment of Boston Avenue from the South lip line of 34th Street to alley South of 35th Street, GWO 10,944, known and designated as Unit 2232-50. AND WHEREAS, the improvements upon the said portion of the abovementioned street has been inspected and found to have been constructed according to the approved plans and specifications. THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS I. That the improvements on said portion of the abovementioned street be, and the same are hereby accepted and the City Engineer be and he is hereby authorized to direct the payment of the City's share. II. This resolution shall take effect and be in force after its passage. PASSED AND APPROVED THIS 12TH DAY OF JANUARY, 1978. /�w 11SIV oy tass, Mayor ATTEST: /� V i • Treva Phillips, C' y Secretary F ed 0. Senter, Jr., City Attorney CONSOLIDATED FINAL ESTIMATE GWO 10,944 Accepted January 12, 1978 QUANTITIES S.Y. S.Y. S.Y. S.Y. S.Y. 10' Wide Concrete Unit & Paving L.F. Alley Valley Alley Slab Sub -Unit Location 6" Base C & G Return Gutter Pavement Removal 2232-50 Boston Avenue Realignment from S.L.L. of 34th Street to Alley South of 35th Street. 2,201.89 1,052.67 15.77 83.67 115.83 765.41 C.Y. S.Y. C.Y. L.F. Pavement Concrete S.Y. L.F. L.F. L.F. Native C & G & Base Driveway 4" Thick Pavement Concrete Sidewalk Dirt Removal Removal Returns Sidewalk Repair Sawing Curb Backfill 1,102.96 178.90 142.77 595.63 200.00 22.90 50.10 80.00 COST ESTIMATE 2,201.89 S.Y. Paving 6" Base 115.83 S.Y. 10' Wide Alley Paving 1,052.67 L.F. Curb & Gutter 765.41 S.Y. Concrete Slab Removal 15.77 S.Y. Alley Return 83.67 S.Y. Valley Gutter 1,102.96 L.F. Curb & Gutter Removal 178.90 S.Y. Pavement & Base Removal 142.77 S.Y. Driveway Returns 595.63 S.Y. 4" Thick Sidewalk 200.00 L.F. Pavement Repair 22.90 L.F. Concrete Sawing 50.10 L.F. Sidewalk Retaining Curb 80.00 C.Y. Native Dirt Backfill COST DISTRIBUTION Unit & Contract Sub -Unit Cost 2232-50 $40,153.70 @ $ 4.75 $10,458.98 @ $19.50 $ 2,258.68 @ $ 5.75 $ 6,052.85 @ $ 3.75 $ 2,870.29 @ $18.50 $ 291.75 @ $19.50 $ 1,631.56 @ $ 3.50 $ 3,860.36 @ $ 3.50 $ 626.15 @ $19.50 $ 2,784.02 @ $13.50 $ 8,041.01 @ $ 4.50 $ 900.00 @ $ 1.00 $ 22.90 @ $ 1.50 $ 75.15 @ $ 3.50 $ 280.00 CONTRACT COST $40,153.70 City Cost $40,153.70 FINAL ACCOUNT Total City Cost $40,153.70 Less Amount Paid on Monthly Estimate 32,881.05 Final Amount Due Contractor $ 7,272.65