HomeMy WebLinkAboutResolution - 102876B - Paving Improvements - Kerr Construction Co - Summer Place Addition - 10_28_197616&9478 RESOLUTION RESOLUTION ACCEPTING IMPROVEMENTS ON PORTIONS OF STREETS AND/OR AVENUES AS LISTED BELOW: WHEREAS, in conformance with the paving requirement provisions of City Ordinance 1331, the subdivider of Summer Place Addition, Lots 1, 2, and 3, made arrangements with Kerr Construction Company for the construction of paving improvements on certain streets dedicated in said subdivision under the provisions of said Ordinance prior to the recording of the subdivision plat of Summer Place Addition, Lots 1, 2, and 3 including the following streets: 27th Street from its intersection with the West Lip Line of Frankford Avenue to its intersection with the West Property Line of Lot 1, Summer Place Addition known and designated as New Subdivision Sub -Unit Number 32 of Unit Number 2019. Frankford Avenue from its intersection with a line 16.00 feet South of the South Property Line of 27th Street to its intersection with a line 29.85 feet North of the North Property Line of Lot 1, Summer Place Addition known and designated as New Subdivision Sub -Unit Number 33 of Unit Number 2019. 27th Street from its intersection with the East Lip Line of East Loop 289 Access Road to its intersection with the East Property Line of Lot 2, Summer. Place Addition known and designated as New Subdivision Sub -Unit 83 of Unit Number 2017. AND WHEREAS, the construction of the above improvements on the above - mentioned streets was performed under the supervision of the City Engineer, and said improvements have been completed and have been inspected and found to have been constructed in accordance with City specifications and in accordance with the provisions of City Ordinance 1331. THEREFORE', BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS. I. That the improvements on said portions of the abovementioned streets be and the same are hereby accepted and the City Engineer be and he is hereby authorized to direct the payment of the City's portion of the cost and to release escrow money. II. This resolution shall take effect and be in force from and after its passage. PASSED AND APPROVED THIS 28TH DAY OF OCTOBER, 1976. Roy Ba s, Mayor ATTEST: 0 . Treva Phillips, Cites Secretary APPR VED: w Wilfa .Watson, City Engineer APPROVED: red°'0. Senter, Jr., Cipf At CONSOLIDATED FINAL ESTIMATE Summer Place Addition Lots 1, 2, and 3 Accepted October 28, 1976 QUANTITIES S.Y. Alley S.Y. Return & S.Y. L.F. Unit & Paving L.F. Drainage Valley C & G Sub -Unit 6" Base C & G Channels Gutter Removal NS 2019-32 27th Street from the W.L.L. of Frankford Avenue to the W.P.L. G.f Lot 1, Summer Place Addition. 1,063.79 538.44 55.88 NS 2019-33 Frankford Avenue from 16' S. of the S.P.L. of 27th Street to 29.85' N. of the N.P.L. of Lot 1, Summer 1,167.79 498.94 43.05 23.33 Place Addition. 503.76 (Temporary Tie-in) - NS 2017-83 27th Street from the E.L.L. of E. Loop 289 Access Road to the E.P.L. of Lot 2, Summer Place Addition. 3,544.51 1,617.37 25.69 94.20 TOTAL 6,279.85 2,654.75 43.05 104.90 '94.20 COST ESTIMATE 6,279.85 S.Y. Paving 6".Base @ $ 2.57 $16,139.21 2,654.75 L.F. Curb & Gutter @ $ 2.57 $ 6,822.71 104.90 S.Y. Valley Gutter @ $10.50 $ 1,101.45 43.05 S.Y. Drainage Channel @ $11.25 $ 484.31 94.20 L.F. Curb & Gutter Removal @ $ 1.50 $ 141.30 CONTRACT COST $24,688.98 COST DISTRIBUTION Unit & Contract Property Sub -Unit Cost Owner Cost NS 2019-32 $ 4,704.47 $ 4,704.47 NS 2019-33 $ 6,307.43 $ 6,307.43 NS 2017-83 $13,677.08 $13,677.08 TOTAL $24,688.98 $24,688.98