Loading...
HomeMy WebLinkAboutResolution - 090976G - Water_Sewer Improvements - Panhandle Construction Co - Ridge Wood Additon - 09_09_197609o92&1� RESOLUTION Resolution accepting water and sewer system improvements for Lots 1-90, Ridge Wood Addition. WHEREAS, the Developer of Lots 1-90, Ridge Wood Addition have complied with the provisions of the City of Lubbock Code, Chapter 34, Article 2, by providing the water and sewer improvements for said addition in accordance with paragraph 61 of said Chapter 34, and, WHEREAS, the total utility cost to the developer is $47,787.17 with the improvements constructed by Panhandle Construction Company having a value of $44,676.60 as determined by the unit prices established by said Chapter 34, and $3,110.57 cash (engineering, wet tie-ins, paving repair, difference in Pro Rata, and actual cost) paid to the City, with Jerry Bradshaw, the develope to receive a refund of $11,196.77 in accordance with Chapter 34 of the Code of the City of Lubbock and, WHEREAS, the construction of the said water and sewer improvements was performed under the supervision of the City Engineer and said improvements have been completed in accordance with the City of Lubbock's plans and specifications, NOW THEREFORE BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: 1. That the improvements be and the same are hereby accepted as an integral part of the water and sewage system of the City of Lubbock. 2. That refund of the refundable cost in the amount of $11,196.77 be made in accordance with said Chapter 34. 3. This resolution shall take effect and be in force from and after its passage. PASSED AND APPROVED THIS 9TH DAJ,01F SEPTEMBER, 1976. l s Roy Bass, Mayor Attested: Treva Phillips, Cit ecretary App ved: i ilfo Watson, City Engineer Approv Fred 0. Senter, City Attor '