RESOLUTION ACCEPTING IMPROVEMENTS ON MUNICIPAL PARKING LOT AND AUTHORIZ
PAYMENT OF CITY'S COST.
WHEREAS, the City of Lubbock heretofore entered into contract with KERR
CONSTRUCTION COMPANY (G.W.O. 3156) for the making and construction of Munici
Parking Lot improvements in said City including among others the following:
Municipal Parking Lot in Block 4, Memorial Center Addition to the City of Lubb
Texas
AND WHEREAS, the improvements upon the said portions of the abovementio
Municipal Parking Lot have been inspected and found to have been constructed
accordance with terms of said contract (G.W.O. 3156).
THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS:
I.
That the improvements on said portions of the abovementioned Municipal
Parking Lot be and the same are hereby accepted, and the City Engineer be and
he is hereby authorized to direct payment of the City's portion of the cost.
II.
This resolution shall take effect and be in force from and after its
passage.
PASSED AND APPROVED THIS 24th DAY OF JUNE, 1976.
ATTEST: Roy ss, Mayor
Treva Phillips, C y Secretary
APPROVED:
Wil ord .. Watson, City -Engineer
APPR D•
Fred 0. Senter,`Jr., City A
COST DISTRIBUTION
Unit &
Sub -Unit
GWO 3156
CONSOLIDATED FINAL ESTIMATE
MUNICIPAL PARKING LOT
BLOCK 4, MEMORIAL CENTER ADDITION
ACCEPTED 6-24-76
Contract
Cost
$32,080.27
CONTRACT COST
Previous payments by monthly estimate
Amount due Contractor
COST ESTIMATE
6,097.88
S.Y.
Paving 6" Base @
294.19
L.F.
Retaining Wall 6"xl.5' @
759.96
L.F.
Curb & Gutter @
140.10
L.F.
Reinforced Curb & Gutter @
111.13
S.Y.
Driveway Return @
66.03
S.Y.
Valley Gutter @
3.27.70
S.Y.
4" Thick Sidewalk @
60
Pre -cast bumper blocks @
1
Sprinkler System Installed @
208.89
L.F.
C&G, C&G Removal and
Pavement Repair @
325.12
S.Y.
Exposed Aggregate Sidewalk
City
Cost
32.080.27
$32,080.27
27,695.09
4,385.18
$
2.50
$
15,244.70
$
2.90
$
853.15
$
2.93
$
2,226.68
$
3.00
$
420.30
$
11.25
$
1,250.21
$
10.85
$
716.42
$
6.55
$
4,766.44
$
9.50
$
570.00
$
Bid
$
2,307.95
$
4.60
$
960.89
@ $
8.50
$
2,763.52
CONTRACT COST
$
32,080.27