Loading...
HomeMy WebLinkAboutResolution - 062476Q - Pavement Improvements - Kerr Construction Co - Memorial Center Addition - 06_24_1976aeZ49& A PV(Zr)T TTTTONI RESOLUTION ACCEPTING IMPROVEMENTS ON MUNICIPAL PARKING LOT AND AUTHORIZ PAYMENT OF CITY'S COST. WHEREAS, the City of Lubbock heretofore entered into contract with KERR CONSTRUCTION COMPANY (G.W.O. 3156) for the making and construction of Munici Parking Lot improvements in said City including among others the following: Municipal Parking Lot in Block 4, Memorial Center Addition to the City of Lubb Texas AND WHEREAS, the improvements upon the said portions of the abovementio Municipal Parking Lot have been inspected and found to have been constructed accordance with terms of said contract (G.W.O. 3156). THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS: I. That the improvements on said portions of the abovementioned Municipal Parking Lot be and the same are hereby accepted, and the City Engineer be and he is hereby authorized to direct payment of the City's portion of the cost. II. This resolution shall take effect and be in force from and after its passage. PASSED AND APPROVED THIS 24th DAY OF JUNE, 1976. ATTEST: Roy ss, Mayor Treva Phillips, C y Secretary APPROVED: Wil ord .. Watson, City -Engineer APPR D• Fred 0. Senter,`Jr., City A COST DISTRIBUTION Unit & Sub -Unit GWO 3156 CONSOLIDATED FINAL ESTIMATE MUNICIPAL PARKING LOT BLOCK 4, MEMORIAL CENTER ADDITION ACCEPTED 6-24-76 Contract Cost $32,080.27 CONTRACT COST Previous payments by monthly estimate Amount due Contractor COST ESTIMATE 6,097.88 S.Y. Paving 6" Base @ 294.19 L.F. Retaining Wall 6"xl.5' @ 759.96 L.F. Curb & Gutter @ 140.10 L.F. Reinforced Curb & Gutter @ 111.13 S.Y. Driveway Return @ 66.03 S.Y. Valley Gutter @ 3.27.70 S.Y. 4" Thick Sidewalk @ 60 Pre -cast bumper blocks @ 1 Sprinkler System Installed @ 208.89 L.F. C&G, C&G Removal and Pavement Repair @ 325.12 S.Y. Exposed Aggregate Sidewalk City Cost 32.080.27 $32,080.27 27,695.09 4,385.18 $ 2.50 $ 15,244.70 $ 2.90 $ 853.15 $ 2.93 $ 2,226.68 $ 3.00 $ 420.30 $ 11.25 $ 1,250.21 $ 10.85 $ 716.42 $ 6.55 $ 4,766.44 $ 9.50 $ 570.00 $ Bid $ 2,307.95 $ 4.60 $ 960.89 @ $ 8.50 $ 2,763.52 CONTRACT COST $ 32,080.27