Loading...
HomeMy WebLinkAboutResolution - 062476C - Paving Improvements - Kerr Construction Co - Sentry Park - 06_24_1976GYQZO7(oG' RRR0T.TTTTnM RESOLUTION ACCEPTING IMPROVEMENTS ON A PORTION OF STREET AND/OR AVENUES AS LISTED BELOW: WHEREAS, in conformance with the paving requirement provisions of City Ordinance 1331, the subdivider of Sentry Park -.Tract "A", made arrangements with Kerr Construction Company for the construction of paving improvements on certain streets dedicated in said subdivision under the provisions of said Ordinance prior to the recording of the subdivision plat of Sentry Park - Trac "A" including the following street: Albany Avenue from the South Lip Line of South Loop 289 to 598 feet south of South Lip Line of loop 289 known and designated as Sub Unit Number 16 of Unit Number 2019. AND WHEREAS, the construction of the above improvements on the abovemen- tioned street was performed under the supervision of the City Engineer, and said improvements have been completed and have been inspected and found to hav been constructed in accordance with City specifications and in accordance with the provisions of City Ordinance 1331. THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS. I. That the improvements on said portions of the abovementioned street be and the same are hereby accepted and the City Engineer be and he is hereby authorized to direct the payment of the City's portion of the cost (and to release escrow money). II. This resolution shall take effect and be in force from and after its pass. PASSED AND APPROVED THIS 24th DAY OF JUNE , 1976. 171 A ATTEST: Roy Wss, Mayor Treva Phillips, Cit Secretary APPROVED: APPROVED: Watson, City Engineer Fred 0. Senter, Jr. ty torney CONSOLIDATED FINAL ESTIMATE SENTRY PARK TRACT "A" Accepted June 24, 1976 UANTITIES S.Y. S.Y. Unit & Paving L.F. C & G Valley Sub -Unit Location 6" Base C & G Removal Gutter 2019-16 Albany Avenue SLL of S. Loop 289 to 598' S. of SLL of Loop 289 2309.26 1124.40 92.0 24.01 COST DISTRIBUTION Unit & Contract Property City to Sub -Unit Cost Owner Cost Contractor 2019-16 $9,282.43 $9,282.43 COST ESTIMATE 2309.26 S.Y. Paving 6" Base @ $ 2.60 $ 6,004.08 1124.40 L.F. Curb & Gutter @ $ 2.60 $ 2,923.44 24.01 S.Y. Valley Gutter @ $ 10.95 $ 262.91 92.0 L.F. C. & G. Removal @ $ 1.00 $ 92.00 CONTRACT COST $ 9,282.43