RESOLUTION ACCEPTING IMPROVEMENTS ON A PORTION OF STREET AND/OR AVENUES
AS LISTED BELOW:
WHEREAS, in conformance with the paving requirement provisions of City
Ordinance 1331, the subdivider of Sentry Park -.Tract "A", made arrangements
with Kerr Construction Company for the construction of paving improvements on
certain streets dedicated in said subdivision under the provisions of said
Ordinance prior to the recording of the subdivision plat of Sentry Park - Trac
"A" including the following street:
Albany Avenue from the South Lip Line of South Loop 289 to 598 feet south of
South Lip Line of loop 289 known and designated as Sub Unit Number 16 of Unit
Number 2019.
AND WHEREAS, the construction of the above improvements on the abovemen-
tioned street was performed under the supervision of the City Engineer, and
said improvements have been completed and have been inspected and found to hav
been constructed in accordance with City specifications and in accordance with
the provisions of City Ordinance 1331.
THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS.
I.
That the improvements on said portions of the abovementioned street be
and the same are hereby accepted and the City Engineer be and he is hereby
authorized to direct the payment of the City's portion of the cost (and to
release escrow money).
II.
This resolution shall take effect and be in force from and after its pass.
PASSED AND APPROVED THIS 24th DAY OF JUNE , 1976.
171 A
ATTEST:
Roy Wss, Mayor
Treva Phillips, Cit Secretary
APPROVED: APPROVED:
Watson, City Engineer
Fred 0. Senter, Jr. ty torney
CONSOLIDATED FINAL ESTIMATE
SENTRY PARK TRACT "A"
Accepted June 24, 1976
UANTITIES
S.Y. S.Y.
Unit & Paving L.F. C & G Valley
Sub -Unit Location 6" Base C & G Removal Gutter
2019-16 Albany Avenue SLL of S. Loop
289 to 598' S. of SLL of
Loop 289 2309.26 1124.40 92.0 24.01
COST DISTRIBUTION
Unit & Contract Property City to
Sub -Unit Cost Owner Cost Contractor
2019-16 $9,282.43 $9,282.43
COST ESTIMATE
2309.26
S.Y.
Paving
6" Base
@
$
2.60
$
6,004.08
1124.40
L.F.
Curb &
Gutter
@
$
2.60
$
2,923.44
24.01
S.Y.
Valley
Gutter
@
$
10.95
$
262.91
92.0
L.F.
C. & G.
Removal
@
$
1.00
$
92.00
CONTRACT COST $ 9,282.43