Loading...
HomeMy WebLinkAboutResolution - 5848 - CO #1 To Contract- Duininck Brothers Inc- Reconstruct Runways 17R-35L Keel, LIA - 05_14_1998RESOLUTION NO. 5 Item No. 17A May 14, 1998 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock BE and is hereby authorized and directed to execute for and on behalf of the City of Lubbock, Change Order No. 1 to a contract by and between the City of Lubbock and Duininck Brothers Inc. to reconstruct runways 17R-35L Keel at Lubbock International Airport. A copy of said change order is attached hereto and incorporated in this Resolution as if fully set forth herein and shall be included in the minutes of the Council. Passed by the City Council this 14 th day of May , 1998. A1-Z 4Y S N, =A EST:, Ka Darnell, City Secretary APPROVEVAS"W CONTENT: 74 Director of Aviation APPROVED AS TO FORM: William de Haas, Contract Attorney OWNER: City of Lubbock CHANGE ORDER # ONE (1) Date Prepared : May 12, 1998 OWNER'S ADDRESS: Lubbock International Airport Route 3 Box 389 Lubbock, Texas 79401 NAME OF LOCATION OF AIRPORT: Lubbock International Airport AIRPORT: Lubbock, Texas NAME OF Duininck Brothers, Inc. ADDRESS OF 330 W.Northwest Highway CONTRACTOR: CONTRACTOR: Grapevine, Texas 76051 DESCRIPTION OF WORK IN CONTRACT: Delta Project No.: TX 97053 AIP Project No.: 3-48-0138-19-97 Reconstruct Runway 17R-35L Keel Current Contract Amt.: 95,362,317.00 Est. Cost This Change: _ S 210,643,75 New Contract Amount: S5,572,960.75 CHANGES ORDERED: ITEM DESCRIPTION QUANTITY UNIT PRICE TOTAL INCREASE OR AMOUNT DECREASE SEE ATTACHED TOTAL: $210,643.75 REASON(S) FOR CHANGE ORDER: Increase scope of work to include construction of Taxiways Q, N, and T shoulders. CURRENT CONTRACT TIME (DAYS) 360 NEW CONTRACT TIME (DAYS) 360 Subject to conditions set forth below, an equitable adjustment is established as follows: CONTRACT PRICE CONTRACT TIME Not Changed X Not Changed X Increased by S210,643.75 Dollars Increased by days Decreased by Dollars Decreased by days The foregoing is in accordance with your contract dated and as listed below: A. The aforementioned change and work affected thereby are subject to all contract stipulations and covenants, B. The rights of the OWNER are not prejudiced; and C. All claims against the OWNER which are incidental to or as a consequence of the aforementioned change are satisfied. 11 ACCEPTED DELTA S FEDERAL AVIATION ADMINISTRATION Approved for Federal Participation within Fund Limitation of Grant Agreement. VICE-PRESIDENT 5/ APPROVED STATE NA TITLE DATE P"": Taa*ny She:� Irnptoverrmantn Lotadotr labbendc IMernatia!W Abpe d A Urea Of t". Md NM fM hem D burs C Prben AMM" 1 P 152 E=o Grath And Subg►edo Phpuafm SY 4.100A0 Moo $1ZM M For Now Pa"moxft 2 P 152 E=aaftvo CkAding And T+rsaitg In Elnpm ed Areas SY 2. w.00 $coo $10.000-00 3 Un w of Cemai! Used to Stet,3&o Subgm:%. V CM 25.0D S1225 0"225 - necdsamry 4 P-601 PartlwWCeraonl Conewa Base C=9% S lnch SY 21S.M $53.50 i11,502.57 S P- 03 Rh"Miin xM Tack Coat CAL 40M $S.00 SM-00 6 TxDOT 340 Hot ewe 16spholie Cmmoo Sarface C uns.Type Tim 35LDa s6SAM S2,2Tb.00 D, 2 IN 7 P-503 Portland Cement Cetncreto Sonata Course, 0 twh Tbkkeeaas SY 3".00 $41.80 siso S0.00 B P-M And as Pasreing SE 4M 00 $1.20 $SPC 90 9 T•901 So I f a$one, Seest V lend lift ACRE am skl oo.00 52,aM" 10 L-110 2 Way A Inch UetdwWound Eh tdeal Dwct LF 20.w $4ADD $080.00 Comets Encoaed hee*xlb sTraenthbo A%d flit* hg 11 L.110 6 Way 4 hch th dargrxanf DacelcW Due% LF 50" SM-00 $2,20Q.00 Conatete Erxased, Mrl xft T►aftcl ng And Bat M ft 12 L-110 I Way 4 Inch Undlzt+g =rtd milt Ek stal Due LF so" $24 00 $12DQOO Ut titled Around BdA ng Cahta, Inrhxl ag Tmaching And8adfng 13 L-125 Rerrnmt% MMTy And ReimaA EaCat g Base- Ell 2.ff0 i70{ DO S1,4m oo lmntedTaxnry Edsrn Lii K b3dut3ng Nffiing Dram Hde And lmta" ®imml Drawn Bad TOTAL D D $210.643.75 Page 1