HomeMy WebLinkAboutResolution - 5848 - CO #1 To Contract- Duininck Brothers Inc- Reconstruct Runways 17R-35L Keel, LIA - 05_14_1998RESOLUTION NO. 5
Item No. 17A
May 14, 1998
RESOLUTION
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock BE and is hereby authorized and
directed to execute for and on behalf of the City of Lubbock, Change Order No. 1 to a
contract by and between the City of Lubbock and Duininck Brothers Inc. to reconstruct
runways 17R-35L Keel at Lubbock International Airport. A copy of said change order is
attached hereto and incorporated in this Resolution as if fully set forth herein and shall be
included in the minutes of the Council.
Passed by the City Council this 14 th day of May , 1998.
A1-Z
4Y S N,
=A EST:,
Ka Darnell, City Secretary
APPROVEVAS"W CONTENT:
74
Director of Aviation
APPROVED AS TO FORM:
William de Haas, Contract Attorney
OWNER: City of Lubbock
CHANGE ORDER # ONE (1)
Date Prepared : May 12, 1998
OWNER'S
ADDRESS:
Lubbock International Airport
Route 3 Box 389
Lubbock, Texas 79401
NAME OF LOCATION OF
AIRPORT: Lubbock International Airport AIRPORT: Lubbock, Texas
NAME OF Duininck Brothers, Inc. ADDRESS OF 330 W.Northwest Highway
CONTRACTOR: CONTRACTOR: Grapevine, Texas 76051
DESCRIPTION OF WORK IN CONTRACT: Delta Project No.: TX 97053
AIP Project No.: 3-48-0138-19-97
Reconstruct Runway 17R-35L Keel Current Contract Amt.: 95,362,317.00
Est. Cost This Change: _ S 210,643,75
New Contract Amount: S5,572,960.75
CHANGES ORDERED:
ITEM DESCRIPTION QUANTITY UNIT PRICE TOTAL INCREASE OR
AMOUNT DECREASE
SEE ATTACHED
TOTAL: $210,643.75
REASON(S) FOR CHANGE ORDER:
Increase scope of work to include construction of Taxiways Q, N, and T shoulders.
CURRENT CONTRACT TIME (DAYS) 360 NEW CONTRACT TIME (DAYS) 360
Subject to conditions set forth below, an equitable adjustment is established as follows:
CONTRACT PRICE
CONTRACT TIME
Not Changed
X Not Changed
X Increased by S210,643.75
Dollars
Increased by
days
Decreased by
Dollars
Decreased by
days
The
foregoing is in accordance with
your contract dated
and as listed
below:
A.
The aforementioned change and
work affected thereby
are subject to all contract stipulations
and covenants,
B.
The rights of the OWNER are not
prejudiced; and
C.
All claims against the OWNER which are incidental to
or as a consequence of the
aforementioned
change are satisfied.
11
ACCEPTED
DELTA
S
FEDERAL AVIATION ADMINISTRATION
Approved for Federal Participation
within Fund Limitation of Grant Agreement.
VICE-PRESIDENT
5/
APPROVED STATE NA TITLE DATE
P"": Taa*ny She:� Irnptoverrmantn
Lotadotr labbendc IMernatia!W Abpe d
A
Urea Of t". Md
NM
fM hem D
burs
C
Prben
AMM"
1
P 152
E=o Grath And Subg►edo Phpuafm
SY
4.100A0
Moo
$1ZM M
For Now Pa"moxft
2
P 152
E=aaftvo CkAding And T+rsaitg In Elnpm ed
Areas
SY
2. w.00
$coo
$10.000-00
3
Un w of Cemai! Used to Stet,3&o Subgm:%. V
CM
25.0D
S1225
0"225
-
necdsamry
4
P-601
PartlwWCeraonl Conewa Base C=9% S lnch
SY
21S.M
$53.50
i11,502.57
S
P- 03
Rh"Miin xM Tack Coat
CAL
40M
$S.00
SM-00
6
TxDOT 340 Hot ewe 16spholie Cmmoo Sarface C uns.Type
Tim
35LDa
s6SAM
S2,2Tb.00
D, 2 IN
7
P-503
Portland Cement Cetncreto Sonata Course, 0 twh
Tbkkeeaas
SY
3".00
$41.80
siso S0.00
B
P-M
And as Pasreing
SE
4M 00
$1.20
$SPC 90
9
T•901
So I f a$one, Seest V lend lift
ACRE
am
skl oo.00
52,aM"
10
L-110
2 Way A Inch UetdwWound Eh tdeal Dwct
LF
20.w
$4ADD
$080.00
Comets Encoaed hee*xlb sTraenthbo A%d
flit* hg
11
L.110
6 Way 4 hch th dargrxanf DacelcW Due%
LF
50"
SM-00
$2,20Q.00
Conatete Erxased, Mrl xft T►aftcl ng And
Bat M ft
12
L-110
I Way 4 Inch Undlzt+g =rtd milt Ek stal Due
LF
so"
$24 00
$12DQOO
Ut titled Around BdA ng Cahta, Inrhxl ag
Tmaching And8adfng
13
L-125
Rerrnmt% MMTy And ReimaA EaCat g Base-
Ell
2.ff0
i70{ DO
S1,4m oo
lmntedTaxnry Edsrn Lii K b3dut3ng Nffiing
Dram Hde And lmta" ®imml Drawn Bad
TOTAL D D
$210.643.75
Page 1