HomeMy WebLinkAboutResolution - 051376N - Paving Improvements - Community Development Work Order - Multiple Locations - 05_13_1976KJ/nh (5 157(p V
RESOLUTION
11BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the CITY OF LUBBOCK, BE and is hereby
authorized and directed to execute for and on behalf of the CITY OF
LUBBOCK an AGREEMENT covering Community Development work order
7511, 1976 Paving Improvement Program, second phase, attached herewith
which shall be spread upon the Minutes of the Council and as spread upon
the Minutes of this Council shall constituteland be a part of this Resolution
as if fully copied herein in detail.
Passed by the City Council this 13th d�_ of May 1976.
r
{
ROY BASS, MAYOR
ATTEST:
z
Treva Phillips, y Secretary -Treasurer
APPROVED AS TO FORM:
Fred O. Senter, Jr., Ck' Attorney
CONSOLIDATED FINAL ESTIMATE
C.D.W.O. 7511
QUANTITIES
S.Y.
S.Y.
Allev
S.Y.
S.Y.
Paving
S.Y.
L.F. Ret.
S.Y.
Concrete
R.R.
Unit &
9" Black
Paving
6" & Dr.
Valley
Slab
Cross -
Sub -Unit Location
Base
6" Base
C & G Channels
Gutter
Removal
ing
2229-41 E: 52nd St. from 39.5'
W. of the E.P.L. of
Ivory to West Raw
Edge of Quirt Ave.
10,387.54
3,846.40
105.08
41.65
2229-42 E. 54th St. from 39.5'
W. of the E.P.L. of
Ivory Ave. to West Raw
Edge of Quirt Ave. 9,603.13 5,013.09
2229-43 E. 56th St. from 39.5'
W. of the E.P.L. of
Ivory Ave. to 150.00'
E. of E.P.L. of
Magnolia Ave. 6,227.45 2,665.26
2229-44 Oak Ave. from 13.00'
S. of S.P.L. of 50th
St. to cul-de-sac S.
of 54th St. 5,697.94 1,139.40
2229-45 Magnolia Ave. from
13.00' S. of S.P.L. of
50th St. to 15' S. of
N.P.L. of 58th St. 8,250.90 4,627.50
2229-46 King Ave. from 13.0'
S. of S.P.L. of 50th
St. to 15' S. of N.P.L.
of 58th St. 8,263.34 4,637.30
41.00
192.79
41.65
41.65
41.65
S.Y.
S.Y. Alley S.Y. S.Y.
Paving S.X. L.F. Ret. S.X. Concrete R.R.
Unit & 9" Black Paving 6" & Dr. Valley Slab Cross
Sub -Unit Location Base 6" Base C & G Channels Gutter Removal ing
2229-55 Ave. "D" from S.L.L.
of 50th St. to S. Raw
Edge of 38th St. 14,735.37 6,865.40 230.01
2229-76 N. Boston Ave. from
S.L.L. of Auburn St.
to 13.0' N. of N.P.L.
of Amherst St. 983.64 633.34 37.21 53.99
2235-1 East Main from 12.00'
E. of W.P.L. of Nutmeg
to 2.0' W. of W.P.L.
of Quirt Ave.
2,473.62
1,841.64
69.86
2229-77
Nutmeg Ave. from 13.0'
N. of N.P.L. of E.
Main St. to 7.00' S.
of N.P.L. of E. 9th
St.
1,736.28
925.3
24.65
2229-78
Oak Ave. from S. Raw
Edge of Parkway Dr.
to 8.00' N. of N.P.L.
of E. 9th St.
6,555.31
2,704.2
240.14
2229-79
E. 5th St. from E.L.L.
of Oak Ave. to 12.00' W.
of W.P.L. of Quirt Ave.
1,943.66
1,031.00
2229-82
Ave. "B" from S.P.L.
of 37th St. to 3.0'
N. of N.P.L. of 40th
St.
1,751.68
1,217.68
27.44
2231-5
Ash Ave. from 20.0'
N. of N.P.L. of E.
Queens St. to 123.91'
N. of S.E. corner,
Block 2, Valley View
Addition.
9,206.28
4,303.1
118.38
2,707.80
S.Y.
S.Y.
Alley
S.Y.
S.Y.
Paving
S.Y.
L.F. Ret.
S.Y.
Concrete
R.R.
Unit &
9" Black
Paving
6" & Dr.
Valley
Slab
Cross -
Sub -Unit Location
Base
6" Base
C & G Channels
Gutter
Removal
ing
2233-3 Indiana Ave. from
S.L.L. of Clovis
Highway to 15.5'
N. of N.P.L. of
Grinnell St.
7,471.70
640.0
4,263.3 393.71
231.17
A-463-5 Greenfair alley from
E. 24th St. to Quirt
Ave.
83.0 28.59
TOTALS 7,471.70 88,456.14 45,796.91 1,210.99 583.03 2,707.80 166.60
*Flood Gauges
3 Ea. @ $50.00
Ea. = $150.00
L.F.
S.Y.
Ea.
C & G
S.Y.
Side-
S.Y. S.Y.
Labor
S.Y.
Re-
Paving
walk
As- N. Ash
To
L.F.
Con-
S.Y. moval
3.5"
& Drive-phalt Ave.
In-
C.Y.
Unit &
12"
crete
Alley &
Black
way
Drive -Drain.
stall
Unclass.
Sub -Unit
Location
C & G
Medians
Paving Repair
Base
(Cons..)
way Slab
Pipe
Borrow
2229-41
Continued
1,268.10
1,320.00
2229-42
Continued
82.25
2229-43
Continued
313.26
2229-44
Continued
1,961.80
2229-45
Continued
2229-46
Continued
2229-55
Continued
131.52
18.44
2229-76
Continued
139.20
2235-1
Continued
52.12
81.67
2229-77
Continued
2229-78
Continued
2229-79
Continued
2229-82
Continued
2231-5
Continued
80.80
74.67
250.20 237.60 1
2233-3
Continued
87.33
248.6
12,457.50
65.08
A-463-5
Continued
3,287.84
TOTALS
3,706.21
87.33
3,287.84 439.92
12,457.50
352.94
268.64 237.60 1
1,320.00
CONSOLIDATED FINAL ESTIMATE
C.D.W.O. 7511
COST ESTIMATE
88,456.14
S.Y.
Paving 6" Base
@
$
2.56
$226,447.72
7,471.70
S.Y.
Paving 9" Black Base
@
$
7.31
$
54.618.13
45.796.91
L.F.
Curb & Gutter (61f)
@
$
2.55
$116,782.12
3,706.21
L.F.
12" Curb & Gutter
@
$
3.00
$
11,118.63
1,210.99
S.Y.
Alley Return & Dr. Channels
@
$
.10.00
$
12,109.90
583.03
S.Y.
Valley Gutter
@
$
10.00
$
5,830.30
2,707.80
S.Y.
Concrete Slab Removal
@
$
2.00
$
5,415.60
166.60
S.Y.
Railroad Crossings
@
$
12.00
$
1,999.20
87.33
S.Y.
Concrete Medians
@
$
'. 7.00
$
611.31
3,287.84
S.Y.
Alley Paving
@
$
13.50
$
44,385.84
439.92
L.F.
C. & G. Removal & Repair
@
$
1.00
$
439.92
12.457.50
S.Y.
3.5" Black Base
@
$
4.90
$
61,041.75
352.94
S.Y.
Concrete Driveway & Sidewalk
@
$
8.10
$
2,858.81
268.64
S.Y.
Asphalt Driveway
@
$
10.00
$
2,686.40
3
Ea.
Flood Gauges
@
$
50.00
$
150.00
237.60
S.Y.
N. Ash Ave. Drain. Slab
@
$
16.15
$
3,837.24
1,320.00
C.Y.
Unclassified Borrow
@
$
0.80
$
1,056.00
1
Ea.
Labor to Install Culvert Pipe
@
$1,050.00
$
1,050.00
CONTRACT COST $552,438.87
CONSOLIDATED FINAL ESTIMATE
C.D.W.O. 7511
COST DISTRIBUTION
Unit & Contract City to
Sub -Unit Cost Contractor
2229-41
$ 41,755.32
$ 41,755.32
2229-42
40,041.84
40,041.84
2229-43
23,678.46
23,678.46
2229-44
23.787.60
23,787.60
2229-45
33,422.23
33,422.23
2229-46
33,479.07
33,479.07
2229-55
58,779.13
58,779.13
2229-76
5,184.34
5,184.34
2235-1
12,440.90
12,440.90
2229-77
7,050.89
7,050.89
2229-78
26,078.70
26,078.70
2229-79
7,604.82
7,604.82
2229-82
7,863.78
7,863.78
2231-5
49,376.85
49,376.85
2233-3
135,805.56
135,805.56
A-463-5
44,883.39
44,883.39
Flood Gauges
150.00
150.00
Unclassified
Borrow-1,056.00
1,056.00
TOTAL
$552,438.87
$552,438.87
Less -
21,300.00
(liquidated damages for delays)(213 days)
Less
- 2,510.00
(liquidated damages requested by HUD)
Less -
-447,442.54
(previously paid by monthly estimate)
Net
- 81,186.33
(final amount due contractor)