Loading...
HomeMy WebLinkAboutResolution - 051376N - Paving Improvements - Community Development Work Order - Multiple Locations - 05_13_1976KJ/nh (5 157(p V RESOLUTION 11BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the CITY OF LUBBOCK, BE and is hereby authorized and directed to execute for and on behalf of the CITY OF LUBBOCK an AGREEMENT covering Community Development work order 7511, 1976 Paving Improvement Program, second phase, attached herewith which shall be spread upon the Minutes of the Council and as spread upon the Minutes of this Council shall constituteland be a part of this Resolution as if fully copied herein in detail. Passed by the City Council this 13th d�_ of May 1976. r { ROY BASS, MAYOR ATTEST: z Treva Phillips, y Secretary -Treasurer APPROVED AS TO FORM: Fred O. Senter, Jr., Ck' Attorney CONSOLIDATED FINAL ESTIMATE C.D.W.O. 7511 QUANTITIES S.Y. S.Y. Allev S.Y. S.Y. Paving S.Y. L.F. Ret. S.Y. Concrete R.R. Unit & 9" Black Paving 6" & Dr. Valley Slab Cross - Sub -Unit Location Base 6" Base C & G Channels Gutter Removal ing 2229-41 E: 52nd St. from 39.5' W. of the E.P.L. of Ivory to West Raw Edge of Quirt Ave. 10,387.54 3,846.40 105.08 41.65 2229-42 E. 54th St. from 39.5' W. of the E.P.L. of Ivory Ave. to West Raw Edge of Quirt Ave. 9,603.13 5,013.09 2229-43 E. 56th St. from 39.5' W. of the E.P.L. of Ivory Ave. to 150.00' E. of E.P.L. of Magnolia Ave. 6,227.45 2,665.26 2229-44 Oak Ave. from 13.00' S. of S.P.L. of 50th St. to cul-de-sac S. of 54th St. 5,697.94 1,139.40 2229-45 Magnolia Ave. from 13.00' S. of S.P.L. of 50th St. to 15' S. of N.P.L. of 58th St. 8,250.90 4,627.50 2229-46 King Ave. from 13.0' S. of S.P.L. of 50th St. to 15' S. of N.P.L. of 58th St. 8,263.34 4,637.30 41.00 192.79 41.65 41.65 41.65 S.Y. S.Y. Alley S.Y. S.Y. Paving S.X. L.F. Ret. S.X. Concrete R.R. Unit & 9" Black Paving 6" & Dr. Valley Slab Cross Sub -Unit Location Base 6" Base C & G Channels Gutter Removal ing 2229-55 Ave. "D" from S.L.L. of 50th St. to S. Raw Edge of 38th St. 14,735.37 6,865.40 230.01 2229-76 N. Boston Ave. from S.L.L. of Auburn St. to 13.0' N. of N.P.L. of Amherst St. 983.64 633.34 37.21 53.99 2235-1 East Main from 12.00' E. of W.P.L. of Nutmeg to 2.0' W. of W.P.L. of Quirt Ave. 2,473.62 1,841.64 69.86 2229-77 Nutmeg Ave. from 13.0' N. of N.P.L. of E. Main St. to 7.00' S. of N.P.L. of E. 9th St. 1,736.28 925.3 24.65 2229-78 Oak Ave. from S. Raw Edge of Parkway Dr. to 8.00' N. of N.P.L. of E. 9th St. 6,555.31 2,704.2 240.14 2229-79 E. 5th St. from E.L.L. of Oak Ave. to 12.00' W. of W.P.L. of Quirt Ave. 1,943.66 1,031.00 2229-82 Ave. "B" from S.P.L. of 37th St. to 3.0' N. of N.P.L. of 40th St. 1,751.68 1,217.68 27.44 2231-5 Ash Ave. from 20.0' N. of N.P.L. of E. Queens St. to 123.91' N. of S.E. corner, Block 2, Valley View Addition. 9,206.28 4,303.1 118.38 2,707.80 S.Y. S.Y. Alley S.Y. S.Y. Paving S.Y. L.F. Ret. S.Y. Concrete R.R. Unit & 9" Black Paving 6" & Dr. Valley Slab Cross - Sub -Unit Location Base 6" Base C & G Channels Gutter Removal ing 2233-3 Indiana Ave. from S.L.L. of Clovis Highway to 15.5' N. of N.P.L. of Grinnell St. 7,471.70 640.0 4,263.3 393.71 231.17 A-463-5 Greenfair alley from E. 24th St. to Quirt Ave. 83.0 28.59 TOTALS 7,471.70 88,456.14 45,796.91 1,210.99 583.03 2,707.80 166.60 *Flood Gauges 3 Ea. @ $50.00 Ea. = $150.00 L.F. S.Y. Ea. C & G S.Y. Side- S.Y. S.Y. Labor S.Y. Re- Paving walk As- N. Ash To L.F. Con- S.Y. moval 3.5" & Drive-phalt Ave. In- C.Y. Unit & 12" crete Alley & Black way Drive -Drain. stall Unclass. Sub -Unit Location C & G Medians Paving Repair Base (Cons..) way Slab Pipe Borrow 2229-41 Continued 1,268.10 1,320.00 2229-42 Continued 82.25 2229-43 Continued 313.26 2229-44 Continued 1,961.80 2229-45 Continued 2229-46 Continued 2229-55 Continued 131.52 18.44 2229-76 Continued 139.20 2235-1 Continued 52.12 81.67 2229-77 Continued 2229-78 Continued 2229-79 Continued 2229-82 Continued 2231-5 Continued 80.80 74.67 250.20 237.60 1 2233-3 Continued 87.33 248.6 12,457.50 65.08 A-463-5 Continued 3,287.84 TOTALS 3,706.21 87.33 3,287.84 439.92 12,457.50 352.94 268.64 237.60 1 1,320.00 CONSOLIDATED FINAL ESTIMATE C.D.W.O. 7511 COST ESTIMATE 88,456.14 S.Y. Paving 6" Base @ $ 2.56 $226,447.72 7,471.70 S.Y. Paving 9" Black Base @ $ 7.31 $ 54.618.13 45.796.91 L.F. Curb & Gutter (61f) @ $ 2.55 $116,782.12 3,706.21 L.F. 12" Curb & Gutter @ $ 3.00 $ 11,118.63 1,210.99 S.Y. Alley Return & Dr. Channels @ $ .10.00 $ 12,109.90 583.03 S.Y. Valley Gutter @ $ 10.00 $ 5,830.30 2,707.80 S.Y. Concrete Slab Removal @ $ 2.00 $ 5,415.60 166.60 S.Y. Railroad Crossings @ $ 12.00 $ 1,999.20 87.33 S.Y. Concrete Medians @ $ '. 7.00 $ 611.31 3,287.84 S.Y. Alley Paving @ $ 13.50 $ 44,385.84 439.92 L.F. C. & G. Removal & Repair @ $ 1.00 $ 439.92 12.457.50 S.Y. 3.5" Black Base @ $ 4.90 $ 61,041.75 352.94 S.Y. Concrete Driveway & Sidewalk @ $ 8.10 $ 2,858.81 268.64 S.Y. Asphalt Driveway @ $ 10.00 $ 2,686.40 3 Ea. Flood Gauges @ $ 50.00 $ 150.00 237.60 S.Y. N. Ash Ave. Drain. Slab @ $ 16.15 $ 3,837.24 1,320.00 C.Y. Unclassified Borrow @ $ 0.80 $ 1,056.00 1 Ea. Labor to Install Culvert Pipe @ $1,050.00 $ 1,050.00 CONTRACT COST $552,438.87 CONSOLIDATED FINAL ESTIMATE C.D.W.O. 7511 COST DISTRIBUTION Unit & Contract City to Sub -Unit Cost Contractor 2229-41 $ 41,755.32 $ 41,755.32 2229-42 40,041.84 40,041.84 2229-43 23,678.46 23,678.46 2229-44 23.787.60 23,787.60 2229-45 33,422.23 33,422.23 2229-46 33,479.07 33,479.07 2229-55 58,779.13 58,779.13 2229-76 5,184.34 5,184.34 2235-1 12,440.90 12,440.90 2229-77 7,050.89 7,050.89 2229-78 26,078.70 26,078.70 2229-79 7,604.82 7,604.82 2229-82 7,863.78 7,863.78 2231-5 49,376.85 49,376.85 2233-3 135,805.56 135,805.56 A-463-5 44,883.39 44,883.39 Flood Gauges 150.00 150.00 Unclassified Borrow-1,056.00 1,056.00 TOTAL $552,438.87 $552,438.87 Less - 21,300.00 (liquidated damages for delays)(213 days) Less - 2,510.00 (liquidated damages requested by HUD) Less - -447,442.54 (previously paid by monthly estimate) Net - 81,186.33 (final amount due contractor)