HomeMy WebLinkAboutResolution - 021276B - Accept Paving Improvements - CCC Co. - Lots 196-230, Subdivider Of Oak Park - 02_12_1976of
ozr?o& 8
RESOLUTION
RESOLUTION ACCEPTING IMPROVEMENTS ON STREETS AND AVENUES AS LISTED
WHEREAS, in conformance with the paving requirement provisions of City
Ordinance 1331, the subdivider of OAK PARK LOTS 196-230, made arrangements wit
COMMERCIAL CONCRETE CONSTRUCTION COMPANY for the construction of paving improv
ments on certain streets dedicated in said subdivision under the provisions of
said Ordinance prior to the recording of the subdivision plat of OAK PARK
LOTS 196-230 including the following streets:
Avenue "W" from its intersection with a line 27.00 feet south of the South Lip
Line of 81st Street to its intersection with the Cul-de-Sac south of 81st Stre
known and designated as New Subdivision Sub -Unit Number 88 of Unit Number 2017
Vernon Avenue from its intersection with a line 27.00 feet south of the South
Lip Line of 81st Street to its intersection with the Cul-de-Sac south of 81st
Street known and designated as New Subdivision Sub -Unit Number 89 of Unit
Number 2017.
Uvalde Avenue from its intersection with a line 27.00 feet south of the South
Lip Line of 81st Street to its intersection with the Cul-de-Sac south of 81st
Street known and designated as New Subdivision Sub -Unit Number 90 of Unit
Number 2017.
North 1/2 of 82nd Street from its intersection with a line 3.00 feet east of
the east property line of alley west of Uvalde Avenue to its intersection with
a line 7.00 feet east of the east property line of alley east of Uvalde Avenue
known and designated as New Subdivision Sub -Unit Number 91 of Unit Number 2017
North 1/2 of 82nd Street from its intersection with a line 15.00 feet east of
the east property line of Waco Avenue to its intersection with a line 3.00 fee
west of the west property line of alley west of Avenue "V" known and designate
as New Subdivision Sub -Unit Number 92 of Unit Number 2017.
AND WHEREAS, the construction of the above improvements on the above -
mentioned streets was performed under the supervision of the City Engineer, an
said improvements have been completed and have been inspected and found to hav
been constructed in accordance with City specifications and in accordance with
the provisions of City Ordinance 1331.
THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS.
I.
That the improvements on said portions of the abovementioned streets
be and the same are hereby accepted and the City Engineer be and he is hereby
authorized to direct the payment of the City's portion of the cost and to
release escrow money.
passage.
II.
This resolution shall take effect and be in force from and after its
PASSED AND APPROVED THIS 12th DAY OF FEBRUARY, 1976.
Roy Ba s, Mayor
ATTEST:
t
Treva Phillips, City y,/ecretary
APPROVED:
0
Watson, City Engineer
0. Senter, Jr., City
y
Consolidated Final Estimate
Oak Park Lots 196 - 230
Accepted February 12, 1976
UANTITIES
S.Y. S.Y. L.F. S.Y.
Unit & Paving L.F. Alley Alley Drainage
Sub -Unit Location 6" Base C & G Return Grading Slab
2017-88 Avenue "W" from 27-feet 1271.80 708.98 22.78
S. of SLL of 81st St. to
Cul-de-Sac S. of 81st St.
2017-89 Vernon Avenue from 27 ft.1271.80
S. of SLL of 81st St. to
Cul-de-Sac S. of 81st St.
2017-90 Uvalde Avenue from 27 ft.1271.80
S. of SLL of 81st St. to
Cul-de-Sac S. of 81st St.
2017-91 N1/2 of 82nd St. from
3 feet E. of EPL of
Alley W. of Uvalde Ave.
to 7' E. of the EPL of
the alley E. of Uvalde
Ave. (concrete only)
2017-92 N1/2 of 82nd St. from
15 ft. E. of EPL of Waco
Avenue to 3 ft. W. of
WPL of alley W. of
Ave. V(concrete only)
TOTAL 3815.40
COST DISTRIBUTION
627.40
626.80 930.00
303.62 22.42
697.54 44.84
2964.34 67.26 930.00
22.78
Unit &
Contract
Property
Sub -Unit
Cost
Owner Cost
2017-88
$6,109.35
$6109.35
2017-89
5,603.49
5603.49
2017-90
6,066.78
6066.78
2017-91
1,123.15
1123.15
2017-92
2,503.65
2503.65
TOTAL
$21,406.42
$21406.42
COST ESTIMATE
3,815.40
S.Y.
Paving 6" Base
2,964.34
L.F.
Curb & Gutter
67.26
S.Y.
Alley Return
22.78
S.Y.
Drainage Channel
930.00
L.F.
Alley Grading
@$3.00
$11,446.20
@$2.85
$
8,448.37
@11.50
$
773.49
@12.00
$
273.36
@$ .50
$
465.00
CONTRACT COST $21,406.42