HomeMy WebLinkAboutResolution - 012276M - CO#4 To Agreement - Page & Wirtz Co - Air Terminal Building, LRA - 01_22_1976KJ/nh
RESOLUTION
oi220l, m
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the MAYOR of the CITY OF LUBBOCK, BE and is hereby
authorized and directed to execute for and on behalf of the CITY OF
LUBBOCK, CHANGE ORDER #4 to the AGREEMENT between the CITY
OF LUBBOCK and PAGE & WIRTZ CONSTRUCTION COMPANY, cover-
ing the new AIR TERMINAL BUILDING to provide for changes in doors
at the request of the airlines, attached herewith which shall be spread
upon the Minutes of the COUNCIL and as spread upon the Minutes of this
COUNCIL shall constitute and be a part of this Resolution as if fully
copied herein in detail.
Passed by the City Council this 22nd day of January 1976.
ROY BASS, MAYOR
ATTEST:
Treva Phillips, City ejcretary-Treasurer
APPROVED AS TO FORM:
r, jr.,
CHANGE
ORDER
too
U ORO)ECT: Lubbock Regional Airport Terminal Building
\ (name, address) Lubbock, Texas
TO (Contractor)
ARCHITECT'S PROJECT NO: 3-70-1
Page & Wirtz Const. Co. CONTRACT FOR• $ 5,804,174.00
P.O. Box 10402
Lubbock, Texas 79408 -
j CONTRACT DATE:• September .13, 1973
You are directed to make the following changes in 'thip Contract:
1.`Reverse four (4) each overhead doors at landside of
airlines apron level operations area $ 1,200.00
2. Install 16"x48" access panel to Continental's apron
level baggage conveyor chase.. 200.00
3. Install 24"x48" plate glass vision window at Texas
International's apron.level operations area. 406.00
4. Install 3-Ox7-Oxl 3/4 h.m. door at Texas International's
apron level operations area. 7.62.00
5. Move conveyor disconnect panel'from South wall of
operations area to the adjacent East walla 299.00
I 6. Install 3-0x7-0x1 3/4 h.m. door with half lite in
the cased opening between office 12F and 012A. 350.00
7. Construct two openings in`Braniff's.main level back.
wall for conveyor drive motors. 100.00
TOTAL $ _3,317.00
The original Contract Sum was $ 5, 8 2 4, 0 7 8 .0 0
804.00
20,
Net change by previous Change Orders $
The Contract Sum prior to this Change Order was . . ... . . . . , $ 5 , 8 0 4 ,17 4 .0 0 .
The Contract Sum will be (increased) (d r d) (uTiMQ d)' by this Change Order. . . $ 3,317.00
The new Contract Sum including this Change Order will be . . . . , , , $ 5,807,491.00
The Contract Time will be (*&VaY5LVd) WMM) (unchanged) by ( -0—) Days.
The Date of Completion as of the date of this Change Order therefore is unchanged .
Whitaker & Hall A/E Page & Wirtz Const. Co. The City of Lubbock
J'ffi'90th St. cP"T5"c§%x 1040.2 QV*bUbbock, Texas
Address Add s Address
Lubbock. Texas,79412 Mlbock, Texas 79408
DATE
OWNER
ARCHITECT
CONTRACTOR
❑
❑
FIELD
❑
OTHER
30, 1975 DATE
DATE J A N 2 2 1976