Loading...
HomeMy WebLinkAboutResolution - 012276M - CO#4 To Agreement - Page & Wirtz Co - Air Terminal Building, LRA - 01_22_1976KJ/nh RESOLUTION oi220l, m BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the MAYOR of the CITY OF LUBBOCK, BE and is hereby authorized and directed to execute for and on behalf of the CITY OF LUBBOCK, CHANGE ORDER #4 to the AGREEMENT between the CITY OF LUBBOCK and PAGE & WIRTZ CONSTRUCTION COMPANY, cover- ing the new AIR TERMINAL BUILDING to provide for changes in doors at the request of the airlines, attached herewith which shall be spread upon the Minutes of the COUNCIL and as spread upon the Minutes of this COUNCIL shall constitute and be a part of this Resolution as if fully copied herein in detail. Passed by the City Council this 22nd day of January 1976. ROY BASS, MAYOR ATTEST: Treva Phillips, City ejcretary-Treasurer APPROVED AS TO FORM: r, jr., CHANGE ORDER too U ORO)ECT: Lubbock Regional Airport Terminal Building \ (name, address) Lubbock, Texas TO (Contractor) ARCHITECT'S PROJECT NO: 3-70-1 Page & Wirtz Const. Co. CONTRACT FOR• $ 5,804,174.00 P.O. Box 10402 Lubbock, Texas 79408 - j CONTRACT DATE:• September .13, 1973 You are directed to make the following changes in 'thip Contract: 1.`Reverse four (4) each overhead doors at landside of airlines apron level operations area $ 1,200.00 2. Install 16"x48" access panel to Continental's apron level baggage conveyor chase.. 200.00 3. Install 24"x48" plate glass vision window at Texas International's apron.level operations area. 406.00 4. Install 3-Ox7-Oxl 3/4 h.m. door at Texas International's apron level operations area. 7.62.00 5. Move conveyor disconnect panel'from South wall of operations area to the adjacent East walla 299.00 I 6. Install 3-0x7-0x1 3/4 h.m. door with half lite in the cased opening between office 12F and 012A. 350.00 7. Construct two openings in`Braniff's.main level back. wall for conveyor drive motors. 100.00 TOTAL $ _3,317.00 The original Contract Sum was $ 5, 8 2 4, 0 7 8 .0 0 804.00 20, Net change by previous Change Orders $ The Contract Sum prior to this Change Order was . . ... . . . . , $ 5 , 8 0 4 ,17 4 .0 0 . The Contract Sum will be (increased) (d r d) (uTiMQ d)' by this Change Order. . . $ 3,317.00 The new Contract Sum including this Change Order will be . . . . , , , $ 5,807,491.00 The Contract Time will be (*&VaY5LVd) WMM) (unchanged) by ( -0—) Days. The Date of Completion as of the date of this Change Order therefore is unchanged . Whitaker & Hall A/E Page & Wirtz Const. Co. The City of Lubbock J'ffi'90th St. cP"T5"c§%x 1040.2 QV*bUbbock, Texas Address Add s Address Lubbock. Texas,79412 Mlbock, Texas 79408 DATE OWNER ARCHITECT CONTRACTOR ❑ ❑ FIELD ❑ OTHER 30, 1975 DATE DATE J A N 2 2 1976