HomeMy WebLinkAboutResolution - 032976R - CO#10 To Agreement - Page & Wirtz Co. - Terminal Building, LRA - 03_29_1976KJ/ dw RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the MAYOR of the CITY OF LUBBOCK, BE and is hereby authorized and directed to execute for and on behalf of the CITY OF LUBBOCK, CHANGE ORDER NO. 10 concerning restaurant wiring and flooring changes to the AGREEMENT between the CITY OF LUBBOCK and PAGE & WIRTZ CONSTRUCTION covering the construction of the new terminal building at LUBBOCK REGIONAL AIR TERMINAL, attached herewith which shall be spread upon the Minutes of the COUNCIL and as .spread upon the Minutes of this COUNCIL shall constitute and be a part of this Resolution as if fully copied herein in detail. Passed by the City Council this 29thday of Ma rch , 1976. MY BASS, MAYOR ATTEST: Treva Phillips, City ecretary-Treasurer Y APPROVED AS TO FORM: red O. Senter, Jr., Cit5.Qkforney CHANGE OWNER El ARCHITECT El Y ORDER CONTRACTOR a LD OTHER PROJECT: LUBBOCK REGIONAL AIRPORT (Kitchen/Restaurant Area) (name, address) Terminal Building Lubbock, Texas TO (Contractor) ARCHITECT'S PROJECT NO: 3-70-1 Page & Wirtz Const. Co. P.O. Box 10402 CONTRACT FOR: $:5,875,487.30- Lubbock, Texas CONTRACT DATE:Segtember 13, 1973 You are directed to make the following changes in this Contract: Modify Restaurant, Kitchen and Food Service Areas in Accordance with Drawings numbered: Pi bated Jan. 23, 1976 (Main level plbg. plans) P2 Dated Jan. 23, 1976 (Apron level.plbg. plans) M1 Dated Jan. 23, 1976 (Main level Mech. plans) M2 Dated Jan. 23, 1976 (Apron level Mech. plans) M3 Dated Mar. 11, 1976 (Exhaust hood details)._-. k RC1 Dated'Ja.n. 23,-1976 (Main level reflected clg. plan) RC2 Dated Jan. 23, 1976 (Apron level reflected clg. plan) ' SEE ATTACHED EXHIBIT "A" TO CHANGE ORDER NUMBER NINE (9) $ 170,674.00 The original Contract Sum was . . . . . . . . . ... . . . $ 5,824,978.00 Net change by previous Change Orders . . . . . . .. . . .. $ 50,509.00 The Contract Sum prior to this Change Order was . . . . . . . . . $ 5,875,487.30 The Contract Sum will be (increased) (&UrMotl) (LW%bW19M by this Change Order . . $ 170,674.00 The new Contract Sum including this Change Order will be . . . . . . . . . . $ 6,046,161.30 The Contract Time will be X%E- SFRM) (60J=—M) (unchanged) by ( —0—) Days. The Date of Completion as of the date of this Change Order therefore is unchanged WHITAKER & HALL A/E PAGE & WIRTZ CONST . CO. CITY OF LUBBOCK ARCHITECT CONTRACTOR 50th Street CONTRACTORP_O. Box 10402 OWNER Xubbock, Texas Address Lubbock, Texas Address Lubbock, Texas Address' march` 2'f, 1�76 March 22 1976 DATE Z 1 DATE oAT1 'MAR 2 9 1916 �► ,. DATE OF ISSUANCE March 22, 1976 CHANGE ORDER NUMBER DIIVE (9 ) ONE PACE EXHIBIT "A" TO CHANGE ORDER #9 KITCHEN/RESTAURANT - Add'l. Construction Cost MAIN LEVEL Cerama-gard Clg. $ 2,16500 Quarry tile floor & base. 5,342.00 Cer. the wainscot 3,902.00 Tape, bed, epoxy paint 2,241.00 Drywall 1,428.00 Millwork (vert: wood wall) 1,237.00 Gen. Constr. to accomodate plbg. & hvac 5,424.00 H.M. door & frame 243.00 Finish hdwr. 137.00 Electrical 700 AMP service 11,278.00 wiring to equipmt. 10,789.00 kitchen lighting. 2,664t00 metering 101406.00 Plumbing 18,191.00 Exhaust systems 27,279.00 Kitchen/Rest. A/C 10,189.00 Plaster Repair 849.00 Fire Extinguisher (hood) 1,431.00 SUB TOTAL $106,195.0( KITCHEN/RESTAURANT - Add'1. Construction Cost con't. • APRON LEVEL Quarry tile floor & base $12,448.00 Ceramic tile (toilets) 998.00 Tape, bed, epoxy paint 2,857.00 Cerama-gard clg. 5,801.00 Drywall 2,777.00 H.M. doors & frames 745.00 Masonry 298.00 , Finish hdwr. 233.00 Toilet stalls&•accessories 1,378.00 Masonry removal .118.00 Conc. removal & patch 1,049.00 Plumbing 5,222.00 Hvac 22,518.00 _ Sleeve gas lines 695.00 Flyfans 1,861.00 Electrical 5,481.00 SUB TOTAL $ 64,479.0 TOTAL MIT. $17 G , 6 74 - 0