HomeMy WebLinkAboutResolution - 032976R - CO#10 To Agreement - Page & Wirtz Co. - Terminal Building, LRA - 03_29_1976KJ/ dw
RESOLUTION
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the MAYOR of the CITY OF LUBBOCK, BE and is hereby
authorized and directed to execute for and on behalf of the CITY OF
LUBBOCK, CHANGE ORDER NO. 10 concerning restaurant wiring and
flooring changes to the AGREEMENT between the CITY OF LUBBOCK and
PAGE & WIRTZ CONSTRUCTION covering the construction of the new
terminal building at LUBBOCK REGIONAL AIR TERMINAL, attached
herewith which shall be spread upon the Minutes of the COUNCIL and as
.spread upon the Minutes of this COUNCIL shall constitute and be a part of
this Resolution as if fully copied herein in detail.
Passed by the City Council this 29thday of Ma rch , 1976.
MY BASS, MAYOR
ATTEST:
Treva Phillips, City ecretary-Treasurer
Y
APPROVED AS TO FORM:
red O. Senter, Jr., Cit5.Qkforney
CHANGE OWNER El
ARCHITECT El
Y ORDER CONTRACTOR a
LD
OTHER
PROJECT: LUBBOCK REGIONAL AIRPORT (Kitchen/Restaurant Area)
(name, address) Terminal Building
Lubbock, Texas
TO (Contractor)
ARCHITECT'S PROJECT NO: 3-70-1
Page & Wirtz Const. Co.
P.O. Box 10402 CONTRACT FOR: $:5,875,487.30-
Lubbock, Texas
CONTRACT DATE:Segtember 13, 1973
You are directed to make the following changes in this Contract:
Modify Restaurant, Kitchen and Food Service Areas in Accordance
with Drawings numbered:
Pi bated Jan. 23, 1976 (Main level plbg. plans)
P2 Dated Jan. 23, 1976 (Apron level.plbg. plans)
M1 Dated Jan. 23, 1976 (Main level Mech. plans)
M2 Dated Jan. 23, 1976 (Apron level Mech. plans)
M3 Dated Mar. 11, 1976 (Exhaust hood details)._-. k
RC1 Dated'Ja.n. 23,-1976 (Main level reflected clg. plan)
RC2 Dated Jan. 23, 1976 (Apron level reflected clg. plan) '
SEE ATTACHED EXHIBIT "A" TO CHANGE ORDER NUMBER NINE (9)
$ 170,674.00
The original Contract Sum was . . . . . . . . . ... . . . $ 5,824,978.00
Net change by previous Change Orders . . . . . . .. . . .. $ 50,509.00
The Contract Sum prior to this Change Order was . . . . . . . . . $ 5,875,487.30
The Contract Sum will be (increased) (&UrMotl) (LW%bW19M by this Change Order . . $ 170,674.00
The new Contract Sum including this Change Order will be . . . . . . . . . . $ 6,046,161.30
The Contract Time will be X%E- SFRM) (60J=—M) (unchanged) by ( —0—) Days.
The Date of Completion as of the date of this Change Order therefore is unchanged
WHITAKER & HALL A/E PAGE & WIRTZ CONST . CO. CITY OF LUBBOCK
ARCHITECT CONTRACTOR
50th Street CONTRACTORP_O. Box 10402 OWNER Xubbock, Texas
Address Lubbock, Texas Address Lubbock, Texas Address'
march` 2'f, 1�76 March 22 1976
DATE Z 1 DATE oAT1 'MAR 2 9 1916 �► ,.
DATE OF ISSUANCE March 22, 1976 CHANGE ORDER NUMBER DIIVE (9 )
ONE PACE
EXHIBIT "A" TO CHANGE ORDER #9
KITCHEN/RESTAURANT - Add'l. Construction
Cost
MAIN LEVEL
Cerama-gard Clg.
$ 2,16500
Quarry tile floor & base.
5,342.00
Cer. the wainscot
3,902.00
Tape, bed, epoxy paint
2,241.00
Drywall
1,428.00
Millwork (vert: wood wall)
1,237.00
Gen. Constr. to accomodate plbg. & hvac
5,424.00
H.M. door & frame
243.00
Finish hdwr.
137.00
Electrical
700 AMP service
11,278.00
wiring to equipmt.
10,789.00
kitchen lighting.
2,664t00
metering
101406.00
Plumbing
18,191.00
Exhaust systems
27,279.00
Kitchen/Rest. A/C
10,189.00
Plaster Repair
849.00
Fire Extinguisher (hood)
1,431.00
SUB TOTAL
$106,195.0(
KITCHEN/RESTAURANT - Add'1. Construction
Cost con't.
•
APRON LEVEL
Quarry tile floor & base
$12,448.00
Ceramic tile (toilets)
998.00
Tape, bed, epoxy paint
2,857.00
Cerama-gard clg.
5,801.00
Drywall
2,777.00
H.M. doors & frames
745.00
Masonry
298.00
,
Finish hdwr.
233.00
Toilet stalls&•accessories
1,378.00
Masonry removal
.118.00
Conc. removal & patch
1,049.00
Plumbing
5,222.00
Hvac
22,518.00
_ Sleeve gas lines
695.00
Flyfans
1,861.00
Electrical
5,481.00
SUB TOTAL
$ 64,479.0
TOTAL MIT.
$17 G , 6 74 - 0