Loading...
HomeMy WebLinkAboutResolution - 101377B - Pavement Improvement - Lubbock Asphalt Products Inc - Methodist Hospital Add - 10_13_1977Ala Cf1T TTTTO'KT 7?B RESOLUTION ACCEPTING IMPROVEMENTS ON A PORTION OF A STREET AS LISTED BELOW: WHEREAS, in conformance with the paving requirement provisions of City Ordinance 1331, the subdivider of Methodist Hospital Addition, Lot 2, made arrange- ments with Lubbock Asphalt Products, Inc. for the construction of paving improve- ments on a certain street dedicated in said subdivision under the provisions of said Ordinance prior to the recording of the subdivision plat of Methodist Hospital Addition, Lot 2 including the following street: 20th Street - Closing street stub on West side of Joliet Avenue at 20th Street and Alley Stub construction on North side of 21st Street 80 feet West of west property line of Joliet Avenue. Sub -Unit 2021-71. AND WHEREAS, the construction of the above improvements on the above - mentioned street was performed under the supervision of the City Engineer, and said improvements have been completed and have been inspected and found to have been constructed in accordance with City specifications and in accordance with the provisions of City Ordinance 1331. THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS. I. That the improvements on said portions of the abovementioned street be and the same are hereby accepted and the City Engineer be and he is hereby authorized to direct the payment of the City's portion of the cost and to release escrow money. passage. II. This resolution shall take effect and be in force from and after its PASSED AND APPROVED THIS 13TH DAY OF OCTOBER, 1977. Roy Bas , Mayor ATTEST: Trev Ph'll Ci y Se etary APPR D: Watson, City Engineer AYYKUVED: Ap— red O. Senter, Jr.,' City At rney A CONSOLIDATED FINAL ESTIMATE . Methodist Hospital Addition, Lot 2 Accepted October 13, 1977 QUANTITIES . S.Y. L.F. S.Y S.Y. Unit & Asphalt C & G L.F. Alley Resur- Sub-Unit Location Removal Removal C & G Return facing 2021-71 20th Street and Joliet Avenue Street Stub Closing and Alley Stub Constuc- tion. 74.87 65.42 81.42 20.20 40.89 COST ESTIMATE 74.87 S.Y. Asphalt Removal @ $ 1.50 $112.31 81.42 L.F. Curb & Gutter @ $ 3.65 $297.18 20.20 S.Y. Alley Return @ $14.50 $292.90 40.89 S.Y. Resurface @ $ 3.00 $122.67 65.42 L.F. Curb & Gutter Removal @ $ 1.50 $ 98.13 CONTRACT COST $923.19 COST DISTRIBUTION Unit & Contract Property Sub -Unit Cost Owner Cost 2021-71 $923.19 $923.19