RESOLUTION ACCEPTING IMPROVEMENTS ON PORTIONS OF STREETS AND AVENUE AS
LISTED BELOW:
WHEREAS, in conformance with the paving requirement provisions of City
Ordinance 1331, the subdivider of University Pines Addition, Lots 126-197., made
arrangements with Kerr Construction Company for the construction of paving
improvements on certain streets dedicated in said subdivision under the provisions
of said Ordinance prior to the recording of the subdivision plat of University
Pines Addition including the following streets:
South !� of 90th Street from its intersection with a line 7.00 feet west
of west property line of Alley west of Elgin Avenue to its intersection
with a line 16.00 feet east of east property line of Elgin Avenue (Con-
crete Only) known and designated as New Subdivision Sub -Unit Number 89
of Unit Number 2019.
91st Street from its intersection with a line 7.00 feet west of west
property line of Alley west of Elgin Avenue to its intersection with
the :southwest: lip line of Canton Avenue known and designated as New
Subdivision Sub -Unit Number 90 of Unit Number 2019.
92nd Street from its intersection with a line 7.00 feet west of west
property line of Alley west of Elgin Avenue to its intersection with
the northwest lip line of Canton Avenue known and designated as New
Subdivision Sub -Unit Number 91 of Unit Number 2019.
Elgin Avenue from its intersection with the south lip line of 90th
Street to its intersection with the north lip line of 91st Street
known and designated as New Subdivision Sub -Unit Number 92 of Unit
Number 2019.
Elgin Avenue from its intersection with the south lip line of 91st
Street to its intersection with the north lip line of 92nd Street
known and designated as New Subdivision Sub -Unit Number 93 of Unit
Number 2019.
Elgin Avenue from its intersection with the south lip line of 92nd
Street to its intersection with a line 7.00 feet south of south property
line of Alley south of 92nd Street known and designated as New Sub-
division Sub -Unit Number 94 of Unit Number 2019.
93rd Street from its intersection with a line 60.00 feet west of west
property line of Lot 140 to its intersection with the west lip line
of Canton Avenue known and designated as New Subdivision Sub -Unit
Number 95 of Unit Number 2019.
Canton Avenue from its intersection with the south lip line of 91st
Street to its intersection with the southeast property line of Lot 139
known and designated as New Subdivision Sub -Unit Number 96 of Unit
Number 2019.
Canton Avenue from its intersection with a line 7.00 feet north of north
property line of Alley north of 91st Street to its intersection with the
northeast end of radius of Lot 127 known and designated as New Subdivisv
Sub -Unit Number 97 of Unit Number 2019.
91st Street drainage channels into Lake Number 86 known and designated
as New Subdivision Sub -Unit Number 97-A of Unit Number 2019.
91st Street from its intersection with the northeast end of radius of
Lot 127 to its intersection with the southeast property line of Lot
126 known and designated as New Subdivision Sub -Unit Number 98 of Unit
Number 2019.,
AND WHEREAS, the construction of the above improvements on the above -
mentioned streets was performed under the supervision of the City Engineer, and
said improvements have been completed and have been inspected and found to have
been constructed in accordance with City specifications and in accordance with the
provisions of City Ordinance 1331.
THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS.
I.
That the improvements on said portions of the abovementioned streets be
and the same are hereby accepted"and the City Engineer be and he is hereby
authorized to direct the payment of the City's portion of the cost (and to release
escrow money).
II.
This resolution shall take effect and be in force from and after its
passage.
-PASSED AND APPROVED THIS 10TH DAY OF MARCH, 1977.
INS
Roy Bass, Mayor
ATTEST:
Treva Phillips, City cretary
APPROVED:
Wilfo atson, City Engineer
APPROVED:
AFFr2edO.ZSeantere,dJr. , City '�
CONSOLIDATED FINAL ESTIMATE
University Pines Addiiton, Lots 126-197
Accepted March 10, 1977
QUANTITIES
S.Y. 6" S.Y. S.Y. 12"
Unit & Paving L.F. Alley Valley C & G
Sub -Unit Location 6" Base C & G Return Gutter L.F.
NS 2019-89 South 1 of 90th Street
from 5'E. of the W.P.L.
of the alley west of Elgin
Avenue to 16'E. of the
E.P.L. of Elgin Avenue
(Concrete Only). 132.60 16.77
NS 2019-90 91st Street from 5'E. of
the W.P.L. of the alley west
of Elgin Avenue to the S.W.
Lip Line of Canton Avenue.
Developer Quantities 4,094.15 2,061.25 33.53 44.76
City's Extra Width 35.56
NS 2019-91 92nd Street from 5'E. of
the W.P.L. of the alley
west of Elgin Avenue to the
N.W. Lip Line of Canton
Avenue.
Developer Quantities 2,981.23 1,532.71 33.53 52.54
City's Extra Width 35.56
NS 2019-92 Elgin Avenue from the S.L.L.
of 90th Street to the N.L.L.
of 91st Street.
Developer Quantities 1,004.64 572.50 19.09
City's Extra Width 292.22
NS 2019-93 Elgin Avenue from the S.L.L.
of 91st Street to the N.L.L.
of 92nd Street.
Developer Quantities 1,008.20 574.50 19.09
City's Extra Width 293.33
NS 2019-94 Elgin Avenue from the S.L.L.
of 92nd Street to 7' South of
the S.P.L. of the alley South
of 92nd Street.
Developer Quantities 564.54 ;319.96 19.09
City's Extra Width 165.56
NS 2019-95 93rd Street from 60'W. of the
W.P.L. of Lot 140 to the W.L.L.
of Canton Avenue. 414.41 236.57
S.Y.
6"
S.Y.
S.Y.
1211
Unit &
Paving
L.F.
Alley
Valley
C & G
Sub -Unit
Location
6" Base
C & G
Return
Gutter
L.F.
NS 2019--96
Canton Avenue from the
S.L.L. of 91st Street to
the S.E.P.L. of Lot 139.
3,183.28
1,611.73
67.27
160.64
NS 2019-97
Canton Avenue from 7'N.
of the N.P.L. of the
alley N. of 91st Street
to the N.E. end of radius
of Lot 127.
700.04
251.29
79.19
71.69
NS 2019-97-A
91st Street drainage
channels into Lake #86.
462.93
103.42
71.69
NS 2019-98 91st Street from the.
N.E. end of radius of Lot
127 to the S.E.P.L. of
Lot 126. 601.87
Total Developer Quantities 14,552.36
Total City Extra Width 822.23
285.10
8,041.14 390.98 257.94 143.38
CONSOLIDATED FINAL ESTIMATE
University Pines Addition, Lots 126-197
Accepted March 10, 1977
COST ESTIMATE
14,552.36
S.Y.
Paving 6" Base
@
$ 2.05
$29,632.34
822.23
S.Y.
Paving 6" Base (City)
@
$ 2.05
$ 1,685.57
8,041.14
L.F.
6" Curb & Gutter
@
$ 4.05
$32,566.62
390.98
S.Y.
Alley Return & Drainage
Channel @
$10.90
$ 4,261.68
257.94
S.Y.
Valley Gutter
@
$ 5.00
$ 1,289.70
143.38
L.F.
12" Curb & Gutter
@
$ 4.80
$ 688.22
CONTRACT COST
$70,324.13
COST DISTRIBUTION
Unit &
Contract
Property
City to
Sub -Unit
Cost
Owner Cost
Contractor
NS
2019-89
$ 719.82
$ 719.82
NS
2019-90
$17,403.25
$17,330.35
$ 72.90
NS
2019-91
$13,020.07
$12,947.17
$ 72.90
NS
2019-92
$ 5,185.27
$ 4,586.22
$ 599.05
NS
2019-93
$ 5,202.95
$ 4,601.62
$ 601.33
NS
2019-94
$ 3,000.63
$ 2,661.23
$ 339.40
NS
2019-95
$ 1,807.65
$ 1,807.65 .
NS
2019-96
$14,589.67
$14,589.67
NS
2019-97
$ 3,660.08
$ 3,660.08
NS
2019-97-A
$ 3,346.26
$ 3,346.26
NS
2019-98
$ 2,388.48
$ 2,388.48
TOTAL
$70,324.13
$68,638.55
$1,685.58