HomeMy WebLinkAboutResolution - 022477O - Accept Paving Improvements - WD Turner Co - Lots 6-25, Clovis Road Addition - 02_24_1977RF.gnT.TTTT0W
RESOLUTION ACCEPTING IMPROVEMENTS ON A PORTION OF A STREET AS LISTED
BELOW:
WHEREAS, in conformance with the paving requirement provisions of City
Ordinance 1331, the subdivider of Clovis Road Addition, Lots 6-25, made arrangements
with W.D. Turner Construction Company for the construction of paving improvements
on certain streets dedicated in said subdivision under the provisions of said
Ordinance prior to the recording of the subdivision plat of Clovis Road Addition,
Lots 6-25 including the following street:
NS 2020-36 North Nashville Avenue from south lip line of U.S. 84 (Clovis
Road) to 13.5 feet North of north property line of Princeton
Street.
AND WHEREAS, the construction of the above improvements on the above -
mentioned street was performed under the supervision of. the City Engineer, and said
improvements have been completed and have been inspected and found to have been
constructed in accordance with City specifications and in accordance with the
provisions of City Ordinance 1331.
THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS.
I.
That the improvements on said portions of the abovementioned street be
and the same are hereby accepted and the City Engineer be and he is hereby authori
to direct the payment of the City's portion of the cost (and to release escrow
money).
II.
This resolution shall take effect and be in force from and after its
passage.
-�PASSED'AND APPROVED THIS
ATTEST:
Treva Phillips, C y Secretary
APP 0 -D:
it d Watson, City Engineer
24TH DAY OF FEBRUARY, 1977.
Roy Bass, Mayor
CONSOLIDATED FINAL ESTIMATE
CLOVIS ROAD ADDITION
Accepted February 24, 1977
QUANTITIES
S.Y.
L.F.
S.Y.
Alley
C & G
Unit &
Paving
L.F. Return &
Removal &
Sub -Unit Location
6" Base
C & G Drainage Channels
Pavement Repair
NS 2020-36 N. Nashville Avenue
from S.L.L. of U.S. 84
(Clovis Road) to 13.5'
N. of N.P.L. of Prince-
ton Street.
5,724.04
2,065.44 416.80
111.00
COST ESTIMATE
5,724.04
S.Y.
Paving 6" Base
@
$ 2.90
$16,599.72
2..065.44
L.F.
Cub & Gutter
@
$ 3.22
$ 6,650.72
416.80
S.Y.
Alley Return & Drainage Channels
@
$12.00
$ 5,001.60
111.00
L.F.
C & G Removal & Pavement Repair
@
$ 0.01
$ 1.11
CONTRACT COST $28,253.14
COST DISTRIBUTION
Unit & Contract Developer City to
Sub -Unit Cost Cost Contractor
NS 2020-36 $28,253.14 $28,253.14