HomeMy WebLinkAboutResolution - 011377C - Pavement Improvements - Kerr Construction Co - Park Place Addition - 01_13_1977RESOLUTION
RESOLUTION ACCEPTING IMPROVEMENTS ON (A PORTION) OF (A STREET) AS
LISTED BELOW:
WHEREAS, in 'conformance with the paving requirement provisions of City
Ordinance 1331, the subdivider of Park Place Addition, Lots 1-10, made arrangements
with Kerr Construction Company for the construction of paving improvements on
certain (street) or (streets) dedicated in said subdivision under the provisions of
said Ordinance prior to the recording of the subdivision plat of Park Place
Addition, Lots 1-10 including the following (street):
17th Place from the east lip line of Chicago Avenue to south end of CUL-DE-SAC
East of Chicago Avenue. Designated as New Sub -Unit 2019-99.
AND WHEREAS, the construction of the above improvements on the above -
mentioned (street) was performed under the supervision of the City Engineer, and
said improvements have been completed and have been inspected and found to have
been constructed in accordance with City specifications and in accordance with
the provisions of City Ordinance 1331.
THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS.
I.
That the improvements on said portions of the abovementioned (street)
be and the same are hereby accepted and the City Engineer be and he is hereby
authorized to direct the payment of the City's portion of the cost (and to release
escrow money).
II.
This resolution shall take effect and be in force from and after its
passage._:. .
PASSED AND APPROVED THIS 13TH DAY OF JANUARY, 1977.
Lam It
Roy B Mayor
ATTEST: t
Treva Philips, City Secretary
APP VED"Watson, City Engineer
AP�VED:
red 0. Senter, Jr., City orney
CONSOLIDATED FINAL ESTIMATE
PARK PLACE ADDITION, LOTS 1-10
Accepted January 13, 1977
UANTITIES
L.F.
S.Y.
S.Y.
C.& G
Unit &
Paving L.F.
Alley
Removal
Sub -Unit Location
6" Base C & G
Return
& Repair
NS 2019-99 17th Place from E.L.L. of
Chicago Avenue to South
end of CUL-DE-SAC East of
Chicago Avenue.
1,626.95 860.57
40.40
120.00
COST ESTIMATE
1,626.95 S.Y. Paving 6" Base @ $ 3.15 $5,124.89
860.57 L.F. Curb & Gutter @ $ 3.10 $2,667.77
40.40 S.Y. Alley Return @ $11.50 $ 464.60
120.00 L.F. C & G Removal & Pavement Repair @ $ 1.50 $ 180.00
CONTRACT COST $8,437.26
COST DISTRIBUTION
Unit & Contract Developer
Sub -Unit Cost Cost
NS 2019-99 $8,437.26 $8,437.26