Loading...
HomeMy WebLinkAboutResolution - 011377C - Pavement Improvements - Kerr Construction Co - Park Place Addition - 01_13_1977RESOLUTION RESOLUTION ACCEPTING IMPROVEMENTS ON (A PORTION) OF (A STREET) AS LISTED BELOW: WHEREAS, in 'conformance with the paving requirement provisions of City Ordinance 1331, the subdivider of Park Place Addition, Lots 1-10, made arrangements with Kerr Construction Company for the construction of paving improvements on certain (street) or (streets) dedicated in said subdivision under the provisions of said Ordinance prior to the recording of the subdivision plat of Park Place Addition, Lots 1-10 including the following (street): 17th Place from the east lip line of Chicago Avenue to south end of CUL-DE-SAC East of Chicago Avenue. Designated as New Sub -Unit 2019-99. AND WHEREAS, the construction of the above improvements on the above - mentioned (street) was performed under the supervision of the City Engineer, and said improvements have been completed and have been inspected and found to have been constructed in accordance with City specifications and in accordance with the provisions of City Ordinance 1331. THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS. I. That the improvements on said portions of the abovementioned (street) be and the same are hereby accepted and the City Engineer be and he is hereby authorized to direct the payment of the City's portion of the cost (and to release escrow money). II. This resolution shall take effect and be in force from and after its passage._:. . PASSED AND APPROVED THIS 13TH DAY OF JANUARY, 1977. Lam It Roy B Mayor ATTEST: t Treva Philips, City Secretary APP VED"Watson, City Engineer AP�VED: red 0. Senter, Jr., City orney CONSOLIDATED FINAL ESTIMATE PARK PLACE ADDITION, LOTS 1-10 Accepted January 13, 1977 UANTITIES L.F. S.Y. S.Y. C.& G Unit & Paving L.F. Alley Removal Sub -Unit Location 6" Base C & G Return & Repair NS 2019-99 17th Place from E.L.L. of Chicago Avenue to South end of CUL-DE-SAC East of Chicago Avenue. 1,626.95 860.57 40.40 120.00 COST ESTIMATE 1,626.95 S.Y. Paving 6" Base @ $ 3.15 $5,124.89 860.57 L.F. Curb & Gutter @ $ 3.10 $2,667.77 40.40 S.Y. Alley Return @ $11.50 $ 464.60 120.00 L.F. C & G Removal & Pavement Repair @ $ 1.50 $ 180.00 CONTRACT COST $8,437.26 COST DISTRIBUTION Unit & Contract Developer Sub -Unit Cost Cost NS 2019-99 $8,437.26 $8,437.26