HomeMy WebLinkAboutResolution - 102375C - Pavements Improvements - Kerr Construction Co - Times Square Addition - 10_23_1975RESOLUTION
RESOLUTION ACCEPTING IMPROVEMENTS ON PORTIONS OF STREETS AND/OR AVE-
NUES AS LISTED BELOW:
WHEREAS, in conformance with the paving requirement provisions of
City Ordinance 1331, the subdivider of TIMES SQUARE ADDITION Lots 218-241 &
Tract E, made arrangements with Kerr Construction Company for the construction
of paving improvements on certain streets dedicated in said subdivision under
the provisions of said Ordinance prior to the recording of the subdivision
plat of TIMES SQUARE ADDITION including the following streets:
Detroit Avenue from its intersection with a line 15.00 feet North of the North
Property Line of 78th Street to its intersection with a line 453.00 feet North
of the North Property Line of 78th Street known and designated as New Subdivi-
sion Sub -Unit Number 22 of Unit Number 2018.
76th Street from its intersection with the East Lip Line of Elgin Avenue to i
intersection with the South End of radius of Cul-de-Sac at 76th Street and
Detroit Avenue known and designated as New Subdivision Sub -Unit Number 23 of
Unit Number 2018.
Elgin Avenue from its intersection with a line 15.00 feet North of the North
Property Line of 78th Street to its intersection with a line 7.00 feet North
of the North Property Line of the alley North of 74th Street known and desig-
nated as New Subdivision Sub -Unit Number 24 of Unit Number 2018.
AND WHEREAS, the construction of the above improvements on the above
mentioned streets was performed under the supervision of the City Engineer, an
said improvements have been completed and have been inspected and found to
have been constructed in accordance with City specifications and in accordance
with the provisions of City Ordinance 1331.
THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS.
I.
That the improvements on said portions of the abovementioned streets
be and the same are hereby accepted and the City Engineer be and he is hereby
authorized to direct the payment of the City's portion of the cost and to rele
escrow money.
II.
This resolution shall take effect and be in force from and after its
passage.
PASSED AND APPROVED THIS 23rd DAY OF OCTOBER, 1975.
AX
Roy fass, Mayor
ATTEST:
r"" F
Treva Philtips, ty Secretary
APPROVED:
Wilfc,rd/ D. Watson, City Engineer
Fred 0. Sent--?' r., City At hey
CONSOLIDATED FINAL ESTIMATE
TIMES SQUARE ADDITION
Lots 218 - 241
Accepted October 23, 1975
UANTITIES
S.Y. S.Y. S.Y. L.F.
Unit & Paving L.F. Alley Valley Alley
Sub -Unit Locations 6" Base C & G Return Gutter Grading
NS 2018-22 Detroit Avenue from 15' N. of 1489.74 849.26 20.20
the NPL of 78th Street to 453'
N. of the NPL of 78th Street
NS 2018-23 76th Street from the ELL of
Elgin Avenue to the South
End of radius of Cul-de-Sac
at 76th Street and Detroit
Avenue.
NS 2018-24 Elgin Avenue from 15' North
of the NPL of 78th Street to
7' North of the NPL of the
alley N. of 74th Street.
TOTAL
COST ESTIMATE
2218.27 1153.36 _.
4399.85 1121.60 20.20 27.27 682.79
8107.86 3124.22 40.40 27.27 682.79
8107.86
S.Y. Paving
6" Base
@
$ 2.85
$
23,107.40
3124.22
L.F. Curb &
Gutter
@
$ 2.95
$
9,216.45
40.40
S.Y. Alley
Return
@
$11.40
$
460.56
27.27
S.Y. Valley
Gutter
@
$11.40
$
310.88
682.79
L.F. Alley
Grading
@
$ 0.50
$
341.40
CONTRACT
COST
$33,436.69
COST DISTRIBUTION
Pre -paid Paving
Unit &
Contract
Property
City's
Cost Schools Cost
to be Released
Sub Unit
Cost
Owner Cost
to Developer
NS 2018-22
$6981.36
$6981.36
NS 2018-23
$9724..48
$9724.48
NS 2018-24
$16,730.85
$9649.18
$1987.16
$5094.51
$28,320.43,
TOTAL
$33,436.69
$26,355.02
$1987.16
$5094.51
$28,320.43