HomeMy WebLinkAboutResolution - 100975H - Pavement Improvements - City Engineer - Burlington Industrial Addition - 10_09_1975RESOLUTION
RESOLUTION ACCEPTING IMPROVEMENTS ON A PORTION OF.A STREET AS LISTED
hLUW:
WHEREAS, in conformance with the paving requirement provisions of Cit
rdinance 1331, the subdivider of BURLINGTON INDUSTRIAL ADDITION NO. 2, made ar
angements for the construction of paving improvements on certain streets dedi-
ated in said subdivision under the provisions of said Ordinance prior to the
ecording of the subdivision plat of BURLINGTON INDUSTRIAL ADDITION NO. 2 in-
luding the following street.
orth 1/2 of East 44th Street from 300.00 feet ,East of the East Property Line
f Globe Avenue to the East Property Line of Lot 6, Block 10, Burlington Indust
ial Addition No. 2 known and designated as New Subdivision Sub -Unit. Number 25
f Unit No. 2018.
AND WHEREAS, the construction of the above improvements on the above-
ntioned street was performed under the supervision of the City Engineer, and
id improvements have been completed and have been inspected and found to have
en constructed in accordance with City specifications and in accordance with
e provisions of City Ordinance 1331.
THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS.
I.
That the improvements on said portions of the abovementioned street b
nd the same are hereby accepted and the City Engineer be and he is hereby autb
rized to direct the payment of the City's portion of the cost (and to release
scrow money).
II.
This resolution shall take.effect and be in force from and after its
sage.
PASSED AND APPROVED THIS 9th . DAY OF OCTOBER, 1975
t�u ass
EST: Roy Bass, Mayor
✓7 0,
'reva Phillips, Cjffy Secretary
kPPRQVED : .,--% L
OWN
it o D. Watson, City Engineer
PPR D:
Fred 0. Senter, Jr.,,ttiy Attorney
CONSOLIDATED FINAL ESTIMATE
Burlington Industrial Addition No. 2, Lots 5 & 6, Blk. 10
Accepted October 9t4 1975
QUANTITIES
L.F.
Unit & L.F. Re-sur-
Sub-Unit Location C&G facing
2018-25 N 1/2 E. 44th St. from 300.00' E. of EPL of
Globe Ave. to EPL of Lot 6, Blk 10, Burling=
ton Industrial Addition No. 2. 200 200
COST DISTRIBUTION
Unit & Contract Property Prepaid Paving
Sub Unit Cost Owner Cost Control No. 209
2018-25 $719.50 $719.50 $1,112.50
COST ESTIMATE
200 L,F. Curb & Gutter
200 L.F. Resurface
CONTRACT.COST $719.50
Statement from
Contractor