Loading...
HomeMy WebLinkAboutResolution - 082875G - Pavement Improvements - Kerr Construction Co - Best Scan Available - 08_28_1975RF.SnT.TTTTnN RESOLUTION ACCEPTING IMPROVEMENTS ON PORTIONS OF STREETS AND/OR AVENUES AS LISTED BELOW: WHEREAS, on conformance with the paving requirement provision of City Ordinance 1331, the subdivider of Rushland Park Addition Lots 1-18, Block 34, Tracts A-K, made arrangements with Kerr Construction Company for the con- struction of paving improvements on certain streets dedicated in said subdivi- sion under the provisions of said Ordinance prior to the recording of the sub- division plat of Rushland Park Addition including the following streets: 6th Street from its intersection with the West Lip Line of Quaker Avenue to i intersection with a line 12.46 feet East of the East Property Line of Raleigh Avenue known and designated as New Subdivision Sub -Unit Number 1 of Unit Num- ber 2018. Raleigh Avenue from its intersection with the South Lip Line of 4th Street to its intersection with a line 692.46 feet West of the West Lip°'L ne Quaker Avenue known and designated as New Subdivision Sub -Unit Number 2 of Unit Number 2018. The South 1/2 of 4th Street from its intersection with the West Lip Line of Quaker Avenue to its intersection with a line 1289.45 feet West of the West Lip Line of Quaker Avenue known and designated as New Subdivision Sub -Unit Number 3 of Unit Number 2018. Drainage Channels on Tract A, K and Block 34, Rushland Park Addition known and designated as New Subdivision sub -Unit Number 4 of Unit Number 2018. AND WHEREAS, the construction of the above improvements on the above mentioned streets was performed under the supervision of the City Engineer, an said improvements have been completed and have been inspected and found to hav been constructed in accordance with City specifications and in accordance with the provisions of City Ordinance 1331. THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS. I. That the improvements on said portions of the abovementioned streets be and the same are hereby accepted and the City Engineer be and he is hereby authorized to direct the payment of the City's portion of the cost (and to re- lease escrow money). w II. This resolution shall take effect and be in force from and after its passage. PASSED AND APPROVED THIS 28th DAY OF AUGUST, 1975. oil Roy Ms, Mayor ATTEST: Treva Phillips, C ty Secretary APPROVED: .j . Watson, City Engineer 0. Senfer, City At II. This resolution shall take effect and be in force from and after its passage. PASSED AND APPROVED THIS 28th DAY OF AUGUST, 1975. oil Roy Ms, Mayor ATTEST: Treva Phillips, C ty Secretary APPROVED: .j . Watson, City Engineer 0. Senfer, City At CONSOLIDATED FINAL ESTIMATE �.,13 CPq !-) - RUSHLAND PARK ADDITION LOTS 1-18, BLOCK 34 and TRACTS A-K Accepted August 28, 1975 UANTITIES L.F. S.Y. C & G S.Y. S.Y. 6" & Alley S.Y. Removel & L.F,Curb L.F. Unit & Paving Paving L.F. Drainage Valley Pavement & Gutter 12„ Sub -Unit Location 9" Base 6" Base C & G Channel Gutter Repair Removal C & G NS2018-1 6th St. from the WLL of Quaker Ave. to 12.46' E of the EPL of Raleigh Ave NS2018-2 Raleigh Ave. from the SLL of 4th St. to 692.461 W. of the WLL of Quaker Ave. NS2018-3 The S. 1/2 of 4th St. 2284.32 from the WLL of Quaker Ave. to 1289.45' W. of the WLL of Quaker Ave. NS2018-4 Drainage Channels on Tract A, Tract K and Block 34, Rushland Park Addition TOTAL COST ESTIMATE'- 2881.50 1409.46 3115.68 1491.34 1008.40 383.40 1405.64 76.99 92.00 21.11 2284.32 5997.18 4292.60 1405.64 98.10 92.00 5997.18 S.Y. Paving 6" Base 2284.32 S.Y. Paving 9" Base 4292.60 L.F. 6" Curb & Gutter 280.92 L.F. 12" Curb & Gutter 1405.64 S.Y. Alley Return & Drainage Channels 98.10 S.Y. Valley Gutter 92.00 L.F. C & G Removal & Pavement Repair 347.29 L.F. Curb & Gutter Removal 347.27 280.91 347.27 280.9 @ $ 4.25 $25,488.01 @ $ 3.45 $ 7,880.90 @ $ 2.90 $12,448.54 @ $ 3.70 $ 1,039.40 @ $ 9.90 $13,915.84 @ $10.85 $ 1,064.38 @ $ 3.00 $ 276.00 @ $ 1.50 $ 520.93 CONTRACT COST $62,634.00 ,s COST DISTRIBUTION Unit & Contract Sub Unit Cost NS2018-1 $17,445.16 NS2018-2 $17,795.57 NS2018-3 $11,326.17 NS2018-4 $16,067.10 Developer Cost $17,445.16 $17,795.57 $11,326.17 $16,067.10 TOTAL $62,634.00 $62,634.00