RESOLUTION
RESOLUTION ACCEPTING DIFR0VEMENTS ON A PORTION OF AN ALIEY AS LISTED
BELOW:
WHEREAS, in conformance with the paving requirement provisions of
City Ordinance 1797, the subdivider of Leftwich Monterey Heights Addition,
made arrangements with West Texas Construction Company, Inc. for the construc-
tion of paving improvements on certain alley dedicated in said subdivision
under the provisions of said Ordinance prior to the recording of the
subdivision plat of Leftwich Monterey Heights Addition including the following
alley:
Alley drainage channel from its intersection with the East Property Line of th
cul-de-sac at 55th Street to its intersection with the West Property Line of
Gary Avenue, known and designated as part of New Subdivision Unit Number 702.
AND WHEREAS, the construction of the above improvements on the above-
mentioned alley was performed under the supervision of the City Engineer, and
said improvements have been completed and have been inspected and found to
have been constructed in accordance with City specifications and in accordance
with the provisions of City Ordinance 1797.
THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS.
I.
That the improvements on said portions of the abovementioned alley be
and the same is hereby accepted and the City Engineer be and he is hereby
authorized to direct the payment of the City's portion of the cost and to
release escrow money.
II.
This resolution shall take effect and be in force from and after its
passage.
PASSED AND APPROVED THIS 11TH DAY OF AUGUST, 1960.
David C. Casey, Ma r
ATTES
,rtv�
La4enia, Lowe, City Secretary
.APPROVED:
/ ohn T. Hickerson, City Engineer
APPROVED:
Fred 0. Sent r,Jr. , 64 Attorney
a CITY OF LUBBOCK
�aCK.'�
TEXAS
August 11, 1960
Honorable Mayor and City Couanission
Lubbock, Texas
Gentlemen;
I have examined the paving improvements constructed by
West Texas Construction Co., Inc., paving contractor, under their
contract with the subdividers of Leftwich Monterey Heights Addition
and find the improvements on the alley drainage channel from the
East line of the cul-de-sac of 55th Street to the WPL of Gary Avenue
as listed on the final estimate sheet to have been completed in
accordance with the plans and specifications and recommend that you
accept the improvements on said alley, authorizing payment to the
contractor the amount shown on the attached consolidated final estimate
sheet as due them by the City of Lubbock.
Yours very truly,
John T. Hickerson
City Engineer
CONSOLIDATED FIN&L ESTIMATE
LEFTWICH MONL'EREY HEIGHTS ADD,
LOTS 165-297
ACCEPTED AUGUST 11, 1960
QUANPITIES
S.Y. L.F.
Unit Location Alley C & G
Paving
Part of
NS 702 Alley Drainage Channel from East Line of 389.72 252.00
cul-de-sac at 55th Street to the WPL of
Gary Ave.
COST ESTIMATE
389.72 S.Y. Alley Paving @ $5.00 $ 1,948.60
252.00 L.F. Curb & Gutter @ . 1.40 352,80
CONTRACT COST $ 2,301.40
COST DISTRIBUTION
Contract Property
Unit Cost Owner Cost
Part of
NS 702 $ 2,301.40 $ 2,301.40