Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Resolution - 072475E - Change Order 9- Page & Wirtz Construction Co - Memorial Civic Center - 07_24_1975
KJ: cab RESOLUTION O BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the MAYOR of the CITY OF LUBBOCK BE and is hereby authorized and directed to execute for and on behalf of the CITY OF LUBBOC] a CHANGE ORDER NO, 5to the General Construction Contract between the CITY OF LUBBOCK and PAGE & WIRTZ CONSTRUCTION COMPANY for the LUBBOCK MEMORIAL CIVIC CENTER, this Change Order providing for the relocation of the Central Processing Unit, attached herewith which shall be spread upon the minutes of the Council and as spread upon the minutes of this Council shall constitute and be a part of this Resolution as if fully copied herein in detail. Passed by the City Council this 24th day of July 1975. 11,&SS ROY IIASS, MAYOR ATTEST: -4� _�& AP P -4-) Treva Phillips, Cit Secretary -Treasurer APPROVED AS TO FORM: Fred O, Senter, Jr.,��ty Attorney CHANGE OWNER ❑ ARCHITECT ❑ ORDF,R CONTRACTOR ❑ FIELD ❑ AIA DOCUMENT C701 OTHER ( PROJECT: LUBBOCK MEMORIAL CENTER CHANGE ORDER NUMBER: 9 (name, address) LUBBOCK, TEXAS , (Third Change Order to PART I) TO (Contractor) PAGE & WI RTZ -j ARCHITECT'S PROJECT NO: PART I CONSTRUCTION CO. CONTRACT FOR: GENERAL CONSTRUCTION P. 0. BOX 10402 PART I - LUBBOCK MEMORIAL CENTER LUBBOCK, TEXAS 79408 LUBBOCK, TEXAS CONTRACT DATE: February 8, 1974 You are directed to make the following changes in this Contract: Re -locate the Control Center Console from Control Room P-105 at the Central Plant to Office E07 in the Lower Level of the Exhibit Hall as described in the Attachment to this Change Order No. 9 titled "ATTACHMENT TO CHANGE ORDER NO. 9 FOR LUB- BOCK MEMORIAL CENTER.- PART I, LUBBOCK, TEXAS and dated July 23, 1975. l The original Contract Sum was . . . . . . . . . . $ 8,994,852 •00 Net change by previous Change Orders . . . . . . . . $ 44,148.83 The Contract Sum prior to this Change Order was . . . . . . . . . . . . $ 9 ,039 ,000.83 The Contract Sum will be (increased) JAW (-4jgW) ygV) by this Change Order. . $ 12,894 .20 The new Contract Sum including this Change Order will be $ 9,051,895.03 The Contract Time will bexi)oxwxmft (deamx* (unchanged) by ( NONE ) Days. The Date of Completion as of the date of this Change Order therefore is March ,3, 1977 PAGE & WIRTZ THE ARCHITECTS GROUP CONSTRUCTION COMPA"JY CITY OF LUBBOCK, TEXAS ARc fir_ 14th Street 99.' 6' ���c 10402 T.T. BOX 2000 Address Address Address LUBBOCK, TEXAS 79401 LUBBOCK, TEXAS 79408 LU ,q AS 79457 BY BY �J, BY �. DATE July 23, 19751 DATE July 23, 1975 DATE 7-a- 'jS" AIA DOCUMENT C701 ' CHANGE ORDER APRIL 1970 EDITION • AIA®' © 1970 THE ONE PAGE ASIERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., NW, WASHINGTON, D.C. 20006 July 23, 1975 ATTACHMENT TO CHANGE ORDER NO. 9 FOR LUBBOCK MEMORIAL CENTER - PART I LUBBOCK, TEXAS Re -location of Control Center Console The following information, re -location and additional functions all refer to the centralized control and data acquisition system as shown on the drawings and as specified in MECHANICAL AND ELECTRICAL SPECI- FICATIONS FOR PART I - LUBBOCK MEMORIAL CENTER FOR THE CITY OF LUB- BOCK, TEXAS, Section 15c HEATING AND AIR CONDITIONING - PART I, 15c.33 AUTOMATION (Alternate No. 1), pages 64 through 72 inclusive and all existing addenda thereto: 1. Re -locate the Control Center Console from Control Room P-105 at the Central Plant to Office E07 in the Lower Level of the Exhibit Hall. 2. The following additional functions shall be provided for moni- toring equipment in the Central Plant: MONITORED EQUIPMENT REMOTE FUNCTIONS PROVIDED Chillers (3) Start -Stop W/COS Alarm Hi -Pressure Alarm Motor Temperature Boilers (2) Hand -Off Auto W/COS Alarm Intercom Hi -Pressure Alarm Low -Pressure Alarm Pumps (5) Start -Stop W/COS Alarm Room P-108 Temperature Indication Hi Temperature Alarm Heating Unit CP-1 Start -Stop W/COS Alarm Boiler Room Fan #CP-2 Start -Stop W/COS Alarm It shall be the responsibility of this contractor to inter- face the monitoring or manipulation operations for these items of equipment with the Control Center Console. This contractor shall be liable for any costs incurred or dama- ges arising from interfacing and interconnecting with the Control Center Console. Page 1 of 2 July 23, 1975 ATTACHMENT TO CHANGE ORDER NO. 9 FOR LUBBOCK MEMORIAL CENTER - PART I LUBBOCK, TEXAS Re -location of Control Center Console (continued) 3. Under this Change Order, all of the requirements of the Specifications, Section 15c, paragraph 15c.33 AUTOMATION (Alternate No. 1), here-inbefore referred to, shall remain in full force and'shall apply to all changes in location of the Control Center Console and all interfacing and in- terconnecting of the additional functions, required for equipment in the Central Plant, with the Control Center Console. 4. All wiring changes under this Change Order shall be the sole responsibility of this contractor PAGE & W I RTZ THE ARCHITECTS GROUP CONSTRUCTION COMPANY C Y OF UBBOCK ~ By DATE 0 9 -7 S DATE 7- 2 3 - 7-5- DATE Page 2 of.2