Loading...
HomeMy WebLinkAboutResolution - 052660K - Pavement Improvements - Lubbock Pavers - East 28Th Street Et Al - 05_26_1960 1p RESOLUTION G� RESOLUTION ACCEPTING I1,PROVEY2NTS ON PORTIONS OF STRZETTS AND FARKING LOTS AS LISTED BF101: WHEREAS, the City of Lubbock entered into contract with Lubbock Paver on December 14, 1959 for the construction of paving improvements on portions of the following streets and parking lots: East 28th Street from its intersection with a line 2.5 feet South of the South Property Line of Fast 28th Street on Walnut Avenue to its intersection with a line 15 feet North of the North Property Line of East 30th Street, known and desiganted as Sub-Unit 1 of New Subdivision Unit Number 811. East 29th Street from its intersection with a line 15 feet East of the East Property Line of Walnut Avenue to its intersection with a line 15 feet South of the South Property Line of East 28th Street, known and designated as Sub-Unit 2 of New Subdivision Unit Number 811. East 30th Street from its intersectioh with a line 15 feet Fast of the East Property Line of Walnut Avenue to its intersection with a line 2.5 feet East of the East Property Line of the alley East of East 28th Street, known and designated as Sub-Unit 3 of New Subdivision Unit Number 811. The parking lot at the Baseball Diamond at J. B. Maxey Park, known and designated as Sub Unit 1 of N.S. Unit 812. The parking lot at the Casting Pool K. N. Clapp Park, known and designated as Sub Unit 2 of N.S. Unit 812. The parking lot at the Baseball Diamond Mae Simmons Park., known and designated as Sub-Unit 3 of N.S. Unit 813f The parking lot at the swimming pool, Mae Simmons Fark, known and designated as Sub-Unit 4 of N.S. Unit 813. AND WHEREAS, the improvements upon the said portions of the above- mentioned streets and parking lots have been inspected and found to have been constructed according to the approved plans and specifications. THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEAS: I. That the improvements on said portions of the abovementioned streets and parking lots be, and the same are hereby accepted and the City FIngineer be and he is hereby authorized to direct the payment as listed on the estimate sheet numbered 3 and final. . II. This resolution shall take effect and be in force after its passage. PASSED AFT APPROVED THIS 26TH DAY M lfay 1960. David Casey, Mayo ATTEST .- 441 ,.-a owe, City 'Secretary AP VED: J T. Hickerson, City Engineer Vaughn 1. Wilson, City Attorney r �1 s p CITY OF LUBBOCK. CK T TEXAS Ray 26, 1960 Honorable Mayor and City Commission Lubbock, Texas Gentlemen: I have examined the paving improvements constructed by Lubbock Pavers, paving contractor, under their contract dated December 14, 1959, designated as G.W.O. 2474 and G.W.O. 10212 and find the improvements on East 28th St., East 29th St., Fast 30th and on parking lots at Mae Simmons, K. N. Clapp and J. B. Maxey �. Parks as listed on the final estimate sheet to have been completed in accordance with the plans and specifications and recommend that you accept the improvements on said streets and parking lots, authorizing payment to the contractor the amount shown on the attached final estimate sheet as due them by the City of Lubbock. ours ver truly, J hn T. Hie erson ity Engineer tr- MONTHLY ESTIMATE CITY OF LUBBOCK Type of Work iaving Construction Project G.W.O. 2474 Location: E•28th St; E.29th St; & E.30th St; in Manhattan Hts. Estimate No 3 & Final Addition, Lots 198-346 Contract $ 38,812e 50 Estimate Period From March 1 19 60 tr, May 26 , 19 60 On First estimate and final estimate use actual work dates For Lubbock Pavers, 3007 Avenue M, Lubbock, Texas Name and Address of Contractor ITEM UNIT OP PROJECT TOTAL WORK DONE CONTRACT AMOUNT MEASURE ESTIMATE QUANTITIES ON CONTRACT PRICE Sub—base1. Pavement, including S.Y. 7,177.20 7,177.20 1.35 9,689.22 preparation caliche base and uadru le asphalt surface treat- ment (VS 811-1 X. - aration caliche base andquad- ruple asphalt surface treatment 1 Pavement, including sub-base _reparation caliche base and quadruple asphalt treat— me nt NS 811- S.Y. 5,702.18 02.18 1.35 7o697.94 2. Conc. curb & gutter NS 811-ly L.F. 30767.12 3,76-7,12 1 2e Conc. Curb & gutter _ NS 811-2 L.F. 22260,77 2,271.00 _1 2.95-- 2. Conc. curb & gutter I _ (NS 811-3) L.F. 3 186.12 3.186.12 1.45 4,619,87 APPROVED: For Res.Enpr's Office Total Amount of Work Done $ 362113.67 Calculations S^ �� verifi.d 6 : Less 10% Retained . . . . . . . . $__- NOne esident Engineer to suPP�1,1 Papm O.�W K. . . . • . . Difference $ Proof Read By: rty Engineer Dare Less Special Deduction . . . . . . . $ Par City E is Office Less Liquidated Damage $ Calculations City Manager Data v.rifi.a sys Less Previous Payments . . . . . . . $ 20,395-.0 SuPP�infl Pa rs O.K. Amount Due this Estimate . . . . . . $ 3.50 718.27 Proof Read City Commission Date By, 026 MONTHLY ESTIMATE CITY OF LUBBOCK Type of Work Paving Project G.W.O. 10212 eo-*" Location: Parking lots at the following parks: Estimate No 3 & Final _Mae Simmons.., K. N. Clapp & J. B. Maxey Contract 20,400 Estimate Period From March 1 19 60 to-May 26 19 60 r On First estimate and final estimate use actual work dates For Lubbock Pavers, 3007 Avenue M, Lubbock, Texas Name and Address of Contractor ITEM UNIT OF PROJECT TOTAL WORK DONE CONTRACT AMOUNT MEASURE ESTIMATE QUANTITIES ON CONTRACT PRICE preparation, caliche base and quadruple asphalt surface treat- 1 s 0 _ preparation,, caliche base and quadruple asphalt surface treat- ment NS 813-2 1. Pavement including sub base S.Y. 1,115.0 1 115.50 1.35 1 5 05.93 separation, caliche base and quadruple asphalt surface treat- went (NS 813-3 1. Pavement including ubb se preparation, caliche base and quadruple asphalt surface treat- ment (IDS 813- Cone,2. curb & 0 0 2Conc. curb & gutter (NS $1 - L.F. 462.70 L62.70 1.45 670,92 2. Conc. curb & gutter NS 813-4 L.F. 675.70 675.70 1.45 979.77 3. Ref, Conc, Valley Gutter (NS 813I $ 0 0 82 APPROVED: For Res.En is Office Total Amount of Work Done $ 15,,2I0.37 Calculations Verified By: c Less 10'/o Retained .F-- None esident Engineer Date Suppertiny . �> Pa .r.o.K. Difference � ^ Broof Read Gty Engineer Date '� Less Special Deduction . . . . . . . $ For City E 's Office Less Liquidated Damage $ calculations V.rifi.d City Manager Date swvl�i� Less Previous Payments . . . . . . . $ 80908.78 Pa rs o. . _ Amount Due this Estimate b 301.,5 9 Proof Read City Commission Date 026 CONTRACTOR'S AFFIDAVIT ON CLOSING JOB STATE OF TEXAS COUNTY OF LUBBCCK Before me, a Notary Public in and for Lubbock County, Texas, on this day personally appeared Bruce Ba2wei1 �G .t_ R_ Be C '. , who being by me duly sworn, upon oath says: w2. Rruc — &cwQ.sz� JR , aelcJ-►�" _Tmncpnn Hbson Gdo represent to. e City of Lubbock and solemnly swear that I executed a Contract with the City of Lubbock, said Contract being dated December 14, 1959, for Waving Improvements under General Work Order 2474 and General Work Order 10212, and that the work and contract has been completed according to the plans and specifications pertaining to the project and that all labor, materials, supplies and other cost including equipment, rental and hire, and all expense items incurred in connection with said project have been paid in full; that all liens and rights to fix liens against any part of said project or the moneys, bonds, or warrants due the Contractor, have been satisfied by payment to the claimant, his authorized agent or attorney, and full release of all recorded liens or claims have been secured by settlement and duly filed of record with the County Clerk of Lubbock County. I further represent and affina that all Federal, State and Municipal laws were substantially complied with by me in doing and carrying out the job and project herein referred to and that I paid applicable scale of wages, and this affidavit is made to secure payment from the City of Lubbock to me of the full and final moneys due me under this contract. Witness my hand thisQ3jday of%f 19 . O l Attest: Subscribed and sworm to before me this the ,,2--f day of 19 �' • Nota Public in and for Lubbock County, Texas