HomeMy WebLinkAboutResolution - 051260D - Paving Improvements - Kerr Paving Co. - GWO 2468 - 05_12_1960 . - mow '
BESOLUTICU
RESOLUTION ACCEPTIhTG IlTR0Vr3M,1S Cd4 PORTIONS OF ALLEYS, AS LISTED
BELO,I 9.D ORDERU:G THE ISSUANCE OF CERTIFICATES IN EVIDM,,'ZE OF ASSES61�0;;TS
LEVIED.
11HEREAS, the City of Lubbock heretofore passed various street
improvement ordinances and resolutions and entered into contract with
Kerr Paving Company (G.W.0. 2468) for the making and construction of alley
improvements on portions of numerous alleys, in said City including among
others the following:
East-West alley between 33rd Street and 34th Street from its intersection with
the West Property Line of Gary Avenue to its intersection with the East
Property Line of Hartford Avenue, known and designated as Sub-Unit number 8
of Unit Number A-324.
East-West alley between 33rd Street and 34th Street from its intersection with
the west Property Line of Oxford Avenue to its intersection with the East
Property Line of Peoria Avenue, known and designated as Sub-Unit Number 1 of
Unit r•'umber A-325.
Part of East-West alley between 34th Street and 35th Street from its.,_
intersection with a line 650 feet East of the East Property Line of Avenue Ird"
to its intersection with the East Lip Line of Avenue "W", known and designated
as Sub-Unit Number 3 of Unit Number A-325.
East-West alley between 34th Street and 35th Street from its intersection with
the West Lip Line of Avenue "W" to its intersection with the East Lip Line
of Avenue "X", known and designated as'Sub-Unit Number 4 of Unit Number A-325.
East-West alley between 34th Street and 35th Street from its intersection with
the West Lip Line of College Avenue to its intersection with the East Property
Line of Akron Avenue, known and designated as Sub-Unit Number 6 of Unit
Number A-325.
East=rdest alley between 34th Street and 35th Street from its intersection with*
a line 292.5 feet East of the East Property Line of Indiana Avenue to its
intersection_ with the East Property Line of Indiana Avenue, known and designatet
as Sub-Unit Number 10 of Unit Number A-325.
PIM WHEREAS,, the improvements upon the said portions of the above-
mentioned alleys, have been inspected and found to have been constructed in
accordance with terms of said contract (G.W.C. 2468).
THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS:
I.
That the improvements on said portions of the abovementioned alleys
be and the same are hereby accepted, and the City Engineer be and he is hereby
authorized to direct payment of the City's portion of the cost.
II.
That the Mayor and City Secretary be, and they are hereby instructed
to execute and deliver certificates in evidence of the assessments levied
against the parcels.of property abutting upon the said portions of the alleys,
listed above and against the owners of such property in accordance with law
and in the manner provided in said contract, and"the proceedings with
reference to said improvements and assessments where such assessments were
levied.
III.
This resolution sha. l take effect and be in force from and after
its passage.
PASSED AFD APPROVED THIS 12TH DAY OF MAY, 1960.
/12-
David C. Casey
ATT
PT
La nia Lowe, City Secretary
APPROVED:
/07,/L <.
hn T. Hickerson, City Engine
AP VED:
Vaughn 1L. Wilson, City Attorney
CITY O`F LUBBOCK
CK'��
TEXAS
May 12, 1960
Honorable Mayor and City Commission
Lubbock, Texas
Gentlemen:
I have examined the paving improvements constructed by Kerr
Paving Company, paving contractor, under his contract dated November
13, 1959, designated as G.W.O. 2468 and find the improvements on
E-W alleys between 33rd and 34th Streets from Gary to Hartford,
Oxford to Peoria and E-W Alleys between 34th and 35th Streets from
Ave. W to 650' E. of Ave. W, Ave. W to Ave. %, College Ave. to Akron
Ave. and Indiana Ave. to 292.5' E. of Indiana Ave. as listed on
the final estimate and assessment sheet to have been completed
in accordance with the plans and specifications and recommend that
you accept the improvements on said alleys, authorizing payment to the
contractor the amount shown on the attached consolidated final estimate
sheet as due him by the City of Lubbock and ,issue assignable certificates
against property owners for the respective amounts shown on the attached
final assessment sheets as being due against them and their respective
properties.
Yours very truly,
C-- John T. Hickerson
City Engineer
GWO 2468
FINAL PAVING ASSESSMENT E-W Alley North of 34th St. Sheet No. 1 of 1
CITY OF LUBBOCK Unit No. A-324-8
Width 10-20 Feet From Hartford Ave. to Gary Ave.
Owner Lots Block Addition No.Ft. Rate Cost Total Cost
Claude S. Denham 2 & 3 3 Westminster Heights `( 110 1.4993 82.46 164.92
Chan Rix Victory 10 & 11 3 Westminster Heights 110 1.4993 164.92 164.92
John Zournas 12 & 13 3 Westminster Heights 110 2,6301 289,31 289.31
John Zournas 14 & 15 3 Westminster Heights 110 2,6301 289.31 289.31
J. W:,Ray and Harold Chapman 16 & 17 3 Westminster Heights 110 2.6301 289,31 289,31
H. S. Hicks & John 'R. Ragland 18 3 Westminster Heights 55 2.6301 144.66 144.66
' Paul C. Graham & R. T. Samford 19 3 Westminster Heights 55 2.6301 144,66 144,66
o W. L. -McAfee & Lois Alexander W. 27.5' of Lot 20 3 Westminster Heights 27.5 2.6301 72.33 72.33
J. H. Stiles A of Lot 21 & E. 1/2 of Lot 20 3 Westminster Heights 55 2.6301 144.66 144.66
Chester Putteet & David K. Putteet Ek.. of Lot 21 3 Westminster Heights 27.5 2.6301 72.33 72.33
Lubbock Bible Church, Inc. 22 3 Westminster Heights 55 2.6301 144.66 144.66
TOTAL PROPERTY OWNER COST $ 1921.07
CITY'S SHARE 1594.54
TOTAL ESTIMATED SUB-UNIT COST $ 3515.61
Accepted 5-12-60
' GW0 2468
FINAL PAVING ASSESSMENT E-W Alley S. of 34th St.
CITY.OF LUBBOCK Sheet No. 1 of 1
Width 10'-15' Feet From Ave. "%" to Ave. IV" Unit No. A-325-4
Assessed $2.6301/L.F.
Owner Lots Block Addition No. Ft. Cost
Charles F. Booher West 20 feet of Lot 1 1 34th St. Annex 20 $ 52.60
A. R. Osborn East 1/2 of Lot 1 1 34th St. Annex 26.5 69.70
A. R. Osborn East 6.5 feet of West '� of 1 34th St. Annex 6.5 17.10
Lot 1
Graham Holmes 2 1 34th St. Annex 53 139.39
Vivian Foster (husband
Tom J. Foster). 3 1 34th St. Annex 58.25 153.20
Vivian Foster (husband
Tom J. Foster) 4 1 34th St. Annex 58.25 153.20
Mrs. Em<sa Young 5-6-7 1 34th St. Annex 174.75 459.61
` Pearl Sampson(Poulson) East 50.25 feet of Lot 1 1 34th Street 50.25 132.16
Pearl Sampson(Poulson) 2 & West 10 feet of Lot 1 1 34th Street 60 157.81
Wallace C. Bohannon 3 & East 10' of Lot 4 1 34th Street 60 157.81
World Wide Missionary West 40 feet of Lot 4 lees 1 34th Street 40 105.20
Crusader, Inc. 12" x 13%' out of SW corner
A. R. Osburn Beginning at the SW Corner of 1 34th Street 1.0 2.63
Lot 4; Thence North 13t feet;
Thence East 12 inches; Thence
South 13k feet; Thence West
12 inches to beginning
TOTAL PROPERTY OWNER COST 1600.41
CITY'S SHAKE 1822.43
• TOTAL SUB-UNIT COST $ 3422.84
Accepted 5-12-60
GWO 2468
FINAL PAVING ASSESSMENT E-W Alley S. of 34th St. Sheet No. 1 of 1
CITY OF LUBBOCK
Width 10'-150 Feet From College Ave. to Akron Ave. Unit No. A-325-6
Assessed $2.6301/L.F.
Owner Lots Block Addition No.Ft. Cost
Phillips Petroleum Co. Lot 1 and East 20 feet of Lot 2 1 Nora Kinser 80 $ 210.41
M. C. Kinser West 40 feet of Lot 2 & all of
Lot 3 1 Nora Kinser 100 263.05
W. C. Myers 4 1 Nora Kinser 60 157.81
Garlann Fletcher 5 & East 20 feet of Lot 6 1 Nora Kinser 80 210.41
H. H. Danforth West 40 feet of Lot 6 1 Nora Kinser 40 105.20
James Kopt, Trustee 7 & 8 1 Nora Kinser 120 315.61
Gulf Oil Corporation 9 & 10 1 Nora Kinser 125 328.76
TOTAL PROPERTY CWNER COST $ 1591.21
CITY'S SH&RE 1937.19
TOTAL SUBUNIT COST $ 3528.40
� f,
GOD 2468
Accepted 5-12-60
FINAL PAVING ASSESSMENT E-W Alley North of 34th Street Sheet No. 1 of 1
CITY OF LUBBOCK
Width 10-15' Feet From Peoria Ave. to Oxford Ave. Unit No. A-325-1
Owner Lots Block Addition No. Ft. Assessed $2.6301/L.F. Total Cost
Allen Benton West 125 feet of Lot 10 4 Park Terrace 125 $ 328.76
Expressway Realty Co. East 15 feet of 10 & West 135.5
feet of 11 4 Park Terrace 150.5 395,83
Expressway Realty Co. West 1/2 foot of East 29�
feet of Lot 11 4 Park Terrace 0.5 1.32
Edgar L. Judy, et ux East 29 feet of Lot 11 and
West 90.5 feet of Lot 12 4 Park Terrace 119.5 314.30
Menard Field,et ux East 119.5 feet of Lot 12 and
West 1/2 foot of 13 4 Park Terrace 120 315.61
McClain Oil Co. East 89.5 feet of Lot 13 4 Park Terrace 89.5 235.39
TOTAL PROPERTY OWNER COST 1591.21
CITY'S SNARE 1817.67
TOTAL SUBUNIT COST $ 3408.88
Acceptance Date 5-12-60
GWO 2468
FINAL PAVING ASSESSMENT Part of E-W Alley South of 34th Street Sheet No. 1 of 1
CITY OF LUBBOCK
Width 10' in 15' ROW From Ave. W to the EPL of Nislar Key Addition Sub-Unit No. 3 of
Unit No. A-325
$2.6301 rate/L.F.
Owner Lots Addition No.Ft. Cost Total Cost
Mrs. Naanie M. Roberts 1 Joplin 62.5 164.38 $ 164.38
(Mrs. J. D. Roberts)
Genevieve F. Roberts Joplin 2 Joplin 62.5 164.38 164.38
TOTAL PROPERTY OWNER COST $328.76
CITY'S SNARE 383.75
UNIT COST ON THIS ACCEPTANCE $712.51
a Acceptance Date 5-12-60
G.W.O. 2468
FINAL PAVING•ASSESSMENT E-W Alley South of 34th Street Sheet No, l of 1
CITY OF LUBBOCK Sub-Unit No. 10 of
Width 10' in 15' ROW From 300' West of Hartford to Indiana Ave. Unit No. A-325
Paving Total
Owner Lots Addition No. Ft. (Different Rate) Cost Cost
R. C. Hewett 1 Hewett Subd. 60 2.6301 157.81 $ 157.81
R. C. Hewett 2 Hewett Subd. 60 2.6301 157.81 157.81
Alton Edler 3 Hewett Subd. 60 2.6301 157.81 157.81
Phillips Petroleum Co. 4 & 5 Hewett Subd. 112.5 2.6301 295.89 295.89
City of Lubbock 6, 7 & 8 Hewett Subd. 172.5 1.4993 258.63 258.63
Marvin G. McLarty 9 & 10 Hewett Subd. 120 2.6301 315.61 315.61
TOTAL PROPERTY OWNER COST $ 1343.56
CITY'S SHARE 304.99
TOTAL SUB-UNIT COST $ 1648.55
. . Q
CONSOLIDATED FINAL ESTIMATE
GWO 2468
Accepted May 12, 1960
QUANTITIES
S.F.
Unit & Alley L.F.
Sub-Unit Location Paving C & G
A-324-8 E-W alley N. of 34th St. and from Gary Ave. 6291.00
to Hartford Ave.
A-325-1 E-W alley N. of 34th St. and from Oxford 6100.00
Ave. to Peoria Ave.
A-325-3 Part of E-W alley S. of 34th St, and from 1275.00
6501 E. of EPL of Ave. W to Ave. W
A-325-4 E-W alley S. of 34th and from Ave. W to Ave. % 6125.00
A-325-6 E-W alley S. of 34th St. from College Ave. to 6195.00 39.81
Akron Ave.
A-325-10 E-W alley S. of 34th St. from 292.5 feet 2950,00
E. of Indiana Ave. to Indiana Ave.
I
TOTAL 28,936.00 39.81
i
COST ESTIMATE
28,936.00 S.F. Alley Paving @ 0.53222 $ 15,400.32
39.81 L.F. Curb & Gutter @ 1.59 63.29
CONTRACT COST $ 15,463.61
COST DISTRIBUTION
Unit & Contract Property City to
Sub-unit Cost Owner Contractor
Cost NOW
A-324-8 3348.20 1921,07 1427,13
A-325-1 3246,55 1591,21 1655,34
A-325-3 678*58 328.76 349,82
A-325-4 3259,85 1600,41 1659,44
A-325-6 3360,28 1591.21 1769.17
A-325-10 1570,05 1343.56 226.49
TOTAL 15,463.61 8,376.22 7,087.39
�1