RESOLUTION
O/227G a
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the MAYOR of the CITY OF LUBBOCK, BE and is hereby
authorized and directed to execute for and on behalf of the CITY OF
LUBBOCK, CHANGE ORDER #5 to the AGREEMENT between the CITY
OF LUBBOCK and PAGE & WIRTZ CONSTRUCTION COMPANY, covering
the new AIR TERMINAL BUILDING to provide for the low-ering of the
concrete approach for inflight food service trucks, attached herewith,
which shall be spread upon the Minutes of the COUNCIL and as spread
upon the Minutes of the COUNCIL shall constitute and be a part of this
Resolution as if fully copied herein in detail.
Passed by the City Council this: 22nd day of January , 1976.
J/� ;LC
ROY B SS, MAYOR
ATTEST:
a
Treva Phillips, City cretary-Treasurer
APPROVED AS TO FORM:
L
Fred O. Senter, Jr., Cit �Aftorney
_t_• ,�` ••
•,�,,'+
c,� ,; OWNER
_. CAANGE '
.
ARCHITECT ❑
'
ORDER .,�� CONTRACTOR ❑
FIELD ❑
OTHER
PROJECT: Lubbock Regional Airport Terminal Building
(name, address) Lubbock, Texas
TO (Contractor)
[—Page & Wirtz Const. Co. ARCHITECT'S PROJECT NO: 3-70-I
P.O. Box 10402 CONTRACT FOR:
$ 5,804,174.00
Lubbock, Texas 79408
L _j CONTRACT DATE: September 13, 1973
You are directed to make the following changes in this Contract:
1. Lower concrete approach at Kitchen Service Dock to
provide maximum clearance and maintain drainage.
$ 2,891.00
2. Apply two (2) coats of approved sealer over all
brick paver floor areas..
5,456.00
TOTAL
$ 8,347.00
The original Contract Sum was . . . $
5,824,978.00
Net change by previous Change Orders ... ...-) $
17,487.00
The Contract Sum prior to this Change Order was . . . . ... . . . . . . . $
5, 807, 491.00
The Contract Sum will be (increased) ) faxcbmg$d) by this Change Order. . $
8,347.00
The new Contract Sum including this Change Order will be . . . . . . . $
5,815,838.00
The Contract Time will be (bwcommd) (drcceaxW) (unchanged) by
( —0— ) Days.
The Date of Completion as of the date of this Change Order therefore is unchanged
Whitaker & Hall A/E Page,& Wirtz Const. Co. The City of Lubbock
ARgt TP50th St. c9NTACT$8x 10402 Qttgbock, Texas
At�bock, Texas 79412 �`` uTexas 79408 Address
s BY
"V a 0, 1975 %mot
I �/ � /� S
J AN 2 2 1976
DATE DATE +� DATE
['V E OkJSSUANCE CHANGE ORDER NUMBER Five (5 )
December 30, 1975
ONE PAGE