RESOLUTION
aeg'26 !'
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the MAYOR of the CITY OF LUBBOCK, BE and is hereby
authorized and directed to execute for and on behalf of the CITY OF
LUBBOCK a Change Order No. 2 to the CONTRACT between the CITY
OF LUBBOCK and PAGE AND WIRTZ CONSTRUCTION COMPANY to
provide for the roof of the canopy area of the Air Terminal Building
attached herewith which shall be spread upon the Minutes of the COUNCIL
and as spread upon the Minutes of this Council shall constitute and be
a part of this Resolution as if fully copied herein in detail.
Passed _by the City Council this 12thday of June 1975.
R S, MAYOR
ATTEST: `
Treva Phillips, Cit ecretary-Treasurer
APPROVED AS TO FORM:
red O. Senter, Jr. , CIty Kttorney
CHANGE
A OWNER
p
�^ ORDER
J /
DTRACTOR
FIELD
OTHER
O
PROJECT: Lubbock Regional Airport Terminal Building !-J'
(name, address) Lubbock, Texas
TO (Contractor)
Page & Wirtz Con str Co. ARCHITECT'S PROJECT NO: 3-70-1
P.O. Box 10402 CONTRACT FOR: $ 5,798,219.00
Lubbock, Texas. 79408
CONTRACT DATA: September 13, 1973
You are directed to make the followring changes in this Contracts
At canopy roof (RE: Sections 14-0-2 and 7-D-2 Sim.) where contract
documents specify Tnemecrete over gypsum deck fill, omit the•
Tnemecrete and substitute the following:
Two plies of..fiberglas felt, mopped down,,topped with gravel.
Provide metal edge at apronside of roof, and applied reglets.with
sufficient cant and flashing to, insure waterproof installation.
The original Contract sum was $ 5,824,978.00
Net change by Previous Change Ordgrs . $ 26,759.00
The Contract Sum prior to this Change Order was . . . . .. . $ 5,798,219.00
The Contract Sum will be (increasgd) by this Change Order'. . S 4,198.00
The - new Contract Sum including this Change Order will be . . - . . $ 5,802,417.00
The Contract -Time will be Jj=mxjd) (dsed) (unchanged) by ( 0 ) Days.
The Date of Completion as of the date of this Change Order therefore is Unchanged ,
Whitaker & Hall Architects_ Page & Wirtz Const. Co. The City of,Lubbock
JS FF 50th Street c(P!V %x 10402
Address Address Address ,��,' %` 1 "'���
Lubbock. T -xa 9412 Lubbock. -Texas �r79408 ,
OF
i
4211
CHANGE ORDER,NVNI